Universal power-assisted mechanical arm suitable for assembling vacuum melting and pouring mold

By designing a universal power assist robot arm, using components such as flip cylinders, electromagnets and limit cylinders, the problems of versatility, complex assembly process and safety hazards in vacuum smelting casting mold assembly are solved, and steel pipe molds of different sizes and lengths are realized Flexible assembly and efficient installation ensure assembly efficiency and safety.

CN222060340UActive Publication Date: 2024-11-26NANJING TAIZHI AUTOMATION TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420376905.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-28
Publication Date
2024-11-26
Estimated Expiration
2034-02-28

AI Technical Summary

Technical Problem

The existing gas-scaling shaft assisting robotic arms have insufficient versatility, complex assembly process, difficulty in installation and adjustment, and safety hazards in the assembly of vacuum smelting casting molds, and cannot adapt to the transport and flip of steel pipe molds and bottom plugs of different sizes and lengths.

Method used

A universal power assist robot arm is designed, using fixed vertical arms, flip arms, floating arms assembly, electromagnetic suction assembly and support steel pipe assembly, and flexible transport and installation of steel pipes and bottom plugs through flip cylinders, electromagnets and limit cylinders. , set up anti-fall components to ensure safety.

Benefits of technology

The general assembly of steel pipe molds and bottom plugs with 80mm, 90mm, 100mm inner diameter and 1000mm, 1200mm and 1400mm length is achieved, which simplifies the assembly process, improves the assembly efficiency, and avoids the safety risk of steel pipe falling off through fall-proof components.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222060340U_ABST
    Figure CN222060340U_ABST
Patent Text Reader

Abstract

The utility model discloses a universal power-assisted mechanical arm suitable for assembling a vacuum melting pouring mold. The universal power-assisted mechanical arm comprises a fixed vertical arm, a turnover arm hinged to the lower end of the fixed vertical arm and a turnover air cylinder arranged on the inner side of the fixed vertical arm and used for driving the turnover arm to rotate. The overturning arm comprises an overturning body hinged to the lower end of the fixed vertical arm, a floating arm assembly arranged at the bottom of the overturning body in a penetrating mode and capable of swinging up and down in the overturning body, and steel pipe supporting assemblies arranged below the floating arm assembly at intervals and used for stretching into a steel pipe and supporting the steel pipe. The electromagnetic attraction assembly is hinged to the end of the floating arm assembly and used for being attracted to the outer wall of the steel pipe. According to the technical scheme, the problems of universality and installation and adjustment in the prior art can be solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the field of assembling a casting mold in an alloy vacuum induction melting furnace, and in particular relates to a universal power-assisting mechanical arm suitable for assembling a vacuum melting and casting mold. Background Art

[0002] Vacuum induction melting (VIM) is a process of melting new alloys or return materials in a vacuum or inert atmosphere to avoid oxides and contamination from the atmosphere. It is a common method for producing high-temperature alloys, precision alloys and other special alloys. The vacuum induction melting furnace is the core equipment in the field of high-temperature vacuum induction melting alloys. This equipment is mostly used to melt nickel-chromium alloys used in aircraft and rocket engines. Today, vacuum induction melting furnaces play an important role as a carrier for realizing the VIM process and have become key equipment for the production of many special alloy materials.

[0003] The part in the smelting furnace that receives the alloy liquid after smelting is called a mold. Its structure is assembled by a mold frame, a steel pipe mold, a bottom plug, and a pouring riser. Due to the diversity of the shape and size of the finished alloy, the structure of the casting mold is diverse. The assembly of different types of molds is manually assembled by hand according to the production order before pouring. The mold frame is a bracket welded by channel steel for fixing steel pipes, and there are equidistant through holes on its bottom plate. The steel pipe mold is a seamless steel pipe with a processed inner hole. The bottom plug structure is a short shaft of two sections with different diameters, one end of which cooperates with the steel pipe mold with a gap of 0.1mm, and the other end cooperates with the bottom plate hole of the mold frame with a gap of 0.5mm. The shape of the pouring riser is a lower circle at the top, a tapered through hole in the middle, and the lower circle is installed on the inner wall of the top of the steel pipe mold to guide the alloy solution into the steel pipe mold. The steel pipes are closely arranged in the mold frame, and the gap in the same row is 10mm.

[0004] The pneumatic assisted manipulator mentioned in the utility model patent with publication number 203485206U has been very mature in actual production applications. The conventional method of use is to use a floor-standing pneumatic assisted arm with a specially designed end structure. The pneumatic floating structure of the manipulator arm can achieve zero-gravity operation, realize efficient and light handling and flipping of parts, and improve mold assembly efficiency.

[0005] The utility model patent with publication number 217434329U mentions a power-assisted robotic arm carrying a reversible gas expansion shaft. Its applicable parts and usage methods are very similar to those in this industry, both of which are used to transport pipe fittings and assemble them after flipping. However, due to the particularity of the casting assembly process in the casting industry and the particularity of the installation space and size, the conventional power-assisted arm with a reversible gas expansion shaft cannot be used for the assembly of castings in this industry.

[0006] However, the above patent still has the following deficiencies: 1) Universality problem. The conventional air-expanding shaft in the patent has a radius deviation value within 10mm, which cannot be used for steel pipe molds with an inner diameter of 80-100; 2) Assembly process problem. The existing process requires the steel pipe and the bottom plug to be transported and turned as a whole, and the bottom plug must not fall off. This requires the shaft at the end of the robot arm to adopt a hollow structure, which can fix both the steel pipe and the bottom plug, and is universal for steel pipes of different lengths. It can be seen that the conventional air-expanding shaft in the patent cannot adapt; 3) Installation and adjustment problem. After the steel pipe and the bottom plug are transported to the mold frame, they need to be rotated and swung to help the bottom plug embed into the bottom plate hole of the mold frame, while ensuring that the bottom plug does not retract. There are no related parts with this function at the end of the robot arm in the patent; 4) Safety problem. Since a single steel pipe can weigh up to 80KG, it is easy for the steel pipe to fall off if there are power outages, gas outages, bumps, etc. during the transfer process, causing production accidents. There is no structure with a safety function in the patent. Utility Model Content

[0007] Purpose of the utility model: The purpose of the utility model is to provide a universal power-assisted robotic arm suitable for the assembly of vacuum melting and casting molds, which can solve the existing universality problems and installation and adjustment problems.

[0008] Technical solution: The utility model is a universal power-assisting mechanical arm suitable for assembling vacuum melting and casting molds, including a fixed vertical arm, a flip arm hinged at the lower end of the fixed vertical arm, and a flip cylinder arranged on the inner side of the fixed vertical arm to drive the flip arm to rotate; the flip arm includes a flip body hinged at the lower end of the fixed vertical arm, a floating arm assembly penetrating the bottom of the flip body and capable of swinging up and down in the flip body, a supporting steel pipe assembly spaced apart below the floating arm assembly for extending into the interior of a steel pipe and lifting it up, and an electromagnetic suction assembly hinged at the end of the floating arm assembly for adsorbing on the outer wall of the steel pipe.

[0009] Furthermore, a floating hole is provided on the floating arm assembly, and the floating shaft passes through the floating hole and has two ends fixed on two sides of the flip body.

[0010] Furthermore, the electromagnetic suction assembly includes an electromagnet hingedly connected to the bottom of the floating arm assembly through a third rotating shaft, and a cylinder arranged above the electromagnet; one end of the cylinder is hingedly connected to the top of the floating arm assembly, and the other end is hingedly connected to the end of the electromagnet, and the electromagnet is driven to swing by the extension and contraction of the cylinder, thereby achieving the adsorption or detachment of the electromagnet from the outer wall of the steel pipe.

[0011] Furthermore, the bottom surface of the electromagnet is designed to be an arc surface for fitting against the outer wall of the steel pipe.

[0012] Furthermore, the supporting steel pipe assembly comprises a hollow supporting steel pipe, one end of which is fixedly connected to the floating arm assembly, and the other end of which is a free end, and the free end is used to extend into the interior of the steel pipe.

[0013] Furthermore, a bottom plug fixing component is arranged on the supporting steel pipe, and the bottom plug fixing component includes a limit cylinder coaxially arranged at one end of the supporting steel pipe, and a long axis arranged inside the supporting steel pipe; the telescopic rod of the limit cylinder extends into the supporting steel pipe and is fixedly connected to one end of the long axis, so as to drive the long axis to move back and forth inside the supporting steel pipe; a magnetic end suction head is installed at the other end of the long axis, and the bottom plug is positioned and adsorbed by the long axis and the magnetic end suction head.

[0014] Furthermore, an anti-falling component is disposed outside the supporting steel pipe assembly, and the top of the anti-falling component is connected to the floating arm assembly.

[0015] Furthermore, the anti-fall component includes two steel plates, one end of the two steel plates are hingedly connected, and the other end is kept in an open state by a spring. A circular hole is set in the center of one of the steel plates, and an elliptical hole is set in the center of the other steel plate. The outer wall of the steel pipe is locked by using the inclined elliptical hole.

[0016] Beneficial effects: Compared with the prior art, the technical solution of the utility model has the following beneficial effects:

[0017] (1) Versatility: It is applicable to the transportation and installation of steel pipe molds with three inner diameters (80mm, 90mm, 100mm) and three lengths (1000mm, 1200mm, 1400mm) and their matching bottom plugs, without the need to replace parts. It has stronger universal performance and makes production planning more flexible.

[0018] (2) Assembly process: The function of the end of the robot arm conforms to the new assembly process. The bottom plug fixing component keeps the position of the bottom plug unchanged, and the overall transfer and flipping of the steel pipe and the bottom plug can be realized.

[0019] (3) It is easy to install and adjust. After the steel pipe bottom plug is transferred to the mold frame through the floating arm assembly, floating space is left to facilitate the bottom plug of the steel pipe to enter the hole. At the same time, it ensures that the bottom plug does not retract, making the steel pipe positioning into the mold frame smoother and improving assembly efficiency.

[0020] (4) To solve the installation space problem, the end of the robot arm adopts a flat design as a whole, which can more conveniently adjust the position of the corners in the mold frame, making assembly more convenient.

[0021] (5) Solve safety issues and install anti-fall components to prevent steel pipes from falling off during the transfer process due to accidents such as power outages, gas outages, bumps, etc., which may cause production accidents. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a schematic diagram of the structure of the utility model;

[0023] Figure 2 It is a schematic diagram of the structure of the utility model in another state;

[0024] Figure 3 It is a structural schematic diagram of the flip body in the utility model;

[0025] Figure 4 It is a structural schematic diagram of the floating arm assembly in the utility model;

[0026] Figure 5 It is a structural schematic diagram of the electromagnet in the utility model;

[0027] Figure 6 It is a structural schematic diagram of the electromagnet in the utility model at another angle;

[0028] Figure 7 This is a schematic diagram of the structure of the supporting steel pipe assembly in the utility model;

[0029] Figure 8 This is the front view of the supporting steel pipe assembly in the utility model;

[0030] Fig. 9 It is a structural schematic diagram of the anti-falling component in the utility model;

[0031] Fig.10 This is the working state diagram when taking the steel pipe;

[0032] Fig.11 This is a working status diagram when placing the steel pipe into the mold frame. DETAILED DESCRIPTION

[0033] The technical solution of the utility model is described in detail below in conjunction with specific implementation methods and the accompanying drawings of the specification.

[0034] like Figures 1 to 9 As shown, the utility model is a universal power-assisted mechanical arm suitable for vacuum melting and pouring mold assembly, involving the following components: fixed vertical arm 1, flip cylinder 11, connecting flange 12, first rotating shaft 13, flip arm 2, flip body 21, floating shaft 211, second rotating shaft 212, support steel pipe assembly 3, support steel pipe 31, limit cylinder 32, bottom plug fixing component (long axis 33, magnet 34), limit block 35, anti-falling component 4, floating arm assembly 5, floating hole 51, electromagnetic suction assembly 6, electromagnet 61, cylinder 62, third rotating shaft 63. The specific installation method is as follows:

[0035] like Figure 1 and Figure 2As shown, the power-assisting mechanical arm adopts a common structure in the market, and the terminal structure adopts a flat shape design, which is convenient for adjustment in the limited space in the mold frame, and the inner hole of the steel pipe is used as a transfer support and positioning. The terminal structure includes two parts: a fixed vertical arm 1 and a flip arm 2. The fixed vertical arm 1 is installed at the end of the power-assisting mechanical arm, and a connecting flange 12 is installed on the upper end of the fixed vertical arm 1. It is installed at the end of the power-assisting mechanical arm through the connecting flange 12, and the lower end of the fixed vertical arm 1 is hingedly connected to the flip arm 2 through a first rotating shaft 13.

[0036] The fixed vertical arm 1 is equipped with an armrest, an operating button, and a flip cylinder 11, wherein the flip cylinder 11 is arranged on the inner side of the fixed vertical arm 1 to drive the flip arm 2 to rotate. The flip arm 2 is orthogonally flipped by controlling the extension and retraction of the flip cylinder 11, thereby achieving the purpose of flipping the steel pipe.

[0037] The flip arm 2 includes a supporting steel pipe assembly 3, an anti-falling component 4, a flip body 21, a floating arm assembly 5, an electromagnetic suction assembly 6, a bottom plug fixing component, accessories (buttons, handles), etc. The flip body 21 is hinged to the lower end of the fixed vertical arm 1 through the first rotating shaft 13, one end of the flip cylinder 11 is hingedly connected to the inner side of the fixed vertical arm 1, and the other end is hingedly connected to the flip body 21, so that the flip body can be flipped 90 degrees. The floating arm assembly 5 is installed inside the flip body 21 and connected to the flip body 21 through the second rotating shaft 212. Specifically, the floating arm assembly 5 is penetrated at the bottom of the flip body 21, and the flip body 21 has a limiting effect on the floating arm assembly 5, so that the floating arm assembly 5 can swing up and down within a certain range in the flip body 21. The supporting steel pipe assembly 3 is arranged at intervals below the floating arm assembly 5, which is used to extend into the steel pipe and lift it up, and the rear end of the supporting steel pipe assembly 3 is fixedly connected to the floating arm assembly 5. The anti-falling component 4 is sleeved outside the supporting steel pipe assembly 3 and installed on the mounting holes on both sides of the floating arm assembly 5 to prevent the steel pipe from falling. The electromagnetic suction component 6 is hinged at the end of the floating arm assembly 5 to be adsorbed on the outer wall of the steel pipe. The bottom plug fixing component is installed on the supporting steel pipe assembly 3 to install and fix the bottom plug.

[0038] like Figure 3 and Figure 4 As shown, a floating hole 51 is provided on the floating arm assembly 5, and the floating shaft 211 passes through the floating hole 51 and its two ends are fixed on both sides of the flip body 21. The floating arm assembly 5 is equipped with handrails, control buttons, etc. to control the actions of various components.

[0039] like Figure 2 , Figure 5 and Figure 6As shown, the electromagnetic suction assembly 6 includes an electromagnet 61 and a cylinder 62. The electromagnet 61 is hingedly connected to the bottom of the floating arm assembly 5 through a third rotating shaft 63. The third rotating shaft 63 is installed on the side of the electromagnet 61, and the cylinder 62 is arranged above the electromagnet 61. One end of the cylinder 62 is hingedly connected to the top of the floating arm assembly 5, and the other end is hingedly connected to the end of the electromagnet 61. The electromagnet 61 is driven to swing within a certain range by the extension and contraction of the cylinder 62, so that the electromagnet 61 can be adsorbed on or detached from the outer wall of the steel pipe. When the electromagnet 61 is placed flat, it is used to adsorb the outer wall of the steel pipe. In this embodiment, the bottom surface of the electromagnet 61 is designed as an arc surface to fit closely to the outer wall of the steel pipe. During the transportation and flipping process of the steel pipe, it can provide sufficient adsorption force to fix the steel pipe and prevent the steel pipe from shaking or even falling.

[0040] like Figure 7 and Figure 8 As shown, the support steel pipe assembly 3 includes a hollow support steel pipe 31, one end of which is fixedly connected to the floating arm assembly 5, and the other end is a free end. When in use, the free end of the support steel pipe 31 extends into the interior of the steel pipe to lift the steel pipe for transportation. A bottom plug fixing component is provided on the support steel pipe 31. The bottom plug fixing component includes a limit cylinder 32 coaxially arranged at one end of the support steel pipe 31, a long axis 33 and a magnetic end suction head 34 arranged inside the support steel pipe 31. The telescopic rod of the limit cylinder 32 extends into the interior of the support steel pipe 31 and is fixedly connected to one end of the long axis 33, so as to drive the long axis 33 to move back and forth inside the support steel pipe 31. A magnetic end suction head 34 is installed at the other end of the long axis 33, and the bottom plug is positioned and adsorbed by the long axis 33 and the magnetic end suction head 34 to ensure that the bottom plug is in a stable position during the transfer, flipping and installation process. After the mold is installed in place, the mechanical arm can be removed after the limit cylinder 32 is separated from the magnetic suction end 34.

[0041] The rear end of the supporting steel pipe 31 has a limiting step and bolts, which play a limiting role for steel pipe molds of different diameters and lengths, ensuring that the front end positions of different types of steel pipes are uniformly aligned and the bottom plug is positioned. In this embodiment, a limiting block 35 is provided, which can be applicable to the positioning of steel pipe molds of three lengths (1000mm, 1200mm, 1400mm), ensuring that the magnetic end suction head 34 at the head is aligned. The wall thickness of the three steel pipes is 20mm, and the diameter of the supporting steel pipe 31 is 70mm, which can penetrate into the pipe holes of 80mm, 90mm, and 100mm. The distance between the supporting steel pipe 31 and the bottom of the electromagnet 61 is 20mm, which can adsorb three steel pipes of different diameters.

[0042] like Fig. 9 As shown, an anti-falling component 4 is disposed on the outer surface of the supporting steel pipe assembly 3, and the top of the anti-falling component 4 is connected to the floating arm assembly 5. The anti-falling component 4 includes two steel plates, one end of the two steel plates is hingedly connected, and the other end is kept in an open state by two springs, one of the steel plates is provided with a central circular hole, and the other is provided with a central elliptical hole, and the outer wall of the steel pipe is locked by the inclined central elliptical hole.

[0043] In this embodiment, the anti-falling component 4 is installed in the middle and rear section of the supporting steel pipe assembly 3. It is designed as a quick-change component. Different models can be replaced for steel pipes of different diameters. Its function is to lock the steel pipe in the event of a sudden power outage or gas failure when the steel pipe is in a vertical state to prevent it from falling. The anti-falling component 4 has multiple installation holes on the floating arm assembly 5 to protect steel pipes of different lengths. The anti-falling component 4 uses the friction principle, the deadweight of the steel pipe, and the inclined elliptical hole steel plate to lock the outer wall of the steel pipe; after the steel pipe is installed, loosen the steel plate and move up to leave the steel pipe.

[0044] like Fig.10 and 11 As shown, the universal power-assisted mechanical arm suitable for vacuum melting and pouring mold assembly described in the utility model has the following working process:

[0045] S1. The finished steel pipe mold is placed in the storage rack and the whole set is transported to the operating range of the robot arm. The flip arm at the end of the robot arm flips to the horizontal under the action of the cylinder; the electromagnet at the front end of the flip arm is in a head-up state. The employee operates the end handle to adjust the position of the robot arm so that the end supporting steel pipe component is fully inserted into the interior of the required lifting steel pipe mold. After the steel pipe mold reaches the limit position, the robot arm is operated to lock each joint to maintain the end position.

[0046] S2. The employee moves to the other end of the steel pipe mold, selects a suitable bottom plug, installs it to the end of the steel pipe to be lifted, and fixes the bottom plug through the magnetic end of the end bottom plug fixing component.

[0047] S3. The staff operates and lowers the electromagnet, which is energized to absorb the outer wall of the steel pipe mold. The staff loosens the degrees of freedom of each joint of the robotic arm, raises the steel pipe and drops off the storage rack.

[0048] S4. Employees adjust the position of the anti-fall component and lock the outer wall of the steel pipe mold.

[0049] S5. The employee moves the steel pipe mold to an open area and operates the flip cylinder to rotate the flip arm component from a horizontal position to a vertical state along with the steel pipe mold.

[0050] S6. The employee holds the handrail at the end and carries the steel pipe mold to the top of the installation hole in the mold frame, manually loosens the anti-fall device, moves the anti-fall device upward to separate it from the steel pipe, and drops the steel pipe so that the conical part of the bottom plug head enters the hole in the bottom plate of the mold frame.

[0051] S7. Manually shake the steel pipe mold to fine-tune its position so that the bottom plug is completely installed in the hole.

[0052] S8. Manually disconnect the power supply of the electromagnet and release the electromagnet; hold the end handrail, raise the robotic arm, remove the steel pipe, and prepare to install the next steel pipe.

Claims

1. A universal power-assisted mechanical arm suitable for vacuum melting and casting mold assembly, characterized in that: It comprises a fixed vertical arm (1), a flip arm (2) hinged to the lower end of the fixed vertical arm (1), and a flip cylinder (11) arranged inside the fixed vertical arm (1) for driving the flip arm (2) to rotate; The flip arm (2) comprises a flip body (21) hinged at the lower end of the fixed vertical arm (1), a floating arm assembly (5) penetrating the bottom of the flip body (21) and capable of swinging up and down in the flip body (21), a supporting steel pipe assembly (3) arranged at intervals below the floating arm assembly (5) for extending into the interior of the steel pipe and lifting it, and an electromagnetic suction assembly (6) hinged at the end of the floating arm assembly (5) for adsorbing on the outer wall of the steel pipe.

2. The universal power-assisting mechanical arm suitable for vacuum melting and pouring mold assembly according to claim 1 is characterized in that: A floating hole (51) is provided on the floating arm assembly (5); the floating shaft (211) passes through the floating hole (51) and has two ends fixed to two sides of the flip body (21).

3. The universal power-assisting mechanical arm suitable for vacuum melting and pouring mold assembly according to claim 1 is characterized in that: The electromagnetic suction assembly (6) comprises an electromagnet (61) hingedly connected to the bottom of the floating arm assembly (5) via a third rotating shaft (63), and a cylinder (62) arranged above the electromagnet (61); One end of the cylinder (62) is hingedly connected to the top of the floating arm assembly (5), and the other end is hingedly connected to the end of the electromagnet (61). The cylinder (62) is extended and retracted to drive the electromagnet (61) to swing, thereby achieving adsorption or detachment of the electromagnet (61) from the outer wall of the steel pipe.

4. The universal power-assisting mechanical arm suitable for vacuum melting and pouring mold assembly according to claim 3 is characterized in that: The bottom surface of the electromagnet (61) is designed to be an arc surface, which is used to fit the outer wall of the steel pipe.

5. The universal power-assisting mechanical arm suitable for vacuum melting and pouring mold assembly according to claim 1 is characterized in that: The support steel pipe assembly (3) comprises a hollow support steel pipe (31), one end of the support steel pipe (31) is fixedly connected to the floating arm assembly (5), and the other end is a free end, which is used to extend into the interior of the steel pipe.

6. The universal power-assisting mechanical arm suitable for vacuum melting and pouring mold assembly according to claim 5, characterized in that: A bottom plug fixing component is arranged on the supporting steel pipe (31), and the bottom plug fixing component comprises a limit cylinder (32) coaxially arranged at one end of the supporting steel pipe (31), and a long shaft (33) arranged inside the supporting steel pipe (31); The telescopic rod of the limit cylinder (32) extends into the interior of the supporting steel pipe (31) and is fixedly connected to one end of the long shaft (33), so as to drive the long shaft (33) to move back and forth inside the supporting steel pipe (31); A magnetic end suction head (34) is installed at the other end of the long shaft (33), and the bottom plug is positioned and adsorbed through the long shaft (33) and the magnetic end suction head (34).

7. The universal power-assisting mechanical arm suitable for vacuum melting and pouring mold assembly according to claim 1 is characterized in that: The supporting steel pipe assembly (3) is provided with an anti-falling component (4) on its outer surface, and the top of the anti-falling component (4) is connected to the floating arm assembly (5).

8. The universal power-assisting mechanical arm suitable for vacuum melting and pouring mold assembly according to claim 7, characterized in that: The anti-fall component (4) comprises two steel plates, one end of the two steel plates is hingedly connected, and the other end is kept in an open state by a spring, one of the steel plates is provided with a circular hole in the center, and the other is provided with an elliptical hole in the center, and the outer wall of the steel pipe is locked by using the oblique elliptical hole.