Construction system for photovoltaic pile top
By designing a construction system for photovoltaic pile tops, the efficient lifting and transfer of installation brackets is achieved using lifting and transfer mechanisms, the problems of low construction efficiency and safety risks in traditional construction methods are solved, and construction efficiency and safety are improved .
Patent Information
- Application Number
- CN202420932335.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-30
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-04-30
AI Technical Summary
In photovoltaic power generation projects, traditional construction methods require frequent disassembly and assembly of scaffolding, resulting in low construction efficiency, extended construction period, and it is difficult for staff to obtain flexible construction platforms, increasing labor intensity and safety risks.
A construction system for photovoltaic pile tops is designed, including a lifting mechanism and a transfer mechanism. The lifting and transfer of the mounting brackets are realized through side brackets and lifting components, providing a mobile platform for staff to install the brackets, reducing operations. Time and labor intensity.
It improves construction efficiency, reduces the labor intensity of staff, ensures construction safety, avoids the need for frequent climbing of photovoltaic piles, and realizes flexible transportation and efficient installation of installation brackets.
Smart Images

Figure CN222042440U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of photovoltaic pile top transportation, in particular to a construction system for photovoltaic pile tops. Background Art
[0002] In the current field of energy technology, the development of new energy industry is becoming increasingly rich. Among them, photovoltaic power generation projects are an important development direction and are deeply loved by users.
[0003] In traditional photovoltaic power generation applications, photovoltaic power generation mostly adopts a small-area, single-point power generation mode. With the continuous development of technology, existing photovoltaic power generation is mostly set up in places with harsh terrain such as tidal flats, mountains, deserts, lakes and ponds. The areas of tidal flats, mountains, deserts, lakes and ponds used for photovoltaic power generation are very large. If the traditional photovoltaic panel installation method is used, it is necessary to use ladders, scaffolding, lifting devices and other tools, and build scaffolding and other construction platforms on the ground in these areas to set the installation bracket on the top of the photovoltaic pile. However, this process requires frequent disassembly and assembly of scaffolding and change of installation position. It is difficult for workers to obtain a flexible construction platform, which greatly reduces construction efficiency and even seriously lags the construction period.
[0004] Therefore, the utility model is dedicated to providing a construction system for the top of a photovoltaic pile to solve the above-mentioned problem. Utility Model Content
[0005] The purpose of the utility model is to provide a construction system for the top of a photovoltaic pile, which is convenient for the transportation of the installation bracket, and the staff can use the first platform as a support to install multiple installation brackets on the tops of several photovoltaic piles in sequence, thereby reducing the working time and improving the construction efficiency.
[0006] The technical solution provided by the utility model is as follows:
[0007] A construction system for the top of a photovoltaic pile comprises a lifting mechanism, a transfer mechanism and side supports arranged on the tops of a plurality of photovoltaic piles, wherein the extension line of the side supports has a plurality of photovoltaic piles arranged in a straight line, the transfer mechanism is arranged on the side supports and is suitable for moving along the length direction of the side supports to transport an installation support suitable for cooperating with the transfer mechanism, and the lifting mechanism is located in the forward direction of the transfer mechanism.
[0008] The lifting mechanism includes a frame and a lifting assembly arranged on the frame. The frame is movably mounted on a plurality of photovoltaic piles on an extension line of the side bracket so that the frame is suitable for moving in a direction away from the transfer mechanism.
[0009] Among them, the transfer mechanism is provided with a first platform for providing a working place for the staff. When the rack moves, the lifting assembly is used to lift the installation bracket located on the transfer mechanism to the photovoltaic pile on the extension line of the side bracket, so that the staff can install the installation bracket on the top of the photovoltaic pile.
[0010] In some embodiments, the transport mechanism includes a mounting bin movably disposed on the side bracket.
[0011] The number of the first platforms is two, and the two first platforms are arranged on both sides of the side bracket in the width direction.
[0012] In some embodiments, the transfer mechanism also includes a shuttle transport trolley movably disposed on the side bracket, the shuttle transport trolley is spaced apart from the installation bin and is located on a side of the installation bin away from the lifting mechanism, for transporting the installation bracket.
[0013] The shuttle transport trolley is provided with a conveying member for transferring the mounting bracket to the mounting bin, and the lifting assembly is used for lifting the mounting bracket located on the mounting bin.
[0014] In some embodiments, the installation bin includes a crossbeam frame and two brackets, and a plurality of first roller assemblies are disposed on the lower end surface of the crossbeam frame to allow the crossbeam frame to move relative to the side brackets and the installation brackets.
[0015] The two brackets are respectively arranged at two opposite ends of the cross beam frame and located at two ends of the side bracket in the width direction, and each first platform is located at one end of the bracket away from the cross beam frame.
[0016] In some embodiments, the upper end surface of the beam frame is provided with a second roller assembly arranged along the length direction of the beam frame, so that the mounting bracket moves to an end of the mounting bin away from the shuttle transport trolley.
[0017] In some embodiments, it further includes a height adjustment member and a rotating wheel disposed at one end of the height adjustment member, and the other end of the height adjustment member is detachably disposed on the top of the photovoltaic pile on the extension line of the side bracket.
[0018] The rotating wheel is suitable for cooperating with the frame to enable the frame to move, and the height adjustment member is used to adjust the distance between the rotating wheel and the photovoltaic pile.
[0019] In some embodiments, the frame includes a plurality of gantries and a first longitudinal beam disposed along a length direction of the side supports.
[0020] The gantry includes a connecting beam and two columns arranged at both ends of the side bracket in the width direction, the connecting beam is located between the two columns, the first longitudinal beam is arranged between the two columns and connected to a plurality of the connecting beams, and the lower end surface of the first longitudinal beam is suitable for cooperating with the rotating wheel.
[0021] The lifting assembly is arranged on the upper end surfaces of several gantries close to the transfer mechanism.
[0022] In some embodiments, a second platform is provided along the length direction of the side support on the side away from each other of the two columns to provide a working place for the staff.
[0023] In some embodiments, a plurality of locking components are further provided on the column, and the locking components are suitable for engaging with the photovoltaic piles on the extension lines of the side brackets to fix the rack on the photovoltaic piles.
[0024] In some embodiments, the locking assembly includes a limit arm, an elastic member, a connecting arm, a mounting frame and two clamping arms, each of the clamping arms is arranged along the length direction of the side bracket, the clamping arm is arranged between the two columns of the gantry and located on both sides of the photovoltaic pile, and one end of the connecting arm is arranged on the side away from the two clamping arms.
[0025] The mounting frame is arranged on one side of the column and is sleeved on the outer side of the connecting arm. The connecting arm is suitable for moving relative to the mounting frame to adjust the distance between the clamping arm and the photovoltaic pile. A plurality of connecting holes are arranged on the outer side of the connecting arm. The limiting arm is rotatably arranged on the column with a fixed shaft as a rotating shaft.
[0026] The limiting arm includes a connecting portion and a clamping portion suitable for cooperating with the connecting hole, which are connected in sequence. The fixed shaft is located between the clamping portion and the connecting portion. The elastic member is arranged between the connecting portion and the mounting frame and is in a compressed state so that the clamping portion can be engaged with the connecting hole.
[0027] The utility model provides a construction system for photovoltaic pile tops, which has the following beneficial effects:
[0028] 1. The utility model provides a construction system for the top of a photovoltaic pile, which moves on the side bracket through a transfer mechanism, thereby realizing the transfer and transportation of the installation bracket and the staff, without the need for the staff to carry the installation bracket, and the lifting mechanism is movably arranged on a plurality of photovoltaic piles on the extension line of the side bracket, and the installation bracket on the transfer mechanism can be lifted to the photovoltaic pile on the extension line of the side bracket through the lifting assembly, so that the staff on the first platform can install the installation bracket on the photovoltaic pile conveniently, with a simple structure, without the need for the staff to carry the installation bracket, and without the need for frequent disassembly and assembly of scaffolding, which greatly reduces the labor intensity of the staff, and improves the construction efficiency, and also without the need for the staff to climb the photovoltaic piles many times, thereby ensuring the safety of the staff.
[0029] 2. The utility model provides a construction system for the top of a photovoltaic pile, and the transfer mechanism includes an installation bin and a shuttle transport trolley. The shuttle transport trolley moves on the side bracket to transport the installation bracket, and the installation bracket can be transferred to the installation bin through the conveying parts on the shuttle transport trolley, thereby realizing the transportation and transfer of the installation bracket and improving the construction efficiency.
[0030] 3. The utility model provides a construction system for the top of a photovoltaic pile, in which a height adjustment member can adjust the distance between the rotating wheel and the photovoltaic pile so that the photovoltaic pile, the height adjustment member and the rotating wheel are at the same height, thereby improving the stability of the movement of the lifting mechanism. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] The preferred implementation scheme will be described below in a clear and understandable manner with reference to the accompanying drawings to further illustrate the above-mentioned characteristics, technical features, advantages and implementation methods of the present solution.
[0032] Figure 1 This is a structural schematic diagram of an installation bin for a construction system for a photovoltaic pile top provided by the utility model;
[0033] Figure 2 This is a schematic diagram of the structure of the installation bin and the side bracket matching each other in a construction system for the top of a photovoltaic pile provided by the utility model;
[0034] Figure 3 It is a structural schematic diagram of a lifting mechanism of a construction system for a photovoltaic pile top provided by the utility model;
[0035] Figure 4 It is a structural schematic diagram of a locking assembly of a construction system for a photovoltaic pile top provided by the utility model;
[0036] Figure 5 It is a structural schematic diagram of a height adjustment member of a construction system for a photovoltaic pile top provided by the utility model.
[0037] Description of Figure Numbers:
[0038] Lifting mechanism 1, frame 11, gantry 111, connecting beam 1111, column 1112, top beam 1113, first longitudinal beam 112, second platform 113, locking assembly 114, limiting arm 1141, connecting arm 1142, mounting frame 1143, clamping arm 1144;
[0039] Mounting bin 21, beam frame 211, bracket 212, first platform 213, first roller assembly 214, second roller assembly 215, height adjustment member 3, rotating wheel 31, mounting arm 32, threaded rod 33, first clamp 34, second clamp 35;
[0040] Side bracket 4. DETAILED DESCRIPTION
[0041] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the specific implementation methods of the utility model will be described below with reference to the accompanying drawings. Obviously, the accompanying drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings and other implementation methods can be obtained based on these drawings without creative work.
[0042] In order to simplify the drawings, only the parts related to the utility model are schematically shown in each figure, and they do not represent the actual structure of the product. In addition, in order to simplify the drawings and facilitate understanding, in some figures, only one of the parts with the same structure or function is schematically drawn or marked. In this article, "one" not only means "only one", but also means "more than one".
[0043] In this document, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0044] In addition, in the description of the present application, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.
[0045] In one embodiment, a construction system for the top of a photovoltaic pile is described, which realizes the transfer and transportation of the installation bracket through a transfer mechanism, so that the lifting mechanism 1 can lift the installation bracket to the photovoltaic pile on the extension line of the side bracket 4. The staff only needs to stand on the first platform 213 to install the installation bracket on the photovoltaic pile. During this process, there is no need for the staff to climb the photovoltaic pile and carry the installation bracket, and the construction efficiency is greatly improved.
[0046] Specifically, a photovoltaic pile top construction system includes a side bracket 4, which is arranged on the top of the photovoltaic pile, and has a plurality of photovoltaic piles arranged in a straight line on the extension line of the side bracket 4. Figures 1 to 5 The construction system includes a lifting mechanism 1 and a transfer mechanism, wherein the transfer mechanism is arranged on the upper end surface of the side bracket 4 and is suitable for moving along the length direction of the side bracket 4 for transporting the installation bracket, and the lifting mechanism 1 is arranged in the forward direction of the transfer mechanism, and when the transfer mechanism moves forward, the transfer mechanism can be close to the lifting mechanism 1. Accordingly, the lifting mechanism 1 includes a frame 11 and a lifting assembly, and the frame 11 is movably mounted on a plurality of photovoltaic piles on the extension line of the side bracket 4, so that the frame 11 can move along the extension line of the side bracket 4, that is, the frame 11 can move in a direction away from the transfer mechanism, so that the frame 11 is separated from the photovoltaic pile below it and connected to the photovoltaic pile behind it. A first platform 213 is arranged on the transfer mechanism, and the first platform 213 is used to provide a work field for the staff, so that the staff can follow the transfer mechanism to move and install the installation bracket on the top of the photovoltaic pile.
[0047] In the prior art, most installations of photovoltaic piles over a large area are carried out by using ladders, scaffolding or lifting boats and other tools, and adopting traditional ground-based scaffolding platforms. The scaffolding needs to be frequently disassembled and assembled, and the installation position needs to be changed, which is time-consuming and labor-intensive, and the construction efficiency is low.
[0048] The working process of a construction system for the top of a photovoltaic pile provided in this embodiment is as follows: when in use, the staff stands on the first platform 213 of the transfer mechanism, sets the installation bracket on the transfer mechanism, and the transfer mechanism moves along the side bracket 4 to the end of the side bracket 4 close to the lifting mechanism 1. The lifting mechanism 1 moves a certain distance in the direction away from the transfer mechanism, so that the lifting mechanism 1 is separated from one or more photovoltaic piles located below it, and then the installation bracket located on the transfer device is lifted to the photovoltaic pile by the lifting assembly, so that the staff located on the first platform 213 can install the installation bracket on the photovoltaic pile. It should be pointed out that the installation bracket is suitable for cooperating with the transfer mechanism. When the installation bracket is installed on the photovoltaic pile, the installation bracket is connected to the side bracket 4, so that the transfer mechanism can continue to move along the installation bracket after leaving the side bracket 4. Repeat the above operation continuously, and install several installation brackets on the photovoltaic pile in turn.
[0049] In one embodiment, referring to the accompanying drawings, Figure 1 , Figure 2 The present embodiment further describes the transfer mechanism. The transfer mechanism includes a mounting bin 21 movably disposed on the side bracket 4 , and two first platforms 213 are provided and located at both ends of the side bracket 4 in the width direction.
[0050] In this embodiment, the installation bin 21 is movably disposed on the side bracket 4 , and the installation bin 21 is used to transport the installation bracket, and the installation bracket located on the installation bin 21 is lifted to the photovoltaic pile by a lifting assembly.
[0051] Furthermore, the transfer mechanism further includes a shuttle transport trolley, which is located on the side of the installation bin 21 away from the lifting mechanism 1 and is spaced apart from the installation bin 21, and the shuttle transport trolley is movably arranged on the side bracket 4. The shuttle transport trolley is used to transport the installation bracket, and a conveying member is arranged on the shuttle transport trolley, through which the installation bracket can be transferred to the installation bin 21, so that the lifting assembly lifts the installation bracket located on the installation bin 21 to the photovoltaic pile on the extension line of the side bracket 4.
[0052] It is understandable that when the transfer mechanism includes a shuttle transport trolley and an installation bin 21, the shuttle transport trolley, the installation bin 21 and the lifting mechanism 1 are sequentially arranged along the length direction of the side bracket 4. The installation bracket is placed on the shuttle transport trolley, and the installation bin 21 is not provided with the installation bracket at this time. The lifting mechanism 1 moves in a direction away from the installation bin 21, so that one or more photovoltaic piles are separated from the lifting mechanism 1. The installation bin 21 moves to the end of the side bracket 4 in a direction away from the shuttle transport trolley, and the shuttle transport trolley moves in a direction close to the installation bin 21 and communicates with the installation bin 21, so that the conveying member located on the shuttle transport trolley transfers the installation bracket to one end of the installation bin 21 close to the lifting mechanism 1, so as to facilitate the lifting assembly to lift the installation bracket. By transporting the installation bracket and the staff respectively by the shuttle transport trolley and the installation bin 21, compared with the transfer mechanism being separately provided as the installation bin 21, this embodiment can realize the separation of people and goods, and further improves the stability of the movement of the installation bin 21.
[0053] Of course, the conveying member can be set as a transmission belt. In actual production applications, the conveying member can also be set as other devices to achieve the purpose of transferring the installation bracket to the installation bin 21. They are not explained here one by one and are all within the protection scope of the present utility model.
[0054] In one embodiment, referring to the accompanying drawings, Figure 1 , Figure 2 , this embodiment provides a specific structure of an installation bin 21. The installation bin 21 includes a crossbeam frame 211 and a bracket 212. Two brackets 212 are provided, and the two brackets 212 are respectively provided at opposite ends of the crossbeam frame 211. A plurality of first roller assemblies 214 are provided on the lower end surface of the crossbeam frame 211. The plurality of first roller assemblies 214 cooperate with the side bracket 4 so that the crossbeam frame 211 can move relative to the side bracket 4. Moreover, the first roller assembly 214 is suitable for cooperating with the installation bracket, so that the crossbeam frame 211 can move relative to the installation bracket after the installation bracket is installed on the photovoltaic pile.
[0055] Correspondingly, two brackets 212 are arranged at two ends of the side bracket 4 in the width direction, and each first platform 213 is located at one end of a bracket 212 away from the crossbeam frame 211 .
[0056] It is understandable that a plurality of first roller assemblies 214 are provided on the lower end surface of the crossbeam frame 211 so that the installation bin 21 can move stably. The first platform 213 is provided at one end of the bracket 212 away from the crossbeam frame 211, which can reduce the height of the first platform 213, and can improve the safety of the staff while facilitating the installation of the installation bracket.
[0057] Preferably, the bracket 212 is arranged on the crossbeam frame 211 so as to be movable up and down. Specifically, the bracket 212 is provided with a plurality of threaded holes arranged along the length direction of the bracket 212. Correspondingly, the crossbeam frame 211 is also provided with threaded holes. Bolts pass through the threaded holes of the bracket 212 and the threaded holes of the crossbeam frame 211, and the bracket 212 is fixed to the crossbeam frame 211 by tightening the nuts. When in use, the staff can adjust the distance of the bracket 212 relative to the ground by adjusting the bolts passing through different threaded holes on the bracket 212, and then adjust the positional relationship between the first platform 213 and the staff relative to the photovoltaic pile, so as to facilitate the staff's operation.
[0058] Furthermore, the installation bin 21 further includes a second roller assembly 215 , which is disposed on the upper end surface of the crossbeam frame 211 , so that the installation bracket can be moved to an end of the installation bin 21 away from the shuttle transport trolley.
[0059] It should be pointed out that the second roller assembly 215 is arranged along the length direction of the crossbeam frame 211. When the shuttle transport trolley and the installation bin 21 are connected to each other, the conveying member on the shuttle transport trolley is activated to transfer the installation bracket on the shuttle transport trolley to the crossbeam frame 211. Under the action of inertia, the installation bracket is moved to the end of the installation bin 21 away from the shuttle transport trolley through the second roller assembly 215, so as to facilitate the lifting assembly to lift the installation bracket.
[0060] Specifically, the second roller assembly 215 includes a baffle and a plurality of first rollers, the plurality of first rollers are rotatably arranged on the upper end surface of the cross beam frame 211, and the mounting bracket is arranged on the first rollers to move along the length direction of the cross beam frame 211. The baffle is arranged on both sides of the cross beam frame 211 in the width direction to prevent the mounting bracket from falling off the first roller when moving. Accordingly, a plurality of second rollers are arranged on the side where the two baffles are close to each other to reduce the friction between the mounting bracket and the baffle.
[0061] Preferably, the first roller is configured as a universal ball roller to ensure that the mounting bracket can move smoothly on the crossbeam frame 211 .
[0062] Of course, in actual production applications, the second roller assembly 215 may not be provided on the beam frame 211. For example, a conveyor belt may be provided on the beam frame 211 to convey the received installation bracket to one end of the beam frame 211 close to the lifting mechanism 1.
[0063] In one embodiment, referring to the accompanying drawings, Figure 5, this embodiment further describes a construction system for the top of a photovoltaic pile. The construction system also includes a height adjustment member 3 and a rotating wheel 31. The height adjustment member 3 is detachably arranged on the top of the photovoltaic pile of the extension line of the side bracket 4, that is, one end of the height adjustment member 3 is detachably connected to the top of the photovoltaic pile, and the rotating wheel 31 is rotatably arranged at the end of the height adjustment member 3 away from the top of the photovoltaic pile. Among them, the length of the height adjustment member 3 is adjustable to adjust the distance between the rotating wheel 31 and the top of the photovoltaic pile, and the rotating wheel 31 is suitable for cooperating with the frame 11, and the frame 11 is in contact with the rotating wheel 31 so that the frame 11 can move in a direction away from the transfer mechanism.
[0064] It is understandable that photovoltaic piles are mostly set in outdoor environments. The changeable outdoor terrain causes the heights of photovoltaic piles to be different. By adjusting the length of the height adjustment member 3, each photovoltaic pile is adjusted, and the height of the combination of the height adjustment member 3 and the rotating wheel 31 is the same, so that the lifting mechanism 1 can contact the rotating wheel 31 to improve the stability of the movement of the lifting mechanism 1. In addition, the height adjustment member 3 is detachably arranged on the top of the photovoltaic pile. When the frame 11 moves in a direction away from the transfer mechanism, it can be separated from the rotating wheel 31 on one or more photovoltaic piles, so as to facilitate the removal of the height adjustment member 3 and the rotating wheel 31 on these photovoltaic piles, so as to facilitate the installation of the mounting bracket on these photovoltaic piles.
[0065] Specifically, the height adjustment member 3 includes a mounting arm 32, a threaded rod 33, and a first clamp 34 and a second clamp 35 arranged at both ends of the length direction of the mounting arm 32. Among them, the mounting arm 32 is provided with a mounting hole matched with the threaded rod 33, so that the mounting arm 32 can be movably sleeved on the outside of the threaded rod 33, and a nut is provided on the threaded rod 33, the nut is located above the mounting arm 33, and the outer diameter of the nut is greater than the outer diameter of the mounting hole. When in use, the staff adjusts the length of the threaded rod 33 extending from the mounting arm 32 by adjusting the position relationship of the nut on the threaded rod 33, and then adjusts the length of the height adjustment member 3. In addition, when the mounting arm 32 is set on the top of the photovoltaic pile, the first clamp 34 and the second clamp 35 are sleeved on the outside of the photovoltaic pile, and the second clamp 35 and the photovoltaic pile are provided with threaded holes. After the height adjustment member 3 is set on the photovoltaic pile, the staff can use bolts to pass through the threaded holes to achieve the installation and fixation of the height adjustment member 3.
[0066] In one embodiment, referring to the accompanying drawings, Figure 3 , Figure 4, this embodiment provides a specific structure of a frame 11. The frame 11 includes a first longitudinal beam 112 and a plurality of gantries 111, and the first longitudinal beam 112 is arranged along the direction of the extension line of the side bracket 4. Correspondingly, the gantry 111 includes a connecting beam 1111 and two columns 1112, the two columns 1112 are arranged at both ends of the width direction of the side bracket 4, and the connecting beam 1111 is arranged between the two columns 1112, the first longitudinal beam 112 is arranged between the two columns 1112, and is connected to the connecting beams 1111 of the plurality of gantries 111, so that the first longitudinal beam 112 is installed on the gantry 111. In order to enable the frame 11 to move along the extension line of the side bracket 4, the lower end surface of the first longitudinal beam 112 is suitable for cooperating with the rotating wheel 31, so that the frame 11 moves through the first longitudinal beam 112 cooperating with the rotating wheel 31.
[0067] Furthermore, a second platform 113 is provided on the side away from the two columns 1112, and the second platform 113 is provided along the length direction of the side bracket 4 to provide a work place for the staff. It is understandable that the staff can also be located on the second platform 113, so that after the lifting mechanism 1 lifts the mounting bracket to the photovoltaic pile, the height adjustment member 3 and the rotating wheel 31 located at the top of the photovoltaic pile are removed, and then the mounting bracket is installed on the photovoltaic pile.
[0068] Preferably, the length of the second platform 113 can be appropriately increased so that the length of the second platform 113 is greater than the length of the connection line of all the gantries 111 of the rack 11. After the lifting mechanism 1 moves a certain distance in the direction away from the transfer mechanism, the end of the second platform 113 close to the transfer mechanism is still located on both sides of the corresponding photovoltaic pile, so that the staff can disassemble the height adjustment member 3 and the rotating wheel 31 and install the mounting bracket on the photovoltaic pile. The height adjustment member 3 and the rotating wheel 31 can be set only on the photovoltaic pile close to the side bracket 4. Before each movement of the lifting mechanism 1, the staff can walk to the end of the second platform 113 away from the transfer mechanism to install the height adjustment member 3 and the rotating wheel 31 on the photovoltaic pile, so that the lifting mechanism 1 can move.
[0069] It should be pointed out that the rack 11 can be moved by the staff applying thrust to the photovoltaic pile, or a motor can be set on the wheel 31 to drive the wheel 31 to move, so as to achieve the purpose of moving the rack 11. These are not explained here one by one, and all are within the protection scope of the present utility model.
[0070] In one embodiment, referring to the accompanying drawings, Figure 3 The lifting assembly is arranged on the upper end surface of several gantries 111 of the frame 11 close to the installation bin 21, so as to lift the installation bracket.
[0071] Specifically, the upper end surface of several gantries of the frame 11 close to the installation bin is also provided with a top beam 1113, and the top beam 1113 is arranged between two columns 1112. The lifting assembly includes a second longitudinal beam and an electric hoist, the second longitudinal beam is arranged on the lower end surface of several top beams 1113, and the electric hoist is movably arranged on a side of the second longitudinal beam away from the top beam 1113 to lift the installation bracket.
[0072] In one embodiment, referring to the accompanying drawings, Figure 3 , Figure 4 A locking assembly 114 is also provided on the column 1112. The locking assembly 114 is suitable for engaging with the photovoltaic pile of the extension line of the side bracket 4 to fix the rack 11 on the photovoltaic pile. After the locking assembly 114 contacts and limits the position with the photovoltaic pile, the rack 11 can move.
[0073] Specifically, the locking assembly 114 includes a limiting arm 1141, a connecting arm 1142, a mounting frame 1143 and a clamping arm 1144. The clamping arm 1144 is provided in two, and the two clamping arms 1144 are provided on both sides of the photovoltaic pile of the extension line of the side bracket 4, and each clamping arm 1144 is provided along the direction of the extension line of the side bracket 4 and provided between the two columns 1112, and the connecting arm 1142 is provided on the side away from each other of the two clamping arms 1144. The mounting frame 1143 is provided on one side of the column 1112 and is sleeved on the outside of the connecting arm 1142, so that the connecting arm 1142 moves relative to the mounting frame 1143, thereby adjusting the distance between the clamping arm 1144 and the photovoltaic pile.
[0074] Furthermore, the limiting arm 1141 is rotatably arranged on the column 1112 by using a fixed shaft as a rotating shaft, and a plurality of connecting holes are arranged on the outer side of the connecting arm 1142. Accordingly, the limiting arm 1141 includes a clamping portion and a connecting portion that are connected at one time, the clamping portion is suitable for engaging with the connecting hole, the fixed shaft is arranged between the clamping portion and the connecting portion, and the elastic member in a compressed state is arranged between the connecting portion and the installation frame 1143. Under the action of the restoring force of the elastic member, the clamping portion rotates toward the direction close to the installation frame 1143, so that the clamping portion engages with the connecting hole, thereby fixing the connecting arm 1142 in the installation frame 1143.
[0075] When in use, the locking assembly 114 is not engaged with the photovoltaic pile, so that the frame 11 can move. After the frame 11 is moved to a suitable position, the staff extends the connecting arm 1142 so that the two clamping arms 1144 are in contact with the photovoltaic pile, and cooperates with the corresponding connecting holes through the clamping part, and then connects and fixes the connecting arm 1142 to the mounting frame 1143, thereby installing and fixing the frame 11 on the photovoltaic pile to improve the stability of the staff during work and ensure personnel safety.
[0076] It should be noted that the above embodiments can be freely combined as needed. The above is only a preferred implementation of the utility model. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the utility model, and these improvements and modifications should also be regarded as the protection scope of the utility model.
Claims
1. A construction system for the top of a photovoltaic pile, It is characterized in that It includes a lifting mechanism, a transfer mechanism and a side bracket arranged on the top of a plurality of photovoltaic piles, wherein the extension line of the side bracket has a plurality of photovoltaic piles arranged in a straight line, the transfer mechanism is arranged on the side bracket and is suitable for moving along the length direction of the side bracket to transport the mounting bracket suitable for cooperating with the transfer mechanism, and the lifting mechanism is located in the forward direction of the transfer mechanism; The lifting mechanism includes a frame and a lifting assembly arranged on the frame, and the frame is movably mounted on a plurality of photovoltaic piles on an extension line of the side bracket so that the frame is suitable for moving in a direction away from the transfer mechanism; Among them, the transfer mechanism is provided with a first platform for providing a working place for the staff. When the rack moves, the lifting assembly is used to lift the installation bracket located on the transfer mechanism to the photovoltaic pile on the extension line of the side bracket, so that the staff can install the installation bracket on the top of the photovoltaic pile.
2. A construction system for the top of a photovoltaic pile according to claim 1, It is characterized in that The transfer mechanism includes a mounting bin movably disposed on the side bracket; The number of the first platforms is two, and the two first platforms are arranged on both sides of the side bracket in the width direction.
3. A construction system for the top of a photovoltaic pile according to claim 2, It is characterized in that The transfer mechanism further comprises a shuttle transport trolley movably arranged on the side bracket, the shuttle transport trolley is spaced apart from the installation bin and is located on a side of the installation bin away from the lifting mechanism, for transporting the installation bracket; The shuttle transport trolley is provided with a conveying member for transferring the mounting bracket to the mounting bin, and the lifting assembly is used for lifting the mounting bracket located on the mounting bin.
4. A construction system for the top of a photovoltaic pile according to claim 3, It is characterized in that The installation bin comprises a crossbeam frame and two brackets, and a plurality of first roller assemblies are arranged on the lower end surface of the crossbeam frame so as to allow the crossbeam frame to move relative to the side brackets and the installation brackets; The two brackets are respectively arranged at two opposite ends of the cross beam frame and located at two ends of the side bracket in the width direction, and each first platform is located at one end of the bracket away from the cross beam frame.
5. A construction system for the top of a photovoltaic pile according to claim 4, It is characterized in that The upper end surface of the crossbeam frame is provided with a second roller assembly arranged along the length direction of the crossbeam frame, so that the installation bracket moves to an end of the installation bin away from the shuttle transport trolley.
6. A construction system for the top of a photovoltaic pile according to any one of claims 1 to 5, It is characterized in that It also includes a height adjustment member and a rotating wheel arranged at one end of the height adjustment member, and the other end of the height adjustment member is detachably arranged on the top of the photovoltaic pile on the extension line of the side bracket; The rotating wheel is suitable for cooperating with the frame to enable the frame to move, and the height adjustment member is used to adjust the distance between the rotating wheel and the photovoltaic pile.
7. A construction system for the top of a photovoltaic pile according to claim 6, It is characterized in that The frame includes a plurality of gantries and a first longitudinal beam arranged along the length direction of the side bracket; The gantry comprises a connecting beam and two columns arranged at both ends of the side bracket in the width direction, the connecting beam is located between the two columns, the first longitudinal beam is arranged between the two columns and connected to a plurality of the connecting beams, and the lower end surface of the first longitudinal beam is suitable for matching with the rotating wheel; The lifting assembly is arranged on the upper end surfaces of several gantries close to the transfer mechanism.
8. A construction system for the top of a photovoltaic pile according to claim 7, It is characterized in that A second platform is also provided along the length direction of the side bracket on the side where the two columns are far away from each other, so as to provide a working place for the staff.
9. A construction system for the top of a photovoltaic pile according to claim 8, It is characterized in that The upright column is also provided with a plurality of locking components, which are suitable for engaging with the photovoltaic piles on the extension lines of the side brackets to fix the rack on the photovoltaic piles.
10. A construction system for the top of a photovoltaic pile according to claim 9, It is characterized in that The locking assembly includes a limit arm, an elastic member, a connecting arm, a mounting frame and two clamping arms, each of the clamping arms is arranged along the length direction of the side bracket, the clamping arm is arranged between the two columns of the gantry and located on both sides of the photovoltaic pile, and one end of the connecting arm is arranged on a side away from the two clamping arms; The mounting frame is arranged on one side of the column and sleeved on the outer side of the connecting arm. The connecting arm is suitable for moving relative to the mounting frame to adjust the distance between the clamping arm and the photovoltaic pile. A plurality of connecting holes are arranged on the outer side of the connecting arm. The limiting arm is rotatably arranged on the column with a fixed shaft as a rotating shaft. The limiting arm includes a connecting portion and a clamping portion suitable for cooperating with the connecting hole, which are connected in sequence. The fixed shaft is located between the clamping portion and the connecting portion. The elastic member is arranged between the connecting portion and the mounting frame and is in a compressed state so that the clamping portion can be engaged with the connecting hole.