Heat exchange tube inner wall cleaning device

By designing the inner wall cleaning device of the heat exchange tube with the clamping mechanism and the projectile guidance channel, the compressed gas is used to push the cleaning projectile into the inner wall of the heat exchange tube, solving the problem of unsatisfactory results of the traditional cleaning method and achieving efficient and simple inner wall cleaning.

CN222027534UActive Publication Date: 2024-11-19YANTAI HENGHUI COPPER IND CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420247793.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-31
Publication Date
2024-11-19
Estimated Expiration
2034-01-31

AI Technical Summary

Technical Problem

The traditional cleaning method is not ideal for cleaning the inner wall of the heat exchange tube in the nuclear power unit, and the operation is cumbersome and time-consuming, making it difficult to meet the strict cleaning requirements.

Method used

A heat exchange tube inner wall cleaning device including a clamping mechanism and a first and second component that can be relatively far away and close to each other is designed, and a compressed gas is used to push the flexible cleaning projectile into the inner wall of the heat exchange tube through the projectile guide channel to realize cutting. Efficient cleaning of liquids and impurities.

Benefits of technology

It realizes efficient cleaning of the inner wall of the heat exchange tube, simplifies the operation process, reduces working hours and detergent use, and improves the cleanliness.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222027534U_ABST
    Figure CN222027534U_ABST
Patent Text Reader

Abstract

The utility model relates to a heat exchange tube inner wall cleaning device which is simple in structure and convenient to operate, and the device comprises a clamping mechanism which is used for clamping a heat exchange tube so as to position a tube opening in one end of the heat exchange tube; the first assembly and the second assembly can be relatively far away from and close to each other, and the first assembly is provided with a shot filling groove used for filling cleaning shots and a gas inflow channel which is communicated with the shot filling groove and allows compressed gas to flow in; the second assembly is provided with a shot guiding channel which can be communicated with the pipe opening so as to guide the cleaning shot into the pipe opening; when the first assembly and the second assembly are relatively close to each other, a groove opening of the shot filling groove is covered by the second assembly, and the shot filling groove is communicated with the shot guide channel; and when the first assembly and the second assembly are relatively far away from each other, the second assembly uncovers the notch.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to a device for cleaning the inner wall of a heat exchange tube. Background Art

[0002] In nuclear power units, the Moisture Separator Reheater (MSR) is an essential key equipment. The Moisture Separator Reheater contains a number of high-efficiency heat exchange tubes, each of which is about 40 meters long. During the production and manufacturing stage of these heat exchange tubes, it is necessary to process the inner reinforced threads inside the tube to improve its heat exchange performance. When processing the inner reinforced threads, an emulsified cutting fluid is required. The cutting fluid is water-soluble, and after processing, some of the cutting fluid will adhere to the inner wall of the heat exchange tube. Nuclear power units have extremely strict requirements on the cleanliness of heat exchange tubes, requiring the inner wall of the heat exchange tube to be clean and dry, without residue or impurities.

[0003] The traditional cleaning method is to soak the heat exchange tube in a water tank for a period of time, then take it out and use a hot hair dryer to dry the inner wall or clean the impurities attached to the inner wall. However, this cleaning method is cumbersome and requires more man-hours and clean water. In addition, since the heat exchange tube is about 40 meters long, the effect of the traditional cleaning method is not ideal. Summary of the invention

[0004] In order to solve at least one of the above technical problems, the present application proposes a heat exchange tube inner wall cleaning device which has a simple structure and is easy to operate.

[0005] A device for cleaning the inner wall of a heat exchange tube, comprising:

[0006] A clamping mechanism, used for clamping the heat exchange tube to locate the tube opening at one end of the heat exchange tube;

[0007] A first component and a second component that can be relatively far away from and close to each other, the first component having a pellet loading groove for loading cleaning pellets, and a gas inflow channel connected to the pellet loading groove for compressed gas to flow in, and the second component having a pellet guide channel that can be connected to the pipe mouth to guide the cleaning pellets into the pipe mouth;

[0008] When the first component and the second component are relatively close to each other, the notch of the shot loading slot is covered by the second component, and the shot loading slot is connected to the shot guiding channel; when the first component and the second component are relatively far away from each other, the second component releases the cover on the notch.

[0009] In some possible implementations, the first component and the second component are configured to be relatively far away from and close to each other along a first direction;

[0010] The first component has a convex cone portion that gradually protrudes toward the second component in the first direction, and the shot loading groove is formed by being recessed from the end surface of the contraction end of the convex cone portion along the first direction;

[0011] The second component has a tapered groove facing the convex cone portion in the first direction, the tapered groove is gradually concave in the direction away from the first component, and the projectile guide channel extends to the bottom of the tapered groove;

[0012] When the first component and the second component are relatively close to each other, the tapered groove receives the convex cone portion, and the convex cone surface of the convex cone portion is in sealing contact with the concave cone surface of the tapered groove along the first direction.

[0013] In some possible embodiments, the first component includes a first sealing ring arranged on the outer peripheral side of the convex cone portion, and when the first component and the second component are relatively close, the first sealing ring is sealed and clamped between the first component and the second component on the outer peripheral side of the convex cone portion and the conical groove.

[0014] In some possible implementations, a connecting portion between the projectile guiding channel and the tapered groove has a rounded corner around the first direction.

[0015] In some possible implementations, the projectile guiding channel and the gas inflow channel extend linearly along the first direction, and the projectile guiding channel, the conical groove, the projectile loading groove and the gas inflow channel are arranged in sequence in a colinear manner in the first direction.

[0016] In some possible implementations, the projectile guiding channel has a first channel opening and a second channel opening which are arranged opposite to each other in the first direction, and the first channel opening is arranged at the bottom of the tapered groove;

[0017] When viewed along the first direction, the second channel opening is entirely within the pipe opening.

[0018] In some possible implementations, the second component includes:

[0019] A guide sleeve having a first inner hole extending in the first direction, wherein the first inner hole includes the projectile guiding channel and the tapered groove;

[0020] A positioning sleeve, threadedly connected to one end of the guide sleeve, and having a second inner hole penetrating in the first direction and coaxial with the first inner hole, wherein the aperture of the second inner hole is larger than the aperture of the first inner hole;

[0021] A second sealing ring is coaxially arranged at the connection portion between the positioning sleeve and the guide sleeve.

[0022] In some possible implementations, the following further includes:

[0023] a first cylinder, used for driving the first component to move along the first direction;

[0024] a second cylinder, used for driving the second component to move along the first direction;

[0025] A guide rail is used to guide the movement of the first component and the second component in the first direction.

[0026] In some possible implementations, the clamping assembly includes:

[0027] The first clamping block and the second clamping block are configured to be able to move away from and approach each other relatively along a second direction so as to clamp the heat exchange tube therebetween;

[0028] A clamping cylinder is connected to the first clamping block and the second clamping block to drive the first clamping block and the second clamping block to move away from and closer to each other along the second direction.

[0029] In some possible implementations, the second direction is perpendicular to the first direction;

[0030] A step surface is formed at the connection point between the shot filling groove and the gas inflow channel, and the step surface prevents the cleaning shot in the shot filling groove from entering the gas inflow channel.

[0031] According to the heat exchange tube inner wall cleaning device provided by the present application, in implementation, the heat exchange tube to be cleaned is clamped and fixed by a clamping mechanism to position the tube mouth at one end of the heat exchange tube at a desired position. When the first component and the second component are in a relatively distant state, the slot of the shot filling slot is not covered to form an operating space for loading operations. After the flexible cleaning shot is loaded into the shot filling slot, the first component and the second component are relatively close. Then, a compressed gas source is used to provide compressed gas to the gas inflow channel. The compressed gas will quickly push the cleaning shot in the shot filling slot to move to the tube mouth of the heat exchange tube through the shot guide channel of the second component. The shot moves along the tube hole of the heat exchange tube while maintaining full contact with the inner wall of the heat exchange tube and is discharged from the tube mouth at the other end. As a result, the cleaning shot takes out the residual cutting fluid and related impurities on the inner wall of the heat exchange tube, thereby achieving efficient cleaning of the inner wall of the heat exchange tube. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings of the embodiments will be briefly introduced below. Obviously, the drawings in the following description only relate to some embodiments of the present application, rather than limiting the present application.

[0033] Figure 1It is a schematic diagram of the three-dimensional structure of a heat exchange tube inner wall cleaning device provided in one embodiment of the present application.

[0034] Figure 2 yes Figure 1 Top view of the .

[0035] Figure 3 yes Figure 2 Side view of.

[0036] Figure 4 yes Figure 3 Schematic cross-sectional view of the upper half of the structure shown.

[0037] Figure 5 It is a cross-sectional schematic diagram when the cleaning projectile is loaded into the projectile loading groove.

[0038] Figure 6 This is a three-dimensional diagram of the cleaning projectile being loaded into the projectile loading slot.

[0039] Description of reference numerals:

[0040] F1-first direction, AA-heat exchange tube, AA1-tube opening;

[0041] 100-first component, 200-second component, 300-clamping mechanism;

[0042] 1-base frame, 2-projectile filling groove, 3-gas inflow channel, 4-projectile guiding channel, 5-convex cone, 6-conical groove, 7-first sealing ring, 8-guide sleeve, 9-positioning sleeve, 10-guide shaft, 11-first cylinder, 12-second cylinder, 13-first slide, 14-first bracket, 15-cylindrical member, 16-trachea joint, 17-second slide, 18-second bracket, 19-mounting seat, 20-clamping cylinder, 21-clamping block, 22-cleaning projectile, 23-grating sensor, 23a-first part, 23b-second part, 24-second sealing ring. DETAILED DESCRIPTION

[0043] In order to make the purpose, technical scheme and advantages of the present application clearer, the technical scheme of the embodiment of the present application will be clearly and completely described below in conjunction with the drawings of the embodiment of the present application. Obviously, the described embodiment is a part of the embodiment of the present application, rather than all the embodiments. Based on the described embodiment of the present application, all other embodiments obtained by ordinary technicians in this field without creative work belong to the scope of protection of this application. It can be understood that, in the absence of conflict, some technical means of the various embodiments described herein can be replaced or combined with each other.

[0044] In the description of this application, if there are terms such as "first", "second", etc., they are only used to distinguish the objects described and do not have any order or technical meaning. Therefore, an object defined as "first", "second", etc. may explicitly or implicitly include one or more of the objects, and, for example, the term "first element" itself does not mean the existence of the "second element", and the term "second element" itself does not mean the existence of the "first element". In addition, "one" or "a" and similar words do not indicate a quantity limitation, but rather indicate the existence of at least one, and "multiple" means not less than two.

[0045] In the description of the present application, the terms “including”, “having” indicate the existence of the described features, numbers, operations, elements and / or their combinations, but do not exclude the existence or addition of one or more other features, numbers, operations, elements and / or their combinations.

[0046] In the description of the present application, reference to "one embodiment" or "some embodiments" etc. means that one or more embodiments of the present application include a particular feature, structure or characteristic described in conjunction with the embodiment. Thus, the phrases "in one embodiment", "in some embodiments", "in some other embodiments", "in some other embodiments", etc. appearing in different places in the present specification do not necessarily refer to the same embodiment, but mean "one or more but not all embodiments", unless otherwise specifically emphasized in other ways.

[0047] Figures 1 to 6 A heat exchange tube inner wall cleaning device provided in one embodiment of the present application (hereinafter sometimes referred to as "the device") is shown, which includes a base frame 1 and a clamping mechanism 300 supported and held by the base frame 1, a first component 100 and a second component 200.

[0048] The clamping mechanism 300 is used to clamp the heat exchange tube AA to be cleaned to locate the tube opening AA1 at one end of the heat exchange tube AA. Specifically, the top of the base frame 1 has a horizontally arranged workbench with omitted reference numerals, on which a mounting seat 19 is fastened via bolts, and the mounting seat 19 is a generally L-shaped plate structure. A clamping cylinder 20 with two telescopic plates is fixed to one side of the mounting seat 19 via bolts, and a clamping block 21 is respectively connected to the two telescopic plates of the clamping cylinder 20. The two clamping blocks 21 are relatively arranged in the up and down direction (the second direction), and can be relatively close to and away from each other under the drive of the clamping cylinder 20 to selectively clamp and loosen the heat exchange tube AA. In addition, each clamp block 21 has a V-shaped groove (illustration mark omitted) facing the other clamp block 21, and the V-shaped groove is a straight-line extending through groove. In practice, the heat exchange tube AA is clamped between the two V-shaped grooves, which not only reduces the damage to the heat exchange tube AA, but also helps to straighten the posture of the heat exchange tube AA so that its tube mouth AA1 is at a specified position and angle.

[0049] The first component 100 and the second component 200 can be relatively far away from and close to each other. The first component 100 has a shot filling slot 2 for filling the cleaning shot 22, and a gas inflow channel 3 connected to the shot filling slot 2 for compressed gas to flow in. The second component 200 has a shot guide channel 4 that can be connected to the aforementioned nozzle AA1 to guide the cleaning shot 22 into the nozzle AA1. When the first component 100 and the second component 200 are relatively close to each other, the notch of the shot filling slot 2 is covered by the second component 200, and the shot filling slot 2 is connected to the shot guide channel 4; when the first component 100 and the second component 200 are relatively far away from each other, the second component 200 removes the cover of the notch of the shot filling slot 2.

[0050] Thus, in practice, the heat exchange tube AA to be cleaned is clamped and fixed by the clamping mechanism 300, so that the tube opening AA1 at one end of the heat exchange tube AA is positioned at a desired position. When the first component 100 and the second component 200 are relatively far apart (the slot of the shot loading slot 2 is not covered to form an operating space for loading operation), after the flexible cleaning shot 22 is loaded into the shot loading slot 2, the first component 100 and the second component 200 are relatively close. Then, a compressed gas source is used to provide compressed gas (such as compressed air) to the gas inflow channel 3. The compressed gas will quickly push the cleaning shot 22 in the shot filling slot 2 to move to the pipe mouth AA1 of the heat exchange tube AA through the shot guide channel 4 of the second component 200. The shot moves along the tube hole of the heat exchange tube AA while maintaining full contact with the inner wall of the heat exchange tube AA and is discharged from the pipe mouth AA1 at the other end. As a result, the cleaning shot 22 brings out the residual cutting fluid and related impurities on the inner wall of the heat exchange tube AA, thereby achieving efficient cleaning of the inner wall of the heat exchange tube AA.

[0051] In this embodiment, the first component 100 and the second component 200 are configured to be relatively far away and close to each other along a first direction F1, and the first direction F1 is a horizontal direction. Figure 1 and Figure 4Two guide shafts 10 arranged in parallel and extending in the first direction F1 are fixed on the workbench on the top of the base frame 1 via a clamping seat with omitted reference numerals. Each of the first component 100 and the second component 200 is movably connected to the two guide shafts 10, so that the two guide shafts 10 constitute a guide rail for guiding the movement of the first component 100 and the second component 200 in the first direction F1. The first cylinder 11 and the second cylinder 12 are fixed on the workbench of the base frame 1 in a manner of sandwiching the first component 100 and the second component 200 therebetween, wherein the first cylinder 11 is connected to the first component 100 to drive the first component 100 to move in the first direction F1, and the second cylinder 12 is connected to the second component 200 to drive the second component 200 to move in the first direction F1. In this way, each of the first component 100 and the second component 200 can actively move closer to and farther away from the other. The advantage is that the second component 200 can be moved in the first direction F1 to reliably connect the shot guide channel 4 with the tube mouth AA1 of the heat exchange tube AA, and the first component 100 can be moved in the first direction F1 to separate the shot loading slot 2 from the shot guide channel 4 to load the shots, and to connect the shot loading slot 2 with the shot guide channel 4 to allow the clean shots 22 in the loading slot to move to the shot guide channel 4 under the impact of the compressed gas.

[0052] In other embodiments, the position of the first component 100 on the base frame 1 is fixed and cannot be adjusted, but the position of the second component 200 can be adjusted along the first direction F1, thereby achieving the relative distance and proximity between the first component 100 and the second component 200. In still other embodiments, the position of the second component on the base frame 1 is fixed and cannot be adjusted, but the position of the first component 100 can be adjusted along the first direction F1, thereby achieving the relative distance and proximity between the first component 100 and the second component 200.

[0053] In this embodiment, the first component 100 has a convex cone portion 5 that gradually shrinks and protrudes toward the second component 200 in the first direction F1, and the shot loading groove 2 is formed by being recessed along the first direction F1 from the end surface of the contraction end of the convex cone portion 5. Correspondingly, the second component 200 has a tapered groove 6 facing the convex cone portion 5 in the first direction F1, and the tapered groove 6 gradually shrinks and recesses in the direction away from the first component 100, and the shot guiding channel 4 extends to the bottom of the tapered groove 6. When the first component 100 and the second component 200 are relatively close, the tapered groove 6 receives the convex cone portion 5, and the convex cone surface of the convex cone portion 5 and the concave cone surface of the tapered groove 6 are sealed and abutted along the first direction F1. In this way, the sealing performance of the shot loading groove 2 and the shot guiding channel 4 in the connected state can be easily enhanced. In addition, the first component 100 further includes a first sealing ring 7 arranged on the outer peripheral side of the convex cone portion 5. When the first component 100 and the second component 200 are relatively close, the first sealing ring 7 is sealed and clamped between the first component 100 and the second component 200 on the outer peripheral side of the convex cone portion 5 and the tapered groove 6, thereby further enhancing the aforementioned sealing. In other embodiments, the first sealing ring 7 can also be provided on the second component 200 and located on the outer peripheral side of the tapered groove 6.

[0054] It can be understood that, since the above-mentioned conical groove 6 has a tapered structure toward the projectile guide channel 4, it can also guide the cleaning projectiles 22 in the projectile filling groove 2 to smoothly enter the projectile guide channel 4. Specifically, when the cleaning projectile 22 is separated from the projectile filling groove 2 under the action of the compressed airflow, it first contacts the concave conical groove wall surface of the conical groove 6, and then smoothly enters the projectile guide channel 4 toward the groove bottom under the guidance of the concave conical groove wall surface. In addition, in order to allow the cleaning projectile 22 to enter the projectile guide channel 4 more smoothly from the projectile filling groove 2, the present embodiment is provided with a chamfered corner (with reference numerals omitted) around the first direction F1 at the connecting portion between the projectile guide channel 4 and the conical groove 6.

[0055] Please review Figure 4 See also Figure 1 The pellet guide channel 4 and the gas inflow channel 3 are both straight channels extending in a straight line along the first direction F1, and the pellet guide channel 4, the tapered groove 6, the pellet loading groove 2 and the gas inflow channel 3 are sequentially arranged in a colinear manner in the first direction F1. In this way, it is helpful to reduce the movement resistance of the cleaning pellets 22 and the compressed gas, and improve the cleaning efficiency of the cleaning pellets 22 on the inner wall of the heat exchange tube AA.

[0056] See also Figure 5 Combined with Figure 4A step surface with omitted reference numerals is formed at the connection between the shot loading slot 2 and the gas inflow channel 3, and the step surface faces the cleaning shot 22 in the shot loading slot 2, and is used to prevent the cleaning shot 22 in the shot loading slot 2 from entering the gas inflow channel 3. In this way, when the operator loads the cleaning shot 22 into the shot loading slot 2, the cleaning shot 22 will not accidentally enter the gas inflow channel 3 due to the blocking and restriction of the step surface.

[0057] The projectile guiding channel 4 has a first channel opening and a second channel opening which are arranged opposite to each other in the first direction F1 . The first channel opening is arranged at the bottom of the conical groove 6 , and the second channel opening is located at one end of the projectile guiding channel 4 away from the conical groove 6 .

[0058] If the diameter of the tube mouth AA1 of the heat exchange tube AA is smaller than the diameter of the second channel mouth, then in implementation, a step surface facing the shot guide channel 4 will be formed at the joint between the tube mouth AA1 of the heat exchange tube AA and the second channel mouth. When the cleaning shot 22 enters the tube mouth AA1 from the shot guide channel 4, the flexible cleaning shot 22 is easily damaged or even disintegrated due to the obstruction of the step surface, and the cleaning effect is difficult to guarantee.

[0059] In this regard, in this embodiment, the diameter of the second channel opening is set to be slightly smaller than the diameter of the tube opening AA1 of the heat exchange tube AA, and when observed along the first direction F1, the second channel opening is entirely within the tube opening AA1. In this way, when the cleaning projectile 22 enters the tube opening AA1 from the projectile guide channel 4 driven by the compressed gas, there is no step to block the movement of the cleaning projectile 22, thereby preventing the cleaning projectile 22 from being damaged and disintegrated.

[0060] Please see again Figures 1 to 4 In this embodiment, the first assembly 100 includes a first slide 13, a first bracket 14, a cylindrical member 15 and an air pipe joint 16. Two first lugs are integrally formed at the bottom of the first slide 13, and the two first lugs are respectively slidably mounted on the two guide shafts 10 mentioned above. The first bracket 14, which is generally L-shaped, is fixed to the upper surface of the first slide 13 via bolts. The cylindrical member 15 with a connecting flange (the reference numerals are omitted) passes through the first bracket 14 and is fastened to the first bracket 14 via the connecting flange by means of bolts. The aforementioned projectile loading groove 2 and gas inflow channel 3 are specifically formed in the cylindrical member 15. The air pipe joint 16 is provided at one end of the cylindrical member 15 for connecting the air pipe drawn from the compressed gas source.

[0061] The second assembly 200 includes a second slide 17, a second bracket 18, a guide sleeve 8 and a positioning sleeve 9. The bottom of the second slide 17 is integrally formed with two second lugs, which are respectively slidably sleeved on the two guide shafts 10 mentioned above. The second bracket 18, which is generally L-shaped, is fixed to the upper surface of the second slide 17 via bolts. The guide sleeve 8 with a connecting flange (the reference numerals are omitted) passes through the second bracket 18 and is fastened to the second bracket 18 via the connecting flange. The guide sleeve 8 has a first inner hole that is set through in the first direction F1, and the first inner hole includes the aforementioned projectile guide channel 4 and the tapered groove 6. The positioning sleeve 9 is threadedly connected to one end of the guide sleeve 8, and has a second inner hole that is set through in the first direction F1 and is coaxial with the first inner hole. The positioning sleeve 9 (or the second inner hole of the positioning sleeve 9) is used for inserting one end of the heat exchange tube AA, so as to better locate the position of the tube mouth AA1. Therefore, in order to avoid forming the aforementioned step surface, the aperture of the second inner hole should be larger than the aperture of the first inner hole. In addition, the second sealing ring 24 is coaxially arranged at the connection position of the positioning sleeve 9 and the guide sleeve 8, so that in use, good airtightness is obtained at the connection position of the pipe mouth AA1 of the heat exchange tube AA, the positioning sleeve 9 and the guide sleeve 8. In addition, the pipe inlet end of the guide sleeve 8 is configured as a bell mouth, which facilitates the smooth insertion of the heat exchange tube AA.

[0062] When the operator manually loads the cleaning pellets 22 into the pellet loading slot 2, if the first cylinder 11 accidentally moves, mechanical accidents such as pinching the hand may occur. In order to prevent such accidents, the cleaning device of this embodiment is also equipped with a grating sensor 23 electrically connected to the first cylinder 11, and the grating sensor 23 includes a first part 23a and a second part 23b separated from each other, and the separation space between the first part 23a and the second part 23b corresponds to the operation space of the operator when loading the cleaning pellets. In addition, the first cylinder 11 for driving the first component 100 to move is configured to be turned on only when there is no obstruction between the first part 23a and the second part 23b; in other words, the premise that the first cylinder 11 can be turned on and moved is that there is no obstruction between the first part 23a and the second part 23b. In detail, during the process of loading the cleaning pellets 22, the operator's hand blocks the transmission of the light signal between the first part 23a and the second part 23b, and thus the first cylinder 11 will not move.

Claims

1. A heat exchange tube inner wall cleaning device, characterized in that: include: A clamping mechanism, used for clamping the heat exchange tube to locate the tube opening at one end of the heat exchange tube; A first component and a second component that can be relatively far away from and close to each other, the first component having a pellet loading groove for loading cleaning pellets, and a gas inflow channel connected to the pellet loading groove for compressed gas to flow in, and the second component having a pellet guide channel that can be connected to the pipe mouth to guide the cleaning pellets into the pipe mouth; When the first component and the second component are relatively close to each other, the notch of the shot loading slot is covered by the second component, and the shot loading slot is connected to the shot guiding channel; when the first component and the second component are relatively far away from each other, the second component releases the cover on the notch.

2. The device according to claim 1, characterized in that The first component and the second component are configured to be relatively far away from and close to each other along a first direction; The first component has a convex cone portion that gradually protrudes toward the second component in the first direction, and the shot loading groove is formed by being recessed from the end surface of the contraction end of the convex cone portion along the first direction; The second component has a tapered groove facing the convex cone portion in the first direction, the tapered groove is gradually concave in the direction away from the first component, and the projectile guide channel extends to the bottom of the tapered groove; When the first component and the second component are relatively close to each other, the tapered groove receives the convex cone portion, and the convex cone surface of the convex cone portion is in sealing contact with the concave cone surface of the tapered groove along the first direction.

3. The device according to claim 2, characterized in that The first component includes a first sealing ring arranged on the outer peripheral side of the convex cone portion. When the first component and the second component are relatively close, the first sealing ring is sealed and clamped between the first component and the second component on the outer peripheral sides of the convex cone portion and the tapered groove.

4. The device according to claim 2, characterized in that A communicating portion between the projectile guiding passage and the tapered groove has a rounded corner around the first direction.

5. The device according to claim 2, characterized in that The projectile guide channel and the gas inflow channel extend linearly along the first direction, and the projectile guide channel, the tapered groove, the projectile loading groove and the gas inflow channel are sequentially arranged in a collinear manner in the first direction.

6. The device according to claim 5, characterized in that The projectile guiding channel has a first channel opening and a second channel opening which are arranged opposite to each other in the first direction, and the first channel opening is arranged at the groove bottom of the tapered groove; When viewed along the first direction, the second channel opening is entirely within the pipe opening.

7. The device according to claim 6, characterized in that The second component comprises: A guide sleeve having a first inner hole extending in the first direction, wherein the first inner hole includes the projectile guiding channel and the tapered groove; A positioning sleeve, threadedly connected to one end of the guide sleeve, and having a second inner hole penetrating in the first direction and coaxial with the first inner hole, wherein the aperture of the second inner hole is larger than the aperture of the first inner hole; A second sealing ring is coaxially arranged at the connection portion between the positioning sleeve and the guide sleeve.

8. The device according to any one of claims 2 to 7, characterized in that Also includes: a first cylinder, used for driving the first component to move along the first direction; a second cylinder, used for driving the second component to move along the first direction; A guide rail is used to guide the movement of the first component and the second component in the first direction.

9. The device according to claim 2, characterized in that The clamping mechanism comprises: The first clamping block and the second clamping block are configured to be able to move away from and approach each other relatively along a second direction so as to clamp the heat exchange tube therebetween; A clamping cylinder is connected to the first clamping block and the second clamping block to drive the first clamping block and the second clamping block to move away from and closer to each other along the second direction.

10. The device according to claim 9, characterized in that The second direction is perpendicular to the first direction; A step surface is formed at the connection point between the shot filling groove and the gas inflow channel, and the step surface prevents the cleaning shot in the shot filling groove from entering the gas inflow channel.