Electric power safety net maintenance equipment
By designing a power safety net maintenance equipment including sewage tanks, water purification tanks, electric push rods and fixing frames, the problems of disassembly and reinstallation in the existing technology are solved, efficient cleaning and drying are achieved, and improved Work efficiency and water resources are saved.
Patent Information
- Application Number
- CN202420699485.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-07
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2034-04-07
AI Technical Summary
Existing power safety net maintenance equipment needs to be disassembled and reinstalled before cleaning and maintenance, resulting in cumbersome and waste of time and reducing work efficiency.
A device including a sewage tank, a water purifier, a push rod, a fixture, a brush roller, a rubber roller, a pre-wash pipe and a cleaning pipe is designed to clean and squeeze water without disassembling the power safety net. Dry, drive the lifting plate through moving wheels and electric push rods, brush and rubber rollers for brushing and extrusion, hot air ducts for drying, and save water resources through filter valves and return pumps.
It realizes cleaning and maintenance without dismantling the power safety net, improves cleaning efficiency, saves water resources, and facilitates subsequent use.
Smart Images

Figure CN222058192U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of power safety network maintenance, in particular to a power safety network maintenance device. Background Art
[0002] The power safety net is composed of a net body, side ropes, tie ropes and tendon ropes. The net body is made of net ropes woven together, with diamond or square meshes. The distance between two adjacent knots of the woven material is called the mesh size, and the net ropes on the edges of the net body are called side ropes. The size of the safety net is determined by the size of the side ropes, and the ropes that fix the safety net to the support are called tie ropes. In addition, all ropes used to increase the strength of the safety net are collectively called tendon ropes.
[0003] After searching, it was found that the power safety network maintenance equipment in the prior art is typically such as the power safety network maintenance equipment disclosed in publication number CN115739742A, including a first cleaning frame, a second cleaning frame, an air drying box and an ultrasonic generator. The first cleaning frame is provided with a first net rope driving wheel, two second net rope driving wheels and a third net rope driving wheel, and the two second net rope driving wheels are located inside the first cleaning frame. In the present invention, the telescopic motor on the net rope washing assembly drives the telescopic rod to move, and under the action of the driving rod, the upper L-shaped connecting block, the upper tooth plate, the rotating gear and the lower tooth plate, it can drive multiple upper cleaning brushes and multiple lower cleaning brushes to move back and forth, and can clean both sides of the moving power grid at the same time, without the need for staff to manually clean one side at a time, the cleaning speed is fast, and the work intensity is also reduced. After cleaning and soaking and softening in the first cleaning frame, it enters the second cleaning frame, starts the ultrasonic generator, and effectively cleans the four corners of the power grid and the edges of the net rope.
[0004] The power safety net in the prior art often needs to be disassembled for cleaning and maintenance, and the power safety net needs to be reinstalled after cleaning and maintenance, which is cumbersome and wastes cleaning and maintenance time, reducing work efficiency. For this reason, we propose a power safety net maintenance device. Utility Model Content
[0005] The utility model aims to provide an electric power safety network maintenance device, which can complete the cleaning and maintenance work of the electric power safety network without disassembling it, and complete the water squeezing and drying of the electric power safety network after cleaning and maintenance, thereby improving the cleaning and maintenance efficiency and facilitating the subsequent use of the electric power safety network. It solves the problem in the prior art that the electric power safety network often needs to be disassembled before cleaning and maintenance can be carried out, and the electric power safety network needs to be reinstalled after cleaning and maintenance, which is more cumbersome and also wastes cleaning and maintenance time, thereby reducing work efficiency.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an electric power safety network maintenance device, comprising a sewage tank, wherein movable wheels are fixedly installed at the four corners of the lower surface of the sewage tank, a clean water tank is fixedly installed on the upper surface of the sewage tank, an electric push rod is fixedly connected to one side of the sewage tank, a lifting plate is fixedly connected to the end of the electric push rod, a fixed frame is fixedly installed on the lower surface of the lifting plate, fixed plates are symmetrically fixedly installed at both sides of the fixed frame, brush rollers are rotatably installed inside the two fixed plates near the front surface, rubber rollers are rotatably installed on the inner sides of the two fixed plates near the rear surface, and a pre-wash pipe, a cleaning pipe and a hot air pipe are fixedly installed inside the fixed plates.
[0007] Preferably, the cleaning pipe is located between the rubber roller and the brush roller inside the fixed plate, the pre-wash pipe is located inside the fixed plate close to the front surface of the brush roller, and the hot air pipe is located inside the fixed plate close to the rear surface of the rubber roller.
[0008] Preferably, a plurality of nozzles are fixedly installed at equal intervals on the outer surfaces of the pre-wash pipe and the cleaning pipe, and air outlets are symmetrically arranged at both sides of the outer surface of the hot air pipe.
[0009] Preferably, a slide rod is fixedly connected to the upper surface of the clean water tank near the front surface and the rear surface, and through holes are symmetrically provided on the upper surface of the lifting plate near the front surface and the rear surface, and the two slide rods pass through the two through holes.
[0010] Preferably, a brushing motor and an extrusion motor are fixedly mounted on the upper surface of the fixed frame, the end of the brushing motor output shaft is fixedly connected to the end of the brush roller, the end of the extrusion motor output shaft is fixedly connected to the outer surface of the rubber roller, and the outer surfaces of the two brush rollers and the two rubber rollers are fixedly sleeved with transmission gears near the upper surface of the fixed plate.
[0011] Preferably, water-retaining rubber strips are fixedly installed on opposite sides of the two fixed plates near the edge, a pre-wash pump and a reflux pump are fixedly installed on one side of the sewage tank near the fixed frame, the input end of the reflux pump is fixedly connected to a filter valve, and the end of the filter valve is fixedly connected to the outer surface of the fixed plate near the lower surface, the end of the reflux pump output pipe is fixedly connected to the outer surface of the sewage tank near the upper surface, the end of the pre-wash pump input pipe is fixedly connected to the outer surface of the sewage tank near the lower surface, and the end of the pre-wash pump output pipe is fixedly connected to the outer surface of the pre-wash pipe.
[0012] Preferably, a hot air blower is fixedly mounted on the outside of the fixing frame, and the end of the hot air blower output pipe is fixedly connected to the outer surface of the hot air pipe.
[0013] Preferably, a clean water pump is fixedly installed on one side of the outer surface of the clean water tank close to the fixed frame, the end of the clean water pump output pipe is fixedly connected to the outer surface of the cleaning pipe, and the end of the clean water pump input pipe is fixedly connected to the outer surface of the clean water tank close to the lower surface.
[0014] Preferably, a transparent curved pipe is fixedly connected to the outer surface of the clean water tank on one side away from the fixing frame near the lower surface, and a pipe clamp is fixedly installed on the outer surface of the clean water tank on one side away from the fixing frame near the upper surface, and the transparent curved pipe passes through the pipe clamp.
[0015] Compared with the prior art, the beneficial effects of the utility model are as follows:
[0016] 1. The utility model achieves the goal of completing the cleaning and maintenance work of the power safety net without disassembling it by arranging an electric push rod, a fixed frame, a fixed plate, a brush roller, a rubber roller, a hot air pipe, a pre-washing pipe and a cleaning pipe, and completing the squeezing and drying of the power safety net after cleaning and maintenance, thereby improving the cleaning and maintenance efficiency and facilitating the subsequent use of the power safety net. The sewage tank moves by the moving wheels, and the electric push rod drives the lifting plate to move up and down, so that the safety power net enters between the two fixed plates. During the movement of the sewage tank and the fixed plate, the pre-washing pipe first sprays pre-washing water to the power safety net, so that the power safety net is wetted, and then the power safety net is brushed by the two rotating brush rollers. The cleaning pipe sprays cleaning water again to the power safety net after brushing, and the power safety net after cleaning passes between the two rubber rollers, and most of the water is squeezed out by the two rubber rollers, and then the power safety net is dried by the hot air transported by the hot air pipe.
[0017] 2. The utility model achieves the effect of saving water resources by arranging a sewage tank, a filter valve, a pre-wash pump and a reflux pump. A large amount of sewage will be generated during the cleaning process of the power safety net. After most of the impurities are filtered out by the filter valve, the sewage is transported to the sewage tank by the reflux pump. After the pre-wash pump works, the sewage collected in the sewage tank is sprayed out through the pre-wash pipe, which plays a role in pre-cleaning the power safety net.
[0018] 3. The utility model achieves the effect of improving the stability of the lifting plate by setting the sliding rod and the through hole. When the electric push rod drives the lifting plate to move up and down, the sliding rod cooperates with the through hole to guide and limit the lifting and lowering of the lifting plate, thereby improving the stability of the lifting plate. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a three-dimensional diagram of the utility model;
[0020] Figure 2 This is a schematic diagram of the main structure of the utility model;
[0021] Figure 3This is a partial main structural diagram of the sewage tank and the clean water tank of the utility model;
[0022] Figure 4 It is a partial side structural schematic diagram of the fixing plate of the utility model.
[0023] Figure numerals: 1. Water-retaining rubber strip; 2. Fixed plate; 3. Fixed frame; 4. Lifting plate; 5. Brushing motor; 6. Extrusion motor; 7. Sliding rod; 8. Through hole; 9. Clean water tank; 10. Pipe clamp; 11. Transparent bent pipe; 12. Sewage tank; 13. Moving wheel; 14. Hot air blower; 15. Electric push rod; 16. Filter valve; 17. Reflux pump; 18. Pre-wash pump; 19. Clean water pump; 20. Air outlet; 21. Hot air pipe; 22. Transmission gear; 23. Pre-wash pipe; 24. Nozzle; 25. Brush roller; 26. Cleaning pipe; 27. Rubber roller. DETAILED DESCRIPTION
[0024] The technical solution of the utility model is further described below in conjunction with the accompanying drawings and specific embodiments.
[0025] like Figure 1-Figure 4 As shown, the utility model proposes a power safety network maintenance device, including a sewage tank 12, wherein movable wheels 13 are fixedly installed at the lower surface of the sewage tank 12 near the four corners, a clean water tank 9 is fixedly installed on the upper surface of the sewage tank 12, a transparent curved pipe 11 is fixedly connected to the side of the outer surface of the clean water tank 9 away from the fixed frame 3 near the lower surface, a pipe clamp 10 is fixedly installed at the side of the outer surface of the clean water tank 9 away from the fixed frame 3 near the upper surface, and the transparent curved pipe 11 passes through the pipe clamp 10, and the end of the transparent curved pipe 11 is located at At the top of the clean water tank 9, the water level inside the clean water tank 9 can be observed through the transparent curved pipe 11, so as to timely replenish the clean water used for cleaning the power safety network. An electric push rod 15 is fixedly connected to one side of the sewage tank 12, and a lifting plate 4 is fixedly connected to the end of the electric push rod 15. Slide rods 7 are fixedly connected to the upper surface of the clean water tank 9 near the front surface and the rear surface. Through holes 8 are symmetrically provided on the upper surface of the lifting plate 4 near the front surface and the rear surface, and two slide rods 7 pass through the two through holes 8 to improve the stability of the lifting plate 4.
[0026] A fixing frame 3 is fixedly installed on the lower surface of the lifting plate 4. On both sides inside the fixing frame 3, fixing plates 2 are symmetrically and fixedly installed. Near the front surface inside the two fixing plates 2, brush rollers 25 are rotatably installed. The two brush rollers 25 brush both sides of the electric safety net. Near the rear surface inside the two fixing plates 2, rubber rollers 27 are rotatably installed. The two rubber rollers 27 squeeze the electric safety net, so that the water in the electric safety net is squeezed out. A brushing motor 5 and a squeezing motor 6 are fixedly installed on the upper surface of the fixing frame 3. The end of the output shaft of the brushing motor 5 is fixedly connected to the end of the brush roller 25, and the end of the output shaft of the squeezing motor 6 is fixedly connected to the outer surface of the rubber roller 27. On the outer surfaces of the two brush rollers 25 and the two rubber rollers 27, near the upper surface of the fixing plate 2, transmission gears 22 are fixedly sleeved. The two transmission gears 22 on the two brush rollers 25 are meshed with each other, and the two transmission gears 22 on the two rubber rollers 27 are meshed with each other. Inside the fixing plate 2, a pre-washing pipe 23, a cleaning pipe 26 and a hot air pipe 21 are fixedly installed. A number of spray nozzles 24 are equidistantly and fixedly installed on the outer surfaces of the pre-washing pipe 23 and the cleaning pipe 26. On both sides of the outer surface of the hot air pipe 21, air outlets 20 are symmetrically arranged. The main views of the pre-washing pipe 23, the fixing frame 3, the cleaning pipe 26 and the hot air pipe 21 are all in the shape of "冂". The cleaning pipe 26 is located between the rubber roller 27 and the brush roller 25 inside the fixing plate 2. The pre-washing pipe 23 is located near the front surface of the brush roller 25 inside the fixing plate 2. The hot air pipe 21 is located near the rear surface of the rubber roller 27 inside the fixing plate 2.
[0027] On one side of the two fixing plates 2 close to the edge of the opposite side, water blocking rubber strips 1 are fixedly installed. Inside the sewage tank 12, near one side of the fixing frame 3, a pre-washing pump 18 and a reflux pump 17 are fixedly installed. The input end of the reflux pump 17 is fixedly connected to a filter valve 16, and the end of the filter valve 16 is fixedly connected to the outer surface of the fixing plate 2 near the lower surface. The end of the output pipe of the reflux pump 17 is fixedly connected to the outer surface of the sewage tank 12 near the upper surface. The end of the input pipe of the pre-washing pump 18 is fixedly connected to the outer surface of the sewage tank 12 near the lower surface. The end of the output pipe of the pre-washing pump 18 is fixedly connected to the outer surface of the pre-washing pipe 23. During the cleaning process of the electric safety net, a large amount of sewage will be generated. After most of the impurities in the sewage are filtered by the filter valve 16, the sewage is transported to the sewage tank 12 by the reflux pump 17. After the pre-washing pump 18 works, the sewage collected inside the sewage tank 12 is sprayed out through the pre-washing pipe 23, playing a role in pre-cleaning the electric safety net. A hot air blower 14 is fixedly installed outside the fixing frame 3. The end of the output pipe of the hot air blower 14 is fixedly connected to the outer surface of the hot air pipe 21. A water purification pump 19 is fixedly installed on one side of the outer surface of the water purification tank 9 close to the fixing frame 3. The end of the output pipe of the water purification pump 19 is fixedly connected to the outer surface of the cleaning pipe 26. The end of the input pipe of the water purification pump 19 is fixedly connected to the outer surface of the water purification tank 9 near the lower surface.
[0028] When the utility model is in use, the sewage tank 12 is moved by the moving wheel 13, and the electric push rod 15 drives the lifting plate 4 to rise and fall, so that the safety power grid enters between the two fixed plates 2. During the movement of the sewage tank 12 and the fixed plate 2, the pre-wash pump 18 causes the sewage collected in the sewage tank 12 to be sprayed out from the pre-wash pipe 23, and the preliminary pre-cleaning is completed while wetting the power safety net. The power safety net is brushed by the two rotating brush rollers 25, and the clean water pump 19 causes the clean water inside the clean water tank 9 to be sprayed out from the cleaning pipe 26 to complete the cleaning of the power safety net. After the cleaning, the power safety net passes between the two rubber rollers 27, and most of the water is squeezed out by the two rubber rollers 27, and then the hot air transported by the hot air pipe 21 dries the power safety net.
[0029] The above-mentioned specific embodiments are only several preferred embodiments of the present invention. Based on the technical solution of the present invention and the relevant inspiration of the above-mentioned embodiments, those skilled in the art can make various alternative improvements and combinations to the above-mentioned specific embodiments.
Claims
1. A power safety network maintenance device, comprising a sewage tank (12), characterized in that: The lower surface of the sewage tank (12) is fixedly provided with moving wheels (13) near the four corners, the upper surface of the sewage tank (12) is fixedly provided with a clean water tank (9), one side of the sewage tank (12) is fixedly connected with an electric push rod (15), the end of the electric push rod (15) is fixedly connected with a lifting plate (4), the lower surface of the lifting plate (4) is fixedly provided with a fixing frame (3), the fixing plates (2) are symmetrically fixedly provided at the two sides of the fixing frame (3), the two fixing plates (2) are rotatably provided with brush rollers (25) near the front surface, the inner sides of the two fixing plates (2) are rotatably provided with rubber rollers (27) near the rear surface, and the fixing plates (2) are fixedly provided with a pre-washing pipe (23), a cleaning pipe (26) and a hot air pipe (21) inside.
2. The power safety network maintenance equipment according to claim 1, characterized in that: The cleaning pipe (26) is located between the rubber roller (27) and the brush roller (25) inside the fixed plate (2), the pre-washing pipe (23) is located inside the fixed plate (2) near the front surface of the brush roller (25), and the hot air pipe (21) is located inside the fixed plate (2) near the rear surface of the rubber roller (27).
3. The power safety network maintenance equipment according to claim 1, characterized in that: A plurality of nozzles (24) are fixedly installed at equal intervals on the outer surfaces of the pre-washing pipe (23) and the cleaning pipe (26), and air outlets (20) are symmetrically arranged at positions on both sides of the outer surface of the hot air pipe (21).
4. The power safety network maintenance equipment according to claim 1, characterized in that: The upper surface of the clean water tank (9) is fixedly connected with a slide rod (7) near the front surface and the rear surface, and the upper surface of the lifting plate (4) is symmetrically provided with through holes (8) near the front surface and the rear surface, and the two slide rods (7) pass through the two through holes (8).
5. The power safety network maintenance equipment according to claim 1, characterized in that: A scrubbing motor (5) and an extrusion motor (6) are fixedly mounted on the upper surface of the fixing frame (3); the end of the output shaft of the scrubbing motor (5) is fixedly connected to the end of the brush roller (25); the end of the output shaft of the extrusion motor (6) is fixedly connected to the outer surface of the rubber roller (27); and a transmission gear (22) is fixedly sleeved on the outer surfaces of the two brush rollers (25) and the two rubber rollers (27) at positions close to the upper surface of the fixing plate (2).
6. The power safety network maintenance equipment according to claim 1, characterized in that: Water-retaining rubber strips (1) are fixedly installed near the edge of the two opposite sides of the fixed plates (2); a pre-wash pump (18) and a return pump (17) are fixedly installed on one side of the sewage tank (12) near the fixed frame (3); the input end of the return pump (17) is fixedly connected to a filter valve (16), and the end of the filter valve (16) is fixedly connected to the outer surface of the fixed plate (2) near the lower surface; the end of the output pipe of the return pump (17) is fixedly connected to the outer surface of the sewage tank (12) near the upper surface; the end of the input pipe of the pre-wash pump (18) is fixedly connected to the outer surface of the sewage tank (12) near the lower surface; and the end of the output pipe of the pre-wash pump (18) is fixedly connected to the outer surface of the pre-wash pipe (23).
7. The power safety network maintenance equipment according to claim 1, characterized in that: A hot air blower (14) is fixedly mounted on the outside of the fixing frame (3), and the end of the output pipe of the hot air blower (14) is fixedly connected to the outer surface of the hot air pipe (21).
8. The power safety network maintenance equipment according to claim 1, characterized in that: A clean water pump (19) is fixedly mounted on one side of the outer surface of the clean water tank (9) close to the fixing frame (3); the end of the output pipe of the clean water pump (19) is fixedly connected to the outer surface of the cleaning pipe (26); and the end of the input pipe of the clean water pump (19) is fixedly connected to the outer surface of the clean water tank (9) close to the lower surface.
9. The power safety network maintenance equipment according to claim 1, characterized in that: A transparent curved pipe (11) is fixedly connected to a position near the lower surface of the outer surface of the clean water tank (9) facing away from the fixing frame (3), and a pipe clamp (10) is fixedly installed to a position near the upper surface of the outer surface of the clean water tank (9) facing away from the fixing frame (3), and the transparent curved pipe (11) passes through the pipe clamp (10).
