Drilling device for communication engineering

By introducing dust treatment components and motor heat dissipation components into the drilling drill for communication engineering, the dust problem during drilling in the prior art is solved, effective dust treatment and equipment heat dissipation are realized, and operation safety and convenience are improved.

CN222036849UActive Publication Date: 2024-11-22XIAMEN HONGZHOU NETWORK TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420538552.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-20
Publication Date
2024-11-22
Estimated Expiration
2034-03-20

AI Technical Summary

Technical Problem

The existing drilling devices for communication engineering do not have dust removal functions when used, resulting in dust being easily generated during the drilling process, which can cause harm to the health of the operator.

Method used

A driller consisting of a dust treatment assembly consisting of a glass sleeve, a thrust spring, a telescopic suction tube, a large particle filter, a dust treatment box, a dust suction fan and a filter mounting bracket, which is absorbed by dust. The fan and filters perform dust filtering and sucking, combining motor and heat dissipation components for drilling and heat dissipation functions.

Benefits of technology

It effectively solves the problem of dust treatment, improves the health and safety of operators, and achieves convenient drilling process and equipment heat dissipation effects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222036849U_ABST
    Figure CN222036849U_ABST
Patent Text Reader

Abstract

The utility model discloses a drilling device for communication engineering, which comprises a drilling mounting shell, a dust treatment component is arranged on the periphery of the drilling mounting shell, a drilling mounting component is arranged in the drilling mounting shell, and the drilling mounting component comprises a motor heat dissipation component; the dust treatment assembly comprises a glass sleeve, the glass sleeve is in sliding fit with the drilling installation shell, one side of the glass sleeve is connected with a thrust spring, one side of the thrust spring is connected with a fixing circular ring, and the fixing circular ring is connected with the drilling installation shell. In the drilling process, dust is treated, and the problems that an existing drilling device for communication engineering does not have the dust removal function during use, dust is prone to being generated in the drilling process, and the health of operators is harmed are solved, so that the drilling device is convenient for people to use.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of drilling for communication engineering, in particular to a drilling tool for communication engineering. Background Art

[0002] Communication engineering is an undergraduate major in ordinary colleges and universities, belonging to the category of electronic information. The communication engineering major was established along with the development of China's communication industry. It is developed through the mutual penetration and complementation of wired and wireless communications, electronic technology, postal and telecommunications and other majors. Drilling device refers to the general term for equipment used to process holes in solid materials. Common drilling devices include electric drills, drilling machines, etc., and the existing communication engineering drills do not have the function of dust removal when in use. Dust is often easily generated during the drilling process, which is harmful to the health of the operator, so it is not convenient for people to use. Utility Model Content

[0003] (I) Technical solution

[0004] In order to solve the problems raised in the above background technology, the specific technical solutions adopted by the utility model are as follows:

[0005] A drill for communication engineering, comprising a drilling installation shell, a dust treatment component is arranged on the periphery of the drilling installation shell, a drilling installation component is arranged inside the drilling installation shell, and the drilling installation component includes a motor heat dissipation component;

[0006] In order to achieve the purpose of dust treatment, the dust treatment component includes a glass sleeve, which is slidably matched with the drilling installation shell, one side of the glass sleeve is connected to a thrust spring, one side of the thrust spring is connected to a fixed ring, the fixed ring is connected to the drilling installation shell, the inside of the glass sleeve is connected to a telescopic suction tube, one end of the telescopic suction tube is connected to a large particle filter, the end of the telescopic suction tube away from the large particle filter is connected to a dust treatment box, the inside of the dust treatment box is slidingly sealed with a filter mounting frame, a dust filter is installed inside the filter mounting frame, and one side of the dust treatment box is connected to a dust suction fan through a pipe.

[0007] Furthermore, a grab handle is connected to the bottom of the drilling installation shell, and a battery is installed inside the grab handle.

[0008] Furthermore, a control switch is installed on one side of the grab handle, and the dust suction fan is electrically connected to the battery through the control switch.

[0009] Furthermore, in order to achieve the purpose of drilling installation, the drilling installation assembly includes a drilling motor, the drilling motor is connected to the drilling installation shell, the output end of the drilling motor is connected to a rotating rod, the rotating rod is movably connected to the drilling installation shell, one end of the rotating rod is connected to a drill bit installation head, and a drilling bit is installed inside the drill bit installation head.

[0010] Furthermore, the drilling motor is electrically connected to the battery via a control switch.

[0011] Furthermore, in order to achieve the purpose of motor heat dissipation, the motor heat dissipation assembly includes a heat dissipation mounting groove, which is symmetrically opened inside the drilled mounting shell, one of the heat dissipation mounting grooves is installed with a dust filter, and the other heat dissipation mounting groove is installed with a heat dissipation fan.

[0012] Furthermore, the heat dissipation fan is electrically connected to the battery via a control switch.

[0013] (II) Beneficial effects

[0014] Compared with the prior art, the utility model provides a communication engineering drill having the following features:

[0015] Beneficial effects:

[0016] (1) The utility model improves upon the prior art. In actual use, the dust is handled during the drilling process through the dust handling component, thereby solving the problem that the existing drills used in communication engineering do not have the dust removal function during use, and dust is easily generated during the drilling process, which can cause harm to the health of the operator. Therefore, the utility model is convenient for people to use.

[0017] (2) In actual use, by setting up a drilling motor, the drilling motor can drive the rotating rod to rotate after it is started, and when the rotating rod rotates, it can drive the drill mounting head to rotate, and when the drill mounting head rotates, it can drive the drilling drill bit to rotate, thereby achieving the purpose of facilitating drilling. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a schematic diagram of the main structure of a drill for communication engineering according to an embodiment of the utility model;

[0019] Figure 2 It is a stereoscopic diagram of a drill for communication engineering according to an embodiment of the utility model;

[0020] Figure 3 It is a structural schematic diagram of a dust handling component in a drill for communication engineering according to an embodiment of the utility model;

[0021] Figure 4 The present invention is a schematic structural diagram of a drilling installation assembly in a drilling tool for communication engineering according to an embodiment of the present utility model.

[0022] In the figure:

[0023] 1. Drilling installation shell; 2. Dust handling assembly; 201. Glass sleeve; 202. Thrust spring; 203. Fixed ring; 204. Telescopic suction tube; 205. Large particle filter; 206. Dust handling box; 207. Filter mounting frame; 208. Dust filter; 209. Dust suction fan; 3. Drilling installation assembly; 301. Drilling motor; 302. Rotating rod; 303. Drill bit mounting head; 304. Drilling drill bit; 4. Motor heat dissipation assembly; 401. Heat dissipation mounting slot; 402. Dust filter; 403. Heat dissipation fan; 5. Grab handle; 6. Battery; 7. Control switch. DETAILED DESCRIPTION

[0024] In order to further illustrate the technical solution of the present application, the present invention provides drawings, which are part of the disclosure of the present invention and are mainly used to illustrate the embodiments and can be used in conjunction with the relevant descriptions in the specification to explain the operating principles of the embodiments. With reference to these contents, ordinary technicians in the field should be able to understand other possible implementation methods and advantages of the present invention. The components in the figures are not drawn to scale, and similar component symbols are generally used to represent similar components.

[0025] The present invention is now further described in conjunction with the accompanying drawings and specific implementation methods. Figure 1-Figure 4 As shown, a drill for communication engineering according to an embodiment of the utility model includes a drilling installation shell 1, a dust handling component 2 is provided on the periphery of the drilling installation shell 1, a drilling installation component 3 is provided inside the drilling installation shell 1, and the drilling installation component 3 includes a motor heat dissipation component 4.

[0026] like Figure 1-4 As shown, the dust handling assembly 2 includes a glass sleeve 201, the glass sleeve 201 is slidably matched with the drilling installation shell 1, a thrust spring 202 is connected to one side of the glass sleeve 201, a fixed ring 203 is connected to one side of the thrust spring 202, the fixed ring 203 is connected to the drilling installation shell 1, a telescopic suction tube 204 is connected inside the glass sleeve 201, one end of the telescopic suction tube 204 is connected to a large particle filter 205, and the telescopic suction tube 204 is away from the large particle filter 205. One end is connected to a dust treatment box 206, and the dust treatment box 206 has a filter mounting frame 207 in a sliding seal therein, and a dust filter 208 is installed inside the filter mounting frame 207. One side of the dust treatment box 206 is connected to a dust suction fan 209 through a pipeline, and a grab handle 5 is connected to the bottom of the drilling installation shell 1, and a battery 6 is installed inside the grab handle 5. A control switch 7 is installed on one side of the grab handle 5, and the dust suction fan 209 is electrically connected to the battery 6 through the control switch 7.

[0027] Through the above technical scheme, by setting the glass sleeve 201, the glass sleeve 201 can be moved along the drilling installation shell 1 during drilling. After the drilling is completed, the glass sleeve 201 is returned to its original position by the thrust spring 202 and the fixed ring 203. While drilling, the dust suction fan 209 is started by the control switch 7, and the dust suction fan 209 absorbs dust through the dust treatment box 206 and the telescopic suction tube 204. The dust first passes through the large particle filter 205 for large particle filtering, and the dust enters the dust treatment box 206 through the telescopic suction tube 204, and then returns to the dust filter 208 for dust filtering. The filter mounting frame 207 can take out the dust filter 208 for replacement. By setting the grab handle 5, the purpose of easy grasping by the user is achieved, the battery 6 can achieve the purpose of facilitating power supply to the device, and the control switch 7 can achieve the purpose of facilitating control of the device.

[0028] like Figure 1-4 As shown, the drilling installation assembly 3 includes a drilling motor 301, the drilling motor 301 is connected to the drilling installation shell 1, the output end of the drilling motor 301 is connected to a rotating rod 302, the rotating rod 302 is movably connected to the drilling installation shell 1, one end of the rotating rod 302 is connected to a drill bit installation head 303, a drilling drill bit 304 is installed inside the drill bit installation head 303, and the drilling motor 301 is electrically connected to the battery 6 through the control switch 7.

[0029] Through the above technical solution, by setting up a drilling motor 301, the drilling motor 301 can drive the rotating rod 302 to rotate after it is started. When the rotating rod 302 rotates, it can drive the drill mounting head 303 to rotate. When the drill mounting head 303 rotates, it can drive the drilling drill bit 304 to rotate, thereby achieving the purpose of facilitating drilling.

[0030] like Figure 1-4 As shown, the motor heat dissipation assembly 4 includes a heat dissipation mounting groove 401, which is symmetrically opened inside the drilled mounting shell 1, one of the heat dissipation mounting grooves 401 is installed with a dust filter 402, and the other heat dissipation mounting groove 401 is installed with a heat dissipation fan 403, and the heat dissipation fan 403 is electrically connected to the battery 6 through the control switch 7.

[0031] Through the above technical solution, by setting the heat dissipation installation groove 401, the purpose of installing the dust filter 402 and the heat dissipation fan 403 is achieved. At the same time, the dust filter 402 achieves the purpose of heat dissipation and dust prevention, and the heat dissipation fan 403 achieves the purpose of facilitating heat dissipation for the equipment.

[0032] In order to facilitate understanding of the above technical solution of the present invention, the working principle or operation method of the present invention in the actual process is described in detail below.

[0033] Working principle: By setting the glass sleeve 201, the glass sleeve 201 moves along the drilling installation shell 1 when drilling. After the drilling is completed, the glass sleeve 201 returns to its original position through the thrust spring 202 and the fixed ring 203. While drilling, the dust suction fan 209 is started by the control switch 7. The dust suction fan 209 absorbs dust through the dust treatment box 206 and the telescopic suction tube 204. The dust first passes through the large particle filter 205 for large particle filtering. The dust enters the dust treatment box 206 through the telescopic suction tube 204, and then returns to the dust filter 208 for dust filtering. The filter installation frame 207 can take out the dust filter 208 for replacement. By setting the grab handle 5, the purpose of easy grasping by the user is achieved, the battery 6 is convenient for powering the device, and the control switch 7 is convenient for controlling the device.

[0034] By setting the drilling motor 301, the drilling motor 301 can drive the rotating rod 302 to rotate after it is started, and when the rotating rod 302 rotates, it can drive the drill mounting head 303 to rotate, and when the drill mounting head 303 rotates, it can drive the drilling drill 304 to rotate, so as to achieve the purpose of facilitating drilling;

[0035] By setting the heat dissipation installation slot 401, the purpose of installing the dust filter 402 and the heat dissipation fan 403 is achieved. At the same time, the dust filter 402 achieves the purpose of heat dissipation and dust prevention, and the heat dissipation fan 403 achieves the purpose of facilitating heat dissipation for the equipment.

[0036] In the present utility model, unless otherwise clearly stipulated and limited, the terms such as "installation", "setting", "connection", "fixation" and "screw-on" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integrated connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. Unless otherwise clearly defined, ordinary technicians in this field can understand the specific meanings of the above terms in the utility model according to the specific circumstances.

[0037] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A drill for communication engineering, characterized in that: It comprises a drilling installation shell (1), a dust treatment component (2) is arranged on the periphery of the drilling installation shell (1), a drilling installation component (3) is arranged inside the drilling installation shell (1), and the drilling installation component (3) comprises a motor heat dissipation component (4); The dust handling assembly (2) comprises a glass sleeve (201), the glass sleeve (201) is slidably matched with the drilling installation shell (1), one side of the glass sleeve (201) is connected to a thrust spring (202), one side of the thrust spring (202) is connected to a fixed ring (203), the fixed ring (203) is connected to the drilling installation shell (1), the glass sleeve (201) is internally connected to a telescopic suction tube (204), one end of the telescopic suction tube (204) is connected to a large particle filter (205), the end of the telescopic suction tube (204) away from the large particle filter (205) is connected to a dust handling box (206), the dust handling box (206) is internally slidably sealed with a filter mounting frame (207), a dust filter (208) is installed inside the filter mounting frame (207), and one side of the dust handling box (206) is connected to a dust suction fan (209) through a pipeline.

2. A communication engineering drill according to claim 1, characterized in that: The bottom of the drilling installation housing (1) is connected to a grab handle (5), and a storage battery (6) is installed inside the grab handle (5).

3. A communication engineering drill according to claim 2, characterized in that: A control switch (7) is installed on one side of the grab handle (5), and the dust suction fan (209) is electrically connected to the battery (6) via the control switch (7).

4. A communication engineering drill according to claim 3, characterized in that: The drilling installation assembly (3) comprises a drilling motor (301), the drilling motor (301) is connected to the drilling installation housing (1), the output end of the drilling motor (301) is connected to a rotating rod (302), the rotating rod (302) is movably connected to the drilling installation housing (1), one end of the rotating rod (302) is connected to a drill bit installation head (303), and a drilling drill bit (304) is installed inside the drill bit installation head (303).

5. A communication engineering drill according to claim 4, characterized in that: The drilling motor (301) is electrically connected to the battery (6) via a control switch (7).

6. A communication engineering drill according to claim 5, characterized in that: The motor heat dissipation assembly (4) comprises heat dissipation installation grooves (401), wherein the heat dissipation installation grooves (401) are symmetrically arranged inside the drilled installation housing (1), wherein a dust filter (402) is installed inside one of the heat dissipation installation grooves (401), and a heat dissipation fan (403) is installed inside the other heat dissipation installation groove (401).

7. A communication engineering drill according to claim 6, characterized in that: The heat dissipation fan (403) is electrically connected to the battery (6) via a control switch (7).