Quickly-assembled cover arch structure in tunnel hole
By designing a rapidly assembled arch structure, the problem of cumbersome operation of the existing arch structure is solved, efficient reinforcement of tunnel construction is achieved, construction safety and support stability are ensured, and it is suitable for tunnel construction under complex geological conditions.
Patent Information
- Application Number
- CN202420648183.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-29
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2034-03-29
AI Technical Summary
The existing arch structure is cumbersome to use, which is inconvenient for rapid installation by staff, affecting the efficiency of tunnel construction. Especially in complex geological conditions, it is easy to cause landslides and roofs to rise. Reinforcement protection is required to ensure construction safety.
A quick assembly arch structure in the tunnel hole is designed, including arch steel pipe, assembly base, installation component and reinforcement component. Through the rotating connection of the detachable assembly base and installation component, the rapid disassembly and assembly of the arch steel pipe is achieved, combined with The design of anti-detachment ring and limit sleeve ensures the stable connection of the steel pipe and the anti-detachment effect.
The rapid disassembly and assembly of the arch structure is realized, the tunnel construction efficiency is improved, the construction time is reduced, the safety of grouting and reinforcement is ensured, the geological structure is extruded, the risk of extrusion of the tunnel support structure is reduced, and the risk of cracking of the tunnel support structure is increased. The stability of the support structure.
Smart Images

Figure CN222025795U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of tunnel engineering construction, in particular to a quick-assembled sleeve arch structure in a tunnel. Background Art
[0002] With the continuous improvement and development of the national highway network, tunnels account for an increasingly larger proportion in highway construction projects, and are increasingly extending to mountainous areas with complex topography and geology, resulting in the emergence of more mountain tunnels under complex geological conditions such as collapsible loess, mudstone, and carbonaceous slate. When tunnels pass through areas with thick soil layers, tunnel construction is prone to cause landslides and roof collapse, and grouting reinforcement is required above the tunnel face. However, during the grouting period, the high grouting pressure can easily affect the original geological structure, squeeze the tunnel support structure inside the tunnel, and cause the tunnel support structure to crack, affecting the stability of the tunnel support. It is necessary to reinforce and protect the tunnel support to ensure the safety of the grouting reinforcement construction.
[0003] The current reinforcement structure is usually reinforced by a sleeve arch structure. However, the existing sleeve arch structure is cumbersome to operate when in use, which makes it inconvenient for workers to install it quickly, affecting the efficiency of tunnel construction. Utility Model Content
[0004] The utility model aims to provide a quick-assembled sleeve arch structure in a tunnel, so as to alleviate the technical problems in the prior art that the existing sleeve arch structure is complicated to operate during use, inconvenient for workers to quickly install it, and affects the efficiency of tunnel construction.
[0005] The utility model provides a quick-assembled sleeve arch structure in a tunnel, comprising: a sleeve arch steel pipe, an assembly base, a mounting assembly and a reinforcement assembly;
[0006] The sleeve arch steel pipe is in an arc shape;
[0007] The assembly base is used for detachable assembly at the bottom of the tunnel cavity, and the assembly base is configured to be detachably connected to the bottom end of the sleeve arch steel pipe;
[0008] The two mounting assemblies are provided with two, and the two mounting assemblies are rotatably connected via a positioning shaft, and the two mounting assemblies are both located between the two sleeve arch steel pipes, and the top ends of the two sleeve arch steel pipes located on both sides of the two mounting assemblies are detachably connected to the two mounting assemblies respectively;
[0009] The reinforcing component is located below the mounting component, and the reinforcing component is respectively connected to the two mounting components to limit the mutual rotation of the two mounting components.
[0010] In an alternative embodiment,
[0011] The mounting assembly includes a mounting seat and a fixed base;
[0012] The mounting seat is arranged above the fixed base;
[0013] A semicircular limiting sleeve is extended from the side of the mounting seat;
[0014] A semicircular reinforcement sleeve is extended from the side of the fixed base;
[0015] The limiting sleeve and the reinforcing sleeve are surrounded to form an upper plug-in hole, and the upper plug-in hole is used for inserting the top end of the sleeve arch steel pipe.
[0016] In an alternative embodiment,
[0017] The inner walls of the limiting sleeve and the reinforcing sleeve are both provided with an upper anti-slip convex ring;
[0018] The sleeve arch steel pipe is provided with an upper anti-slip groove;
[0019] The upper anti-slip convex ring can extend into the upper anti-slip groove to clamp the sleeve arch steel pipe into the upper plug hole.
[0020] In an alternative embodiment,
[0021] The quick-assembly sleeve arch structure in the tunnel also includes locking bolts;
[0022] The mounting seat and the fixing base are both provided with locking holes, and the locking hole on the mounting seat and the locking hole on the fixing base are connected by the locking bolt.
[0023] In an alternative embodiment,
[0024] A connecting tube is arranged on the side surface of the mounting seat, and the connecting tube is sleeved on the positioning shaft.
[0025] In an alternative embodiment,
[0026] A limiting sleeve is sleeved on the positioning shaft, and the limiting sleeve can abut against the connecting tube to limit the moving stroke of the connecting tube on the positioning shaft.
[0027] In an alternative embodiment,
[0028] The reinforcement assembly includes a stabilizing plate, an assembly plate and a positioning rod;
[0029] There are two assembly plates, which are respectively arranged at two ends of the stabilizing plate to form a U-shaped structure, and the two assembly plates are respectively connected to the two installation components arranged opposite to each other;
[0030] A rotating sleeve is sleeved on the positioning shaft, the bottom of the rotating sleeve is connected to the positioning rod, the stabilizing plate is sleeved on the positioning rod, and the stabilizing plate is configured to be able to move along the positioning rod.
[0031] In an alternative embodiment,
[0032] A moving nut is threadedly connected to the positioning rod, and the moving nut is used to drive the stabilizing plate to move along the positioning rod.
[0033] In an alternative embodiment,
[0034] The reinforcement assembly also includes a fixing rod;
[0035] The fixing rod is threadedly connected to the assembly plate, a slot is provided on the installation assembly, and the end of the fixing rod extends into the slot.
[0036] In an alternative embodiment,
[0037] The assembly base is provided with a lower plug-in hole, the inner wall of the lower plug-in hole is provided with a lower anti-slip convex ring, the sleeve arch steel pipe is provided with a lower anti-slip groove, and the lower anti-slip convex ring can extend into the lower anti-slip groove to clamp the sleeve arch steel pipe in the lower plug-in hole.
[0038] The utility model provides a quick-assembly sleeve arch structure in a tunnel. A detachable assembly base is provided at the bottom of the tunnel cavity. The bottom end of the sleeve arch steel pipe is detachably mounted on the assembly base. Two mounting components are rotatably connected to each other and are located between the two sleeve arch steel pipes. The top of the sleeve arch steel pipe is detachably mounted on the mounting component. The overall structure is convenient for disassembly and assembly, and the quick disassembly and assembly of the sleeve arch structure can be realized, which alleviates the technical problem in the prior art that the existing sleeve arch structure is complicated to operate during use, which is inconvenient for workers to quickly install and affects the efficiency of tunnel construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] In order to more clearly illustrate the specific implementation methods of the utility model or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0040] Figure 1 A schematic diagram of the overall structure of a quick-assembled sleeve arch structure in a tunnel provided by an embodiment of the utility model;
[0041] Figure 2A schematic diagram of the exploded structure of the installation components and the sleeve arch steel pipe in the quick assembly sleeve arch structure in the tunnel provided by the embodiment of the utility model;
[0042] Figure 3 A schematic diagram of the exploded structure of the quick-assembly sleeve arch structure in a tunnel provided by an embodiment of the utility model;
[0043] Figure 4 A schematic diagram of the exploded structure of the mounting seat and the reinforcement assembly in the quick assembly sleeve arch structure in the tunnel provided by the embodiment of the utility model;
[0044] Figure 5 A diagram showing a usage scenario of a quick-assembled sleeve arch structure in a tunnel provided by an embodiment of the utility model.
[0045] Icons: 1-arch steel pipe; 2-assembly base; 3-mounting seat; 4-locking hole; 5-limiting sleeve; 6-slot; 7-connecting tube; 8-positioning shaft; 9-limiting sleeve; 10-positioning rod; 11-stabilizing plate; 12-assembly plate; 13-fixing rod; 14-fixing base; 15-reinforcement sleeve; 16-upper anti-slip convex ring; 17-upper anti-slip groove; 18-locking bolt; 19-ground; 20-grouting hole; 21-tunnel support; 22-tunnel. DETAILED DESCRIPTION
[0046] The technical solution of the utility model will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0047] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0048] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0049] The specific implementation of the present invention is described in detail below in conjunction with the accompanying drawings. It should be understood that the specific implementation described here is only used to illustrate and explain the present invention, and is not used to limit the present invention.
[0050] like Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 5 As shown, the quick-assembly arch structure in the tunnel provided by this embodiment includes: an arch steel pipe 1, an assembly base 2, an installation component and a reinforcement component; the arch steel pipe 1 is in an arc shape, and the arch steel pipe 1 can be set to a quarter arc shape, or can be set to a one-eighth arc shape. Preferably, the arch steel pipe 1 is set to a one-eighth arc shape, and two arch steel pipes 1 are arranged on both sides of the installation component. The two arch steel pipes 1 are connected by an assembly seat. The structure and shape of the assembly seat are similar to those of the assembly base 2. The difference is that the assembly seat has two plug-in holes, which respectively fix the two arch steel pipes 1, and the two arch steel pipes 1 form a group of quarter-arc steel pipe units. Multiple steel pipe units can be arranged side by side, and the multiple steel pipe units are arranged along the length direction of the tunnel 22. The multiple steel pipe units are connected by the assembly base 2 and the installation component.
[0051] The assembly base 2 is used to be detachably assembled at the bottom of the inner cavity of the tunnel 22, and the assembly base 2 can be detachably connected to the bottom end of the sleeve arch steel pipe 1. In an optional embodiment, a lower plug-in hole is provided on the assembly base 2, and a lower anti-slip convex ring is provided on the inner wall of the lower plug-in hole, and the sleeve arch steel pipe 1 is provided with a lower anti-slip groove, and the lower anti-slip convex ring can be extended into the lower anti-slip groove to clamp the sleeve arch steel pipe 1 in the lower plug-in hole.
[0052] There are two mounting assemblies, which are rotatably connected via a positioning shaft 8, and the top ends of the two sleeve arch steel pipes 1 located on both sides of the two mounting assemblies are detachably connected to the two mounting assemblies respectively;
[0053] Specifically, the mounting assembly includes a mounting seat 3 and a fixed base 14; the mounting seat 3 is arranged above the fixed base 14; the side of the mounting seat 3 extends to form a semicircular limiting sleeve 5; the side of the fixed base 14 extends to form a semicircular reinforcement sleeve 15, and when the fixed base 14 is installed on the mounting seat 3, the limiting sleeve 5 and the reinforcement sleeve 15 are surrounded to form an upper plug-in hole, and the upper plug-in hole is used to insert the top end of the arch steel pipe 1.
[0054] In an optional embodiment, the inner walls of the limiting sleeve 5 and the reinforcement sleeve 15 are both provided with an upper anti-slip convex ring 16, and the upper anti-slip convex ring 16 on the limiting sleeve 5 and the upper anti-slip convex ring 16 on the reinforcement sleeve 15 are jointly arranged to form an anti-slip clamping ring; the sleeve arch steel pipe 1 is provided with an upper anti-slip groove 17; the upper anti-slip convex ring 16 can extend into the upper anti-slip groove 17 to clamp the sleeve arch steel pipe 1 in the upper plug-in hole.
[0055] During the installation of the arch steel pipe 1, the arch steel pipe 1 is first inserted into the limiting sleeve 5, so that the upper anti-slip convex ring 16 on the limiting sleeve 5 is inserted into the upper anti-slip groove 17, and then the fixed base 14 is installed on the mounting seat 3, so that the upper anti-slip convex ring 16 on the fixed base 14 is inserted into the upper anti-slip groove 17, and the installation and fixation of the arch steel pipe 1 is completed.
[0056] The quick-assembled arch structure in the tunnel also includes a locking bolt 18; both the mounting seat 3 and the fixed base 14 are provided with a locking hole 4, and the locking hole 4 on the mounting seat 3 and the locking hole 4 on the fixed base 14 are connected by the locking bolt 18 to install and connect the mounting seat 3 with the fixed base 14.
[0057] like Figure 4 As shown, in an optional embodiment, a connecting tube 7 is provided on the side surface of the mounting seat 3 , and the connecting tube 7 is sleeved on the positioning shaft 8 .
[0058] Specifically, a connecting tube 7 is provided on the mounting seat 3 . It should be noted that the connecting tubes 7 on the two mounting seats 3 are staggered so that the connecting tubes 7 on the two mounting seats 3 are both sleeved on the positioning shaft 8 .
[0059] In an optional embodiment, a limiting sleeve 9 is sleeved on the positioning shaft 8 , and the limiting sleeve 9 can abut against the connecting tube 7 to limit the moving stroke of the connecting tube 7 on the positioning shaft 8 .
[0060] Specifically, the limiting sleeve 9 is installed at the middle position of the positioning shaft 8 . The setting of the limiting sleeve 9 limits the movement of the connecting tube 7 to prevent the mounting seat 3 from sliding on the positioning shaft 8 .
[0061] In an optional embodiment, the reinforcement component is located below the mounting component, and the reinforcement component is respectively connected to the two mounting components to limit the mutual rotation of the two mounting components.
[0062] Specifically, the reinforcement component includes a stabilizing plate 11, an assembly plate 12 and a positioning rod 10; two assembly plates 12 are provided, and the two assembly plates 12 are respectively arranged at the two ends of the stabilizing plate 11 to form a U-shaped structure. The two assembly plates 12 are respectively connected to the two relatively arranged installation components to stabilize the two installation components.
[0063] In addition, a rotating sleeve is sleeved on the positioning shaft 8, and a positioning rod 10 is connected to the bottom of the rotating sleeve. A stabilizing plate 11 is sleeved on the positioning rod 10, and the stabilizing plate 11 is configured to be able to move along the positioning rod 10. When the stabilizing plate 11 moves downward along the positioning rod 10, since the two assembly plates 12 are respectively connected to the two mounting components, the two mounting components move downward away from each other's ends, and the angles of the two mounting components can be slightly adjusted, which is suitable for the arch steel pipe 1 with a smaller arc size, and thus the overall structure is suitable for the tunnel 22 with a smaller cross-section.
[0064] In an optional embodiment, a moving nut is threadedly connected to the positioning rod 10 , and the moving nut is used to drive the stabilizing plate 11 to move along the positioning rod 10 .
[0065] Specifically, when the stabilizing plate 11 needs to be moved downward, the moving nut is screwed to move the moving nut downward on the positioning rod 10, and the stabilizing plate 11 moves together with the moving nut.
[0066] In an optional embodiment, the reinforcement assembly further includes a fixing rod 13 ; the fixing rod 13 is threadedly connected to the assembly plate 12 , a slot 6 is provided on the mounting assembly, and an end of the fixing rod 13 extends into the slot 6 .
[0067] Specifically, the mounting assembly includes a mounting seat 3 and a fixed base 14, and grooves are provided on the mounting seat 3 and the fixed base 14. When the fixed base 14 is installed on the mounting seat 3, the two grooves are connected to form a card slot 6. By threading a fixing rod 13 on the assembly plate 12 and extending the fixing rod 13 into the card slot 6, the assembly plate 12 can be connected to the mounting assembly.
[0068] The present embodiment provides a quick-assembled sleeve arch structure in a tunnel, in which a detachable assembly base 2 is provided at the bottom of the inner cavity of the tunnel 22, and the bottom end of the sleeve arch steel pipe 1 is detachably mounted on the assembly base 2. The two mounting components are rotatably connected to each other and are located between the two sleeve arch steel pipes 1. The top of the sleeve arch steel pipe 1 is detachably mounted on the mounting component. The overall structure is convenient for disassembly and assembly, and the quick disassembly and assembly of the sleeve arch structure can be realized, which alleviates the technical problem that the existing sleeve arch structure in the prior art is cumbersome to operate during use, which is inconvenient for the staff to quickly install and affects the efficiency of the construction of the tunnel 22.
[0069] In addition, the anti-slip convex ring cooperates with the limiting sleeve 5 and the reinforcement sleeve 15 to play an anti-slip reinforcement structure for the sleeve arch steel pipe 1. The annular anti-slip groove is a structure in which the sleeve arch steel pipe 1 and the anti-slip convex ring are combined. The assembly base 2 is used to fix the sleeve arch structure. When the grouting holes 20 at the top of the ground 19 into the soil layer are grouting reinforced, the tunnel support 21 is reinforced, which effectively prevents the high grouting pressure from easily affecting the original geological structure and causing squeezing of the tunnel support 21 structure inside the tunnel 22, further reducing the possibility of squeezing and cracking of the tunnel support 21 structure, improving the stability of the tunnel support 21, and allowing the sleeve arch steel pipe 1 to be easily dismantled for reuse in the future.
[0070] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model, rather than to limit it. Although the utility model has been described in detail with reference to the aforementioned embodiments, ordinary technicians in this field should understand that they can still modify the technical solutions recorded in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not make the essence of the corresponding technical solution deviate from the scope of the technical solution of the embodiments of the utility model.
Claims
1. A quick-assembled sleeve arch structure in a tunnel, characterized in that: include: Arched steel pipe (1), assembly base (2), installation components and reinforcement components; The sleeve-arch steel pipe (1) is in an arc shape; The assembly base (2) is used to be detachably assembled on the bottom of the inner cavity of the tunnel (22), and the assembly base (2) is configured to be detachably connected to the bottom end of the sleeve arch steel pipe (1); Two mounting components are provided, the two mounting components are rotatably connected via a positioning shaft (8), and the two mounting components are both located between the two sleeve arch steel pipes (1), and the top ends of the two sleeve arch steel pipes (1) located on both sides of the two mounting components are detachably connected to the two mounting components respectively; The reinforcing component is located below the mounting component, and the reinforcing component is respectively connected to the two mounting components to limit the mutual rotation of the two mounting components.
2. The tunnel quick assembly sleeve arch structure according to claim 1, characterized in that: The mounting assembly comprises a mounting seat (3) and a fixed base (14); The mounting seat (3) is arranged above the fixed base (14); A semicircular limiting sleeve (5) is formed by extending from the side surface of the mounting seat (3); A semicircular reinforcement sleeve (15) is formed by extending from the side of the fixed base (14); The limiting sleeve (5) and the reinforcing sleeve (15) are surrounded to form an upper plug-in hole, and the upper plug-in hole is used for inserting the top end of the sleeve arch steel pipe (1).
3. The tunnel quick assembly sleeve arch structure according to claim 2, characterized in that: The inner walls of the limiting sleeve (5) and the reinforcing sleeve (15) are both provided with an upper anti-slip convex ring (16); The sleeve arch steel pipe (1) is provided with an upper anti-slip groove (17); The upper anti-slip convex ring (16) can extend into the upper anti-slip groove (17) to clamp the sleeve arch steel pipe (1) into the upper plug-in hole.
4. The quick-assembly sleeve arch structure in a tunnel according to claim 2, characterized in that: The tunnel hole quick assembly sleeve arch structure also includes a locking bolt (18); The mounting seat (3) and the fixed base (14) are both provided with locking holes (4), and the locking holes (4) on the mounting seat (3) and the locking holes (4) on the fixed base (14) are connected via the locking bolts (18).
5. The tunnel quick assembly sleeve arch structure according to claim 2, characterized in that: A connecting tube (7) is provided on the side surface of the mounting seat (3), and the connecting tube (7) is sleeved on the positioning shaft (8).
6. The quick-assembly sleeve arch structure in a tunnel according to claim 5, characterized in that: A limiting sleeve (9) is sleeved on the positioning shaft (8), and the limiting sleeve (9) can abut against the connecting tube (7) to limit the movement stroke of the connecting tube (7) on the positioning shaft (8).
7. The quick-assembled sleeve arch structure in a tunnel according to claim 1, characterized in that: The reinforcement assembly comprises a stabilizing plate (11), an assembly plate (12) and a positioning rod (10); Two assembly plates (12) are provided, and the two assembly plates (12) are respectively arranged at two ends of the stabilizing plate (11) opposite to each other to form a U-shaped structure, and the two assembly plates (12) are respectively connected to the two installation components arranged opposite to each other; A rotating sleeve is sleeved on the positioning shaft (8), the bottom of the rotating sleeve is connected to the positioning rod (10), the stabilizing plate (11) is sleeved on the positioning rod (10), and the stabilizing plate (11) is configured to be movable along the positioning rod (10).
8. The tunnel quick assembly sleeve arch structure according to claim 7, characterized in that: A moving nut is threadedly connected to the positioning rod (10), and the moving nut is used to drive the stabilizing plate (11) to move along the positioning rod (10).
9. The tunnel quick assembly sleeve arch structure according to claim 8, characterized in that: The reinforcement assembly also includes a fixing rod (13); The assembly plate (12) is threadedly connected to the fixing rod (13); a clamping groove (6) is provided on the installation assembly; and an end of the fixing rod (13) extends into the clamping groove (6).
10. The tunnel quick assembly sleeve arch structure according to claim 1, characterized in that: The assembly base (2) is provided with a lower plug-in hole, the inner wall of the lower plug-in hole is provided with a lower anti-slip convex ring, the sleeve arch steel pipe (1) is provided with a lower anti-slip groove, and the lower anti-slip convex ring can extend into the lower anti-slip groove to clamp the sleeve arch steel pipe (1) in the lower plug-in hole.