Flood drainage station with automatic slag salvaging function
By introducing salvage components and intercepting components with automatic slag salvage function into the drainage station, the blockage problem caused by debris accumulation at the front end of the gate is solved, ensuring the water discharge efficiency and smooth channels of the drainage station.
Patent Information
- Application Number
- CN202420398722.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-01
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2034-03-01
AI Technical Summary
The front end of the gate of the existing drainage station is prone to accumulation of debris or river slag, causing the gate to be blocked and affecting the efficiency of flood discharge.
A drainage station with automatic slag fishing function was designed, using salvage components and intercepting components. The debris is collected and intercepted through the motor-driven coil rollers and cables to ensure that the gate is not blocked by debris when opened and ensures leakage. Water efficiency.
Effectively prevent gate blockage, ensure water discharge efficiency, and avoid the problems of water surface elevation and channel blockage at critical moments.
Smart Images

Figure CN222024995U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field related to waterlogging drainage stations, in particular to a waterlogging drainage station with an automatic slag scooping function. Background Art
[0002] The drainage station can fully dredge and clear the accumulated water in low-lying areas to keep the roads unobstructed. In terms of management, it carries out regular maintenance according to the instructions for use of the equipment and makes monthly, quarterly and annual equipment inspection and maintenance plans. The components of the drainage station include pump house, outlet culvert, inlet pool, Qixinggou inlet gate, inlet gate inside the dike, inverted siphon, substation and so on.
[0003] The front end of the gate of the existing drainage station is prone to accumulation of debris or river residue, causing large pieces of debris to accumulate at the gate the moment the gate is opened, which can easily block the gate and greatly reduce the flow of the gate. In the long run, it will cause blockage of the channel and even raise the water level, making it difficult to achieve effective flood discharge at critical moments. Utility Model Content
[0004] In order to solve the defects in the prior art, the utility model provides a drainage station with an automatic slag scooping function.
[0005] In order to solve the above technical problems, the utility model provides the following technical solutions:
[0006] The utility model discloses a drainage station with an automatic slag scooping function, comprising a drainage gate and a gate slidably installed in the drainage gate, a top plate fixedly installed on the top of the drainage gate, a lifting screw rod rotatably installed on the top plate, a first motor fixedly installed on the top plate and the output end of the first motor is fixedly connected to the top end of the lifting screw rod, a sleeve is threadedly installed on the outer surface of the bottom end of the lifting screw rod, and the sleeve is fixedly connected to the gate, a slag scooping assembly is arranged in the drainage gate, and an interception assembly is arranged on the drainage gate.
[0007] As a preferred technical solution of the utility model, telescopic rods are fixedly installed on the top plates on both sides of the lifting screw rod, and the bottom ends of the two telescopic rods are fixedly connected to the gate.
[0008] As a preferred technical solution of the utility model, the slag scooping assembly includes a roller shaft rotatably mounted on the top plate, and one end of the roller shaft is fixedly connected to the output end of a second motor fixedly mounted on the top plate, a mounting frame is slidably mounted in the drainage gate, a winding roller is fixedly mounted on the roller shaft, and a cable is wound around the winding roller, one end of the cable is fixedly connected to the winding roller, and the other end is fixedly connected to the mounting frame, a salvage frame is detachably mounted on the mounting frame, and a channel for the cable to pass through is opened on the top plate.
[0009] As a preferred technical solution of the utility model, guide grooves are provided on both sides of the inner wall of the drainage gate, and guide blocks used in conjunction with the guide grooves are fixedly installed on both sides of the mounting frame, and the guide blocks fit and slide in the guide grooves on the same side.
[0010] As a preferred technical solution of the utility model, the interception assembly includes two electric push rods fixedly installed on the inner walls on both sides of the drainage gate, and interception plates are rotatably installed on both sides of the inner wall of the drainage gate. A slide groove is opened on the interception plate and a slider is interactively installed in the slide groove. A connecting rod is fixedly installed on the output end of the electric push rod, and the end of the connecting rod away from the electric push rod on the same side is hinged to the slider on the same side.
[0011] As a preferred technical solution of the utility model, the two intercepting plates are symmetrically arranged, and a plurality of water filtering ports are provided on the two intercepting plates.
[0012] As a preferred technical solution of the utility model, a guide rod is fixedly installed in the slide groove, and the sliding block slides on the outer surface of the guide rod on the same side.
[0013] The beneficial effects of the utility model are:
[0014] 1. This drainage station with automatic slag scooping function is equipped with a salvage component. The second motor drives the roller shaft and the winding roller to rotate. The winding roller rotates to reel in the cable and drives the mounting frame to move upward under the cooperation of the guide block and the guide groove. The movement of the mounting frame drives the salvage frame to follow the movement, and the debris accumulated at the front end of the gate is collected and processed. It can effectively prevent the drainage gate from being blocked due to the accumulation of debris at the front end when the gate is opened to discharge flood water, thereby ensuring its drainage efficiency.
[0015] 2. This type of drainage station with automatic slag scooping function is equipped with an interception component. When the cable lifting mounting frame and the salvage frame are used to clean up the debris or river slag in front of the gate, the electric push rod is started, and the slider is driven to move in the slide groove through the extension and contraction of the electric push rod, thereby driving the interception plate to rotate, so that the interception plates on both sides are in contact and closed, thereby intercepting the debris in the drainage gate. This can prevent the debris or river slag in the river channel from accumulating to the front end of the gate during the process of removing the salvage frame from the drainage gate to scoop up the debris, thereby preventing the drainage gate from being blocked due to the accumulation of debris or river slag in the river channel, thereby further ensuring its water discharge efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0017] Figure 1 This is a schematic diagram of the overall structure of a drainage station with automatic slag removal function according to the utility model;
[0018] Figure 2 This is a schematic diagram of the salvage frame structure of a drainage station with an automatic slag salvaging function according to the utility model;
[0019] Figure 3 This is a schematic diagram of the electric push rod structure of a drainage station with automatic slag scooping function according to the utility model;
[0020] Figure 4 The utility model is a schematic diagram of the guide block structure of a drainage station with an automatic slag scooping function.
[0021] In the figure: 1. drainage gate; 2. gate; 3. top plate; 4. lifting screw; 5. first motor; 6. sleeve; 7. telescopic rod; 8. roller shaft; 9. second motor; 10. mounting frame; 11. winding roller; 12. cable; 13. salvage frame; 14. guide groove; 15. guide block; 16. electric push rod; 17. intercepting plate; 18. slide groove; 19. slider; 20. connecting rod; 21. guide rod. DETAILED DESCRIPTION
[0022] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.
[0023] Example: Figure 1 , Figure 2 , Figure 3 and Figure 4 As shown, the utility model is a drainage station with an automatic slag scooping function, comprising a drainage gate 1 and a gate 2 slidably installed in the drainage gate 1, a top plate 3 is fixedly installed on the top of the drainage gate 1, a lifting screw rod 4 is rotatably installed on the top plate 3, a first motor 5 is fixedly installed on the top plate 3 and the output end of the first motor 5 is fixedly connected to the top of the lifting screw rod 4, a sleeve 6 is threadedly installed on the outer surface of the bottom end of the lifting screw rod 4, and the sleeve 6 is fixedly connected to the gate 2, a slag scooping assembly is arranged in the drainage gate 1, and an intercepting assembly is arranged on the drainage gate 1, the first motor 5 drives the lifting screw rod 4 to rotate, and the rotation of the lifting screw rod 4 can drive the sleeve 6 and the gate 2 to move upward, so that the gate 2 can be opened for flood discharge operation, the operation is simple, and the use is convenient.
[0024] Among them, telescopic rods 7 are fixedly installed on the top plates 3 on both sides of the lifting screw rod 4, and the bottom ends of the two telescopic rods 7 are fixedly connected to the gate 2. By setting the telescopic rods 7, the movement of the gate plate can be guided and limited to ensure the stability of the gate plate during the up and down movement.
[0025] Among them, the slag scooping assembly includes a roller shaft 8 rotatably mounted on the top plate 3, and one end of the roller shaft 8 is fixedly connected to the output end of the second motor 9 fixedly mounted on the top plate 3, a mounting frame 10 is slidably mounted in the drainage gate 1, a winding roller 11 is fixedly mounted on the roller shaft 8, and a cable 12 is wound around the winding roller 11, one end of the cable 12 is fixedly connected to the winding roller 11, and the other end is fixedly connected to the mounting frame 10, a salvage frame 13 is detachably mounted on the mounting frame 10, and a channel for the cable 12 to pass through is opened on the top plate 3, the second motor 9 drives the roller shaft 8 and the winding roller 11 to rotate, the winding roller 11 rotates to reel in the cable 12 and drives the mounting frame 10 to move upward, the movement of the mounting frame 10 drives the salvage frame 13 to follow the movement, and the debris accumulated at the front end of the gate 2 is collected and processed, which can effectively prevent the drainage gate 1 from being blocked by the accumulation of debris at the front end when the gate 2 is opened to discharge flood water, thereby ensuring its water discharge efficiency.
[0026] Among them, guide grooves 14 are opened on both sides of the inner wall of the drainage gate 1, and guide blocks 15 used in conjunction with the guide grooves 14 are fixedly installed on both sides of the mounting frame 10. The guide blocks 15 slide in the guide grooves 14 on the same side. The coordinated use of the guide blocks 15 and the guide grooves 14 can ensure the stability of the mounting frame 10 and the salvage frame 13 during movement.
[0027] The interception assembly includes two electric push rods 16 respectively fixedly mounted on the inner walls of both sides of the drainage gate 1, and interception plates 17 are rotatably mounted on both sides of the inner wall of the drainage gate 1. A slide groove 18 is provided on the interception plate 17, and a slider 19 is interactively installed in the slide groove 18. A connecting rod 20 is fixedly mounted on the output end of the electric push rod 16, and one end of the connecting rod 20 away from the electric push rod 16 on the same side is hinged to the slider 19 on the same side. The two interception plates 17 are symmetrically arranged, and a plurality of water filtering ports are provided on the two interception plates 17. When the cable 12 is lifted, When the mounting frame 10 and the salvage frame 13 are cleaning the debris or river residue in front of the gate 2, the electric push rod 16 is started, and the slider 19 is driven to move in the slide groove 18 through the extension and retraction of the electric push rod 16, thereby driving the interception plate 17 to rotate, so that the interception plates 17 on both sides are in contact and closed, and the debris in the drainage gate 1 is intercepted, thereby preventing the debris or river residue in the river channel from accumulating at the front end of the gate 2 during the process of removing the salvage frame 13 from the drainage gate 1, thereby preventing the drainage gate 1 from being blocked due to the accumulation of debris or river residue in the river channel, thereby further ensuring its water discharge efficiency.
[0028] Among them, a guide rod 21 is fixedly installed in the slide groove 18, and the slider 19 slides on the outer surface of the guide rod 21 on the same side. The guide rod 21 can guide and support the movement of the slider 19 in the slide groove 18, thereby improving the stability of the slider 19 when moving in the slide groove 18.
[0029] During operation, when it is necessary to clean the debris or river residue at the front end of the gate 2, the electric push rods 16 on both sides are started in turn, and the sliding block 19 is driven to move in the sliding groove 18 through the extension and contraction of the electric push rods 16, thereby driving the interception plate 17 to rotate, so that the interception plates 17 on both sides are in contact and closed, and the debris in the river channel is intercepted, so as to avoid the debris or river residue in the river channel from accumulating to the front end of the gate 2 during the process of taking out the salvage frame 13 from the drainage gate 1, thereby causing the drainage gate 1 to be blocked, and then the second motor 9 is started, and the second motor 9 drives the roller shaft 8 and the winding roller 11 to rotate, and the winding roller 11 rotates to reel the cable 12 and drives the mounting frame 10 to move upward under the cooperation of the guide block 15 and the guide groove 14, and the mounting frame 10 moves It drives the salvage frame 13 to follow the movement, collects and processes the debris accumulated at the front end of the gate 2, and can effectively prevent the drainage gate 1 from being blocked by the debris accumulated at the front end when the gate 2 is opened to discharge flood water, thereby ensuring its discharge efficiency. When the gate 2 needs to be opened for discharge water, the electric push rods 16 on both sides are started, and the extension of the electric push rods 16 is used to drive the slider 19 to move to rotate the pulley intercepting plate 17, so that the intercepting plate 17 is disengaged and opened, and then the second motor 9 is started to move the mounting frame 10 and the salvage frame 13 out of the river channel, and then the first motor 5 is started, and the first motor 5 drives the lifting screw rod 4 to rotate, and the rotation of the lifting screw rod 4 can drive the sleeve 6 and the gate 2 to move upward, so that the gate 2 can be opened for flood discharge operation, which is simple to operate and easy to use.
[0030] Finally, it should be noted that the above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. A flood drainage station with an automatic slag removal function, comprising a flood drainage gate (1) and a gate (2) slidably mounted inside the flood drainage gate (1). It is characterized in that A top plate (3) is fixedly mounted on the top of the drainage gate (1), a lifting screw (4) is rotatably mounted on the top plate (3), a first motor (5) is fixedly mounted on the top plate (3), and the output end of the first motor (5) is fixedly connected to the top of the lifting screw (4), a sleeve (6) is threadedly mounted on the outer surface of the bottom end of the lifting screw (4), and the sleeve (6) is fixedly connected to the gate (2), a slag scooping assembly is arranged in the drainage gate (1), and an interception assembly is arranged on the drainage gate (1).
2. A drainage station with automatic slag removal function according to claim 1, It is characterized in that Telescopic rods (7) are fixedly mounted on the top plates (3) on both sides of the lifting screw rod (4), and the bottom ends of the two telescopic rods (7) are fixedly connected to the gate (2).
3. A drainage station with automatic slag removal function according to claim 1, It is characterized in that The slag scooping assembly comprises a roller shaft (8) rotatably mounted on the top plate (3), and one end of the roller shaft (8) is fixedly connected to the output end of a second motor (9) fixedly mounted on the top plate (3); a mounting frame (10) is slidably mounted in the drainage gate (1); a winding roller (11) is fixedly mounted on the roller shaft (8), and a cable (12) is wound around the winding roller (11); one end of the cable (12) is fixedly connected to the winding roller (11), and the other end is fixedly connected to the mounting frame (10); a salvaging frame (13) is detachably mounted on the mounting frame (10), and a channel for the cable (12) to pass through is opened on the top plate (3).
4. A drainage station with automatic slag removal function according to claim 3, It is characterized in that Guide grooves (14) are provided on both sides of the inner wall of the drainage gate (1), and guide blocks (15) used in conjunction with the guide grooves (14) are fixedly installed on both sides of the mounting frame (10), and the guide blocks (15) are fitted and slidable in the guide grooves (14) on the same side.
5. A drainage station with automatic slag removal function according to claim 1, It is characterized in that The interception assembly comprises two electric push rods (16) respectively fixedly mounted on the inner walls on both sides of the drainage gate (1); interception plates (17) are rotatably mounted on both sides of the inner wall of the drainage gate (1); a slide groove (18) is provided on the interception plate (17) and a slider (19) is interactively mounted in the slide groove (18); a connecting rod (20) is fixedly mounted on the output end of the electric push rod (16); and one end of the connecting rod (20) away from the electric push rod (16) on the same side is hinged to the slider (19) on the same side.
6. A drainage station with automatic slag removal function according to claim 5, It is characterized in that The two intercepting plates (17) are symmetrically arranged, and a plurality of water filtering ports are provided on the two intercepting plates (17).
7. A drainage station with automatic slag removal function according to claim 5, It is characterized in that A guide rod (21) is fixedly installed in the slide groove (18), and the sliding block (19) slides on the outer surface of the guide rod (21) on the same side.
