Gas-water separation tank and gas extraction system
By designing a gas-water separation box and gas extraction system, the problem of random discharge of gas and liquids during drilling is solved, and the separation and treatment of liquids and gases is realized, which reduces gas over-limit accidents and environmental pollution, and improves gas pipelines liquidity and hygiene of the drilling site.
Patent Information
- Application Number
- CN202420594509.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-26
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-03-26
AI Technical Summary
During the drilling process, gas, liquid and slag are directly discharged, resulting in excessive gas limit in the drilling field, poor environmental sanitation and water accumulation in the gas pipeline, affecting gas flowability.
A gas-water separation box and gas extraction system were designed to collect the liquid and gas generated during the drilling process through the orifice multi-pass and the gas-water separation box, and process and discharge them through different channels to avoid random discharge and use them. The guide slope, baffle and vertical plate structure ensures separation of liquid and gas.
It effectively reduces gas emissions and drilling site environmental pollution, improves the fluidity of gas pipelines, reduces the frequency of gas exceeding gas accidents, and improves the environmental sanitation around the drilling site.
Smart Images

Figure CN222045702U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of gas extraction, and in particular to a gas-water separation box and a gas extraction system. Background Art
[0002] In coal mines or other underground mining, holes are drilled in working faces or tunnels to remove gas (combustible gas, the main component of which is methane). Subsequently, the joint extraction pipe is inserted into the drilled hole and sealed with mortar. Then, a combiner is used to extract the gas from the drilled hole through the joint extraction pipe. The extracted gas is transported to the gas pipeline to effectively discharge the gas in the rock formation and reduce the danger of gas accumulation.
[0003] However, in the prior art, during the drilling process, the gas generated by the drilling, the flushing cooling medium during the drilling of the drill rod, and the oil in the coal mine are directly discharged into the drilling site or the working face, and the gas and liquid are discharged together, which has the following disadvantages:
[0004] 1. It is easy to cause excessive gas in the drilling site and working face, endangering the life safety of workers and the safe construction of the mine.
[0005] 2. The water, oil and residue generated during the drilling process are directly discharged into the drilling site, resulting in deep silt in the drilling site and poor environmental sanitation around the drilling site.
[0006] 3. During the drilling process, the water produced by drilling will flow into the gas pipeline. A certain amount of water will accumulate in the gas pipeline, thus occupying the space in the gas pipeline and affecting the gas fluidity in the gas pipeline. Utility Model Content
[0007] The utility model aims to provide a gas-water separation box and a gas extraction system to solve the problem that gas and liquid are not collected separately and are discharged randomly during the current drilling process.
[0008] To achieve the above-mentioned purpose, the utility model adopts the following technical solution: an air-water separation box, comprising a box body, a main inlet, an air suction port and multiple gas inlets are provided on the top of the box body, and a discharge port is provided on the bottom of the box body; the discharge port and the air suction port are located on the same side of the box body, and the main inlet is located on the other side of the box body.
[0009] In order to achieve the above-mentioned object, the utility model also adopts the following technical scheme: a gas extraction system, including a gas pipeline, an orifice multi-way device and a gas-water separation box;
[0010] The orifice multi-way device includes a shell and an inner hole casing, a drill pipe inlet, an upper outlet and a lower outlet located on the shell; the inner hole casing and the drill pipe inlet are respectively located on the left and right sides of the shell, and the inner hole casing and the drill pipe inlet are horizontally opposite to each other; the upper outlet and the lower outlet are respectively located on the upper and lower sides of the shell; a first feed hose is connected between the upper outlet and the gas inlet, a second feed hose is connected between the lower outlet and the main inlet, a discharge hose is connected to the gas pipeline and the exhaust port, and a discharge pipe is connected to the discharge port.
[0011] The principle and effect of the present application scheme are as follows: during the drilling process, the liquid and gas generated during the drilling process enter the inner casing of the hole, and these substances enter the orifice multi-pass device through the inner casing of the hole. Some liquids (water, oil and slag) and a small amount of gas flow out through the lower discharge port, and the outflowing medium enters the main inlet through the second feed hose, so the main inlet is used to receive the liquid (water, oil and slag) and a small amount of gas generated during the drilling process. At the same time, during the drilling process, for the gas in the orifice multi-ventilation, since the gas is lighter, more gas is discharged through the upper discharge port, and the discharged gas enters the gas inlet through the first feed hose, so the gas inlet is used to receive a major part of the gas generated during the drilling process.
[0012] In this way, the liquid and gas generated during the drilling process are collected in the gas-water separation box. Since the gas is lighter and the liquid is heavier, the gas in the gas-water separation box is located above the liquid. Finally, the gas pipeline is evacuated through the discharge hose, and the gas flows out from the exhaust port and is collected in the gas pipeline, reducing the indiscriminate emission of gas and greatly reducing the gas inflow into the drilling site and working face to cause gas over-limit accidents.
[0013] At the same time, the liquid that enters the gas-water separation box is discharged from the discharge port, and the liquid is discharged into the water pit along the discharge pipe. The sludge and other liquids in the water pit are subsequently processed centrally, thereby avoiding the problem of poor environment around the drilling site caused by indiscriminate discharge of liquid, and greatly improving the environment around the drilling site.
[0014] Therefore, the gas-water separation box in the present application can collect and separate gas and liquid during the drilling process, collect gas and liquid separately, and solve the problem of random discharge of gas and liquid.
[0015] Preferably, as an improvement, a guide slope is provided at the bottom of the box body, the guide slope is opposite to the main inlet, the lower end of the guide slope is close to the discharge port, and the higher end of the guide slope is far away from the discharge port.
[0016] Therefore, the liquid entering from the main inlet will first flow downward onto the guide slope, and then the liquid will flow along the guide slope toward the discharge port. The guide slope has a certain guiding effect on the liquid flowing toward the discharge port, which is beneficial to the flow of liquid toward the discharge port and reduces the accumulation and blockage of slag-containing liquid in the gas-water separation box.
[0017] Preferably, as an improvement, a first baffle fixed inside the box is provided below the gas inlet.
[0018] Therefore, the first baffle is provided to block the liquid to a certain extent, thereby preventing the liquid entering the gas-water separation box from splashing upward and entering the gas inlet, so that the liquid can be stably located inside the gas-water separation box.
[0019] Preferably, as an improvement, a plurality of second baffles are fixedly provided inside the box body, the plurality of second baffles are located below the air suction port, the plurality of second baffles are vertically distributed, and each second baffle is inclined.
[0020] Therefore, the second baffle is used to block the liquid. When the gas is sucked upward from the gas extraction port, a large suction force is generated. The second baffle is used to prevent the liquid from being sucked into the gas extraction port, thereby preventing the liquid from entering the gas pipeline. Since a large suction force is generated when the gas extraction port is sucked upward from the gas extraction port, a plurality of second baffles are vertically distributed to ensure the second baffle's blocking effect on the liquid.
[0021] Preferably, as an improvement, a vertical plate is fixedly provided inside the box body, which divides the inner part of the box body into a feed chamber and an exhaust chamber, and the exhaust chamber and the air suction port are opposite; the ends of two adjacent second baffles are respectively connected to the vertical plate and the inner wall of the box body opposite to the vertical plate.
[0022] Thus, the vertical plate is arranged to divide the box into a feed chamber and an exhaust chamber, so that when the liquid enters the box, it will first enter the feed chamber and then enter the exhaust chamber. The feed chamber is close to the main inlet, so the liquid in the feed chamber is more surging, while the exhaust chamber is far away from the main inlet, so the liquid in the exhaust chamber is relatively calm, and the degree of liquid splashing is reduced, which is conducive to reducing the degree of liquid being sucked upward. At the same time, by arranging the vertical plate, the adjacent second baffles are respectively connected to the inner wall of the box and the vertical plate, so that the bottom inclination directions of the adjacent second baffles are different, and the second baffles are staggered, which further improves the effect of preventing the liquid from being sucked upward.
[0023] Preferably, as an improvement, the main inlet and the air extraction port are respectively located at two ends of a diagonal line at the top of the box body.
[0024] Therefore, the distance between the main inlet and the air suction port is relatively far, and after the liquid enters from the main inlet, the splashing of the liquid toward the air suction port can be further reduced.
[0025] Preferably, as an improvement, the number of the gas inlets is six, and the six gas inlets are divided into two rows, with three inlets in each row.
[0026] Thus, a plurality of gas inlets are provided, which can be connected to different air intake hoses.
[0027] Preferably, as an improvement, the diameter of the lower outlet is larger than the diameter of the upper outlet, and the diameter of the second feed hose is larger than the diameter of the first feed hose.
[0028] Since the medium flowing out of the lower outlet is mainly water, oil and residue, the amount of the outflow is large and the volume is large, so the diameter of the lower outlet and the second feed hose is set to be larger. The medium flowing out of the upper outlet is mainly gas, and the volume of gas is relatively small, so the diameter of the upper outlet and the first feed hose is set to be smaller.
[0029] Preferably, as an improvement, a drill rod is inserted into the drill rod inlet, the tail end of the drill rod is connected to an emergency extraction pipe, and the emergency extraction pipe is connected to the gas inlet.
[0030] Therefore, in the prior art, a water inlet pipe is connected to the tail end of the drill pipe, which is used to supply water to the drill pipe when it is working, so as to cool the drill pipe during the drilling process. However, when there is a lot of gas, the drilling can be suspended, the water inlet pipe can be removed from the tail end of the drill pipe, and the emergency extraction pipe can be connected between the gas inlet and the tail end of the drill pipe to speed up the discharge of gas or liquid to the gas-water separation box, reduce the diffusion of gas to the outside, and improve the safety level. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 This is a structural diagram of the gas extraction system.
[0032] Figure 2 Schematic diagram of the internal structure of the gas-water separation box.
[0033] Figure 3 It is a schematic structural diagram of the top of the gas-water separation box.
[0034] Figure 4 This is another structural diagram of the gas extraction system.
[0035] Figure 5 It is a structural diagram of a positive pressure whistle. DETAILED DESCRIPTION
[0036] The following is further described in detail through specific implementation methods:
[0037] The figure marks in the drawings of the specification include: gas-water separation box 1, orifice multi-way device 2, rock formation 3, joint extraction pipe 4, second feed hose 5, drill rod 6, first feed hose 7, emergency extraction pipe 8, extraction pipe 9, butterfly valve 10, tee pipe 11, discharge hose 12, extraction hose 13, combiner 14, water drain 15, extraction port 16, gas inlet 17, main inlet 18, discharge port 19, first baffle 20, second baffle 21, guide slope 22, lower discharge port 23, air bag 24, upper discharge port 25, air valve 26, positive pressure whistle 27, vertical plate 28, inner hole casing 29, whistle shell 30, small ball 31, reserved port 32.
[0038] Example 1
[0039] Basically as attached Figure 1-Figure 3 As shown: This embodiment discloses a gas-water separation box 1, including a box body, the box body is made of iron, and the box body has a square shape. The top of the box body is provided with a main inlet 18, an air suction port 16 and a plurality of gas inlets 17, and the main inlet 18, the air suction port 16 and the plurality of gas inlets 17 are all connected to the internal chamber of the box body. Figure 3 As shown, the main inlet 18 and the air extraction port 16 are respectively located at the two ends of the diagonal line of the top of the box. The number of gas inlets 17 is six, and the six gas inlets 17 are divided into two rows, with three in each row. Of course, in other embodiments, the number and layout of the main inlet 18, the air extraction port 16 and the gas inlet 17 can also be other ways, which will not be repeated here.
[0040] The bottom of the box is provided with a discharge port 19; the discharge port 19 and the air extraction port 16 are located on the same side of the box (eg Figure 2 The middle discharge port 19 and the air extraction port 16 are both located on the left side of the box body), and the main inlet 18 is located on the other side of the box body ( Figure 2 on the right side of the Figure 2 As shown, a guide slope 22 is provided at the bottom of the box body, and the guide slope 22 is opposite to the main inlet 18. The lower end of the guide slope 22 is close to the discharge port 19, and the high end of the guide slope 22 is away from the discharge port 19. In this way, the medium entering from the main inlet 18 first falls downward onto the guide slope 22, and then flows along the guide slope 22 toward the discharge port 19, thereby accelerating the flow of the medium and reducing the accumulation of the medium in the box body.
[0041] Combination Figure 2 As shown, a first baffle 20 fixed (for example, by welding or clamping) inside the box is provided below each gas inlet 17, and the first baffle 20 is tilted. Figure 2 The left end of the first baffle 20 is lower than the right end. A vertical plate 28 is fixed inside the box body by welding or clamping. The vertical plate 28 divides the chamber inside the box body into a feed chamber and an exhaust chamber. Figure 2The chamber on the left side of the middle vertical plate 28 is an exhaust chamber, which is opposite to and connected to the air extraction port 16. The chamber on the right side of the vertical plate 28 is a feed chamber, which is connected to the main inlet 18, and the bottom of the feed chamber is connected to the bottom of the exhaust chamber. A plurality of second baffles 21 are fixedly provided inside the box body, and the plurality of second baffles 21 are all located below the air extraction port 16. The plurality of second baffles 21 are vertically distributed, and each second baffle 21 is tilted. The ends of two adjacent second baffles 21 are respectively connected to the vertical plate 28 and the inner wall on the left side of the vertical plate 28, so that the inclination directions of the two adjacent second baffles 21 are different, and the two adjacent second baffles 21 are staggered, which is conducive to improving the blocking effect on the liquid.
[0042] Combination Figure 1 , Figure 4 As shown, this embodiment further discloses a gas extraction system, including a gas pipeline, an orifice multi-way device 2 and the above-mentioned gas-water separation box 1. The gas pipeline includes a tee pipe 11 and a butterfly valve 10 installed at one end of the tee pipe 11.
[0043] The orifice multi-way device 2 includes a shell and an inner hole sleeve 29, a drill pipe inlet, an upper outlet 25 and a lower outlet 23 located on the shell. The shell is provided with a chamber inside. The inner hole sleeve 29 is located at the front end of the shell and communicates with the shell chamber. The inner hole sleeve 29 and the shell can be connected by welding or by screws. The drill pipe inlet is located at the rear end of the shell and communicates with the chamber. The drill pipe inlet is connected to the inner hole sleeve 29. The drill pipe inlet is used to insert the drill pipe 6. The upper outlet 25 and the lower outlet 23 are respectively located on the upper and lower sides of the shell, and the upper outlet 25 and the lower outlet 23 are respectively connected to the shell chamber. A first feed hose 7 is connected between the upper outlet 25 and one of the gas inlets 17 (the remaining gas inlets 17 can be blocked with a cover plate when the pipeline is not connected to prevent the gas in the box from flowing upward through the gas inlet 17), and a second feed hose 5 is connected between the lower outlet 23 and the main inlet 18. In this embodiment, the diameter of the lower outlet 23 is larger than that of the upper outlet 25, and the diameter of the second feed hose 5 is larger than that of the first feed hose 7. Specifically, the diameter of the second feed hose 5 is 159 mm, and the diameter of the first feed hose 7 is 63 mm.
[0044] The bottom end of the gas pipeline tee 11 and the gas extraction port 16 are connected to a discharge hose 12, and the diameter of the discharge hose 12 is also 159 mm. The discharge port 19 is connected to a discharge pipe (not shown in the figure), and the end of the discharge pipe away from the gas-water separation box 1 extends to the water pit.
[0045] The gas extraction system in this embodiment also includes a flow collector 14 and a water discharger 15. The water discharger 15 is connected to the flow collector 14. One end of the flow collector 14 is connected to the bottom end of the three-way pipe 11 of the gas pipeline through an extraction hose 13. The flow collector 14 is also connected to a connecting extraction pipe 4. The other end of the connecting extraction pipe 4 is inserted into the drilled hole. At the same time, the connecting extraction pipe 4 is fixed in the drilled hole through sealing grouting. In this way, for the drilled hole, the gas in the rock formation 3 enters the flow collector 14 through the connecting extraction pipe 4, and then the gas is extracted into the gas pipeline through the extraction hose 13.
[0046] The specific implementation process is as follows: the drill rod 6 is inserted into the drill rod entrance horizontally, the drill rod 6 passes through the inner casing 29 of the hole, and the drill rod 6 drills the working surface of the rock layer 3. In this embodiment, the drill rod 6 adopts the drill rod in the prior art, and the drill rod 6 is provided with a drill bit and a driving machine. The drill rod 6 is the prior art, and its specific structure is not described in detail here.
[0047] During the drilling process, the liquid and gas generated by the drilling enter the inner casing 29 of the hole, and the liquid and gas enter the orifice manifold 2 through the inner casing 29. Some liquids (water, oil and slag) and a small amount of gas flow out through the lower discharge port 23, and the outflowing medium enters the main inlet 18 through the second feed hose 5, and then enters the chamber of the gas-water separation box 1. The medium first enters the feed cavity, and the medium flows along the guide slope 22 toward the discharge port 19. For liquids such as water, oil and slag, they flow into the discharge pipe through the discharge port 19. The discharge pipe discharges the liquids uniformly into the water pit, and the sludge in the water pit is cleaned by the on-site handyman and put into woven bags and transported to the ground through belts, thus improving the environment around the drilling site.
[0048] At the same time, during the drilling process, since the gas is lighter, more gas enters the orifice multi-way device 2 and is discharged through the upper discharge port 25. The discharged gas enters the gas inlet 17 through the first feed hose 7. Therefore, the gas inlet 17 is used to receive a major part of the gas generated during the drilling process.
[0049] In this way, the liquid and gas generated during the drilling process are collected in the gas-water separation box 1. Since the gas is lighter and the liquid is heavier, the gas in the gas-water separation box 1 is located above the liquid. Finally, the gas in the gas-water separation box 1 is exhausted through the discharge hose 12 under the negative pressure of the gas pipeline, and the gas flows out from the exhaust port 16 and is collected in the gas pipeline, avoiding the indiscriminate discharge of gas and greatly reducing the gas inflow into the drilling site and working face to cause gas over-limit accidents.
[0050] During the flow of liquid and gas in the gas-water separation box 1, due to the setting of the first baffle 20 and the second baffle 21, a part of the liquid can be blocked to prevent the liquid from splashing upward or being sucked upward into the discharge hose 12, and to prevent the liquid from entering the gas pipeline, thereby achieving the separation of gas and liquid.
[0051] In the prior art, when the drill rod 6 is drilling, the tail end of the drill rod 6 is connected to a water inlet pipe, which is used to supply water to the drill rod 6 during the drilling operation to cool the drill rod 6 during the drilling process. When a lot of gas is generated after drilling, the water inlet pipe at the tail end of the drill rod 6 can be removed, and an emergency extraction pipe 8 can be connected to the tail end of the drill rod 6, and the other end of the emergency extraction pipe 8 is connected to another gas inlet 17, so that the gas generated by drilling can also enter the gas-water separation box 1 through the emergency extraction pipe 8, thereby adding another route for the gas to flow into the gas-water separation box 1, which is used for emergency extraction at the water tail of the drill rod 6 when drilling a spray hole, which is conducive to accelerating the discharge of gas or liquid to the gas-water separation box 1.
[0052] In addition, combined Figure 1 As shown, an exhaust pipe 9 is also connected to the butterfly valve 10, and one end of the exhaust pipe 9 away from the butterfly valve 10 is directed toward the orifice manifold 2. In this way, during the drilling process, if a more serious blowout phenomenon occurs, the exhaust pipe 9 can be used to directly suck the gas around the borehole, thereby sucking the gas into the gas pipeline, providing a suction route for collecting the gas around the borehole.
[0053] Example 2
[0054] Combination Figure 4 As shown, the upper outlet 25 of this embodiment has three branches, namely, a first branch pointing upward, a second branch pointing rightward, and a third branch pointing leftward. The first branch is also connected to an air bag 24, and the third branch is connected to a positive pressure whistle 27. The third branch is used to connect to the first feeding hose 7. When a spray hole occurs, the gas flows upward from the upper outlet 25, the air bag 24 expands, and the air bag 24 bulges to indicate that there is a spray hole, which is convenient for the operator to observe.
[0055] At the same time, the positive pressure whistle 27 is located between the upper discharge port 25 and the first feed hose 7, combined with Figure 5As shown, the positive pressure whistle 27 includes a whistle shell 30 connected to the third branch, a small ball 31 and a compression spring, a reserved opening 32 is provided on the whistle shell 30, the small ball 31 is located in the whistle shell 30, the compression spring is connected between the bottom end of the whistle shell 30 and the small ball 31, and the top of the whistle shell 30 is connected to the third branch of the upper outlet 25. In this way, the small ball 31 is usually located above the reserved hole under the action of the compression spring. When the hole is sprayed, the gas enters the whistle shell 30, and the small ball 31 is pressed down by the gas pressure. The small ball 31 overcomes the elastic force of the compression spring and moves downward. The small ball 31 moves to the bottom of the reserved opening 32, and the gas gushes out from the reserved opening 32 and makes a sound, so that the operator can immediately find the spray hole by listening to the sound and take measures. In this embodiment, the airbag 24 expands and the positive pressure whistle 27 makes a sound to remind the operator, which is conducive to the operator to find the spray hole in time.
[0056] In this embodiment, a gas valve 26 is connected to the second branch of the upper discharge port 25. The gas valve 26 is usually in a normally closed state. When there is a lot of gas, the gas valve 26 can be opened, and another hose can be connected between the gas valve 26 and the residual gas inlet 17 to increase gas extraction.
[0057] The above is only an embodiment of the utility model, and the common knowledge such as the known specific technical solutions and / or characteristics in the solution is not described in detail here. It should be pointed out that for those skilled in the art, without departing from the technical solution of the utility model, several deformations and improvements can be made, which should also be regarded as the protection scope of the utility model, and these will not affect the effect of the implementation of the utility model and the practicality of the patent. The scope of protection required by this application shall be based on the content of its claims, and the specific implementation methods and other records in the specification can be used to interpret the content of the claims.
Claims
1. A gas-water separation box, comprising a box body, characterized in that: A main inlet, an air suction port and multiple gas inlets are provided on the top of the box body, and a discharge port is provided at the bottom of the box body; the discharge port and the air suction port are located on the same side of the box body, and the main inlet is located on the other side of the box body; a first baffle fixed inside the box body is provided below the gas inlet.
2. The gas-water separation box according to claim 1, characterized in that: A guide slope is provided at the bottom of the box body, the guide slope is opposite to the main inlet, the lower end of the guide slope is close to the discharge port, and the higher end of the guide slope is far away from the discharge port.
3. The gas-water separation box according to claim 1, characterized in that: A plurality of second baffles are fixedly arranged inside the box body, the plurality of second baffles are located below the air suction port, the plurality of second baffles are vertically distributed, and each second baffle is inclined.
4. The gas-water separation box according to claim 3, characterized in that: A vertical plate is fixedly provided inside the box body, and the vertical plate divides the inner part of the box body into a feed chamber and an exhaust chamber, and the exhaust chamber is opposite to the air suction port; the ends of two adjacent second baffles are respectively connected to the vertical plate and the inner wall of the box body opposite to the vertical plate.
5. The gas-water separation box according to claim 1, characterized in that: The main inlet and the air extraction port are respectively located at two ends of the diagonal line of the top of the box body.
6. The gas-water separation box according to claim 1, characterized in that: The number of the gas inlets is six, and the six gas inlets are divided into two rows, with three inlets in each row.
7. Gas extraction system, characterized by: It comprises a gas pipeline, an orifice multi-way device and a gas-water separation box as described in any one of claims 1 to 6; The orifice multi-way device includes a shell and an inner hole casing, a drill pipe inlet, an upper outlet and a lower outlet located on the shell; the inner hole casing and the drill pipe inlet are respectively located on the left and right sides of the shell, and the inner hole casing and the drill pipe inlet are horizontally opposite to each other; the upper outlet and the lower outlet are respectively located on the upper and lower sides of the shell; a first feed hose is connected between the upper outlet and the gas inlet, a second feed hose is connected between the lower outlet and the main inlet, a discharge hose is connected to the gas pipeline and the air extraction port, and a discharge pipe is connected to the discharge port.
8. The gas extraction system according to claim 7, characterized in that: The diameter of the lower outlet is larger than that of the upper outlet, and the diameter of the second feed hose is larger than that of the first feed hose.
9. The gas extraction system according to claim 7, characterized in that: A drill rod is inserted into the drill rod inlet, and an emergency extraction pipe is connected to the tail end of the drill rod, and the emergency extraction pipe is connected to the gas inlet.
Citation Information
Cited By
Gas buffer device and blowout prevention system
CN224326275U
A gas extraction gas-water separator
CN224422422U