Natural gas boiler water preheating device
By using electric push rods and water guide components in the natural gas boiler water preheating device, ensure that the hot water enters the water guide tank first and is extracted, and the unheated water continues to be heated in the heating box until all the water is preheated before entering the boiler. , and reheat the boiler flue gas, which solves the problem that the water pump does not enter the boiler by the heated water when pumping water, and improves the water preheating efficiency and energy utilization rate.
Patent Information
- Application Number
- CN202420460889.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-11
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2034-03-11
AI Technical Summary
In the natural gas boiler water preheating device, when the water pump pumps away the water inside the heating box, it may also pump unheated water into the boiler, affecting the water preheating efficiency.
A water preheating device including a base plate, a heating box, a water guide assembly and an electric push rod are designed. The movable rod and the sealing plate are driven by the electric push rod to ensure that the hot water enters the water guide tank first and is extracted, and is not heated. The cold water is continued to heat in the heating box until all the water is preheated before it is pumped into the boiler. At the same time, the water is reheated in the heat conduction channel using the boiler flue gas.
Improve the preheating efficiency of water, ensure that all water is fully heated before entering the boiler, avoiding unheated water entering the boiler directly, and improving the energy utilization rate and the service life of the boiler.
Smart Images

Figure CN222027148U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of boiler equipment, in particular to a natural gas boiler water preheating device. Background Art
[0002] As the name implies, a natural gas boiler refers to a boiler that uses gas as fuel. Natural gas boilers are the most economical compared to oil boilers and electric boilers, so most people choose natural gas boilers as boiler equipment for steam, heating, and bathing. However, during the heating process of a natural gas boiler, the water temperature heats up too slowly from the original stage, causing unnecessary energy damage and low efficiency. Therefore, during heating, it is preheated through a preheating device.
[0003] According to a Chinese patent with publication number CN217082518U, a natural gas boiler water preheating device is disclosed. This utility model can reduce resource waste and extend the service life of the boiler by adding a preheating device before the water enters the boiler. By setting up two forms of preheating, electric heating and boiler flue gas heating, it can improve resource utilization and is easy to use.
[0004] Regarding the above-mentioned disclosed patent content, after water is added to the heating box for preheating, the water in the heating box will be pumped into the boiler through the water pump, but it takes a long time to preheat all the water added to the heating box. If the water in the heating box is not fully preheated and is pumped away by the water pump, the unheated cold water will also flow into the boiler together with the hot water, so that the cold water in the boiler will take a long time to heat, thereby reducing the overall preheating efficiency of the water. Utility Model Content
[0005] Based on this, the purpose of the utility model is to provide a natural gas boiler water preheating device to solve the technical problem that when the water pump draws out the water inside the heating box, unheated water may also be pumped into the boiler, thereby affecting the preheating efficiency of the water.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a natural gas boiler water preheating device, comprising a base plate and a heating box, a frame is installed on the top of the base plate, a preheating box is arranged inside the frame, a water guide assembly is arranged inside the preheating box, and the water guide assembly comprises a water guide box arranged inside the preheating box and an electric push rod installed on the top of the preheating box, a heat conduction channel is opened on the inner wall of the water guide box, a plurality of water conduction holes are opened between the water guide box and the heating box, a connecting plate is installed at the output end of the electric push rod through a telescopic rod, and a plurality of movable rods penetrating into the interior of the preheating box are arranged on both sides of the bottom of the connecting plate, and a blocking plate is installed at the bottom end of the movable rod.
[0007] By adopting the above technical solution, when hot water needs to flow into the water guide box, the electric push rod can be started to work, the telescopic rod contracts and drives the movable rod to move upward.
[0008] Furthermore, a boiler is installed on one side of the top of the bottom plate, a water pump is provided on one side of the boiler, and a water inlet end of the water pump is connected to a pumping pipe extending to the inside of the water guide box.
[0009] By adopting the above technical solution, when it is necessary to extract heated water, the water pump can be started. The water pump can extract the water inside the water guide box through the pumping pipe, and the water will flow into the boiler.
[0010] Furthermore, a water tank is installed on the top of the frame, and a water inlet pipe is provided on one side of the top of the water tank.
[0011] By adopting the above technical solution, the water tank can store water, and the water can be added into the water tank through the water inlet pipe.
[0012] Furthermore, a heating box is installed inside the water guide box, and an electric heating plate is installed below the inside of the heating box.
[0013] By adopting the above technical solution, when water flows into the heating box, the electric heating plate can be started, and the electric heating plate can heat the water.
[0014] Furthermore, the bottom of the water tank is connected to a water outlet pipe extending to the interior of the heating box, and a first solenoid valve is installed on the water outlet pipe.
[0015] By adopting the above technical solution, when water needs to be preheated, the first solenoid valve can be opened so that the water inside the water tank can flow into the heating box through the water outlet pipe.
[0016] Furthermore, a fan is installed below one side of the boiler, and an air outlet end of the fan is connected to an air pipe extending into the heat conduction channel.
[0017] By adopting the above technical solution, when the flue gas generated by the boiler is needed, the fan can be started, and the fan can extract the boiler flue gas, and the boiler flue gas will enter the heat conduction channel through the gas pipe.
[0018] Furthermore, a pressure relief valve is provided on one side of the top of the preheating box.
[0019] By adopting the above technical solution, the setting of the pressure relief valve can play a pressure relief role and avoid excessive air pressure inside the preheating box.
[0020] Furthermore, the size of the blocking plate is larger than the diameter of the water guide hole, and one side of the blocking plate is in contact with the inner wall of the water guide box.
[0021] By adopting the above technical solution, the plugging plate can plug the water guide holes, thereby preventing the water that has just flowed into the heating box from directly entering the water guide tank through the water guide holes.
[0022] Further, the heat conduction channel is in a "U" shape, and the wall thickness of the water guide tank is the same as that of the heating box.
[0023] By adopting the above technical solution, high-temperature flue gas can flow in the heat conduction channel, facilitating reheating of the water inside the water guide tank.
[0024] Further, a sealing ring is provided between the movable rod and the water guide tank.
[0025] By adopting the above technical solution, the setting of the sealing ring can improve the sealing performance of the water guide tank and prevent heat from escaping through the gap between the movable rod and the water guide tank.
[0026] In summary, the main beneficial effects of the present utility model are as follows:
[0027] The present utility model is provided with a water guide assembly. When it is necessary to make hot water flow into the water guide tank, the electric push rod can be started to make the electric push rod work. The telescopic rod contracts and drives the movable rod to move upward. The movable rod drives the plugging plate to move upward, so that the plugging plate no longer plugs the water guide holes. Since the density of hot water is smaller than that of cold water, hot water will be above the cold water. At this time, the hot water will flow into the water guide tank through the water guide holes for being pumped by the water pump, while the unheated cold water will still be inside the heating box. And as the water is continuously heated and the water in the tank continuously flows into the heating box, the hot water will always flow upward and continuously flow into the water guide tank through the water guide holes, so that the water pumped by the water pump is all heated water, avoiding the unheated water from being directly pumped into the boiler by the water pump, facilitating subsequent heating of the water by the boiler. The flue gas can directly enter the heat conduction channel through the gas transmission pipe and flow in the heat conduction channel to heat the hot water in the water guide tank, thereby improving the preheating efficiency of the water. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 is the overall three-dimensional structure schematic diagram of the present utility model;
[0029] Figure 2 is the overall front sectional structure schematic diagram of the present utility model;
[0030] Figure 3 is the three-dimensional structure schematic diagram of the water guide tank of the present utility model;
[0031] Figure 4 is the side sectional partial structure schematic diagram of the water guide tank of the present utility model;
[0032] Figure 5This is a three-dimensional structural schematic diagram of the connecting plate of the utility model.
[0033] In the figure: 1, bottom plate; 2, boiler; 3, water pump; 4, water suction pipe; 5, fan; 6, gas transmission pipe; 7, frame; 8, preheating box; 9, water guiding component; 901, water guiding tank; 902, heat conduction channel; 903, water guiding hole; 904, electric push rod; 905, connecting plate; 906, movable rod; 907, blocking plate; 10, pressure relief valve; 11, water tank; 12, water inlet pipe; 13, water outlet pipe; 14, first solenoid valve; 15, heating box; 16, electric heating plate; 17, drain pipe; 18, second solenoid valve. Specific embodiments
[0034] Next, the technical solutions in the embodiments of the present utility model will be clearly and completely described in conjunction with the accompanying drawings in the embodiments of the present utility model. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present utility model and should not be construed as a limitation to the present utility model.
[0035] Next, the embodiments of the present utility model will be described according to its overall structure. Embodiment 1:
[0036] A natural gas boiler water preheating device, as Figure 1-Figure 5 shown, includes a bottom plate 1 and a heating box 15. A frame 7 is installed on the top of the bottom plate 1. A preheating box 8 is arranged inside the frame 7. A water guiding component 9 is arranged inside the preheating box 8. A boiler 2 is installed on one side of the top of the bottom plate 1. A water pump 3 is arranged on one side of the boiler 2. The water inlet end of the water pump 3 is connected with a water suction pipe 4 extending into the water guiding tank 901. When it is necessary to pump the heated water, the water pump 3 can be started. When the water pump 3 works, it can pump the water inside the water guiding tank 901 through the water suction pipe 4, and the water will flow into the boiler 2. A pressure relief valve 10 is arranged on one side of the top of the preheating box 8. The setting of the pressure relief valve 10 can play a role in relieving pressure and prevent the air pressure inside the preheating box 8 from being too high.
[0037] Specifically, the water guiding component 9 includes a water guiding tank 901 arranged inside the preheating box 8 and an electric push rod 904 installed on the top of the preheating box 8. A heat conduction channel 902 is opened on the inner wall of the water guiding tank 901. A plurality of water guiding holes 903 are opened between the water guiding tank 901 and the heating box 15. The heat conduction channel 902 is in a "U" shape. The wall thickness of the water guiding tank 901 is the same as that of the heating box 15, so that the high-temperature flue gas can flow inside the heat conduction channel 902, which is convenient for reheating the water inside the water guiding tank 901. A sealing ring is arranged between the movable rod 906 and the water guiding tank 901. The setting of the sealing ring can improve the sealing performance of the water guiding tank 901 and prevent heat from being discharged through the gap between the movable rod 906 and the water guiding tank 901.
[0038] Specifically, the output end of the electric push rod 904 is installed with a connecting plate 905 through a telescopic rod, and a plurality of movable rods 906 that penetrate into the preheating box 8 are provided on both sides of the bottom of the connecting plate 905. When hot water needs to flow into the water guide box 901, the electric push rod 904 can be started to make the electric push rod 904 work, and the telescopic rod contracts to drive the movable rod 906 to move up. A blocking plate 907 is installed at the bottom end of the movable rod 906. After the movable rod 906 moves up, it will drive the blocking plate 907 to move up, so that the blocking plate 907 no longer blocks the water guide hole 903, so that hot water can flow into the water guide box 901 through the water guide hole 903. The size of the blocking plate 907 is larger than the diameter of the water guide hole 903. One side of 907 fits with the inner wall of the water guide box 901, and the sealing plate 907 can block the water guide hole 903, thereby preventing the water that has just flowed into the heating box 15 from directly entering the water guide box 901 through the water guide hole 903. The bottom end height of the water outlet pipe 13 is lower than the height of the water guide hole 903, which facilitates hot water to continue to flow into the water guide box 901 through the water guide hole 903. One side of the heating box 15 is connected to a drain pipe 17 extending to the inside of the water guide box 901, and a second solenoid valve 18 is installed on the drain pipe 17. When all the water in the heating box 15 needs to be discharged, the second solenoid valve 18 can be opened to allow the water to flow into the water guide box 901 through the drain pipe 17 and then be pumped away by the water pump 3.
[0039] See also Figure 1-Figure 2 A water tank 11 is installed on the top of the frame 7, and a water inlet pipe 12 is provided on one side of the top of the water tank 11. The water tank 11 can store water, and water can be added to the water tank 11 through the water inlet pipe 12. A heating box 15 is installed inside the water guide box 901, and an electric heating plate 16 is installed below the inside of the heating box 15. When water flows into the heating box 15, the electric heating plate 16 can be started, and the electric heating plate 16 can heat the water. The bottom of the water tank 11 is connected to a water outlet pipe 13 extending to the inside of the heating box 15, and a first solenoid valve 14 is installed on the water outlet pipe 13. When the water needs to be preheated, the first solenoid valve 14 can be opened so that the water in the water tank 11 can flow into the inside of the heating box 15 through the water outlet pipe 13. Embodiment 2:
[0040] On the basis of the above-mentioned embodiment 1, in order to improve the heating efficiency of the water in the water guide box 901 and improve the utilization efficiency of the flue gas generated by the boiler 2, the high-temperature flue gas will be drawn into the water guide box 901 through the setting of the following structure to heat the water in the water guide box 901.
[0041] See also Figure 1-Figure 2A fan 5 is installed at the lower side of the boiler 2, and the air outlet end of the fan 5 is connected to an air pipe 6 extending to the inside of the heat conduction channel 902. When the flue gas generated by the boiler is needed, the fan 5 can be started. The fan 5 can extract the boiler flue gas, and the boiler flue gas will enter the heat conduction channel 902 through the air pipe 6 to reheat the water in the water guide box 901.
[0042] The working principle of the utility model is as follows: first, the user can install the preheating device and connect the power supply, and cold water flows into the water tank 11 through the water inlet pipe 12. When the water needs to be preheated, the first solenoid valve 14 can be opened to allow the water in the water tank 11 to flow into the heating box 15 through the water outlet pipe 13, and then the electric heating plate 16 is started to heat the water;
[0043] Since the density of cold water is greater than that of hot water, the heated hot water will flow to the top of the cold water. When the hot water needs to flow into the water guide box 901, the electric push rod 904 can be started to make the electric push rod 904 work, the telescopic rod contracts and drives the movable rod 906 to move upward, and the movable rod 906 drives the blocking plate 907 to move upward, so that the blocking plate 907 no longer blocks the water guide hole 903. At this time, the hot water in the heating box 15 will flow into the water guide box 901 through the water guide hole 903, while the unheated cold water will continue to be heated in the heating box 15. As the water continues to be heated, and the water in the water tank 11 continues to flow into the heating box 15, the hot water will continue to flow upward and continue to flow into the water guide box 901 through the water guide hole 903. Then the water pump 3 is started. The water pump 3 can extract the hot water in the water guide box 901 and transport the preheated water to the boiler 2.
[0044] The high-temperature flue gas generated by the boiler will be extracted by the fan 5 and enter the heat conduction channel 902 through the gas pipe 6, so that the high-temperature flue gas flows in the heat conduction channel 902 and heats the water in the water guide box 901 again.
[0045] Although an embodiment of the utility model has been shown and described, this specific embodiment is only an explanation of the utility model and is not a limitation of the utility model. The specific features, structures, materials or characteristics described may be combined in a suitable manner in any one or more embodiments or examples. After reading this specification, those skilled in the art may make modifications, substitutions and variations to the embodiments without creative contribution as needed without departing from the principles and purpose of the utility model. However, as long as they are within the scope of the claims of the utility model, they are protected by patent law.
Claims
1. A natural gas boiler water preheating device, comprising a base plate (1) and a heating box (15), characterized in that: A frame (7) is installed on the top of the bottom plate (1). A preheating box (8) is arranged inside the frame (7). A water guiding component (9) is arranged inside the preheating box (8). The water guiding component (9) includes a water guiding tank (901) arranged inside the preheating box (8) and an electric push rod (904) installed on the top of the preheating box (8). A heat conduction channel (902) is formed on the inner wall of the water guiding tank (901). A plurality of water guiding holes (903) are formed between the water guiding tank (901) and the heating box (15). The output end of the electric push rod (904) is installed with a connecting plate (905) through a telescopic rod. A plurality of movable rods (906) penetrating to the inside of the preheating box (8) are arranged on both sides of the bottom of the connecting plate (905). A blocking plate (907) is installed at the bottom end of the movable rod (906).
2. A natural gas boiler water preheating device according to claim 1, characterized in that: A boiler (2) is installed on one side of the top of the bottom plate (1). A water pump (3) is arranged on one side of the boiler (2). The water inlet end of the water pump (3) is connected with a water suction pipe (4) extending to the inside of the water guiding tank (901).
3. A natural gas boiler water preheating device according to claim 1, characterized in that: A water tank (11) is installed on the top of the frame (7). A water inlet pipe (12) is arranged on one side of the top of the water tank (11).
4. A natural gas boiler water preheating device according to claim 1, characterized in that: A heating box (15) is installed inside the water guiding tank (901). An electric heating plate (16) is installed below the inside of the heating box (15).
5. A natural gas boiler water preheating device according to claim 3, characterized in that: The bottom of the water tank (11) is connected with a water outlet pipe (13) extending to the inside of the heating box (15). A first electromagnetic valve (14) is installed on the water outlet pipe (13).
6. A natural gas boiler water preheating device according to claim 1, characterized in that: A fan (5) is installed below one side of the boiler (2). The air outlet end of the fan (5) is connected with an air delivery pipe (6) extending to the inside of the heat conduction channel (902).
7. A natural gas boiler water preheating device according to claim 1, characterized in that: A pressure relief valve (10) is arranged on one side of the top of the preheating box (8).
8. A natural gas boiler water preheating device according to claim 1, characterized in that: The size of the blocking plate (907) is larger than the diameter of the water guiding hole (903). One side of the blocking plate (907) is attached to the inner wall of the water guiding tank (901).
9. A natural gas boiler water preheating device according to claim 1, characterized in that: The heat conduction channel (902) is in a "U" shape. The wall thickness of the water guiding tank (901) is the same as that of the heating box (15).
10. A natural gas boiler water preheating device according to claim 1, characterized in that: A sealing ring is arranged between the movable rod (906) and the water guiding tank (901).
