High-temperature material continuous bowl filling equipment
By designing a continuous bowl loading equipment for high-temperature materials, using inert gas protection and high-temperature resistant seals, the problem that existing bowl loading machines cannot be continuously installed at high temperatures is solved, efficient material transportation and molding is achieved, and battery materials are improved quality.
Patent Information
- Application Number
- CN202420058384.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-09
- Publication Date
- 2024-11-26
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing bowl loaders cannot continuously load the bowl under high temperature environment, resulting in the oxidation of the material in the air, affecting the molding quality, and the equipment components cannot withstand high temperatures, so the quality of the high temperature bowl cannot be guaranteed.
A high-temperature material continuous bowl loading equipment is designed, including a rack, loading assembly and loading assembly. It adopts inert gas to protect the material, and material conveying and loading the bowl is carried out through the sealing structure of the loading silo and the replacement silo, using lifting devices and weighing The sensor ensures material uniformity and quality, and uses high-temperature resistant seals to prevent external air from entering.
The continuous and uninterrupted filling of high-temperature materials is achieved, which reduces the energy consumption of firing materials, improves the quality of molded battery materials, prevents material oxidation, and ensures the quality of high-temperature filling of high-temperature packaging.
Smart Images

Figure CN222063467U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of battery material sintering and molding, in particular to a high-temperature material continuous loading device. Background Art
[0002] New energy vehicles that use batteries as power are widely used, most of which use lithium batteries. In the production of powder materials such as the positive and negative electrodes of lithium batteries, the powdered raw materials must first be loaded into the sagger, and then transported to the kiln for high-temperature sintering. In order to ensure the consistency of the materials after sintering and the quality of the fired materials, the loading speed, loading amount, loading density and the flatness of the material surface in the sagger need to be precisely controlled. This requires a dedicated loading machine for subpackaging. The current loading machine works by allowing the empty sagger to enter the loading machine under atmospheric environment. The lifting platform is located inside the elevator. The lifting platform is lifted by the elevator, and at the same time, it drives the empty sagger to be lifted upward to the discharge port of the screw machine. It descends while discharging the material until the sagger is filled with materials. Then the rollers in the lifting platform rotate to transport the sagger to the external sintering equipment. The non-metallic parts used in the equipment can only withstand temperatures below 80°C. They cannot work normally in an environment with a temperature greater than 80°C and the gas environment of the sagger is not controlled. The material in the sagger is easily oxidized in the air at high temperature, affecting the performance of the material after molding.
[0003] The existing patent with announcement number CN219776371U discloses an automatic bowl loading machine for a lithium battery production line, including a material box and a sagger, the material box has a feeding port, the sagger is arranged below the feeding port, and also includes a positioning mechanism for stabilizing the sagger, and a shaking mechanism connected to the positioning mechanism, which is used to shake the powder in the sagger. The automatic bowl loading machine does not replace the air environment of the bowl loading, and the connection of the bowl loading machine is not treated with high temperature protection, and the quality of high-temperature bowl loading cannot be guaranteed. Utility Model Content
[0004] The utility model aims to provide a high-temperature material continuous potting device, which solves the problem that the existing potting machine cannot be used for the continuous potting of high-temperature materials.
[0005] In order to achieve the above utility model purpose, the technical solution adopted by the utility model is as follows:
[0006] A device for continuously loading high-temperature materials comprises a frame, a feeding assembly and a charging assembly, wherein the charging assembly is arranged on the frame, the feeding assembly is arranged on the charging assembly, the charging assembly comprises a feeding bin, a replacement bin and a conveying roller, the feeding bin is arranged below the feeding assembly, the feeding bin is communicable with the replacement bin, the conveying roller passes through the feeding bin and the replacement bin for conveying the sagger, and high-temperature materials can be conveyed and continuously loaded, the step of reheating and heating the materials is omitted, the energy consumption of sintering materials is reduced, and inert gas is used for protection when conveying materials to ensure the quality of the materials.
[0007] Furthermore, the loading assembly also includes a first bin door and a second bin door, wherein the first bin door is arranged on a side wall of the replacement bin, and the second bin door is arranged between the replacement bin and the loading bin, and the material is transferred from the loading bin to the sagger to prevent the material from being oxidized.
[0008] Furthermore, the charging assembly also includes a lifting device, which is arranged in the replacement bin. The lifting device drives the sagger to move up and down in the replacement bin to assist in loading.
[0009] Preferably, the lifting device includes a driver, a guide rod and a lifting platform, the driver is arranged on the top of the loading bin, the driver is connected to the lifting platform, the guide rod penetrates the loading bin in a direction perpendicular to the conveying roller, and the lifting platform is slidably connected to the guide rod, and is used to lift the empty sagger in the loading bin for loading.
[0010] Preferably, the lifting device further comprises a weighing sensor, which is arranged between the driver and the lifting platform and is used to weigh the weight of the material loaded into the sagger to ensure the consistency of each loading.
[0011] Preferably, the loading bin includes a first exhaust valve and a first air inlet valve, the first exhaust valve is arranged on the top wall of the loading bin, and the first air inlet valve is arranged on the side wall of the replacement bin, the replacement bin includes a second exhaust valve and a second air inlet valve, the second exhaust valve is arranged on the top of the replacement bin, and the second air inlet valve is arranged on the side wall of the replacement bin, which are used to respectively exhaust the air in the loading bin and the replacement bin to prevent oxidation of the material.
[0012] Furthermore, it also includes a feeder, which is arranged between the loading component and the charging component. The feeder includes a screw feeder and a seal. The screw feeder is arranged in a horizontal direction, and the seal is arranged between the screw feeder and the charging component, which is used to transfer materials from the buffer bin to the loading bin to complete the transfer of materials.
[0013] Furthermore, the loading assembly includes a buffer bin, a vibrator, an automatic valve, a third air intake valve and a third exhaust valve. The buffer bin is arranged above the loading assembly, the automatic valve is arranged on the buffer bin, the third air intake valve and the third exhaust valve are both arranged on the outer wall of the buffer bin, and the vibrator is arranged on the side wall of the buffer bin. The vibrator can make the material density in the buffer bin uniform and improve the performance of the sintered material.
[0014] Preferably, the feeding assembly further comprises a material level sensor, and the material level sensor is arranged on the inner wall of the buffer bin and is used to detect the material storage amount in the buffer bin.
[0015] More preferably, a weighing bin is provided between the feeding assembly and the feeding bin, for leveling and weighing the material from the feeding assembly, so as to improve the quality of the subsequent sintering material.
[0016] The beneficial effects of the utility model are:
[0017] The high-temperature material continuous loading equipment feeds materials into a closable loading bin and a replacement bin through a loading component. The replacement bin is used to isolate the empty sagger with inert gas before it enters the replacement bin. The loading component can also provide inert gas protection for the materials entering the buffer bin. The materials are fed into the sagger in the loading bin, and the sagger receives the materials in the loading bin, thereby completing continuous loading of the materials. A high-temperature resistant seal is used at the connection between the loading component and the charging component to prevent external air from entering the bin, so that the high-temperature materials can be transferred and loaded, thereby improving the quality of the formed battery materials. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 This is a front view of the high-temperature material continuous loading equipment provided by the utility model;
[0019] Figure 2 A side view of the high-temperature material continuous loading equipment provided by the utility model;
[0020] Figure 3 The charging state of the high temperature material continuous charging device provided by the utility model Figure 1 ;
[0021] Figure 4 The charging state of the high temperature material continuous charging device provided by the utility model Figure 2 ;
[0022] Figure 5 This is a system flow chart of the high temperature material continuous loading equipment provided by the utility model;
[0023] Figure 6A schematic diagram of the structure of the high-temperature material continuous loading equipment provided in Example 3;
[0024] Figure 7 This is a simplified structural diagram of the high-temperature material continuous loading equipment provided in Example 4.
[0025] Reference numerals:
[0026] 1. Frame; 2. Sagger; 3. Loading assembly; 31. Buffer bin; 32. First material level sensor; 33. Third air inlet valve; 34. First vibrator; 35. Third air exhaust valve; 36. Leakage-proof part; 37. Automatic valve; 38. First agitator; 4. Feeder; 41. Screw feeder; 42. Seal; 5. Lifting device; 51. Driver; 52. Guide rod; 53. Weighing sensor; 54. Lifting platform; 6. Loading assembly; 61. Loading bin; 62. Replacement bin; 621. Second air exhaust valve; 622. Second air inlet valve; 63. Dust hood; 64. Conveying roller; 65. First bin door; 66. First air exhaust valve; 67. First air inlet valve; 68. Second bin door; 7. Weighing bin; 71. Second vibrator; 72. Feed valve; 73. Second material level sensor; 74. Second agitator. DETAILED DESCRIPTION
[0027] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0028] Embodiment 1
[0029] like Figure 1-Figure 4As shown, the present embodiment discloses a high-temperature material continuous loading device, including a frame 1, a loading assembly 3 and a charging assembly 6, the charging assembly 6 is arranged on the frame 1, the loading assembly 3 is arranged on the charging assembly 6, the charging assembly 6 includes a loading bin 61, a replacement bin 62 and a conveying roller 64, the loading bin 61 is arranged below the loading assembly 3, the loading bin 61 and the replacement bin 62 can be communicated, the conveying roller 64 passes through the loading bin 61 and the replacement bin 62 for conveying the sagger 2, the loading bin 61, the replacement bin 62 and the loading assembly 3 can be sealed respectively, and the air therein can be emptied by passing inert gas therein to ensure that no oxidation reaction occurs during the loading process of the whole material, the equipment has the ability to continuously and uninterruptedly load high-temperature materials below 400°C, the high-temperature materials can enter the high-temperature kiln directly after loading and start firing, and there is no need to heat up from room temperature again, which can reduce the power demand of the high-temperature kiln in the rear stage, save the energy consumption of firing materials, and has high industrial value.
[0030] A dust collecting hood 63 is provided below the upper bin 61 , and the dust collecting hood 63 is used to collect dust spilled when the spiral feeder 41 adds materials into the sagger 2 , so as to prevent the dust from leaking outward and causing environmental pollution.
[0031] Furthermore, the loading assembly 3 also includes a first bin door 65 and a second bin door 68. The first bin door 65 is arranged on a side wall of the replacement bin 62, and the second bin door 68 is arranged between the replacement bin 62 and the loading bin 61. The first bin door 65 and the second bin door 68 are used to isolate the replacement bin 62 from the external environment and separate the replacement bin 62 from the loading bin 61.
[0032] Preferably, the charging assembly 6 further comprises a lifting device 5 , which is disposed in the replacement bin 62 , and drives the sagger 2 to move up and down in the replacement bin 62 , so as to assist in loading.
[0033] Furthermore, the lifting device 5 includes a driver 51, a guide rod 52 and a lifting platform 54. The driver 51 is arranged on the top of the upper bin 61. The driver 51 is connected to the lifting platform 54. The guide rod 52 penetrates the upper bin 61 in a direction perpendicular to the conveying roller 64. The lifting platform 54 is slidably connected to the guide rod 52. The driver 51 provides power for lifting the lifting platform 54, and the guide rod 52 improves the stability of the movement of the lifting platform 54.
[0034] Preferably, the lifting device 5 further comprises a weighing sensor 53 , which is disposed between the driver 51 and the lifting platform 54 . The weighing sensor 53 is used to confirm the quality of the charge in the sagger 2 and ensure the consistency of each charge.
[0035] Preferably, the loading bin 61 includes a first exhaust valve 66 and a first air inlet valve 67, the first exhaust valve 66 is arranged on the top wall of the loading bin 61, and the first air inlet valve 67 is arranged on the side wall of the replacement bin 62, and the replacement bin 62 includes a second exhaust valve 622 and a second air inlet valve 621, the second exhaust valve 621 is arranged on the top of the replacement bin 62, and the second air inlet valve 622 is arranged on the side wall of the replacement bin 62. The air in the bin is replaced by the air inlet valve and the exhaust valve to prevent the air from oxidizing and reacting with the high-temperature material to affect the sintering quality of the battery material.
[0036] Furthermore, it also includes a feeder 4, which is arranged between the loading component 3 and the charging component 6. The feeder 4 includes a screw feeder 41 and a seal 42. The screw feeder 41 is arranged in a horizontal direction, and the seal 42 is arranged between the screw feeder 41 and the charging component 6, and is used for sealing the discharge end of the screw feeder 41 with the loading bin 61. The lower opening of the buffer bin 31 and the feeder 4 are sealed with a leak-proof part 36, and the feeder 4 is surrounded by a sealed shell as a whole to prevent air from contacting the material.
[0037] Furthermore, the feeding component 3 includes a buffer bin 31, a first vibrator 34, an automatic valve 37, a third air intake valve 33 and a third exhaust valve 35. The buffer bin 31 is arranged above the loading component 6, the automatic valve 37 is arranged on the buffer bin 31, the third air intake valve 33 and the third exhaust valve 35 are both arranged on the outer wall of the buffer bin 31, the first vibrator 34 is arranged on the side wall of the buffer bin 31, the automatic valve 37 closes the top opening of the buffer bin 31 for automatic feeding, and the buffer bin 31 is an inverted cone-shaped bin body, which plays the role of automatically gathering materials.
[0038] Preferably, a plurality of first vibrators 34 are arranged around the side wall of the buffer bin 31 . The first vibrators 34 can make the density of the material in the buffer bin 31 uniform during feeding, thereby improving the consistency of feeding.
[0039] Preferably, the feeding component 3 also includes a first material level sensor 32, which is arranged on the inner wall of the buffer bin 31. The first material level sensor 32 is installed at the upper and lower parts of the buffer bin 31 to detect the feed amount and ensure the consistency of the feeding amount each time.
[0040] More preferably, it also includes a leak-proof part 36, which is arranged between the automatic valve 37 and the buffer bin 31. The leak-proof part 36 is a static sealing structure composed of a high-temperature resistant flange and non-metallic materials, which can withstand high temperatures above 400°C for a long time and is used to prevent leakage of materials and gas.
[0041] The working process of the high temperature material continuous loading equipment is as follows:
[0042] The high-temperature material enters the buffer bin 31 through the automatic valve 37. The buffer bin 31 is closed after storing enough material. When loading, the first vibrator 34 is started to shake the material. The third air inlet valve 33 and the third air exhaust valve 35 are opened at the same time. The inert protective gas is introduced through the third air inlet valve 33 to exhaust the air in the buffer bin 31. The empty sagger 2 is sent into the replacement bin 62 by the conveying roller 64. The first bin door 65 of the replacement bin 62 is closed to completely close the replacement bin 62. The second air exhaust valve 621 and the second air inlet valve 22 are opened to introduce the inert protective gas. The protective gas empties the air in the replacement bin 62 and then seals it. The loading bin 61 empties the air in the bin at the same time, and the second bin door 68 is opened. The empty sagger 2 enters the loading bin 61 driven by the conveying roller 64. The lifting device 5 drives the empty sagger 2 to rise, and the material is delivered to the empty sagger 2 by the screw feeder 41. After the weighing sensor 53 on the lifting device 5 senses that the sagger 2 is full, the screw feeder 41 stops feeding, and the sagger 2 filled with material moves downward to the conveying roller 64, which delivers the sagger 2 to the sintering equipment to complete the material sintering.
[0043] Embodiment 2
[0044] See also Figure 5 This embodiment also discloses an invention for continuously loading high-temperature materials, comprising the following steps:
[0045] S1. Feeding: High-temperature materials enter the buffer chamber 31 from the outside. The buffer chamber 31 is closed after the materials are loaded. Inert gas is input through the third air inlet valve 33 on the buffer chamber 31. The air in the buffer chamber 31 is discharged to the outside through the third air exhaust valve 35 on the buffer chamber 31. A closed space protected by inert gas is formed in the buffer chamber 31 to prevent the materials in a high-temperature state from being gasified, which may cause the performance of the sintered materials to deteriorate.
[0046] S2, feeding: the material is transported from the feeder 4 below the buffer bin 31 to the top of the replacement bin 62;
[0047] S3, entering the sagger: the sagger 2 is sent from the buffer chamber 31 into the replacement chamber 62. After the replacement chamber 62 is closed, the replacement chamber 62 and the loading chamber 61 adjacent to the replacement chamber 62 are emptied by inert gas, and the sagger 2 enters the loading chamber 61 from the replacement chamber 62;
[0048] S4, loading: the sagger 2 moves upward to the top of the upper bin 61, and the materials are released from the buffer bin 31 into the sagger 2. After the sagger 2 is filled with sufficient materials, it descends to the bottom of the upper bin 61 and is then transported to the external material sintering equipment;
[0049] S5. Repeat steps S1-S4 to complete the continuous loading of materials. By directly loading the high-temperature materials, the direct transfer of the high-temperature materials for secondary sintering can be achieved, which reduces the energy consumption of reheating the materials and shortens the process of battery material sintering.
[0050] Embodiment 3
[0051] like Figure 6 As shown, the present embodiment also discloses a high-temperature material continuous loading device, wherein a weighing bin 7 is provided between the feeder 4 below the loading assembly 3 and the loading bin 61, a feed valve 72 is provided above the weighing bin 7 for controlling the incoming material, a second vibrator 71 is provided on the side wall of the weighing bin 7 for vibrating the incoming material, a second material level sensor 73 is used for measuring the amount of the incoming material, and the weighing bin 7 can homogenize the material so that the material is evenly heated in the subsequent sintering, thereby improving the quality of the sintered material.
[0052] Preferably, a gas valve for filling and discharging protective gas is provided in the weighing bin 7 to replace the air in the weighing bin 7 .
[0053] More preferably, a feeder 4 is further provided below the weighing bin 7, and the feeder 4 is used for conveying materials, which can make the conveying more stable and controllable, and expand the transfer range of the materials.
[0054] Embodiment 4
[0055] like Figure 7 As shown, on the basis of the second embodiment, this embodiment further discloses a high-temperature material continuous loading device, wherein a first agitator 38 is provided in the buffer bin 31, and a second agitator 74 is provided in the weighing bin 7, for further making the temperature of the materials in the buffer bin 31 and the weighing bin 7 uniform, improving the uniformity of heating the materials, and ensuring the reliable quality of the sintered materials. The two agitators can eliminate the bridging phenomenon during the movement of the agglomerated materials, and facilitate the powder materials to fall in sequence.
[0056] According to the disclosure and teaching of the above description, the technical personnel in the field of the utility model can also change and modify the above implementation. Therefore, the utility model is not limited to the specific implementation methods disclosed and described above, and some modifications and changes of the utility model should also fall within the scope of protection of the claims of the utility model. In addition, although some specific terms are used in this specification, these terms are only for the convenience of description and do not constitute any limitation to the utility model.
Claims
1. A high-temperature material continuous loading device, comprising a frame (1), a feeding assembly (3) and a charging assembly (6), wherein the charging assembly (6) is arranged on the frame (1), and the feeding assembly (3) is arranged on the charging assembly (6), characterized in that: The loading assembly (6) comprises a loading bin (61), a replacement bin (62) and a conveying roller (64); the loading bin (61) is arranged below the loading assembly (3); the loading bin (61) and the replacement bin (62) are communicable; the conveying roller (64) passes through the loading bin (61) and the replacement bin (62) and is used for conveying the sagger (2); the lifting device (5) is arranged in the replacement bin (62); the lifting device (5) drives the sagger (2) to move up and down in the replacement bin (62).
2. The high temperature material continuous loading equipment according to claim 1, characterized in that: The loading assembly (3) further comprises a first bin door (65) and a second bin door (68), wherein the first bin door (65) is arranged on a side wall of the replacement bin (62), and the second bin door (68) is arranged between the replacement bin (62) and the loading bin (61).
3. The high temperature material continuous loading equipment according to claim 1 is characterized in that: The charging assembly (6) further comprises a lifting device (5), wherein the lifting device (5) is arranged in the replacement bin (62), and the lifting device (5) drives the sagger (2) to move up and down in the replacement bin (62).
4. The high temperature material continuous loading equipment according to claim 3 is characterized in that: The lifting device (5) comprises a driver (51), a guide rod (52) and a lifting platform (54); the driver (51) is arranged on the top of the loading bin (61); the driver (51) is connected to the lifting platform (54); the guide rod (52) penetrates the loading bin (61) in a direction perpendicular to the conveying roller (64); and the lifting platform (54) is slidably connected to the guide rod (52).
5. The high temperature material continuous loading equipment according to claim 1, characterized in that: The loading bin (61) comprises a first exhaust valve (66) and a first intake valve (67), wherein the first exhaust valve (66) is arranged on the top wall of the loading bin (61), and the first intake valve (67) is arranged on the side wall of the replacement bin (62); the replacement bin (62) comprises a second exhaust valve (621) and a second intake valve (622), wherein the second exhaust valve (621) is arranged on the top of the replacement bin (62), and the second intake valve (622) is arranged on the side wall of the replacement bin (62).
6. The high temperature material continuous loading equipment according to claim 1, characterized in that: The invention also comprises a feeder (4), wherein the feeder (4) is arranged between the loading assembly (3) and the charging assembly (6), and the feeder (4) comprises a screw feeder (41) and a sealing member (42), wherein the screw feeder (41) is arranged in a horizontal direction, and the sealing member (42) is arranged between the screw feeder (41) and the charging assembly (6).
7. The high temperature material continuous loading equipment according to claim 6, characterized in that: The loading component (3) comprises a buffer bin (31), a vibrator (34), an automatic valve (37), a third air intake valve (33) and a third air exhaust valve (35); the buffer bin (31) is arranged above the loading component (6); the automatic valve (37) is arranged on the buffer bin (31); the third air intake valve (33) and the third air exhaust valve (35) are both arranged on the outer wall of the buffer bin (31); and the vibrator (34) is arranged on the side wall of the buffer bin (31).
8. The high temperature material continuous loading equipment according to claim 7, characterized in that: The material loading assembly (3) further comprises a material level sensor (32), and the material level sensor (32) is arranged on the inner wall of the buffer bin (31).
9. The high temperature material continuous loading equipment according to any one of claims 1 to 8, characterized in that: A weighing bin (7) is provided between the feeding assembly (3) and the feeding bin (61).
Citation Information
Cited By
High-temperature material continuous bowl loading equipment and method
CN117645168A
High-temperature material continuous potting equipment and method
CN117645168B
