Biomass-fired water pipe type hot water boiler

By using the double-sided air inlet and independent air bin of the chain grate in the boiler, combined with the water-cooled pipe wall and secondary air duct design, the problem of black smoke and dust pollution during combustion of biomass pellet fuel is solved, and low nitrogen emissions are achieved and efficient combustion, suitable for different biomass fuels.

CN222047786UActive Publication Date: 2024-11-22HENAN SITONG BOILER
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323241681.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-11-30
Publication Date
2024-11-22
Estimated Expiration
2033-11-30

AI Technical Summary

Technical Problem

When the current operating living and industrial boilers use biomass pellet fuel directly, they are prone to black smoke, low efficiency and dust pollution. The existing structure is not suitable for the combustion of biomass pellet fuel.

Method used

A biomass-burning water pipe-type hot water boiler is designed, using the layered combustion method of chain grates to achieve low temperature and high efficiency low oxygen combustion through double-sided air inlet and independent air bins, and the water-cooled pipe wall is added to enhance sealing and heating surface. , and a secondary air duct and smoke barrier are installed in the combustion chamber to strengthen incineration and flue gas treatment.

Benefits of technology

Full combustion, low nitrogen emissions and efficient combustion are achieved, the grate coking is avoided, the adaptability to different biomass fuels is improved, and the sealing and heating effect of the boiler are enhanced through the water-cooled pipe wall.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222047786U_ABST
    Figure CN222047786U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of boilers, in particular to a biomass-fired water pipe type hot water boiler which comprises a boiler body, a combustion chamber is arranged on the lower portion inside the boiler body, a chain grate stoker is installed at the bottom of the boiler body, the combustion chamber comprises a front arch and a rear arch, a secondary air pipe is installed on the front arch, and a smoke partition wall is installed on one side, located on the top of the combustion chamber, inside the boiler body. A lower boiler barrel is arranged on the lower portion of one side of the smoke partition wall, and an upper boiler barrel is installed on the upper portion in the boiler body. According to the biomass-fired water pipe type hot water boiler, a layered combustion mode of a chain grate is adopted, combustion equipment comprises the chain grate, a fuel hopper and the like, air enters the grate from two sides, a plurality of independent air bins are arranged below the grate so that the air inlet amount of the grate can be uniform and combustion can be conveniently controlled, and air needed by combustion enters the lower portion of the grate through an air flue through an air blower; and the air enters each independent air bin in a double-side air inlet mode, so that low-temperature, high-efficiency and low-oxygen combustion is realized, and the combustion effects of sufficient combustion and low-nitrogen emission are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of boilers, in particular to a biomass-fired water-tube hot water boiler. Background Art

[0002] Biomass fuel boilers use high-density compressed biomass as boiler fuel. Due to the dense compression of the fuel, the overflow rate of volatiles is limited, so the combustion of biomass fuel is mainly controlled by the following conditions: a certain temperature; a certain air (oxygen); the degree of mixing of fuel and air (oxygen); the time for the combustibles in the fuel to react violently with the oxygen in the air. Since the ignition point of biomass fuel is 250℃, the increase in its temperature is supplied by ignition heat. The combustion process of biomass fuel is a process in which the combustible components in the fuel and the oxygen in the air react violently and release heat.

[0003] Therefore, the amount of oxygen supplied determines the process of the combustion reaction. By controlling the amount of oxygen supplied, the combustion reaction can be well controlled. In addition, biomass fuel has a certain amount of moisture, and biomass fuel is compressed and formed. Its compression is dense, which limits the overflow speed of volatiles, and it is not easy to ignite and burn to form a bright yellow flame, and it is easy to emit black smoke. Therefore, the structure of the current domestic and industrial boilers is not suitable for direct use of biomass pellet fuel. If biomass pellet fuel is used directly without modification, the boiler will emit black smoke, low efficiency, and dust pollution. Utility Model Content

[0004] The purpose of the utility model is to provide a biomass-fired water-tube hot water boiler to solve the problems raised in the above-mentioned background technology that the structures of currently used domestic and industrial boilers are not suitable for directly using biomass pellet fuels. If biomass pellet fuels are directly used without modification, the boilers will emit black smoke, have low efficiency, and have dust pollution.

[0005] To achieve the above-mentioned purpose, the utility model provides a biomass-fired water tube hot water boiler, including a furnace body, a combustion chamber is arranged at the lower part of the interior of the furnace body, a chain grate is installed at the bottom of the furnace body, the combustion chamber includes a front arch and a rear arch, a secondary air duct is installed on the front arch, a smoke-blocking wall is installed on one side of the top of the combustion chamber inside the furnace body, a lower boiler drum is arranged on the lower part of one side of the smoke-blocking wall, an upper boiler drum is installed on the upper part of the interior of the furnace body, one end of the furnace body is connected to a smoke exhaust pipe, an economizer is connected to the outer end of the smoke exhaust pipe, a soot blower is installed on the inner side of the connection between the furnace body and the smoke exhaust pipe, the upper boiler drum and the lower boiler drum are connected by a convection tube bundle, and a smoke folding wall is installed at the convection tube bundle inside the furnace body.

[0006] In this embodiment, a fuel hopper is provided on the outer wall of one end of the furnace body, and the bottom of the fuel hopper is connected to the combustion chamber through a pipeline.

[0007] Specifically, a plurality of independent wind bins are arranged at the bottom of the chain grate, and air inlets are arranged on both sides of the independent wind bins.

[0008] Furthermore, a slag drop port is provided at the bottom of one end of the chain grate, and a ash cleaning door is provided at the bottom of the furnace body near one end of the chain grate.

[0009] Furthermore, a fire door is provided on one side of the combustion chamber.

[0010] Furthermore, a return pipe is provided inside the upper drum, a return pipe seat is installed at the top of the return pipe, a steam-water separator is installed above the interior of the upper drum, and a steam collecting tank is installed on the top of the steam-water separator.

[0011] Furthermore, a slag discharger is installed on one side of the bottom of the furnace body near the slag outlet.

[0012] Furthermore, a water-cooling tube wall is installed on the inner wall of the furnace body, and the upper end of the water-cooling tube wall is connected to the upper boiler drum, and the lower end is connected to the lower boiler drum.

[0013] Compared with the prior art, the utility model has the following beneficial effects:

[0014] 1. The biomass-fired water-tube hot water boiler adopts a layered combustion method of a chain grate. The combustion equipment includes a chain grate, a fuel hopper, etc. The grate adopts double-sided air inlet. In order to make the air intake of the grate uniform and facilitate the control of combustion, a number of independent wind chambers are arranged under the grate. The air required for combustion enters the lower part of the grate through the air duct through the blower, and then enters each independent wind chamber. The air intake method is double-sided air intake to achieve low-temperature, high-efficiency, and low-oxygen combustion, so as to achieve a combustion effect of full combustion and low nitrogen emissions, avoid grate coking and improve the adaptability to different biomass fuels. The air volume required for different fuels at different combustion stages can be artificially adjusted through independent wind chambers, and the lateral wind pressure is consistent, so there will be no biased burning phenomenon. The front arch is arranged with a secondary air duct, which is put into operation when biomass fuel is used, which can strengthen the combustion, make the fuel fully burn out, and improve the combustion efficiency.

[0015] 2. In the biomass-fired water-tube hot water boiler, the radiation heating surface is increased by water-cooling the tube wall, which not only increases the sealing function of the boiler, but also increases the furnace volume and heating surface, and at the same time strengthens the strength of the rear arch. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a front structural schematic diagram of the utility model;

[0017] Figure 2It is a side structural schematic diagram of the utility model;

[0018] Figure 3 It is a schematic diagram of the top structure of the utility model.

[0019] The meaning of each number in the figure is:

[0020] 1. Furnace body; 101. Smoke folding wall; 2. Fuel hopper; 3. Chain grate; 31. Independent wind bin; 32. Slag outlet; 33. Ash cleaning door; 4. Combustion chamber; 41. Front arch; 411. Secondary air duct; 42. Rear arch; 43. Fire door; 44. Smoke partition wall; 5. Lower drum; 6. Upper drum; 61. Steam-water separator; 62. Steam collecting tank; 7. Return pipe; 71. Return pipe seat; 8. Smoke exhaust pipe; 9. Economizer; 10. Soot blower; 11. Convection tube bundle; 12. Slag discharger; 13. Water-cooled tube wall. DETAILED DESCRIPTION

[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0022] The utility model provides a biomass-fired water tube hot water boiler. Figure 1-Figure 3 As shown, it includes a furnace body 1, a combustion chamber 4 is arranged at the lower part of the furnace body 1 to provide space for material combustion, a chain grate 3 is installed at the bottom of the furnace body 1 for fuel combustion and in contact with air to ensure full combustion of the fuel, the combustion chamber 4 includes a front arch 41 and a rear arch 42, a secondary air duct 411 is installed on the front arch 41 for secondary air intake to ensure full combustion of the fuel, a smoke-isolating wall 44 is installed at one side of the top of the combustion chamber 4 inside the furnace body 1 to block the smoke, an opening is arranged on one side of the smoke-isolating wall 44 to allow the smoke to pass through and enter the convection tube bundle 11 in a centralized manner, and a lower pot is arranged at the lower part of one side of the smoke-isolating wall 44 Drum 5, an upper drum 6 is installed on the upper part of the furnace body 1, one end of the furnace body 1 is connected with a smoke exhaust pipe 8 for exhausting smoke, the outer end of the smoke exhaust pipe 8 is connected with an economizer 9 for recovering waste heat of the smoke, a soot blower 10 is installed on the inner side of the connection between the furnace body 1 and the smoke exhaust pipe 8, for blowing off dust attached to the convection tube bundle 11 to avoid affecting the contact between the smoke and the convection tube bundle 11, the upper drum 6 and the lower drum 5 are connected through the convection tube bundle 11, and a smoke folding wall 101 is installed at the convection tube bundle 11 inside the furnace body 1, so that the smoke flows in a circuitous manner in the furnace body 1, thereby increasing the distance of the smoke and improving the heat exchange effect.

[0023] In this embodiment, a fuel hopper 2 is provided on the outer wall of one end of the furnace body 1, and the bottom of the fuel hopper 2 is connected to the combustion chamber 4 through a pipeline to facilitate the addition of fuel.

[0024] Specifically, a plurality of independent wind bins 31 are provided at the bottom of the chain grate 3, and air inlets are provided on both sides of the independent wind bins 31. The air volumes required for different combustion stages of different fuels can be manually adjusted through the independent wind bins 31, and the lateral wind pressure is consistent, so that uneven burning will not occur.

[0025] Furthermore, a slag outlet 32 ​​is provided at the bottom of one end of the chain grate 3 for discharging waste slag after combustion, and a cleaning door 33 is provided at the bottom of the furnace body 1 near one end of the chain grate 3 for cleaning the chain grate 3.

[0026] Furthermore, a fire-stirring door 43 is provided on one side of the combustion chamber 4 for staggering the fuel to make it burn evenly.

[0027] Furthermore, a return water pipe 7 is provided inside the upper boiler drum 6, and a return water pipe seat 71 is installed at the top of the return water pipe 7 for adding water to the upper boiler drum 6. A steam-water separator 61 is installed above the interior of the upper boiler drum 6 for steam-water separation, and a steam collecting tank 62 is installed on the top of the steam-water separator 61, which is connected to an external gas pipeline for gas use.

[0028] Furthermore, a slag discharger 12 is installed on one side of the bottom of the furnace body 1 near the slag outlet 32 ​​for discharging waste slag for recovery.

[0029] Furthermore, a water-cooled tube wall 13 is installed on the inner wall of the furnace body 1. The upper end of the water-cooled tube wall 13 is connected to the upper drum 6, and the lower end is connected to the lower drum 5. The water-cooled tube wall 13 increases the radiation heating surface, which not only increases the sealing function of the boiler, but also increases the furnace volume and heating surface, and together strengthens the strength of the rear arch 42.

[0030] When the biomass-fired water-tube hot water boiler of the utility model is used, the device is first assembled, water is added into the upper drum 6 through the return pipe 7, the water in the upper drum 6 enters the lower drum 5 through the convection tube bundle 11, and then fuel is added into the combustion chamber 4 through the fuel hopper 2, the fuel falls on the chain grate 3, the fuel burns to generate smoke, the smoke enters the rear of the furnace body 1 through the opening on one side of the smoke partition wall 44, and heat exchanges with the convection tube bundle 11, and heats the water in the convection tube bundle 11. After the water is heated, steam is generated, and the steam and water are separated by the steam separator 61, and then enter the steam collecting tank 62. The air pipeline is used for gas use, and a plurality of independent wind chambers 31 are arranged at the bottom of the chain grate 3 to achieve sufficient air intake. The independent wind chambers 31 make the amount of air required for different fuels in different combustion stages can be manually adjusted, and the lateral wind pressure is consistent, and there will be no uneven burning. The front arch 41 is arranged with a secondary air duct 411, which is put into operation when biomass fuel is used to enhance combustion, make the fuel burn out fully, and improve combustion efficiency. In addition, the radiation heating surface is increased by the water-cooled tube wall 13, which not only increases the sealing function of the boiler, but also increases the furnace volume and heating surface, and at the same time strengthens the strength of the rear arch 42.

[0031] Finally, it should be noted that the electronic components of the economizer 9, soot blower 10, slag discharger 12, etc. in this embodiment are all universal standard parts or parts known to those skilled in the art, and their structures and principles can be known to those skilled in the art through technical manuals or through conventional experimental methods. In the idle part of this device, all the above-mentioned electrical components are connected by wires respectively, and the specific connection means should refer to the working sequence between the electrical components in the above-mentioned working principle to complete the electrical connection, which are all well-known technologies in the art.

[0032] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only preferred examples of the utility model and are not used to limit the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection of the utility model is defined by the attached claims and their equivalents.

Claims

1. A biomass-fired water-tube hot water boiler, comprising a furnace body (1), characterized in that: A combustion chamber (4) is arranged at the lower part of the furnace body (1), a chain grate (3) is installed at the bottom of the furnace body (1), the combustion chamber (4) comprises a front arch (41) and a rear arch (42), a secondary air duct (411) is installed on the front arch (41), a smoke-isolating wall (44) is installed at one side of the top of the combustion chamber (4) inside the furnace body (1), a lower drum (5) is arranged at the lower part of one side of the smoke-isolating wall (44), and the furnace body ( 1), an upper drum (6) is installed on the upper part of the furnace body (1), one end of the furnace body (1) is connected to a smoke exhaust pipe (8), the outer end of the smoke exhaust pipe (8) is connected to an economizer (9), a soot blower (10) is installed on the inner side of the connection between the furnace body (1) and the smoke exhaust pipe (8), the upper drum (6) and the lower drum (5) are connected via a convection tube bundle (11), and a smoke folding wall (101) is installed inside the furnace body (1) at the convection tube bundle (11).

2. The biomass fired water tube hot water boiler according to claim 1, characterized in that: A fuel hopper (2) is provided on the outer wall of one end of the furnace body (1), and the bottom of the fuel hopper (2) is connected to the combustion chamber (4) through a pipeline.

3. The biomass fired water tube hot water boiler according to claim 1, characterized in that: A plurality of independent wind bins (31) are arranged at the bottom of the chain grate (3), and air inlets are arranged on both sides of the independent wind bins (31).

4. The biomass-fired water-tube hot water boiler according to claim 1, characterized in that: A slag drop port (32) is provided at the bottom of one end of the chain grate (3), and an ash cleaning door (33) is provided at the bottom of the furnace body (1) near one end of the chain grate (3).

5. The biomass fired water tube hot water boiler according to claim 1, characterized in that: A fire door (43) is provided on one side of the combustion chamber (4).

6. The biomass fired water tube hot water boiler according to claim 1, characterized in that: A water return pipe (7) is arranged inside the upper drum (6), a water return pipe seat (71) is installed at the top of the water return pipe (7), a steam-water separator (61) is installed above the interior of the upper drum (6), and a steam collecting tank (62) is installed at the top of the steam-water separator (61).

7. The biomass-fired water-tube hot water boiler according to claim 4, characterized in that: A slag discharger (12) is installed on one side of the bottom of the furnace body (1) near the slag outlet (32).

8. The biomass fired water tube hot water boiler according to claim 1, characterized in that: The inner wall of the furnace body (1) is provided with a water-cooling pipe wall (13), the upper end of the water-cooling pipe wall (13) is connected to the upper boiler drum (6), and the lower end is connected to the lower boiler drum (5).