Simple and efficient deep hole blasting structure
Through the combined structure of round steel pipes, rock powder, woven bags, emulsified explosives and electronic detonators, the safety risks and high costs in underground mine blasting are solved, and the simple and efficient deep hole blasting effect is achieved, reducing the working time and cost. And improves blasting efficiency and accuracy.
Patent Information
- Application Number
- CN202420630932.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-29
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-03-29
AI Technical Summary
The existing ordinary drilling and blasting technology and patio drilling rig welling technology have safety risks and high costs in underground mine blasting, and the operation cycle takes a long time, lacking a simple and efficient deep hole blasting structure.
Using a combined structure of round steel pipes, rock powder, woven bags, emulsified explosives, electronic detonators and cotton ropes, the electronic detonators with precise delay time are achieved by segmented blasting and electronic detonators that accurately set the delay time, and the woven bags and rock powder are used. It is effectively filled as a sealing material.
It reduces safety risks, shortens operating time and costs, improves blasting efficiency and accuracy, and ensures the effective crushing effect of explosives on rocks.
Smart Images

Figure CN222048768U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field related to underground mine blasting, and in particular to a simple and efficient deep hole blasting structure. Background Art
[0002] Underground mine blasting refers to rock and soil blasting operations carried out in underground mines. Underground mines adopt the segmented empty field followed by filling mining method. The ore in the segmented mining field is slid into the bottom ore bin through the segmented chute, and is transported to the main chute by the mine car pulled by an electric locomotive. After being crushed at the crushing station, it is lifted to the surface ore pile. The underground mine chute construction methods include ordinary drilling and blasting well construction technology and shaft drilling rig well construction technology. However, the existing ordinary drilling and blasting well construction technology and shaft drilling rig well construction technology do not have the effect of simplicity and efficiency. Therefore, a simple and efficient deep hole blasting structure is particularly needed.
[0003] Because the existing ordinary drilling and blasting well-building technology and the well-building technology with a raised shaft drilling rig do not have simple and efficient effects, the ordinary drilling and blasting well-building technology operates under the roof, and there are safety risks of falling rocks, falling from heights, and mechanical injuries, and each operation cycle takes a long time. The installation and disassembly time of the well drilling rig technology is long and the cost is high. Utility Model Content
[0004] The purpose of the utility model is to provide a simple and efficient deep hole blasting structure to solve the problems raised in the above background technology that the existing ordinary drilling and blasting well-forming technology and the well-forming technology of the well drilling rig do not have simple and efficient effects, the ordinary drilling and blasting well-forming technology operates under the roof, and there are safety risks such as falling rocks, falling from heights, and mechanical injuries, and each operation cycle takes a long time, and the installation and disassembly time of the well drilling rig well-forming technology is long and the cost is high.
[0005] To achieve the above-mentioned objectives, the utility model provides the following technical solutions: a simple and efficient deep hole blasting structure, comprising a round steel pipe, a first rock powder is installed on one side surface of the round steel pipe, a first woven bag is installed on one side surface of the first rock powder, an emulsion explosive is installed on one side surface of the first woven bag, an electronic detonator is installed on one side surface of the emulsion explosive, a second rock powder is installed on one side surface of the second rock powder, and a cotton rope is installed on one side surface of the second woven bag.
[0006] Preferably, the first woven bag is fixed to the round steel pipe by cotton rope, and the number of the second woven bags is five.
[0007] Preferably, the electronic detonator and the emulsion explosive are connected in series, and the number of the first woven bags is three.
[0008] Preferably, the second woven bag and the second rock powder are used together as the plugging material, and the material of the first woven bag is polyethylene.
[0009] Compared with the prior art, the beneficial effects of the utility model are as follows: the simple and efficient deep hole blasting structure, through the arrangement of the round steel pipe, the first rock powder, the first woven bag, the emulsion explosive, the electronic detonator, the second rock powder, the second woven bag and the cotton rope, when it is necessary to make the underground mine more simple and efficient during blasting, firstly, the personnel operate the down-the-hole drill under the supported chamber to drill a downward vertical hole, after drilling the hole, measure the hole depth in turn, then seal the bottom hole with the second rock powder and the second woven bag, load the emulsion explosive, fill the hole mouth with the first rock powder and the first woven bag, and finally perform the blasting operation, blasting the well from the bottom hole to the hole mouth in sections of two meters or four meters, each time The amount of explosives for segmented blasting can be controlled. By accurately setting the delay time of the electronic detonator, the effect of controlling the blasting vibration can be achieved. The first woven bag and the first rock powder are used together as sealing materials. The first rock powder can be collected during the drilling process, and it is easy to obtain. The first woven bag is inexpensive and easy to transport. It can also be replaced by a clean cement woven bag. Since the second woven bag has a large friction with the wall of the blasthole, the second rock powder can be held to form a bottom hole sealing section. Similarly, a filling section can also be formed at the hole mouth. Such effective filling ensures that the detonation gas generated after the explosion of the explosives has a crushing effect on the rock, thereby achieving a simpler and more efficient effect when blasting underground mines. BRIEF DESCRIPTION OF THE DRAWINGS
[0010] Figure 1 This is a schematic diagram of the overall appearance structure of the utility model;
[0011] Figure 2 This is a schematic diagram of the structure of the utility model emulsion explosive and electronic detonator used in combination;
[0012] Figure 3 This is a schematic diagram of the structure of the round steel pipe and the first woven bag used in conjunction with each other in the utility model;
[0013] Figure 4 This is a schematic diagram of the structure of the second woven bag and the cotton rope used in combination in the utility model.
[0014] In the figure: 1. round steel pipe; 2. first rock powder; 3. first woven bag; 4. emulsion explosive; 5. electronic detonator; 6. second rock powder; 7. second woven bag; 8. cotton rope. DETAILED DESCRIPTION
[0015] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0016] See also Figure 1-4 The utility model provides a technical solution: a simple and efficient deep hole blasting structure, comprising a round steel pipe 1, a first rock powder 2 is installed on one side surface of the round steel pipe 1, a first woven bag 3 is installed on one side surface of the first rock powder 2, an emulsion explosive 4 is installed on one side surface of the first woven bag 3, an electronic detonator 5 is installed on one side surface of the emulsion explosive 4, a second rock powder 6 is installed on one side surface of the emulsion explosive 4, a second woven bag 7 is installed on one side surface of the second rock powder 6, and a cotton rope 8 is installed on one side surface of the second woven bag 7. Through the arrangement of the round steel pipe 1, the first rock powder 2, the first woven bag 3, the emulsion explosive 4, the electronic detonator 5, the second rock powder 6, the second woven bag 7, and the cotton rope 8, when it is necessary to make the underground mine more simple and efficient during blasting, firstly, the personnel operate the down-the-hole drill under the supported chamber to drill a downward vertical hole, and after drilling the hole, measure the hole depth in turn, and then use the second rock powder 6 and the cotton rope 8 to drill the hole depth. The second woven bag 7 blocks the bottom hole, and the emulsion explosive 4 is loaded. The first rock powder 2 and the first woven bag 3 are used to fill the hole mouth. Finally, the blasting operation is carried out. The well is blasted in sections with a height of two meters or four meters from the bottom hole to the hole mouth. The amount of explosives for each section blasting can be controlled. By accurately setting the delay time of the electronic detonator 5, the effect of controlling the blasting vibration is achieved. The first woven bag 3 and the first rock powder 2 are used as plugging materials together. The first rock powder 2 can be collected during the drilling process, and the material is easy to obtain. The first woven bag 3 is inexpensive and easy to transport. It can also be replaced by a clean cement woven bag. Since the second woven bag 7 has a large friction with the blasthole wall, the second rock powder 6 can be held to form a bottom hole plugging section. Similarly, a filling section can also be formed at the hole mouth. Such effective filling ensures the crushing effect of the detonation gas generated after the explosion of the explosive on the rock, thereby achieving a simpler and more efficient effect of blasting the underground mine.
[0017] Furthermore, the first woven bag 3 is fixed to the round steel pipe 1 by means of a cotton rope 8, and the number of the second woven bags 7 is five. By providing the first woven bag 3, a filling section can be better formed at the hole.
[0018] Furthermore, the electronic detonator 5 and the emulsion explosive 4 are connected in series, and the number of the first woven bags 3 is three. By setting the electronic detonator 5, the delay time can be accurately set to achieve the effect of controlling the blasting vibration.
[0019] Furthermore, the second woven bag 7 and the second rock powder 6 are used together as plugging materials. The material of the first woven bag 3 is polyethylene. Through the provision of the second woven bag 7, the second rock powder 6 can be better held to form a plugging section.
[0020] Working principle: When it is necessary to make underground mines more convenient and efficient during blasting, first, personnel operate a down-the-hole drill under the supported chamber to drill a downward vertical hole. After drilling the hole, measure the hole depth in turn, then use the second rock powder 6 and the second woven bag 7 to block the bottom hole, load the emulsion explosive 4, and fill the hole mouth with the first rock powder 2 and the first woven bag 3. Finally, blasting is performed from the bottom hole to the hole mouth in sections of two or four meters. The amount of explosives for each section blasting can be controlled. By accurately setting the delay time of the electronic detonator 5, the effect of controlling the blasting vibration is achieved. The first woven bag 3 and The first rock powder 2 is used as a plugging material. The first rock powder 2 can be collected during the drilling process, and the material is easy to obtain. The first woven bag 3 is inexpensive and easy to transport, and can also be replaced by a clean cement woven bag. Since the second woven bag 7 has a large friction with the borehole wall, the second rock powder 6 can be held to form a bottom hole plugging section. Similarly, a filling section can also be formed at the hole mouth. Such effective filling ensures that the detonation gas generated after the explosion of the explosives has a crushing effect on the rock, thereby achieving a simpler and more efficient effect when blasting underground mines, thereby completing a simple and efficient deep hole blasting structure.
[0021] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A simple and efficient deep hole blasting structure, comprising a round steel pipe (1), characterized in that: A first rock powder (2) is installed on one side surface of the round steel pipe (1), a first woven bag (3) is installed on one side surface of the first rock powder (2), an emulsion explosive (4) is installed on one side surface of the first woven bag (3), an electronic detonator (5) is installed on one side surface of the emulsion explosive (4), a second rock powder (6) is installed on one side surface of the emulsion explosive (4), a second woven bag (7) is installed on one side surface of the second rock powder (6), and a cotton rope (8) is installed on one side surface of the second woven bag (7).
2. A simple and efficient deep hole blasting structure according to claim 1, characterized in that: The first woven bag (3) is fixed to the round steel pipe (1) by means of a cotton rope (8), and the number of the second woven bags (7) is five.
3. A simple and efficient deep hole blasting structure according to claim 1, characterized in that: The electronic detonator (5) and the emulsion explosive (4) are connected in series, and the number of the first woven bags (3) is three.