Filling roadbed structure suitable for permafrost region

By adopting multi-layer structure filling roadbed design and vibration compaction technology in the highways in permafrost areas, the problem of roadbed cracking caused by freezing and melting is solved, the strength and stability of the roadbed are improved, and the roadbed is extended. Service life.

CN222043740UActive Publication Date: 2024-11-22科尔沁右翼前旗交通运输事业发展中心
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420605713.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-27
Publication Date
2024-11-22
Estimated Expiration
2034-03-27

AI Technical Summary

Technical Problem

Highways in permafrost areas have problems such as cracking of roadbeds due to frost swelling, thawing and freeze-thawing processes, resulting in insufficient roadbed strength and shortened service life.

Method used

The filling roadbed design adopts a multi-layer structure, including permafrost layer, gravel layer, slate base layer, gravel layer, stone layer, civil grille, roadbed filler layer and insulation protection path, through layered paving and vibration compaction Technology, combined with impact rolling, enhance the replenishment pressure, ensure surface water development and substrate stability, and set up insulation channels on both sides of the roadbed to prevent frost and swelling diseases.

Benefits of technology

It improves the strength and stability of the roadbed, reduces frost and swelling diseases, prevents surface water from infiltration, and extends the service life of the highway.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222043740U_ABST
    Figure CN222043740U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of fill roadbeds in permafrost regions, in particular to a fill roadbed structure suitable for permafrost regions, which comprises a permafrost layer, a roadbed structure body is arranged on the permafrost layer, the roadbed structure body comprises a gravel layer laid on the permafrost layer, and a rubble base layer is laid on the gravel layer. A first rock ballast layer and a second rock ballast layer are laid on the rubble base layer, a stone layer is laid between the first rock ballast layer and the second rock ballast layer, a civil grid is laid on the second rock ballast layer, a roadbed filler layer is laid on the civil grid, and heat preservation protection ways are filled on the two sides of the roadbed filler layer. Through the arrangement of the roadbed structure body, the top surface of the ventilation layer of the rubble base layer should be roughly flat, holes exceeding 6 cm are not formed, surface water development is improved, the surface layer of the base is mostly made of humus soil, silky clay and gravel-containing silky clay with different thicknesses, the upper limit range of frozen soil is mostly a wet and soft foundation, the bearing capacity of the surface soil foundation is low, and the surface soil foundation is not damaged. And the substrate is more stable and firm.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a fill roadbed structure, in particular to a fill roadbed structure suitable for permafrost areas, belonging to the technical field of fill roadbeds in permafrost areas. Background Art

[0002] Permafrost has a great impact on the quality and service life of roads. Compared with general land types, the most notable feature of permafrost is that its properties are significantly different from those of general soil. It is a complex system of ice and cement. Permafrost roadbed diseases are mainly caused by permafrost degradation, resulting in frost heave, thaw settlement, and slurrying of the roadbed, as well as road cracking caused by the freeze-thaw process.

[0003] The highway built in the permafrost zone of Arshan is an important route. The surface vegetation in the area is dense, the surface water system and river network are developed, the river valley is relatively open, wetlands are widely distributed during the flood season, and there are many island-like permafrost and soft foundations. The geological conditions are extremely complex. Once the foundation undergoes freeze-thaw changes, the foundation volume will change, thus damaging the roadbed and pavement.

[0004] Therefore, there is an urgent need to improve a fill roadbed structure suitable for permafrost areas to solve the above-mentioned problems. Utility Model Content

[0005] The utility model aims to provide a fill roadbed structure suitable for permafrost areas, which can enhance the strength of the roadbed and avoid roadbed damage.

[0006] In order to achieve the above-mentioned purpose, the main technical solutions adopted by the utility model include:

[0007] A fill roadbed structure suitable for permafrost areas comprises a frozen soil layer, on which a roadbed structure body is arranged, the roadbed structure body comprises a gravel layer laid on the frozen soil layer, a slab stone base layer is laid on the gravel layer, a first slag layer and a second slag layer are laid on the slab stone base layer, a stone layer is laid between the first slag layer and the second slag layer, a civil grid is laid on the second slag layer, a roadbed filling layer is laid on the civil grid, and both sides of the roadbed filling layer are filled with thermal insulation berms.

[0008] Preferably, the thickness of the gravel layer is 30 cm, which provides auxiliary protection for the base surface of the frozen soil layer and the bottom of the slate base layer.

[0009] Preferably, the slab-stone base layer is made of hard or relatively hard rock, the uniaxial saturated compressive strength of the stone should be greater than 30 MPa, the particle size should be controlled within the range of 100 to 250 mm, the thickness is 1.0 m, and it is paved in two layers. The upper 30 cm layer is paved with slab-stones with a particle size of 100 to 150 mm, and the lower 70 cm layer is paved with slab-stones with a particle size of 200 to 300 mm. The top surface of the slab-stone ventilation layer should be roughly flat, and there should be no holes exceeding 6 cm to improve surface water development. The surface layer of the base is mostly humus, silty clay and gravel-containing silty clay of varying thicknesses. The upper limit range of frozen soil is mostly wet and soft foundations, and the surface soil foundation has low bearing capacity, which makes the base more stable and solid, while preventing aggregate leakage from affecting the ventilation effect of the slab-stone layer.

[0010] Preferably, the mud content of the stone layer and the second slag layer is less than 5%, the particle size is less than 200 mm, and the strength is not less than 30 MPa.

[0011] Preferably, the stones used in the stone layer are not easy to expand and disintegrate, the maximum particle size of the filler should be no more than 500mm, the thickness should not exceed 2 / 3 of the layer thickness, the content of particles less than 0.075mm should not be more than 5%, and a vibratory roller with a dead weight of not less than 22t should be used for layered compaction. The compaction control standard can be controlled by combining porosity and compaction settlement difference or construction parameters, and impact rolling should be used to enhance the compaction every 1.5m layer thickness. The number of compaction times is controlled at 20 times to reduce post-construction settlement and improve the stability of the roadbed.

[0012] Preferably, the thermal insulation berm has a thickness of 0.5 m and a slope of 1:1.5, and is filled with clay soil removed by base replacement.

[0013] Preferably, a water collecting trough is provided on the thermal insulation berm, and a plurality of drainage troughs are provided on one side of the water collecting trough.

[0014] The utility model has at least the following beneficial effects:

[0015] Through the setting of the roadbed structure, the top surface of the ventilation layer of the slab stone base should be roughly flat, and there should be no holes larger than 6 cm, which can improve the development of surface water. The surface layer of the base is mostly humus, silty clay and gravel-containing silty clay of varying thickness. The upper limit of the frozen soil range is mostly soft foundation, and the bearing capacity of the surface soil foundation is low, making the base more stable and solid. At the same time, it prevents the aggregate from leaking and affecting the ventilation effect of the slab stone layer. The stone layer is compacted in layers by a vibrating roller with a deadweight of not less than 22 tons. The compaction control standard can be controlled by the porosity and compaction settlement difference or construction parameters. Impact rolling is used to enhance the compaction every 1.5m layer thickness. The number of compaction times is controlled at 20 times to reduce post-construction settlement and improve the stability of the roadbed. The thermal insulation berm can prevent frost heave disease at the foot of the slope and block the surface water at the foot of the slope from seeping into the base below the roadbed filling layer. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0017] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0018] Figure 2 For the utility model Figure 1 Enlarged view of point A in the middle;

[0019] Figure 3 It is a partial surface schematic diagram of the thermal insulation berm of the present utility model.

[0020] In the figure, 1. frozen soil layer; 2. roadbed structure body; 3. gravel layer; 4. rubble layer; 5. first slag layer; 6. stone layer; 7. second slag layer; 8. civil grid; 9. roadbed filling layer; 10. thermal insulation berm; 11. water collection trough; 12. drainage trough. DETAILED DESCRIPTION

[0021] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.

[0022] like Figure 1-Figure 3 As shown, this embodiment provides an embodiment of a fill roadbed structure suitable for permafrost areas.

[0023] A fill roadbed structure suitable for permafrost areas comprises a frozen soil layer 1, a roadbed structure body 2 is arranged on the frozen soil layer 1, the roadbed structure body 2 comprises a gravel layer 3 laid on the frozen soil layer 1, a slab stone base layer 4 is laid on the gravel layer 3, a first slag layer 5 and a second slag layer 7 are laid on the slab stone base layer 4, a stone layer 6 is laid between the first slag layer 5 and the second slag layer 7, a civil grid 8 is laid on the second slag layer 7, a roadbed filling layer 9 is laid on the civil grid 8, both sides of the roadbed filling layer 9 are filled with thermal insulation berms 10, the gravel layer 3 is 30 cm thick, the slab stone base layer 4 is made of hard or relatively hard rock, the uniaxial saturated compressive strength of the stone material should be greater than 30 MPa, and the particle size should be controlled within the range of 100 to 250 mm. The thickness is 1.0m and it is paved in two layers. The upper 30cm layer is paved with 100mm-150mm stone slabs, and the lower 70cm layer is paved with 200mm-300mm stone slabs. The mud content of the stone layer 6 and the second slag layer 7 is less than 5%, the particle size is less than 200mm, and the strength is not less than 30MPa. The stone used in the stone layer 6 is not easy to expand and disintegrate. The maximum particle size of the filler should not be greater than 500mm, and the thickness should not exceed 2 / 3 of the layer thickness. The content of particles less than 0.075mm is not more than 5%. The thickness of the thermal insulation berm 10 is 0.5m, and the slope is 1:1.5. It is filled with clay soil excavated by base replacement. A water collection trough 11 is opened on the thermal insulation berm 10, and multiple drainage troughs 12 are opened on one side of the water collection trough 11. The top surface of the ventilation layer of the slab stone base layer 4 should be roughly flat, and there should be no holes larger than 6 cm, which can improve the development of surface water. The surface layer of the base is mostly humus, silty clay and gravel-containing silty clay of varying thickness. The upper limit of the frozen soil range is mostly soft foundation, and the bearing capacity of the surface soil foundation is low, making the base more stable and solid, while preventing the aggregate from leaking down and affecting the ventilation effect of the slab stone layer. The stone layer 6 is compacted in layers by a vibrating roller with a deadweight of not less than 22 tons. The compaction control standard can be controlled by the porosity and compaction settlement difference or construction parameters. Impact rolling is used to enhance the compaction every 1.5m layer thickness, and the number of compaction times is controlled at 20 times to reduce post-construction settlement and improve the stability of the roadbed. The thermal insulation berm 10 can prevent the frost heave disease at the foot of the slope and block the surface water at the foot of the slope from penetrating into the base below the roadbed filling layer 9. The opening of the water collection trough 11 and the drainage trough 12 is conducive to the discharge of water on the thermal insulation berm 10.

[0024] In this embodiment, if Figure 1-Figure 3 As shown, the working process of a fill roadbed structure suitable for permafrost areas provided in this embodiment is as follows:

[0025] Step 1: After cutting off the shrubs above the ground and sawing off the tree stumps, dig out the ice-saturated and ice-rich frozen soil layers on the frozen soil layer 1, retain the less ice and more ice frozen soil layers at the bottom of the frozen soil layer 1, and make appropriate adjustments based on the engineering geology and hydrogeological conditions of the base.

[0026] Step 2: Lay a gravel layer 3 on the base of the frozen soil layer 1, then fill a 0.5-1.5m thick stone base layer 4 on the gravel layer 3, and after layered compaction, use a 25KJ triangular impact roller to enhance the pressure, and the number of times of compaction is controlled to be 20 times, and then fill a 30cm first slag layer 5 on the top of the stone base layer 4 and roll it densely;

[0027] Step 3: Fill the stone layer 6 on the first slag layer 5. The maximum particle size of the filler should not be greater than 500mm, and should not exceed 2 / 3 of the layer thickness. The content of particles less than 0.075mm should not be greater than 5%. It is required to use a vibrating roller with a deadweight of not less than 22t to compact the layers in layers, and use impact rolling to enhance the compaction every 1.5m of layer thickness. The number of compaction times is controlled to be 20 times. Then, lay the second slag layer 7 on the stone layer 6 and compact it.

[0028] Step 4: Lay civil grid 8 on the second slag layer 7, then build roadbed filling layer 9 on the civil grid 8 and compact it, finally build insulation berm 10 on both sides of roadbed filling layer 9 with clay and compact it, the thickness of insulation berm 10 is 0.5m, and the slope is 1:1.5.

[0029] In summary, in this embodiment, according to a fill roadbed structure suitable for permafrost areas of this embodiment, through the setting of the roadbed structure body 2, the top surface of the ventilation layer of the slab stone base layer 4 should be roughly flat, and there should be no holes larger than 6 cm, so as to improve the development of surface water. The surface layer of the base is mostly humus soil, silty clay and gravel-containing silty clay of varying thicknesses. The upper limit range of frozen soil is mostly wet and soft foundation. The surface soil foundation bearing capacity is low, making its base more stable and solid, and preventing the aggregate from leaking down and affecting the ventilation effect of the slab stone layer. The stone layer 6 A vibratory roller with a deadweight of not less than 22t is used for layered compaction. The compaction control standard can be controlled by a combination of porosity and compaction settlement difference or construction parameters. Impact rolling is used to enhance the compaction every 1.5m layer thickness. The number of compaction passes is controlled at 20 times to reduce post-construction settlement and improve the stability of the roadbed. The thermal insulation berm 10 can prevent frost heave at the foot of the slope and block the surface water at the foot of the slope from infiltrating into the base layer below the roadbed filling layer 9. The opening of the sump 11 and the drainage trough 12 is conducive to the discharge of water on the thermal insulation berm 10.

[0030] For example, certain words are used in the specification and claims to refer to specific components. Those skilled in the art should understand that hardware manufacturers may use different terms to refer to the same component. This specification and claims do not use differences in names as a way to distinguish components, but use differences in the functions of components as the criteria for distinction. For example, "including" mentioned throughout the specification and claims is an open term, so it should be interpreted as "including but not limited to". "Approximately" means that within an acceptable error range, those skilled in the art can solve technical problems within a certain error range and basically achieve technical effects.

[0031] It should be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a product or system including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such product or system. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the product or system including the elements.

[0032] The above description shows and describes several preferred embodiments of the utility model, but as mentioned above, it should be understood that the utility model is not limited to the form disclosed herein, and should not be regarded as excluding other embodiments, but can be used in various other combinations, modifications and environments, and can be modified within the scope of the utility model concept described herein through the above teachings or the technology or knowledge of the relevant field. The changes and modifications made by those skilled in the art do not deviate from the spirit and scope of the utility model, and should be within the scope of protection of the claims attached to the utility model.

Claims

1. A fill roadbed structure suitable for permafrost areas, comprising a permafrost layer (1), Features: A roadbed structure body (2) is arranged on the frozen soil layer (1), and the roadbed structure body (2) comprises a gravel layer (3) laid on the frozen soil layer (1), a slab stone base layer (4) is laid on the gravel layer (3), a first slag layer (5) and a second slag layer (7) are laid on the slab stone base layer (4), a stone layer (6) is laid between the first slag layer (5) and the second slag layer (7), a civil grid (8) is laid on the second slag layer (7), a roadbed filling layer (9) is laid on the civil grid (8), and both sides of the roadbed filling layer (9) are filled with thermal insulation berms (10).

2. A fill roadbed structure suitable for permafrost areas according to claim 1, Features: The thickness of the gravel layer (3) is 30 cm.

3. The fill roadbed structure suitable for permafrost areas according to claim 1, Features: The slab stone base (4) is made of hard or relatively hard rock, the uniaxial saturated compressive strength of the stone should be greater than 30Mpa, and the particle size should be controlled within the range of 100-250mm. The thickness of the slab stone base (4) should be 1.0-1.5m, and it is paved in two layers, the thickness of the upper layer should be 0.2-0.5m, the specification is 100-150mm, and the thickness of the lower layer can be 0.8-1.0m, the specification is not less than 200mm.

4. The fill roadbed structure suitable for permafrost areas according to claim 1, Features: The mud content of the stone layer (6) and the second slag layer (7) is less than 5%, the particle size is less than 200 mm, and the strength is not less than 30 MPa.

5. The fill roadbed structure suitable for permafrost areas according to claim 1, Features: The stone used in the stone layer (6) is not easy to expand and disintegrate, the maximum particle size of the filler should not be greater than 500mm, the thickness should not exceed 2 / 3 of the layer thickness, and the content of particles less than 0.075mm should not be greater than 5%.

6. The fill roadbed structure suitable for permafrost areas according to claim 1, Features: The thermal insulation berm (10) has a thickness of 0.5 m and a slope of 1:1.5, and is filled with clay soil removed from the basement for replacement.

7. The fill roadbed structure suitable for permafrost areas according to claim 1, Features: A water collecting trough (11) is provided on the heat-insulating berm (10), and a plurality of drainage grooves (12) are provided on one side of the water collecting trough (11).