Heat shrink tube with clamp structure

By designing clamp structure and heat shrink joints in the heat shrink tube, the line offset problem caused by loose connection of the thread head is solved, the connection stability and positioning ability of the heat shrink tube are improved, and the reliability of line transmission is ensured.

CN222052599UActive Publication Date: 2024-11-22CAS APPLIED CHEM MATERIALS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323629224.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-28
Publication Date
2024-11-22
Estimated Expiration
2033-12-28

AI Technical Summary

Technical Problem

When using heat shrink tubes, the connection and installation of the wire head position is easily loose, resulting in internal lines offset and affecting line transmission.

Method used

A heat shrink tube with a clamp structure is designed, including an outer tube sleeve and an inner tube sleeve, connecting block, upper tube sleeve, lower tube sleeve, guide column, return spring and protective plate, and the connection stability is improved through the cooperation of these components. and a heat shrink joint is formed between the outer sleeve and the inner sleeve to enhance positioning capability.

Benefits of technology

The clamp connection, protection and heat shrink positioning capabilities of the heat shrink tube are improved to ensure the stability and safety of line transmission.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222052599U_ABST
    Figure CN222052599U_ABST
Patent Text Reader

Abstract

The utility model discloses a heat shrink tube with a clamp structure, which comprises an outer tube sleeve, an inner tube sleeve is mounted in the outer tube sleeve, one end of a reset spring is connected with a protective plate, and a protective pad is adhered to one end of the protective plate. The upper hoop piece and the lower hoop piece are installed on the side edges of the connecting block respectively, the first lug piece is installed on the side edge of the upper hoop piece, the second lug piece is installed on the side edge of the lower hoop piece, and the first lug piece and the second lug piece are connected and installed through the connecting pin. Therefore, the upper hoop piece and the lower hoop piece form an up-and-down whole, then under connection of the guide column, the upper hoop piece and the lower hoop piece are matched with the reset spring, the guide column extends into the groove of the protection plate, at the moment, the reset spring can correspondingly stretch out and draw back, and meanwhile the guide column slightly moves in the groove of the protection plate. And after the protection plate and the protection pad are matched, the purpose of connection protection can be achieved, and therefore the overall hoop connection capacity is well improved in the working process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of heat shrink tubes, in particular to a heat shrink tube with a clamp structure. Background Art

[0002] Heat shrink tubing is a special polyolefin heat shrink tubing. During use, the outer layer has insulation protection capabilities, while the inner layer has advantages such as waterproofing. During production, the heat shrink tubing needs to be heated to a high elastic state, a load is applied to expand it, and it is quickly cooled while maintaining the expansion to enter a glass state. When it is heated during use, it will return to a high elastic state, but at this time there is no load and it will shrink, so it is called a heat shrink tubing.

[0003] When heat shrink tubing is used today, it is mainly used for insulation, sealing and protection of cables, that is, it is installed on live equipment. During use, it is necessary to connect and install the wire ends. If the connection becomes loose, it is easy for the internal lines to shift, which can directly affect the line transmission in the heat shrink tubing. Utility Model Content

[0004] The purpose of the utility model is to provide a heat shrinkable tube with a clamp structure to solve the problem proposed in the above background technology that a connection installation at the position of the wire head is required during use. If looseness occurs during connection, the internal line may be easily offset, which may directly affect the line transmission in the heat shrinkable tube.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a heat shrink tube with a clamp structure, comprising an outer tube sleeve, an inner tube sleeve installed inside the outer tube sleeve, a connecting block installed on one side of the inner tube sleeve, a fixing block installed on the top and bottom ends of the connecting block, an upper hoop piece installed at a position close to the top end of one side of the connecting block, a first ear piece installed at both ends of the upper hoop piece, a lower hoop piece installed at a position close to the bottom end of one side of the connecting block, a second ear piece installed at both ends of the lower hoop piece, a connecting pin connected between the first ear piece and the second ear piece, one end of the lower hoop piece is connected to a guide column, the outer side wall of the guide column is connected to a reset spring, one end of the reset spring is connected to a protective plate, and one end of the protective plate is bonded to a protective pad.

[0006] Preferably, the first ear pieces are symmetrically distributed about the central axis of the upper hoop piece, and the second ear pieces are symmetrically distributed about the central axis of the lower hoop piece.

[0007] Preferably, the guide posts are evenly distributed at one end of the upper hoop plate and the lower hoop plate, a notch is provided inside the protective plate, and the guide posts extend into the inside of the notch.

[0008] Preferably, a heat shrinkage seam is formed between the outer tube sleeve and the inner tube sleeve, a first embedding groove is formed at the top and bottom ends of the inner wall of the outer tube sleeve, and a positioning ball is provided inside the first embedding groove.

[0009] Preferably, the first embedding grooves are evenly distributed at the top and bottom of the inner wall of the outer tube sleeve, and a first groove body is opened on one side of the top and bottom ends of the inner wall of the outer tube sleeve.

[0010] Preferably, the first groove body is symmetrically distributed about the central axis of the outer sleeve, a first insert block is embedded in the first groove body, an installation slot is opened in the first insert block, and a positioning column is connected to the interior of the installation slot.

[0011] Preferably, the installation slots are symmetrically distributed about the central axis of the first insert block, and the positioning columns are symmetrically distributed about the central axis of the first slot body.

[0012] Preferably, the outer side wall of the outer tube sleeve is coated with a wear-resistant layer, and an inner core flame-retardant layer is fixed at the position of the core layer inside the outer tube sleeve.

[0013] Preferably, positioning grooves are provided at both ends of the inner core flame retardant layer, and a heat conductive layer is fixed inside the positioning grooves.

[0014] Preferably, positioning layers are fixed on both sides of the heat conducting layer.

[0015] Compared with the prior art, the utility model has the following beneficial effects: the heat shrinkable tube with the clamp structure not only improves the clamp connection capability of the heat shrinkable tube, but also improves the protection capability and heat shrink positioning capability of the heat shrinkable tube;

[0016] (1) The upper hoop piece and the lower hoop piece are respectively installed on the side of the connecting block, the first ear piece is installed on the side of the upper hoop piece, and the second ear piece is installed on the side of the lower hoop piece, and the connection and installation between the first ear piece and the second ear piece are completed by using a connecting pin, so that the upper hoop piece and the lower hoop piece form a vertical whole, and then under the connection of the guide column, the guide column and the return spring are matched with each other, so that the guide column extends into the groove of the protective plate. At this time, the return spring can be correspondingly extended and retracted, and the guide column moves slightly in the groove of the protective plate. The protective plate and the protective pad can achieve the purpose of connection protection after cooperation, so that the overall clamp connection ability is better improved during the working process;

[0017] (2) The wear-resistant layer is coated on the outer wall of the outer sleeve for wear-resistant protection, and the inner core flame-retardant layer is fixed at the middle position of the inner core of the outer sleeve for the purpose of centralized flame retardancy. At the same time, with the cooperation of the positioning groove and the positioning layer, the centralized positioning of the heat-conducting layer is facilitated, so the heat-conducting layer serves the purpose of heat conduction, thereby better improving the overall heat shrinkage capacity;

[0018] (3) After a heat shrinkage seam is formed between the outer tube sleeve and the inner tube sleeve, there is a heat shrinkage space. At the same time, when the first embedding groove is opened, there is a positioning ball inside. Therefore, during heat shrinkage, the positioning ball can be used for positioning. Similarly, the opening of the first groove body allows the positioning column to pass through the installation slot in the first embedding block, thereby achieving the purpose of positioning. Therefore, during the heat shrinkage process, it has a certain deformation space, thereby better improving the overall practical use ability during the working process. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 This is a schematic diagram of the main structure of the utility model;

[0020] Figure 2 This is a schematic diagram of the front cross-sectional structure of the outer tube sleeve of the utility model;

[0021] Figure 3 It is a partial front view structural diagram of the outer tube sleeve of the utility model;

[0022] Figure 4 This is a schematic diagram of the front cross-sectional structure of the inner core of the outer tube sleeve of the utility model;

[0023] Figure 5 It is a side structural schematic diagram of the upper hoop piece of the utility model;

[0024] Figure 6 For the utility model Figure 5 Schematic diagram of the enlarged cross-section structure at point A in the middle.

[0025] In the figure: 1, outer sleeve; 2, inner sleeve; 3, connecting block; 4, upper hoop; 5, fixing block; 6, heat shrink joint; 7, first embedded groove; 8, first groove body; 9, positioning ball; 10, first embedded block; 11, positioning column; 12, installation slot; 13, wear-resistant layer; 14, heat-conducting layer; 15, positioning groove; 16, positioning layer; 17, inner core flame-retardant layer; 18, first ear piece; 19, connecting pin; 20, lower hoop; 21, protective plate; 22, protective pad; 23, second ear piece; 24, guide column; 25, reset spring. DETAILED DESCRIPTION

[0026] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0027] See also Figure 1-6The utility model provides an embodiment: a heat shrink tube with a clamp structure, comprising an outer tube sleeve 1, an inner tube sleeve 2 is installed inside the outer tube sleeve 1, a connecting block 3 is installed on one side of the inner tube sleeve 2, a fixing block 5 is installed on the top and bottom ends of the connecting block 3, an upper hoop piece 4 is installed at a position near the top of one side of the connecting block 3, a first ear piece 18 is installed at both ends of the upper hoop piece 4, a lower hoop piece 20 is installed at a position near the bottom of one side of the connecting block 3, a second ear piece 23 is installed at both ends of the lower hoop piece 20, a connecting pin 19 is connected between the first ear piece 18 and the second ear piece 23, one end of the lower hoop piece 20 is connected to a guide column 24, the outer side wall of the guide column 24 is connected to a return spring 25, one end of the return spring 25 is connected to a protective plate 21, and one end of the protective plate 21 is bonded with a protective pad 22.

[0028] The first ear pieces 18 are symmetrically distributed with respect to the central axis of the upper hoop piece 4 , and the second ear pieces 23 are symmetrically distributed with respect to the central axis of the lower hoop piece 20 .

[0029] The guide posts 24 are evenly distributed at one end of the upper hoop plate 4 and the lower hoop plate 20 . A notch is provided inside the protection plate 21 , and the guide posts 24 extend into the inside of the notch.

[0030] A heat shrinkage seam 6 is formed between the outer tube sleeve 1 and the inner tube sleeve 2 . A first embedding groove 7 is provided at the top and bottom ends of the inner wall of the outer tube sleeve 1 . A positioning ball 9 is provided inside the first embedding groove 7 .

[0031] The first embedding grooves 7 are evenly distributed at the top and bottom of the inner wall of the outer sleeve 1 , and a first groove body 8 is opened on one side of the top and bottom of the inner wall of the outer sleeve 1 .

[0032] The first slot body 8 is symmetrically distributed about the central axis of the outer sleeve 1 , and a first insert block 10 is embedded in the first slot body 8 . An installation slot 12 is formed in the first insert block 10 , and a positioning column 11 is connected to the installation slot 12 .

[0033] The installation slots 12 are symmetrically distributed with respect to the central axis of the first insert block 10 , and the positioning posts 11 are symmetrically distributed with respect to the central axis of the first slot body 8 .

[0034] The outer wall of the outer tube sleeve 1 is coated with a wear-resistant layer 13, an inner core flame retardant layer 17 is fixed at the position of the core layer inside the outer tube sleeve 1, positioning grooves 15 are provided at both ends of the inner core flame retardant layer 17, a heat conductive layer 14 is fixed inside the positioning groove 15, and positioning layers 16 are fixed on both sides of the heat conductive layer 14.

[0035] After the heat shrinkage seam 6 is further formed between the outer tube sleeve 1 and the inner tube sleeve 2, there is a heat shrinkage space. Similarly, the first groove body 8 and the first embedding groove 7 also have a heat shrinkage space while performing positioning.

[0036] Working principle: First, during the working process, the wear-resistant layer 13 is coated on the outer wall of the outer sleeve 1 for wear-resistant protection. At the same time, the inner core flame-retardant layer 17 is fixed at the middle position of the inner core of the outer sleeve 1 for the purpose of centralized flame retardancy. After the heat shrinkage seam 6 is formed between the outer sleeve 1 and the inner sleeve 2, there is a heat shrinkage space. At the same time, under the opening of the first embedding groove 7, there is a positioning ball 9 inside it. Therefore, during heat shrinkage, the positioning ball 9 can be used for positioning. Similarly, the opening of the first groove body 8 allows the positioning column 11 to pass through the installation slot 12 in the first embedding block 10, and the positioning work is also completed. In the actual use process, under the connection of the guide column 24, it cooperates with the reset spring 25 to allow the guide column 24 to extend into the groove of the protective plate 21. At this time, the reset spring 25 can be correspondingly extended and retracted, and the guide column 24 moves slightly in the groove of the protective plate 21, and the protective plate 21 and the protective pad 22 cooperate to achieve the protection work after connection, thereby ensuring a stable connection.

Claims

1. A heat shrinkable tube with a clamp structure, comprising an outer tube sleeve (1), characterized in that: An inner tube sleeve (2) is installed inside the outer tube sleeve (1); a connecting block (3) is installed on one side of the inner tube sleeve (2); a fixing block (5) is installed at the top and bottom of the connecting block (3); an upper hoop plate (4) is installed at a position close to the top of one side of the connecting block (3); first ear plates (18) are installed at both ends of the upper hoop plate (4); a lower hoop plate (20) is installed at a position close to the bottom of one side of the connecting block (3); second ear plates (23) are installed at both ends of the lower hoop plate (20); a connecting pin (19) is connected between the first ear plate (18) and the second ear plate (23); one end of the lower hoop plate (20) is connected to a guide column (24); an outer side wall of the guide column (24) is connected to a return spring (25); one end of the return spring (25) is connected to a protective plate (21); one end of the protective plate (21) is bonded to a protective pad (22).

2. The heat shrinkable tube with a clamp structure according to claim 1, characterized in that: The first ear pieces (18) are symmetrically distributed about the central axis of the upper hoop piece (4), and the second ear pieces (23) are symmetrically distributed about the central axis of the lower hoop piece (20).

3. The heat shrinkable tube with a clamp structure according to claim 1, characterized in that: The guide columns (24) are evenly distributed at one end of the upper hoop plate (4) and the lower hoop plate (20); a notch is provided inside the protection plate (21), and the guide columns (24) extend into the inside of the notch.

4. The heat shrinkable tube with a clamp structure according to claim 1, characterized in that: A heat shrinkage seam (6) is formed between the outer tube sleeve (1) and the inner tube sleeve (2), and a first embedding groove (7) is provided at the top and bottom ends of the inner wall of the outer tube sleeve (1), and a positioning ball (9) is provided inside the first embedding groove (7).

5. The heat shrinkable tube with a clamp structure according to claim 4, characterized in that: The first embedded grooves (7) are evenly distributed at the top and bottom of the inner wall of the outer tube sleeve (1), and a first groove body (8) is provided on one side of the top and bottom of the inner wall of the outer tube sleeve (1).

6. The heat shrinkable tube with a clamp structure according to claim 5, characterized in that: The first groove body (8) is symmetrically distributed about the central axis of the outer sleeve (1); a first insert block (10) is embedded in the first groove body (8); a mounting slot (12) is provided in the first insert block (10); and a positioning column (11) is connected to the inside of the mounting slot (12).

7. The heat shrinkable tube with a clamp structure according to claim 6, characterized in that: The installation slots (12) are symmetrically distributed about the central axis of the first insert (10), and the positioning columns (11) are symmetrically distributed about the central axis of the first slot body (8).

8. The heat shrinkable tube with a clamp structure according to claim 1, characterized in that: The outer wall of the outer tube sleeve (1) is coated with a wear-resistant layer (13), and an inner core flame-retardant layer (17) is fixed at the position of the middle core layer inside the outer tube sleeve (1).

9. The heat shrinkable tube with a clamp structure according to claim 8, characterized in that: Positioning grooves (15) are provided at both ends of the inner core flame retardant layer (17), and a heat conducting layer (14) is fixed inside the positioning groove (15).

10. The heat shrinkable tube with a clamp structure according to claim 9, characterized in that: Positioning layers (16) are fixed on both sides of the heat-conducting layer (14).