Titanium alloy pipe fitting chamfering and deburring equipment

By designing automated chamfer and deburring equipment for titanium alloy pipe fittings, using components such as frames, U-frames and hydraulic push rods, automatic chamfer and deburring operations at both ends of the pipe fittings are achieved, solving the low efficiency and high cost in traditional technology The problem of this has improved processing efficiency and product quality.

CN222037038UActive Publication Date: 2024-11-22CHANGZHOU BETA TITANIUM TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420696897.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-07
Publication Date
2024-11-22
Estimated Expiration
2034-04-07

AI Technical Summary

Technical Problem

During the processing of traditional titanium alloy pipe fittings, the chamfer deburring process is inefficient, and it is impossible to handle both ends of the pipe fittings at the same time, resulting in high production costs and low processing efficiency.

Method used

A titanium alloy pipe fitting chamfer deburring equipment was designed, using frames, U-shaped frames, feeding mechanisms, pressing mechanisms, hydraulic push rods and rotating motors to realize automatic chamfering and deburring operations at both ends of the pipe fittings. The material preparation rack and the feeding mechanism realize automatic loading and unloading, and the pipe fittings are processed in combination with the chamfered cutter head.

Benefits of technology

It greatly improves processing efficiency, reduces labor costs, ensures the quality and safety of pipe fittings, realizes simultaneous processing at both ends of pipe fittings, and improves overall production efficiency and product quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222037038U_ABST
    Figure CN222037038U_ABST
Patent Text Reader

Abstract

The utility model discloses chamfering and deburring equipment for a titanium alloy pipe fitting, and belongs to the field of pipe fitting machining equipment. Chamfering and deburring equipment for titanium alloy pipe fittings comprises a rack and a collecting box, a U-shaped frame is fixed to the middle of the upper side of the rack, a material preparation frame is fixed to one side of the feeding end of the U-shaped frame, a feeding mechanism is installed under the material preparation frame, and a pressing mechanism is fixedly installed at the bottom in the U-shaped frame; according to the chamfering and deburring equipment for the titanium alloy pipe fitting, automatic chamfering and deburring operation of the two ends of the pipe fitting is achieved, the machining efficiency is greatly improved, automatic feeding is achieved through cooperation of the material preparation frame and the feeding mechanism, and the labor cost is reduced; the blanking mechanism, the blanking inclined plate and the collecting box are combined, so that automatic blanking is realized, unified collection is facilitated, the U-shaped frame and the trapezoidal base are matched to press the pipe fitting, and then the chamfering tool bit is used for chamfering and deburring the end of the pipe fitting, so that the quality and the safety of pipe fitting processing are ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of pipe processing equipment, in particular to a titanium alloy pipe chamfering and deburring device. Background Art

[0002] Titanium alloy pipe fittings are pipe parts made of titanium alloy materials. They are widely used in aviation, aerospace, marine, chemical and other fields because of their light weight, high strength, excellent corrosion resistance and good welding performance. During the production process, burrs may appear on the edges of pipe fittings, which not only affects the appearance, but also may cause safety hazards during use. Therefore, it is very important to chamfer and deburr titanium alloy pipe fittings. Chamfering can eliminate the sharp angles of the edges and reduce stress concentration; while deburring can ensure the smooth surface of the pipe fittings and improve the safety and reliability of use.

[0003] After in-depth research and analysis, we found that in the traditional pipe processing and production process, there are many deficiencies in the chamfering and deburring of pipe fittings. First of all, this operation is mostly semi-automated and relies heavily on manual loading and unloading, which is not only inefficient but also increases labor costs. Secondly, the existing pipe chamfering and deburring equipment has a single function and can usually only chamfer and deburr one end of the pipe fitting, and cannot achieve simultaneous processing of both ends, which greatly reduces the overall processing efficiency. In view of the above problems, it is particularly urgent to improve and upgrade the existing technology in order to improve processing efficiency, reduce production costs, and further improve the quality and safety of pipe fittings. Utility Model Content

[0004] The purpose of the present invention is to provide a titanium alloy pipe chamfering and deburring device to solve the problems raised in the background technology.

[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0006] The U-shaped frame is fixed with a plurality of hydraulic push rods on both sides, and a rotating motor is installed on the movable end of the hydraulic push rod to fix the rotating motor, and a chamfering cutter head is fixed on the power output end of the rotating motor, and the chamfering cutter head passes through the reserved hole on the U-shaped frame in the horizontal direction and is located between the trapezoidal base and the U-shaped frame.

[0007] Furthermore, the feeding mechanism includes a hydraulic cylinder, a pushing block, and an arc-shaped recess. The hydraulic cylinder is installed and fixed on the upper side of the frame. The pushing block is fixedly connected to the movable rod at the movable end of the hydraulic cylinder. An arc-shaped recess is preset at the positive corner of the pushing block in the horizontal direction. The size of the arc-shaped recess is adapted to the outer diameter of the titanium alloy pipe fitting.

[0008] Furthermore, the pushing block is of a right-angled trapezoidal structure, the upper bottom edge of the pushing block is in contact with the lower side of the discharge port of the material preparation rack, and when the movable rod of the hydraulic cylinder is in an initial state, the arc-shaped recess on the pushing block is located just below the discharge port at the bottom of the material preparation rack, and when the movable rod of the hydraulic cylinder is at its maximum extension, the arc-shaped recess on the pushing block is located just below the clamping mechanism.

[0009] Furthermore, the clamping mechanism is provided with a second hydraulic cylinder, which is installed and fixed on the horizontal section of the U-shaped frame. The movable end of the second hydraulic cylinder is fixed with a lower pressure block through a movable rod, and the lower pressure block is slidably connected to the guide rail on the inner side of the U-shaped frame along the vertical direction.

[0010] Furthermore, a lower notch is preset on the lower side of the lower pressing block, and an upper notch is preset on the upper side of the trapezoidal base. Both the lower notch and the upper notch are semicircular structures. The lower notch is located just above the upper notch and is adapted to the outer diameter of the titanium alloy pipe.

[0011] Furthermore, a feeding mechanism is installed on the inner side of the trapezoidal base, and the feeding mechanism includes a hydraulic cylinder three, a connecting plate, and a rotating plate. The movable end of the hydraulic cylinder three is fixedly connected to the connecting plate through a movable rod, and the bottom of the rotating plate is rotatably connected to the inner side of the trapezoidal base. The lower surface of the rotating plate is hinged to the connecting plate, and the titanium alloy pipe fittings stored on the trapezoidal base are located exactly on the rotating path of the rotating plate.

[0012] Furthermore, a control panel is fixedly mounted on the frame, and the control panel is electrically connected to the feeding mechanism, the clamping mechanism, the unloading mechanism, the hydraulic pushing rod, and the rotating motor respectively.

[0013] Compared with the prior art, the utility model provides a titanium alloy pipe chamfering and deburring device, which has the following beneficial effects:

[0014] The titanium alloy pipe chamfering and deburring equipment provided in the utility model realizes automatic chamfering and deburring operations at both ends of the pipe fittings, greatly improving the processing efficiency. Through the cooperation of the material preparation rack and the feeding mechanism, automatic loading is realized, reducing labor costs. The combination of the unloading mechanism, the unloading inclined plate and the collection box realizes automatic unloading, which is convenient for unified collection. The U-shaped frame and the trapezoidal base cooperate to press the pipe fittings, and then the chamfering cutter head is used to chamfer and deburr the ends of the pipe fittings, ensuring the quality and safety of the pipe fitting processing. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 This is a schematic diagram of the top view of a titanium alloy pipe chamfering and deburring device proposed by the utility model;

[0016] Figure 2 This is a rear view structural schematic diagram of a titanium alloy pipe chamfering and deburring device proposed by the utility model;

[0017] Figure 3 This is a schematic cross-sectional structure diagram of a titanium alloy pipe chamfering and deburring device proposed by the utility model;

[0018] Figure 4 This is a schematic cross-sectional structure diagram of a pressing mechanism of a titanium alloy pipe chamfering and deburring device proposed by the utility model;

[0019] Figure 5 The utility model discloses a chamfering cutter head structure schematic diagram of a titanium alloy pipe chamfering and deburring device.

[0020] In the figure: 1. Frame; 2. U-shaped frame; 21. Reserved hole; 3. Material preparation rack; 4. Feeding mechanism; 41. Hydraulic cylinder 1; 42. Pushing block; 43. Arc notch; 5. Trapezoidal base; 6. Clamping mechanism; 61. Hydraulic cylinder 2; 62. Lower pressure block; 7. Unloading mechanism; 71. Hydraulic cylinder 3; 72. Connecting plate; 73. Rotating plate; 8. Hydraulic push rod; 9. Rotating motor; 91. Chamfering cutter head; 10. Unloading inclined plate; 11. Collection box; 12. Control panel. DETAILED DESCRIPTION

[0021] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0022] In the description of the present invention, it should be understood that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc., indicating directions or positional relationships, are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present invention.

[0023] Embodiment 1:

[0024] Reference Figure 1-5 A titanium alloy pipe chamfering and deburring device comprises: a frame 1, a collecting box 11, a U-shaped frame 2 is fixed in the middle of the upper side of the frame 1, a material preparation frame 3 is fixed on one side of the feeding end of the U-shaped frame 2, a feeding mechanism 4 is installed directly below the material preparation frame 3, a pressing mechanism 6 is fixedly installed at the bottom of the U-shaped frame 2, a trapezoidal base 5 is fixed directly below the pressing mechanism 6, the trapezoidal base 5 is fixed to the upper side of the frame 1, a material discharge inclined plate 10 is fixed on the bottom of one side of the discharging end of the U-shaped frame 2, and a material feeding mechanism 4 is installed directly below the material preparation frame 3. The material inclined plate 10 is located between the trapezoidal base 5 and the collecting box 11, and the discharge port of the unloading inclined plate 10 is just above the collecting box 11. Hydraulic pushing rods 8 are installed and fixed on both sides of the U-shaped frame 2 in a direction perpendicular to the material preparation rack 3. The movable end of the hydraulic pushing rod 8 is fixed with a rotating motor 9 through a movable rod. The power output end of the rotating motor 9 is fixed with a chamfering cutter head 91. The chamfering cutter head 91 passes through the reserved hole 21 on the U-shaped frame 2 in the horizontal direction and is located between the trapezoidal base 5 and the U-shaped frame 2.

[0025] like Figure 4 As shown, the feeding mechanism 4 includes a hydraulic cylinder 41, a pushing block 42, and an arc-shaped recess 43. The hydraulic cylinder 41 is fixedly installed on the upper side of the frame 1, and the pushing block 42 is fixedly connected to the movable rod at the movable end of the hydraulic cylinder 41. The positive corner of the pushing block 42 is preset with an arc-shaped recess 43 in the horizontal direction, and the size of the arc-shaped recess 43 is adapted to the outer diameter of the titanium alloy pipe fitting.

[0026] like Figure 4 As shown, the push block 42 is a right-angled trapezoidal structure, and the upper bottom edge of the push block 42 is in contact with the lower side of the discharge port of the material preparation rack 3. When the movable rod of the hydraulic cylinder 41 is in the initial state, the arc-shaped recess 43 on the push block 42 is located just below the discharge port at the bottom of the material preparation rack 3. When the movable rod of the hydraulic cylinder 41 is at the maximum extension length, the arc-shaped recess 43 on the push block 42 is located just below the clamping mechanism 6.

[0027] like Figure 4As shown, the clamping mechanism 6 is provided with a hydraulic cylinder 2 61, which is installed and fixed on the horizontal section of the U-shaped frame 2. The movable end of the hydraulic cylinder 2 61 is fixed with a lower pressing block 62 through a movable rod, and the lower pressing block 62 is slidably connected to the guide rail on the inner side of the U-shaped frame 2 along the vertical direction.

[0028] like Figure 4 As shown, a lower notch is preset on the lower side of the lower pressing block 62, and an upper notch is preset on the upper side of the trapezoidal base 5. Both the lower notch and the upper notch are semicircular structures. The lower notch is located just above the upper notch and is adapted to the outer diameter of the titanium alloy pipe.

[0029] Embodiment 2:

[0030] The difference between this embodiment and embodiment 1 is that:

[0031] like Figure 4 As shown, a feeding mechanism 7 is installed on the inner side of the trapezoidal base 5, and the feeding mechanism 7 includes a hydraulic cylinder 3 71, a connecting plate 72, and a rotating plate 73. The movable end of the hydraulic cylinder 3 71 is fixedly connected to the connecting plate 72 through a movable rod, and the bottom of the rotating plate 73 is rotatably connected to the inner side of the trapezoidal base 5. The lower surface of the rotating plate 73 is hinged to the connecting plate 72, and the titanium alloy pipe fittings stored on the trapezoidal base 5 are located exactly on the rotating path of the rotating plate 73.

[0032] like Figure 1 As shown, a control panel 12 is fixedly mounted on the frame 1, and the control panel 12 is electrically connected to the feeding mechanism 4, the clamping mechanism 6, the unloading mechanism 7, the hydraulic pushing rod 8, and the rotating motor 9 respectively; by setting the control panel 12, it is convenient for the operator to perform integrated switch control of the feeding mechanism 4, the clamping mechanism 6, the unloading mechanism 7, the hydraulic pushing rod 8, and the rotating motor 9, which brings convenience to the processing of pipes.

[0033] Working principle: When the utility model is in working state, titanium alloy pipes with the same outer diameter are placed in the preparation rack 3, such as Figure 4 As shown, the feeding mechanism 4 is then started and the movable rod on the feeding mechanism 4 is extended, which can drive the titanium alloy pipe fittings retained on the arc-shaped recess 43 to move horizontally to the left to just below the clamping mechanism 6, and then the hydraulic cylinder 2 61 on the clamping mechanism 6 is started. The movable rod of the hydraulic cylinder 2 61 is extended to drive the lower pressing block 62 to move vertically downward, and the lower recess below the lower pressing block 62 cooperates with the upper recess above the trapezoidal base 5, so that the titanium alloy pipe fittings are clamped and fixed between the trapezoidal base 5 and the lower pressing block 62. At the same time, the hydraulic cylinder 1 41 drives the pushing block 42 to return to its original position to prepare for the next loading. It should be noted that during the horizontal movement of the pushing block 42, the upper bottom edge of the pushing block 42 is in contact with the discharge port of the preparation rack 3, which effectively prevents the pipe fittings stored in the preparation rack 3 from continuing to fall.

[0034] After completing the above work, if Figure 5 As shown, the hydraulic push rods 8 on both sides of the U-shaped frame 2 are started at the same time, and the movable ends of the hydraulic push rods 8 drive the rotating motors 9 on both sides to move toward each other through the extension of the movable rods. At the same time, the rotating motor 9 is started to use the output shaft to drive the chamfering cutter head 91 to rotate. The chamfering cutter heads 91 on both sides are against the two ends of the titanium alloy pipe fittings during the rotation process, so that the chamfering and deburring work on both ends of the titanium alloy pipe fittings can be completed at the same time. After the pipe processing is completed, the hydraulic cylinder 2 61 drives the lower pressing block 62 to return to its original position upward, and the hydraulic push rod 8 drives the chamfering cutter head 91 on the rotating motor 9 to return to its original position. Subsequently, the unloading mechanism 7 is started to use the extension of the movable rod and the cooperation of the connecting plate 72 to make the rotating plate 73 rotate counterclockwise. During the rotation of the rotating plate 73, the processed pipe fittings on the trapezoidal base 5 are pushed away, and the pipe fittings roll down along the inclined surface on the trapezoidal base 5 onto the unloading inclined plate 10, and are finally collected in the collecting box 11. The equipment as a whole can simultaneously complete the chamfering and deburring operations at both ends of the titanium alloy pipe fittings, and automatic loading can be realized by arranging the preparation rack 3 and the feeding mechanism 4, and automatic unloading can be realized by arranging the unloading mechanism 7, the unloading inclined plate 10, and the collecting box 11, which greatly improves the production and processing efficiency of titanium alloy pipe fittings, and the U-shaped frame 2 and the trapezoidal base 5 cooperate to press the pipe fittings, and then the chamfering cutter head 91 is used to chamfer and deburr the end of the pipe fittings, thereby ensuring the quality and safety of pipe fitting processing.

Claims

1. A titanium alloy pipe chamfering and deburring device, include: A frame (1) and a collection box (11), characterized in that a U-shaped frame (2) is fixed in the middle of the upper side of the frame (1), a material preparation frame (3) is fixed on one side of the feeding end of the U-shaped frame (2), a feeding mechanism (4) is installed directly below the material preparation frame (3), a clamping mechanism (6) is fixedly installed at the bottom of the U-shaped frame (2), a trapezoidal base (5) is fixed directly below the clamping mechanism (6), the trapezoidal base (5) is fixed to the upper side of the frame (1), a material discharge inclined plate (10) is fixed on the bottom of one side of the discharging end of the U-shaped frame (2), and the material discharge inclined plate (10) is fixed to the lower side of the U-shaped frame (2). 0) is located between the trapezoidal base (5) and the collecting box (11), the discharge port of the unloading inclined plate (10) is just above the collecting box (11), and hydraulic push rods (8) are installed and fixed on both sides of the U-shaped frame (2) in a direction perpendicular to the material preparation frame (3), and the movable end of the hydraulic push rod (8) is fixed with a rotating motor (9) through the movable rod, and the power output end of the rotating motor (9) is fixed with a chamfering cutter head (91), and the chamfering cutter head (91) passes through the reserved hole (21) on the U-shaped frame (2) in the horizontal direction and is located between the trapezoidal base (5) and the U-shaped frame (2).

2. A titanium alloy pipe chamfering and deburring device according to claim 1, It is characterized in that The feeding mechanism (4) comprises a hydraulic cylinder (41), a push block (42), and an arc-shaped recess (43); the hydraulic cylinder (41) is fixedly mounted on the upper side of the frame (1); the push block (42) is fixedly connected to a movable rod at a movable end of the hydraulic cylinder (41); an arc-shaped recess (43) is preset at a positive corner of the push block (42) in a horizontal direction; the size of the arc-shaped recess (43) is adapted to the outer diameter of the titanium alloy pipe fitting.

3. A titanium alloy pipe chamfering and deburring device according to claim 2, It is characterized in that The push block (42) is of a right-angled trapezoidal structure, and the upper bottom edge of the push block (42) is in contact with the lower side of the discharge port of the material preparation rack (3). When the movable rod of the hydraulic cylinder (41) is in an initial state, the arc-shaped recess (43) on the push block (42) is located just below the discharge port at the bottom of the material preparation rack (3). When the movable rod of the hydraulic cylinder (41) is at its maximum extension, the arc-shaped recess (43) on the push block (42) is located just below the clamping mechanism (6).

4. A titanium alloy pipe chamfering and deburring device according to claim 1, It is characterized in that The clamping mechanism (6) is provided with a second hydraulic cylinder (61), which is fixedly mounted on the horizontal section of the U-shaped frame (2), and a lower pressing block (62) is fixedly mounted on the movable end of the second hydraulic cylinder (61) via a movable rod, and the lower pressing block (62) is slidably connected to the guide rail inside the U-shaped frame (2) in the vertical direction.

5. A titanium alloy pipe chamfering and deburring device according to claim 4, It is characterized in that The lower side of the lower pressing block (62) is preset with a lower notch, and the upper side of the trapezoidal base (5) is preset with an upper notch. Both the lower notch and the upper notch are semicircular structures. The lower notch is located just above the upper notch and is adapted to the outer diameter of the titanium alloy pipe.

6. The titanium alloy pipe chamfering and deburring device according to claim 1, It is characterized in that A material unloading mechanism (7) is installed on the inner side of the trapezoidal base (5), and the material unloading mechanism (7) comprises a hydraulic cylinder three (71), a connecting plate (72), and a rotating plate (73). The movable end of the hydraulic cylinder three (71) is fixedly connected to the connecting plate (72) via a movable rod, the bottom of the rotating plate (73) is rotatably connected to the inner side of the trapezoidal base (5), and the lower surface of the rotating plate (73) is hinged to the connecting plate (72). The titanium alloy pipe fittings stored on the trapezoidal base (5) are located exactly on the rotating path of the rotating plate (73).

7. A titanium alloy pipe chamfering and deburring device according to claim 6, It is characterized in that A control panel (12) is fixedly mounted on the frame (1), and the control panel (12) is electrically connected to the feeding mechanism (4), the pressing mechanism (6), the unloading mechanism (7), the hydraulic push rod (8), and the rotating motor (9).