Pressure manhole with high sealing performance

By using gears and connecting rod mechanisms in the pressure manhole to achieve rapid fixation of the cover, combined with a multi-layer pressure relief structure, the problems of time-consuming and labor-intensive operation and safety hazards in the prior art are solved, and the operation efficiency and safety are improved.

CN222026264UActive Publication Date: 2024-11-19SHANGHAI HENGCHENG BEVERAGE EQUIP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323423334.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-15
Publication Date
2024-11-19
Estimated Expiration
2033-12-15

AI Technical Summary

Technical Problem

During use, existing pressure manholes need to rotate multiple handles to fix the cover, which makes the operation time-consuming and labor-intensive and reduces the operation efficiency.

Method used

A high-sealing pressure manhole is designed, adopting a structure including a fixed assembly and a secondary pressure relief assembly, which enables rapid fixation of the cover through gears and linkage mechanisms, and ensures high pressure relief conditions through a multi-layer pressure relief structure. security.

Benefits of technology

The operation efficiency is improved, the cap can be fast fixed, and the difficulty of use is reduced. At the same time, the secondary pressure relief structure avoids safety problems caused by damage to the primary pressure relief structure, ensuring the safety of the brewing process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222026264U_ABST
    Figure CN222026264U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of beer brewing, and discloses a high-sealing-performance pressure manhole which comprises a brewing barrel, a hinge piece is installed on one side of the brewing barrel, a sealing cover is connected to one side of the hinge piece, a sealing ring is installed at the lower end of the sealing cover, and a fixing assembly is arranged at the upper end of the sealing cover. A secondary pressure relief assembly is mounted at the upper end of the sealing cover; the fixing assembly comprises a first gear, a gear ring is arranged on one side of the first gear, and a second gear is installed on one side of the gear ring. The sealing cover is rapidly fixed through the arranged fixing assembly, the operation efficiency is improved to a certain degree, a worker can use the brewing barrel more conveniently, the brewing barrel is subjected to pressure relief treatment through the arranged second-stage pressure relief assembly, a second-stage pressure relief structure is safer, and it is avoided that after a first-stage pressure relief structure is damaged, the brewing barrel is not damaged. And the safety problem caused by overlarge pressure in the brewing barrel is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of beer brewing, in particular to a pressure manhole with high sealing performance. Background Art

[0002] Beer is mainly made from malt, hops, water and yeast. Under the action of yeast, these raw materials will generate alcohol and carbon dioxide to form wine. Beer is a fermented wine with a low alcohol content. It is fresh and refreshing, with a malt aroma and a little bitterness.

[0003] In the beer brewing process, the pressure manhole device is an important equipment. It needs to remain sealed throughout the entire brewing process. Once the sealing is destroyed, it will lead to beer deterioration, reduced production and safety hazards in the production process. It is necessary to design a highly sealed pressure manhole to seal the beer brewing equipment.

[0004] Chinese Patent Publication No.: CN216382537U discloses "An outward-opening pressure manhole", including a sealing cover and an outer ring, the sealing cover is hinged to the outer ring, a plurality of fixing devices are arranged on the outer ring, the fixing devices include a handle and a stud, a mounting block is arranged on the outer ring, a locking ring is arranged on the stud, the locking ring is slidably connected to the stud along the length direction of the stud, the top wall of the locking ring is abutted against the bottom wall of the handle, the end of the stud away from the handle is hinged to the mounting block, a positioning ring is arranged on the outer side wall of the locking ring, and a spring is arranged on the stud. After the staff rotates the sealing cover to fit with the outer ring, the stud is rotated in the direction close to the sealing cover by the handle. When the locking ring abuts against the side wall of the sealing cover, the handle is rotated to move the locking ring in the direction close to the mounting block, and the bottom wall of the positioning ring is pressed against the top wall of the sealing cover. Under high pressure, the connection between the sealing cover and the outer ring is still stable, thereby improving the sealing performance of the manhole.

[0005] In the above-mentioned prior art, after the staff rotates the cover to fit with the outer ring, the staff rotates the stud toward the cover through the handle. When the locking ring abuts against the side wall of the cover, the handle is turned to move the locking ring toward the mounting block, and the bottom wall of the positioning ring abuts against the top wall of the cover. Under high pressure, the connection between the cover and the outer ring remains stable, thereby improving the sealing of the manhole. However, during the use of the existing pressure manhole, it is necessary to rotate multiple handles to fix the cover, which is time-consuming and labor-intensive, and reduces the operating efficiency to a certain extent. Utility Model Content

[0006] The utility model aims to provide a highly sealed pressure manhole to solve the problem in the above background technology that multiple handles need to be rotated to fix the cover, which is time-consuming and labor-intensive during use and reduces the operating efficiency to a certain extent.

[0007] In order to solve the above technical problems, the utility model provides the following technical solutions: a highly sealed pressure manhole, comprising a brewing barrel, a hinged part is installed on one side of the brewing barrel, a sealing cover is connected to one side of the hinged part, a sealing ring is installed at the lower end of the sealing cover, and a fixing component is provided at the upper end of the sealing cover, and a secondary pressure relief component is installed at the upper end of the sealing cover;

[0008] The fixing assembly includes a first gear, a gear ring is provided on one side of the first gear, a second gear is installed on one side of the gear ring, a connecting rod is connected to the upper end of the second gear, and a screw is connected to the lower end of the second gear, a limiting plate is installed at a position corresponding to the screw on the cover, and a fixing plate is installed at a position corresponding to the screw on the brewing barrel;

[0009] The secondary pressure relief assembly includes a first pressure relief bin, a sliding bin is provided at the upper end of the first pressure relief bin, a sliding rod is provided at the lower end of the sliding bin, a first spring is sleeved on the outer side of the sliding rod, and a first pressure plate is connected to the lower end of the sliding rod, the first pressure relief bin is provided with first pressure relief holes on both sides below the first pressure plate, and a second pressure relief bin is provided on the outer side of the first pressure relief bin, a clamping block is provided at the upper end of the sliding bin, a second pressure plate is installed inside the second pressure relief bin, a telescopic rod is provided at the upper end of the second pressure plate, a second spring is installed inside the telescopic rod, and a second pressure relief hole is provided at the upper end of the second pressure relief bin.

[0010] Preferably, the brewing barrel is hinged to the cover via a hinge, the cover matches the brewing barrel, and the sealing ring is detachably connected to the cover.

[0011] Preferably, the first gear meshes with a gear ring, and the gear ring meshes with the second gear.

[0012] Preferably, there are multiple sets of the second gears, which are symmetrically arranged on the outer side of the gear ring, and the connecting rod is rotationally connected to the second gears.

[0013] Preferably, the limiting plate is fixedly connected to the sealing cover, the screw rod passes through the limiting plate and extends to the outside thereof, the fixing plate is fixedly connected to the brewing barrel, and the fixing plate is provided with a screw hole matching the screw rod.

[0014] Preferably, the first pressure relief chamber is connected to the inner cavity of the brewing barrel, the second pressure relief chamber is connected to the inner cavity of the brewing barrel, the first pressure plate matches the first pressure relief chamber, the sliding chamber is slidably connected to the sliding rod, and the sliding rod is fixedly connected to the first pressure plate.

[0015] Preferably, the clamping block is fixedly arranged at the upper end of the sliding chamber, the second pressure plate matches the clamping block, one end of the second spring is fixedly connected to the second pressure plate, and the other end of the second spring is fixedly connected to the second pressure relief chamber.

[0016] Compared with the prior art, the beneficial effects achieved by the utility model are:

[0017] First, the utility model can quickly fix the cover by setting a fixing component, which improves the operating efficiency to a certain extent and makes it more convenient for the staff to use it. By rotating the first gear, the rotation of the first gear drives the gear ring to rotate, the rotation of the gear ring drives the rotation of multiple groups of second gears, and the rotation of multiple groups of second gears drives the screw to rotate. The screw rotates and screws into the fixing plate to press the sealing ring set at the lower end of the cover against the brewing barrel, thereby sealing the inside of the brewing barrel.

[0018] Second, the utility model provides a secondary pressure relief component to relieve pressure on the brewing barrel. The secondary pressure relief structure is safer and can avoid safety problems caused by excessive pressure in the brewing barrel after the primary pressure relief structure is damaged. When the pressure in the brewing barrel is too high, the first pressure plate is pushed to move upward, and the upward movement of the first pressure plate drives the sliding rod to slide in the sliding bin. At the same time, the first spring is compressed and the gas is discharged from the first pressure relief hole. When the pressure in the second pressure relief bin is too high, the second pressure plate is pushed to move upward and disengage from the block, and the gas overflows from the second pressure relief hole. The secondary pressure relief structure improves safety. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a structural schematic diagram of the utility model;

[0020] Figure 2 It is a cross-sectional view of the utility model;

[0021] Figure 3 It is a cross-sectional view of the fixing assembly of the utility model;

[0022] Figure 4 For this utility model Figure 2 A magnified view of the structure at center A;

[0023] Figure 5 It is a schematic diagram of the structure of the two-stage pressure relief component of the utility model.

[0024] In the figure: 1. brewing barrel; 2. hinge; 3. sealing cover; 4. fixing assembly; 401. first gear; 402. gear ring; 403. second gear; 404. connecting rod; 405. limit plate; 406. screw; 407. fixing plate; 5. secondary pressure relief assembly; 501. first pressure relief chamber; 502. sliding chamber; 503. sliding rod; 504. first spring; 505. first pressure plate; 506. first pressure relief hole; 507. second pressure relief chamber; 508. block; 509. second pressure plate; 510. telescopic rod; 511. second spring; 512. second pressure relief hole; 6. sealing ring. DETAILED DESCRIPTION

[0025] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0026] See also Figure 1-Figure 5 A highly sealed pressure manhole comprises a brewing barrel 1, a hinge 2 is installed on one side of the brewing barrel 1, a cover 3 is connected to one side of the hinge 2, a sealing ring 6 is installed at the lower end of the cover 3, and a fixing component 4 is provided at the upper end of the cover 3, and a secondary pressure relief component 5 is installed at the upper end of the cover 3; the fixing component 4 comprises a first gear 401, a gear ring 402 is provided on one side of the first gear 401, a second gear 403 is installed on one side of the gear ring 402, a connecting rod 404 is connected to the upper end of the second gear 403, and a screw 406 is connected to the lower end of the second gear 403, a limiting plate 405 is installed at the position corresponding to the screw 406 of the cover 3, and a fixing plate 407 is installed at the position corresponding to the screw 406 of the brewing barrel 1; the secondary pressure relief component 5 comprises a first gear 401, a gear ring 402 is provided on one side of the first gear 401, a second gear 403 is installed on one side of the gear ring 402, a connecting rod 404 is connected to the upper end of the second gear 403, and a screw 406 is connected to the lower end of the second gear 403, a limiting plate 405 is installed at the position corresponding to the screw 406 of the cover 3, and a fixing plate 407 is installed at the position corresponding to the screw 406 of the brewing barrel 1; A pressure relief chamber 501, a sliding chamber 502 is provided at the upper end of the first pressure relief chamber 501, a sliding rod 503 is provided at the lower end of the sliding chamber 502, a first spring 504 is sleeved on the outer side of the sliding rod 503, and a first pressure plate 505 is connected to the lower end of the sliding rod 503, the first pressure relief chamber 501 is provided with first pressure relief holes 506 on both sides below the first pressure plate 505, and a second pressure relief chamber 507 is provided on the outer side of the first pressure relief chamber 501, a clamping block 508 is provided at the upper end of the sliding chamber 502, a second pressure plate 509 is installed inside the second pressure relief chamber 507, a telescopic rod 510 is provided at the upper end of the second pressure plate 509, a second spring 511 is installed inside the telescopic rod 510, and a second pressure relief hole 512 is provided at the upper end of the second pressure relief chamber 507.

[0027] Through the above technical solution, the cover 3 is quickly fixed by the fixed component 4, which improves the operating efficiency to a certain extent and makes it more convenient for the staff to use it. By rotating the first gear 401, the first gear 401 drives the gear ring 402 to rotate, the gear ring 402 drives the multiple sets of second gears 403 to rotate, the multiple sets of second gears 403 drive the screw 406 to rotate, the screw 406 rotates and screws into the fixed plate 407 to press the sealing ring 6 set at the lower end of the cover 3 against the brewing barrel 1, and the inside of the brewing barrel 1 is sealed. Through the secondary pressure relief component 5, the brewing barrel 1 is The barrel 1 is subjected to pressure relief treatment, and the secondary pressure relief structure is safer, which can avoid the situation where the pressure in the brewing barrel 1 is too high and cause safety problems after the primary pressure relief structure is damaged. When the pressure in the brewing barrel 1 is too high, the first pressure plate 505 moves upward, and the upward movement of the first pressure plate 505 drives the slide bar 503 to slide in the sliding bin 502. At the same time, the first spring 504 is compressed, and the gas is discharged from the first pressure relief hole 506. When the pressure in the second pressure relief bin 507 is too high, the second pressure plate 509 is pushed to move upward and disengage from the block 508, and the gas overflows from the second pressure relief hole 512. The secondary pressure relief structure improves safety.

[0028] Specifically, the brewing barrel 1 is hinged to the cover 3 via the hinge 2, the cover 3 matches the brewing barrel 1, and the sealing ring 6 is detachably connected to the cover 3.

[0029] Through the above technical solution, the brewing barrel 1 brews and ferments beer, and the cover 3 is hinged to the brewing barrel 1 through the hinge 2, which is convenient for opening and closing the cover 3, and the sealing ring 6 improves the sealing performance of the brewing barrel 1.

[0030] Specifically, the first gear 401 is meshed with the gear ring 402 , and the gear ring 402 is meshed with the second gear 403 .

[0031] Through the above technical solution, the rotation of the first gear 401 drives the gear ring 402 to rotate, and the rotation of the gear ring 402 drives the second gear 403 to rotate, thereby driving multiple groups of second gears 403 to rotate simultaneously.

[0032] Specifically, there are multiple groups of second gears 403 , which are symmetrically arranged on the outer side of the gear ring 402 , and the connecting rod 404 is rotatably connected to the second gears 403 .

[0033] Through the above technical solution, multiple sets of second gears 403 rotate simultaneously to drive multiple sets of screw rods 406 to rotate simultaneously, and the connecting rod 404 plays a certain supporting role on the first gear 401, the second gear 403 and the gear ring 402.

[0034] Specifically, the limiting plate 405 is fixedly connected to the cover 3 , the screw 406 penetrates the limiting plate 405 and extends to the outside thereof, the fixing plate 407 is fixedly connected to the brewing barrel 1 , and the fixing plate 407 is provided with a screw hole matching the screw 406 .

[0035] Through the above technical solution, a screw hole matching the screw 406 is opened in the limiting plate 405, the screw 406 is threadedly connected to the limiting plate 405, and the fixing plate 407 is threadedly connected to the screw 406, so that the cover 3 can press the brewing barrel 1 tightly, which is convenient for operation.

[0036] Specifically, the first pressure relief chamber 501 is connected to the inner cavity of the brewing barrel 1, the second pressure relief chamber 507 is connected to the inner cavity of the brewing barrel 1, the first pressure plate 505 matches the first pressure relief chamber 501, the sliding chamber 502 is slidably connected to the sliding rod 503, and the sliding rod 503 is fixedly connected to the first pressure plate 505.

[0037] Through the above technical scheme, the first pressure relief chamber 501 and the second pressure relief chamber 507 cooperate to perform pressure relief processing. Under the conditions of high temperature and high pressure, the pressure may exceed its normal range. The first pressure relief chamber 501 and the second pressure relief chamber 507 cooperate to improve safety. When the pressure in the brewing barrel 1 is too large, the first pressure plate 505 moves upward. The upward movement of the first pressure plate 505 drives the slide bar 503 to slide in the sliding chamber 502. At the same time, the first spring 504 is compressed. When the first pressure plate 505 moves to above the first pressure relief hole 506, the gas enters the second pressure relief chamber 507 for pressure relief processing.

[0038] Specifically, the clamping block 508 is fixedly arranged at the upper end of the sliding chamber 502 , the second pressure plate 509 matches the clamping block 508 , one end of the second spring 511 is fixedly connected to the second pressure plate 509 , and the other end of the second spring 511 is fixedly connected to the second pressure relief chamber 507 .

[0039] Through the above technical solution, the block 508 is matched with the second pressure plate 509. Under normal circumstances, the second pressure plate 509 clamps the block 508 to form an integral structure, thereby maintaining the airtightness of the brewing barrel 1. When the telescopic rod 510 moves upward, the telescopic rod 510 automatically shortens a certain distance. Under normal circumstances, the second spring 511 applies pressure to the second pressure plate 509, and the second pressure plate 509 clamps the block 508.

[0040] When in use, when it is necessary to fix the cover 3, the cover 3 is covered on the upper end of the brewing barrel 1, and the first gear 401 is rotated. The rotation of the first gear 401 drives the gear ring 402 to rotate. The rotation of the gear ring 402 drives the multiple sets of second gears 403 to rotate. The rotation of the multiple sets of second gears 403 drives the screw 406 to rotate. The screw 406 rotates and screws into the fixing plate 407. When the screw 406 rotates and screws into the fixing plate 407 to a certain distance, the sealing ring 6 provided at the lower end of the cover 3 presses against the brewing barrel 1. The sealing ring 6 presses against the brewing barrel 1 to seal the inside of the brewing barrel 1. When the pressure in the brewing barrel 1 exceeds When pressure relief is needed, the pressure in the brewing barrel 1 is too high, causing the first pressure plate 505 to move upward. The upward movement of the first pressure plate 505 drives the slide bar 503 to slide in the sliding bin 502, and the first spring 504 is compressed. When the first pressure plate 505 moves above the first pressure relief hole 506, the gas enters the second pressure relief bin 507 for pressure relief. When the pressure in the second pressure relief bin 507 is too high, the excessive pressure in the second pressure relief bin 507 pushes the second pressure plate 509 to move upward and disengage from the block 508, and the gas overflows from the second pressure relief hole 512 for safe pressure relief.

[0041] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit thereof, and the scope of the invention is defined by the appended claims and their equivalents.

Claims

1. A highly sealed pressure manhole, comprising a brewing barrel (1), characterized in that: A hinge (2) is installed on one side of the brewing barrel (1), a cover (3) is connected to one side of the hinge (2), a sealing ring (6) is installed at the lower end of the cover (3), a fixing component (4) is provided at the upper end of the cover (3), and a secondary pressure relief component (5) is installed at the upper end of the cover (3); The fixing assembly (4) comprises a first gear (401), a gear ring (402) is provided on one side of the first gear (401), a second gear (403) is installed on one side of the gear ring (402), a connecting rod (404) is connected to the upper end of the second gear (403), and a screw (406) is connected to the lower end of the second gear (403), a limiting plate (405) is installed at a position corresponding to the screw (406) on the cover (3), and a fixing plate (407) is installed at a position corresponding to the screw (406) on the brewing barrel (1); The secondary pressure relief assembly (5) comprises a first pressure relief chamber (501), a sliding chamber (502) is arranged at the upper end of the first pressure relief chamber (501), a sliding rod (503) is arranged at the lower end of the sliding chamber (502), a first spring (504) is sleeved on the outer side of the sliding rod (503), and a first pressure plate (505) is connected to the lower end of the sliding rod (503), and the first pressure relief chamber (501) is provided with first pressure relief holes (504) on both sides below the first pressure plate (505). 6), and a second pressure relief chamber (507) is arranged on the outer side of the first pressure relief chamber (501), a clamping block (508) is arranged at the upper end of the sliding chamber (502), a second pressure plate (509) is installed inside the second pressure relief chamber (507), a telescopic rod (510) is arranged at the upper end of the second pressure plate (509), a second spring (511) is installed inside the telescopic rod (510), and a second pressure relief hole (512) is opened at the upper end of the second pressure relief chamber (507).

2. A highly sealed pressure manhole according to claim 1, characterized in that: The brewing barrel (1) is hingedly connected to the sealing cover (3) via a hinge (2); the sealing cover (3) matches the brewing barrel (1); and the sealing ring (6) is detachably connected to the sealing cover (3).

3. The high-sealing pressure manhole according to claim 1 is characterized in that: The first gear (401) is meshed with the gear ring (402), and the gear ring (402) is meshed with the second gear (403).

4. The high-sealing pressure manhole according to claim 1 is characterized in that: The second gears (403) are multiple groups, and the multiple groups of second gears (403) are symmetrically arranged outside the gear ring (402), and the connecting rod (404) is rotationally connected to the second gears (403).

5. The high-sealing pressure manhole according to claim 1, characterized in that: The limiting plate (405) is fixedly connected to the sealing cover (3), the screw rod (406) passes through the limiting plate (405) and extends to the outside thereof, the fixing plate (407) is fixedly connected to the brewing barrel (1), and the fixing plate (407) is provided with a screw hole matching the screw rod (406).

6. The high-sealing pressure manhole according to claim 1, characterized in that: The first pressure relief chamber (501) is in communication with the inner cavity of the brewing barrel (1), the second pressure relief chamber (507) is in communication with the inner cavity of the brewing barrel (1), the first pressure plate (505) matches the first pressure relief chamber (501), the sliding chamber (502) is slidably connected to the sliding rod (503), and the sliding rod (503) is fixedly connected to the first pressure plate (505).

7. The high-sealing pressure manhole according to claim 1, characterized in that: The clamping block (508) is fixedly arranged at the upper end of the sliding chamber (502), the second pressure plate (509) matches the clamping block (508), one end of the second spring (511) is fixedly connected to the second pressure plate (509), and the other end of the second spring (511) is fixedly connected to the second pressure relief chamber (507).