Glaze pouring device and ceramic production equipment

By designing a glaze coating device with detachable glaze tray on the ceramic tile production line, the low production efficiency and environmental pollution caused by frequent glaze replacement are solved, rapid recycling and conversion of glaze is achieved, and production efficiency and working conditions are improved. .

CN222038980UActive Publication Date: 2024-11-22FOSHAN OCEANO CERAMICS
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323558967.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-25
Publication Date
2024-11-22
Estimated Expiration
2033-12-25

AI Technical Summary

Technical Problem

On the ceramic tile production line, due to changes in batches, colors and types of glazes, frequent replacement of glazes is required, resulting in increased labor intensity for workers, low production efficiency, and waste of glazes and environmental pollution.

Method used

A glaze coating device is designed, including a transport component, glaze coating component and glaze coupling component. Through the removable connection of the first and second glaze coupling plates, the glaze coating material can be quickly recovered and converted, avoiding line cleaning and improving Productivity.

Benefits of technology

The rapid glaze conversion of glaze is achieved, which reduces glaze waste and environmental pollution, and improves workers' production efficiency and working conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222038980U_ABST
    Figure CN222038980U_ABST
Patent Text Reader

Abstract

The utility model discloses a glaze pouring device and ceramic production equipment, and relates to the technical field of ceramic production. The glaze pouring device comprises a conveying assembly, a glaze pouring assembly and a glaze receiving assembly, wherein the conveying assembly is used for conveying green bricks; the glaze pouring assembly is arranged on the side, where the green bricks are placed, of the conveying assembly, and the glaze pouring assembly is used for pouring glaze to the green bricks; the glaze receiving assembly is arranged between the glaze pouring assembly and the conveying assembly, the glaze receiving assembly comprises a first glaze receiving disc and a second glaze receiving disc, the first glaze receiving disc is detachably connected with the second glaze receiving disc, the first glaze receiving disc is used for receiving glaze flowing down from the glaze pouring assembly, and the second glaze receiving disc is used for receiving glaze flowing down from the glaze pouring assembly. The second glaze receiving disc is used for receiving the glaze, so that the green bricks which do not need to be coated with the glaze are prevented from being sprayed with the glaze. The situation that a line needs to be stopped for cleaning the glaze pouring device is avoided, glazing conversion is rapidly carried out, and the production efficiency of the glaze pouring device is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of ceramic production, and in particular to a glazing device and ceramic production equipment. Background Art

[0002] Ceramic tile is a widely used building material. The glaze on its surface not only affects its appearance, but also determines its performance and quality. In the ceramic tile production line, bell glaze is a commonly used glazing method, which can make the glaze evenly cover the surface of the ceramic tile to form a smooth glaze layer. However, in actual production, due to the changes in batches, colors and types of glazes, as well as the diversified needs of the market, the glaze needs to be replaced frequently. This brings great difficulties and pressure to the glazing line workers. They have to clean the glazing equipment many times, glaze on and off, and complete these operations in a short time to ensure the continuity and efficiency of production. This not only increases the labor intensity and risks of the workers, but also causes waste of glaze and environmental pollution. Utility Model Content

[0003] In view of this, the purpose of this application is to provide a glaze pouring device and ceramic production equipment, aiming to solve the technical problems in the prior art.

[0004] To achieve the above objectives, the technical solutions adopted in this application are as follows:

[0005] In a first aspect, an embodiment of the present application provides a glazing device, comprising:

[0006] A conveying assembly, the conveying assembly is used to convey the bricks;

[0007] A glaze pouring assembly, which is arranged on the side of the conveying assembly where the brick blank is placed, and is used to pour glaze on the brick blank;

[0008] A glaze receiving assembly is arranged between the glaze pouring assembly and the conveying assembly, and the glaze receiving assembly includes a first glaze receiving tray and a second glaze receiving tray, the first glaze receiving tray and the second glaze receiving tray are detachably connected, the first glaze receiving tray is used to receive the glaze flowing down from the glaze pouring assembly so that bricks that do not need to be glazed can avoid glazing, and the second glaze receiving tray is used to recover the glaze.

[0009] In one embodiment of the first aspect, the glaze pouring assembly comprises:

[0010] A glaze storage part, the glaze storage part is arranged at one end of the glaze pouring component away from the conveying component, and the glaze storage part is used to store glaze;

[0011] The glaze pouring part is arranged on a side of the glaze storage part close to the conveying component, and is used for pouring glaze on the bricks on the conveying component.

[0012] In one of the embodiments of the first aspect, the glaze storage portion includes a glaze storage hopper, the glaze storage hopper is arranged at an end of the glaze pouring portion away from the conveying component, and the glaze storage hopper is used to store glaze.

[0013] In one embodiment of the first aspect, the glaze storage portion further includes a first output pipe, which is disposed at one end of the glaze storage hopper close to the glaze pouring portion, and the first output pipe is used to transport glaze to the glaze pouring portion.

[0014] In one of the embodiments of the first aspect, the glazing portion includes a glaze hood, which is disposed between the first output pipe and the conveying assembly, and the glaze hood is used to perform glazing treatment on the brick blank.

[0015] In one of the embodiments of the first aspect, the first glaze receiving tray is disposed between the conveying component and the glaze hood, and the first glaze receiving tray is disposed corresponding to the edge of the glaze hood. The first glaze receiving tray is used to allow the glaze flowing down from the glaze hood to avoid bricks that do not need to be glazed, and to receive and recover the glaze flowing in from the glaze hood.

[0016] In one embodiment of the first aspect, the first glaze receiving tray has a first collecting trough, which is arranged on a side of the first glaze receiving tray close to the glaze pouring hood, and the first collecting trough is used to collect glaze flowing from the glaze pouring hood.

[0017] In one of the embodiments of the first aspect, the glaze receiving assembly further includes a second output pipe, which is disposed on a side of the first glaze receiving tray close to the second glaze receiving tray, and the second output pipe is used to transport the glaze in the first collecting tank to the second glaze receiving tray.

[0018] In one of the embodiments of the first aspect, the second glaze receiving tray is arranged on the side of the conveying component away from the first glaze receiving tray, the second glaze receiving tray has a second collecting trough, the second collecting trough is arranged on the side of the second glaze receiving tray close to the first glaze receiving tray, and the second collecting trough is used to collect glaze flowing into the first glaze receiving tray.

[0019] In a second aspect, an embodiment of the present application provides a ceramic production equipment, including the glazing device described in any of the above embodiments.

[0020] Compared with the prior art, the beneficial effects of the present application are as follows: the present application proposes a glaze pouring device and a ceramic production equipment. The glaze pouring device comprises a conveying component, a glaze pouring component and a glaze receiving component, the conveying component is used to convey the brick blank; the glaze pouring component is arranged on the side of the conveying component where the brick blank is placed, the glaze pouring component is used to pour glaze on the brick blank; the glaze receiving component is arranged between the glaze pouring component and the conveying component, the glaze receiving component comprises a first glaze receiving tray and a second glaze receiving tray, the first glaze receiving tray and the second glaze receiving tray are detachably connected, the first glaze receiving tray is used to receive the glaze flowing down from the glaze pouring component, so that the brick blank that does not need to be glazed can avoid being poured with glaze, and the second glaze receiving tray is used to recover the glaze. The present application arranges the glaze receiving assembly between the glaze pouring assembly and the conveying assembly, and detachably connects the first glaze receiving tray and the second glaze receiving tray, so that when different glazes are needed on the brick blanks of the present application, the first glaze receiving tray is installed, and the first glaze receiving tray receives the glaze flowing down from the glaze pouring assembly, thereby blocking the glaze flowing down from the glaze pouring assembly from being poured on the brick blanks that do not need to be glazed, thereby avoiding the need to stop the line for cleaning the glaze pouring device, quickly performing glazing conversion, and improving its production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.

[0022] Figure 1 A schematic diagram of the structure of the glaze pouring device from one perspective in the present application is shown;

[0023] Figure 2 Another perspective structural schematic diagram of the glazing device in the present application is shown;

[0024] Figure 3 Another perspective structural schematic diagram of the glazing device in the present application is shown;

[0025] Figure 4 A schematic diagram of the three-dimensional structure of the glaze connection assembly in the present application is shown;

[0026] Figure 5 A partial structural schematic diagram of the glaze joint assembly in the present application is shown;

[0027] Figure 6 A schematic structural diagram of the second glaze receiving tray in the present application is shown.

[0028] Description of main component symbols:

[0029] 100-glaze pouring device; 110-transmission assembly; 111-conveyor belt; 112-transmission shaft; 120-glaze pouring assembly; 121-glaze storage unit; 1211-glaze storage hopper; 1212-first output pipe; 1213-control valve; 122-glaze pouring unit; 1221-glaze pouring cover; 130-glaze receiving assembly; 131-first glaze receiving tray; 1311-first collecting tank; 132-second glaze receiving tray; 1321-second collecting tank; 133-second output pipe; 101-brick. DETAILED DESCRIPTION

[0030] The embodiments of the present application are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present application, and cannot be understood as limiting the present application.

[0031] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0032] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0033] In this application, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0034] In the present application, unless otherwise clearly specified and limited, a first feature being “above” or “below” a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being “above”, “above”, and “above” a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being “below”, “below”, and “below” a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0035] like Figure 1 As shown, an embodiment of the present application provides a glaze pouring device 100. The glaze pouring device 100 includes a conveying component 110, a glaze pouring component 120 and a glaze receiving component 130.

[0036] The conveying assembly 110 is used to convey the green bricks 101. The glaze receiving assembly 130 is arranged on the side of the conveying assembly 110 where the green bricks 101 are placed, and the glazing assembly 120 is used to glaze the green bricks 101.

[0037] The glaze receiving assembly 130 is disposed between the glaze pouring assembly 120 and the conveying assembly 110. Figure 3 and Figure 4 As shown, the glaze receiving assembly 130 includes a first glaze receiving tray 131 and a second glaze receiving tray 132, and the first glaze receiving tray 131 and the second glaze receiving tray 132 are detachably connected. The first glaze receiving tray 131 is used to receive the glaze flowing down from the glazing assembly 120 so that the bricks 101 that do not need to be glazed can avoid being glazed, and the second glaze receiving tray 132 is used to recycle the glaze.

[0038] In the related art, conventional glazing equipment glazes downwards from the glaze on the bell jar. When multiple ceramic tiles need to be coated with different glazes, the glazes need to be frequently replaced, and the line needs to be frequently stopped for cleaning of the glazing equipment, resulting in low production efficiency, glaze waste and environmental pollution.

[0039] In this embodiment, the glaze pouring device 100 includes a conveying component 110, a glaze pouring component 120 and a glaze receiving component 130. In this embodiment, the glaze receiving component 130 is arranged between the glaze pouring component 120 and the conveying component 110, and the first glaze receiving tray 131 and the second glaze receiving tray 132 are detachably connected, so that when the brick blank 101 of this embodiment needs to be coated with different glazes, the first glaze receiving tray 131 is installed, and the first glaze receiving tray 131 receives the glaze flowing from the glaze pouring component 120, thereby preventing the glaze flowing from the glaze pouring component 120 from pouring on the brick blank 101 that does not need to be coated with the glaze. And when the brick blank 101 that needs to be coated with the glaze passes by, the first glaze receiving tray 131 is removed, and the glaze flowing from the glaze pouring component 120 can be glazed on the brick blank 101, thereby avoiding the need to stop the line to clean the glaze pouring device 100, quickly switching the glaze, and improving its production efficiency.

[0040] Alternatively, if Figure 3 As shown, the transmission assembly 110 includes a conveyor belt 111 and a transmission shaft 112 .

[0041] Specifically, the conveyor belt 111 is disposed on a side of the transmission component 110 close to the glazing component 120 , and the transmission shaft 112 is disposed on an end of the conveyor belt 111 away from the glazing component 120 .

[0042] The conveying shaft 112 is used to drive the conveyor belt 111 , and in this embodiment, the brick 101 is placed on the conveyor belt 111 , and the brick 101 is transported to the bottom of the glazing assembly 120 through the conveyor belt 111 for glazing.

[0043] Alternatively, if Figure 2 As shown, the glaze pouring assembly 120 includes a glaze storage portion 121 and a glaze pouring portion 122 .

[0044] The glaze storage portion 121 is disposed at one end of the glaze pouring component 120 away from the conveying component 110 , and the glaze storage portion 121 is used for storing glaze.

[0045] In addition, the glaze pouring part 122 is arranged on a side of the glaze storage part 121 close to the conveying component 110 , and the glaze pouring part 122 is used to pour glaze on the brick blanks 101 on the conveying component 110 .

[0046] Alternatively, if Figure 3 As shown, the glaze storage portion 121 includes a glaze storage hopper 1211 and a first output pipe 1212 .

[0047] The glaze storage hopper 1211 is arranged at one end of the glaze pouring part 122 away from the conveying component 110, and the glaze storage hopper 1211 is used for storing glaze.

[0048] Specifically, the glaze storage hopper 1211 in this embodiment is connected to the external glaze tank through the external glaze supply system, and then this embodiment can transport the glaze in the external glaze tank to the glaze storage hopper 1211 through the external glaze supply system, thereby completing the operation of supplying the glaze storage hopper 1211.

[0049] In addition, the first output pipe 1212 is disposed at one end of the glaze storage hopper 1211 close to the glaze pouring portion 122 , and the first output pipe 1212 is used to transport glaze to the glaze pouring portion 122 .

[0050] Alternatively, if Figure 3 As shown, the glaze storage part 121 further includes a control valve 1213, and the control valve 1213 is arranged on the first output pipe 1212. In this embodiment, the first output pipe 1212 can be opened or closed by the control valve 1213, so as to control the discharge of the glaze storage hopper 1211.

[0051] Alternatively, if Figure 3 As shown, the glazing section 122 includes a glazing cover 1221 , and the glazing cover 1221 is arranged between the first output pipe 1212 and the transmission component 110 , that is, the glazing cover 1221 is located between the first output pipe 1212 and the conveyor belt 111 .

[0052] In this embodiment, the brick 101 is glazed by the glaze cover 1221 .

[0053] Specifically, the control valve 1213 is opened, and the glaze in the glaze storage hopper 1211 is transported to the glaze pouring cover 1221 through the first output pipe 1212 . The glaze output from the first output pipe 1212 flows along the outer wall of the glaze pouring cover 1221 to the conveyor belt 111 .

[0054] Furthermore, the brick 101 is conveyed to the bottom of the glaze hood 1221 by the conveyor belt 111, that is, the brick 101 is located between the conveyor belt 111 and the glaze hood 1221, so that the glaze flowing down the outer wall of the glaze hood 1221 can glaze the brick 101.

[0055] Optionally, the first glaze receiving tray 131 is arranged between the conveying assembly and the glaze pouring hood 1221 , that is, the first glaze receiving tray 131 is located between the conveyor belt 111 and the glaze pouring hood 1221 .

[0056] The first glaze receiving tray 131 is arranged corresponding to the edge of the glaze pouring cover 1221 , that is, the first glaze receiving tray 131 corresponds to the edge of the glaze pouring cover 1221 where the glaze flows out.

[0057] In this embodiment, the glaze flowing down from the glaze hood 1221 avoids the bricks 101 that do not need to be glazed by using the first glaze receiving tray 131. Specifically, the first glaze receiving tray 131 receives the glaze flowing in from the glaze hood 1221, and prevents the glaze flowing down from the glaze hood 1221 from being glazed onto the bricks 101 that do not need to be glazed, thereby realizing a rapid conversion of glazing, avoiding the need to stop the line to clean the glazing device 100, and improving its production efficiency.

[0058] Specifically, Figure 4 and Figure 5 As shown, the first glaze receiving tray 131 has a first collecting groove 1311 , and the first collecting groove 1311 is arranged on a side of the first glaze receiving tray 131 close to the glaze pouring cover 1221 .

[0059] In this embodiment, the glaze flowing from the glaze hood 1221 is collected by the first collecting tank 1311 .

[0060] Optionally, the second glaze receiving tray 132 is arranged on a side of the conveying assembly away from the first glaze receiving tray 131, that is, the second glaze receiving tray 132 is located on a side of the conveyor belt 111 away from the first glaze receiving tray 131. The second glaze receiving tray 132 is fixed on the production line rack.

[0061] Alternatively, if Figure 4 and Figure 6 As shown, the second glaze receiving tray 132 has a second collecting groove 1321 , and the second collecting groove 1321 is arranged on a side of the second glaze receiving tray 132 close to the first glaze receiving tray 131 .

[0062] In this embodiment, the glaze flowing into the first glaze receiving tray 131 can be collected by the second collecting groove 1321 of the second glaze receiving tray 132 .

[0063] Specifically, the second glaze receiving tray 132 in this embodiment is used to receive and recycle glaze. The second glaze receiving tray 132 is connected to the external glaze tank through the glaze return pipe, and the second glaze receiving tray 132 recycles the glaze in the second collecting tank 1321 to the external glaze tank through the glaze return pipe, thereby realizing the recycling of glaze.

[0064] Alternatively, if Figure 3 , Figure 4 and Figure 5 As shown, the glaze receiving assembly 130 further includes a second output pipe 133 , and the second output pipe 133 is disposed on a side of the first glaze receiving tray 131 close to the second glaze receiving tray 132 .

[0065] The second output pipe 133 is fixedly connected to the second glaze receiving tray 132. Optionally, the second output pipe 133 and the second glaze receiving tray 132 are, for example, integrally formed.

[0066] Specifically, in this embodiment, the glaze in the first collecting tank 1311 is transported to the second glaze receiving tray 132 through the second output pipe 133 .

[0067] Optionally, there are four second output tubes 133 , for example, and the four second output tubes 133 are respectively arranged at the four corners of the first glaze receiving tray 131 , that is, two of the second output tubes 133 are located at one edge of the conveyor belt 111 , and the other two second output tubes 133 are located at the other edge of the conveyor belt 111 .

[0068] Specifically, Figure 4 As shown, in this embodiment, the first glaze receiving tray 131 can be mounted on the second glaze receiving tray 132 through four second output tubes 133, and a certain gap is left between the first glaze receiving tray 131 and the conveyor belt 111, so that the bricks 101 on the conveyor belt 111 can pass through between the first glaze receiving tray 131 and the conveyor belt 111.

[0069] It should be noted that this embodiment does not limit the number of the second output tubes 133 , and the specific number of the second output tubes 133 can be designed according to actual production conditions.

[0070] Optionally, the first glaze receiving plate 131 is mounted on the second glaze receiving tube, for example, via the second output tube 133, thereby achieving a detachable connection between the first glaze receiving tube and the second glaze receiving tube, facilitating installation and removal of the first glaze receiving tube.

[0071] In this embodiment, when there is no need to block the glaze hood 1221 from glazing the brick 101, the first glaze receiving tray 131 can be removed from between the brick 101 and the glaze hood 1221, and the glaze hood 1221 can then glaze the brick 101. At the same time, the excess glaze during glazing is connected to the second collecting tank 1321 through the second glaze receiving tray 132, and the glaze in the second collecting tank 1321 is recovered into the external glaze tank through the second glaze receiving tray 132.

[0072] When it is necessary to block the glaze hood 1221 from glazing the brick 101, the first glaze receiving tray 131 can be placed between the brick 101 and the glaze hood 1221, and placed on the second glaze receiving tray 132, so that the glaze flowing down from the glaze hood 1221 can be connected to the first collecting tank 1311 to prevent the brick 101 from being glazed. Then, the glaze in the first collecting tank 1311 is transported to the second collecting tank 1321 through the second output pipe 133, and the glaze in the second collecting tank 1321 is recovered to the external glaze tank through the second glaze receiving tray 132, thereby realizing the rapid conversion of glazing of the glazing device 100 in this embodiment, avoiding the need to stop the line to clean the glazing device 100, and improving its production efficiency.

[0073] This embodiment provides a ceramic production equipment, which has the glazing device 100 described in any of the above embodiments, and thus has all the beneficial effects of the glazing device 100, which will not be described in detail here.

[0074] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0075] Although the embodiments of the present application have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limitations on the present application. Ordinary technicians in this field can change, modify, replace and modify the above embodiments within the scope of the present application.

Claims

1. A glaze pouring device, characterized in that: include: A conveying assembly, the conveying assembly is used to convey the bricks; A glaze pouring assembly, which is arranged on the side of the conveying assembly where the brick blank is placed, and is used to pour glaze on the brick blank; A glaze receiving assembly is arranged between the glaze pouring assembly and the conveying assembly, and the glaze receiving assembly includes a first glaze receiving tray and a second glaze receiving tray, the first glaze receiving tray and the second glaze receiving tray are detachably connected, the first glaze receiving tray is used to receive the glaze flowing down from the glaze pouring assembly so that bricks that do not need to be glazed can avoid glazing, and the second glaze receiving tray is used to recover the glaze.

2. The glaze pouring device according to claim 1, characterized in that: The glaze pouring assembly comprises: A glaze storage part, the glaze storage part is arranged at one end of the glaze pouring component away from the conveying component, and the glaze storage part is used to store glaze; The glaze pouring part is arranged on a side of the glaze storage part close to the conveying component, and is used for pouring glaze on the bricks on the conveying component.

3. The glaze pouring device according to claim 2, characterized in that: The glaze storage part comprises a glaze storage hopper, the glaze storage hopper is arranged at one end of the glaze pouring part away from the conveying component, and the glaze storage hopper is used for storing glaze.

4. The glaze pouring device according to claim 3, characterized in that: The glaze storage part also includes a first output pipe, which is arranged at one end of the glaze storage bucket close to the glaze pouring part, and the first output pipe is used to transport glaze to the glaze pouring part.

5. The glaze pouring device according to claim 4, characterized in that: The glazing part includes a glaze hood, which is arranged between the first output pipe and the conveying component, and is used for glazing the bricks.

6. The glaze pouring device according to claim 5, characterized in that: The first glaze receiving tray is arranged between the conveying component and the glaze hood, and the first glaze receiving tray is arranged corresponding to the edge of the glaze hood. The first glaze receiving tray is used to make the glaze flowing down from the glaze hood avoid the bricks that do not need to be glazed, and to receive and recover the glaze flowing in from the glaze hood.

7. The glaze pouring device according to claim 5, characterized in that: The first glaze receiving tray has a first collecting groove, which is arranged on a side of the first glaze receiving tray close to the glaze pouring cover, and the first collecting groove is used to collect glaze flowing in from the glaze pouring cover.

8. The glaze pouring device according to claim 7, characterized in that: The glaze receiving assembly also includes a second output pipe, which is arranged on a side of the first glaze receiving tray close to the second glaze receiving tray, and the second output pipe is used to transport the glaze in the first collecting tank to the second glaze receiving tray.

9. The glaze pouring device according to claim 1, characterized in that: The second glaze receiving tray is arranged on the side of the conveying component away from the first glaze receiving tray, and the second glaze receiving tray has a second collecting trough, which is arranged on the side of the second glaze receiving tray close to the first glaze receiving tray, and the second collecting trough is used to collect glaze flowing into the first glaze receiving tray.

10. A ceramic production equipment, characterized in that: The invention comprises the glazing device according to any one of claims 1 to 9.