By immersing the lower part of the thick-walled steel pipe into the quenching sink water and using an outer and inner sprayer for full circumference cooling, combined with the design of the loading flip plate and a short slope, the problems of uneven quenching and bending of the thick-walled steel pipe are solved, achieving high Quality quenching and reduces equipment failure and noise pollution.
Patent Information
- Application Number
- CN202420717790.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-09
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2034-04-09
AI Technical Summary
The existing steel pipe quenching process is difficult to effectively cool thick-walled steel pipes. Especially the outer and inner spray quenching equipment causes uneven cooling in the lower half, which is prone to quenching bending problems. The immersion equipment in the groove has uneven cooling and high equipment failure rate. The problem.
A thick-walled steel pipe quenching unit was designed. By immersing the lower part of the steel pipe into the quenching sink water, and using an external sprayer to spray water on the outer wall of the steel pipe at high speed, combining the design of the loading flip plate and short slope table , realizes rapid cooling of the steel pipes in full circumference, cancels the compression device, and uses a transverse chain bed for quenching and transfer of steel pipes to avoid noise pollution.
High-quality continuous quenching of thick-walled pipes is achieved, cooling effect is improved, bending problems are avoided, equipment investment and maintenance costs are reduced, failure rate is reduced, and air blowing devices are required to reduce noise pollution.
Smart Images

Figure CN222064618U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of steel pipe production and processing, and particularly relates to a thick-walled steel pipe quenching unit. Background Art
[0002] There are two main steel pipe quenching processes in production at present: one is external shower and internal spray quenching equipment, and the other is tank immersion steel pipe quenching equipment. External shower and internal spray quenching equipment sprays and quenches the outer wall of the steel pipe that rotates at high speed after heating, and sprays water to the inner wall at the end of the pipe with high-speed water flow, so that the inner and outer walls of the steel pipe are cooled quickly at the same time. During quenching in this process, the lower half of the steel pipe cannot contact water, so the cooling effect is limited. It is mainly suitable for steel pipes with smaller wall thickness values, and it is difficult to quench thick-walled pipes. In addition, the problem of this process is that during quenching, the clamping device pressed on the top of the steel pipe blocks the external shower water, which makes the steel pipe cool slowly at the clamping wheel, the quenching effect is poor, and even stress concentration or cracks will occur. Tank immersion steel pipe quenching equipment is to directly and completely immerse the steel pipe that rotates at high speed after heating in water, and spray water to the inner wall at the end of the pipe with high-speed water flow, so that the purpose of quenching the inner and outer walls at the same time can also be achieved. Although this process can quench steel pipes with larger wall thickness, its main problem is that when the steel pipe is immersed in water, it is prone to uneven cooling along the entire length, and quenching bending often occurs. Utility Model Content
[0003] In view of the above problems, the purpose of the utility model is to provide a thick-walled steel pipe quenching unit, which immerses the lower part of the steel pipe into the water in the quenching tank, uses an external shower and an internal sprayer to shower water on the outer wall and spray water on the inner wall of the high-speed rotating steel pipe in the quenching tank, and then quickly cools the inner and outer walls of the entire circumference of the steel pipe at the same time, thereby realizing continuous high-quality quenching of thick-walled pipes.
[0004] The technical solution of the utility model is: a thick-walled steel pipe quenching unit, including a feed conveying roller, a loading flap, a quenching water trough, a discharge inclined platform, a transverse chain bed, a discharge platform, a discharge flap and a discharge conveying roller, which are arranged in sequence along an axis. A rotator and a turner are provided on the upper inner side of the quenching water trough, the rotator is close to the loading flap, an external shower and an internal sprayer are provided above the rotator, and a short inclined platform is provided on the upper side of the side wall of the quenching water trough close to the loading flap, and the short inclined platform is located below the loading flap.
[0005] The turning angle of the feeding flap is 7°~9°, and the turning angle of the plane where the feeding flap is located is arranged parallel to the plane where the short inclined platform is located.
[0006] The height of the loading flap after it is raised is 10-20 mm higher than the upper surface of the short inclined platform on the side wall of the quenching water tank.
[0007] The turning arm of the material turner can rotate around its rotation axis, and has four working positions, which are respectively: quenching position, material receiving position, material blocking position and material turning position from bottom to top.
[0008] The technical effects of the utility model are as follows: 1. The utility model immerses the lower part of the steel pipe into the water of the quenching water tank, and uses an external shower and internal sprayer to shower water on the outer wall and spray water on the inner wall of the high-speed rotating steel pipe in the quenching water tank. After heating, the high-speed rotating thick-walled steel pipe is showered with water on the outer wall and sprayed with water on the inner wall while the lower part is immersed in water. In this way, the thick-walled pipe is cooled in the entire circumferential direction at the same time. Compared with the original external shower and internal spray quenching process, the quenching effect of the thick-walled pipe is greatly improved, and the problem of uneven initial cooling of the original immersion steel pipe quenching process in the tank, which leads to easy bending after quenching, is avoided; 2. The utility model adopts a loading flap Combined with the loading on the short inclined table, the equipment investment cost and floor space are reduced, while the equipment failure rate and maintenance cost are reduced; 3. The utility model eliminates the clamping device in the existing quenching unit that blocks the external water spray and has more failure points. The stability requirements of the steel pipe during rotary quenching are met through the dead weight of the thick-walled pipe, which can avoid the formation of "soft belts" during quenching and reduce the equipment failure rate; 4. The utility model sets a transverse chain bed after quenching, which completes the transportation of the steel pipe after quenching on the one hand, and on the other hand, the quenching water on the inner wall can flow away naturally when the steel pipe is slowly transported on the transverse chain bed, eliminating the blowing device with serious noise pollution.
[0009] The following is a further description with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0010] Figure 1 The present invention is a schematic structural diagram of a thick-walled steel pipe quenching unit according to an embodiment of the present invention.
[0011] Figure numbers: 1-feed conveying roller, 2-loading flap, 3-short inclined platform, 4-rotator, 5-quenching water tank, 6-turner, 7-external shower and internal sprayer, 8-unloading inclined platform, 9-transverse chain bed, 10-discharging platform, 11-discharging flap, 12-discharging conveying roller. DETAILED DESCRIPTION Example 1
[0012] like Figure 1 As shown, a thick-walled steel pipe quenching unit includes a feed conveying roller 1, a loading flap 2, a quenching water trough 5, a discharge inclined platform 8, a transverse chain bed 9, a discharge platform 10, a discharge flap 11 and a discharge conveying roller 12 arranged in sequence along the axis, a rotator 4 and a turner 6 are provided on the upper inner side of the quenching water trough 5, the rotator 4 is close to the loading flap 2, an external shower and internal sprayer 7 is provided above the rotator 4, a short inclined platform 3 is provided on the upper side wall of the quenching water trough 5 close to the loading flap 2, and the short inclined platform 3 is located below the loading flap 2.
[0013] During actual use, the utility model immerses the lower part of the steel pipe into the water of the quenching tank, and adopts the external shower and internal spray device to shower water on the outer wall and spray water on the inner wall of the high-speed rotating steel pipe in the quenching tank. After heating, the high-speed rotating thick-walled steel pipe is showered with water on the outer wall and sprayed with water on the inner wall while the lower part is immersed in water, so that the thick-walled pipe can be cooled simultaneously in the entire circumferential direction. Compared with the original external shower and internal spray quenching process, the quenching effect of the thick-walled pipe is greatly improved, and at the same time, the problem of uneven initial cooling of the original immersion steel pipe quenching process in the tank, which leads to easy bending after quenching, is avoided. Example 2
[0014] Preferably, on the basis of Example 1, in this embodiment, the turning angle of the feeding flap 2 is 7°~9°, and the turning angle of the plane where the feeding flap 2 is located is arranged parallel to the plane where the short inclined platform 3 is located.
[0015] During actual use, the utility model adopts a loading flap in combination with a short inclined platform for loading, which reduces equipment investment costs and floor space, and also reduces equipment failure rate and maintenance costs. Example 3
[0016] Preferably, on the basis of Example 1 or Example 2, in this embodiment, the height of the loading flap 2 after it is raised is 10-20 mm higher than the upper surface of the short inclined platform 3 of the side wall of the quenching water tank 5.
[0017] During actual use, the height of the loading flap 2 of the utility model after it is raised is 10-20 mm higher than the upper surface of the short inclined platform 3 on the side wall of the quenching water tank 5, which facilitates the steel pipe to be quenched to roll obliquely downward along the loading flap 2 to the short inclined platform 3 of the quenching water tank 5. Example 4
[0018] Preferably, based on Example 1 or Example 3, in this embodiment, the turning arm of the material turner can rotate around its rotation axis, and has four working positions, from bottom to top: quenching position, material receiving position, material blocking position and material turning position.
[0019] During actual use, the steel pipe to be quenched rolls obliquely downward along the loading flap 2 to the short inclined platform 3 of the quenching water tank 5, and then rolls to the end of the turning arm of the turner 6 at the blocking position. The turning arm of the turner 6 continues to rotate downward to the receiving position. At the same time, the steel pipe to be quenched rolls downward along the turning arm of the turner 6 to the quenching center position; the turning arm of the turner 6 falls downward to the quenching position, and the steel pipe to be quenched falls on the rotator 4 and rotates at high speed; the external shower and internal sprayer 7 starts to spray the outer surface of the high-speed rotating steel pipe to be quenched. The wall is sprinkled with water and the inner wall is sprayed with water. At the same time, the water level in the quenching water tank 5 rises due to the water sprayed into it by the outer sprinkler and inner sprayer 7, so that the lower part of the steel pipe to be quenched is immersed in the water of the quenching water tank 5, so that the inner wall and outer wall of the entire circumference of the steel pipe to be quenched are quickly cooled at the same time, thereby completing the quenching; after the quenched steel pipe is quenched according to the production process, the outer sprinkler and inner sprayer 7 stop sprinkling water on the outer wall of the steel pipe and spraying water on the inner wall, and the turning hook of the turner 6 rotates upward from the quenching position to the turning position to turn the quenched steel pipe onto the unloading inclined stand 8.
[0020] When the utility model is actually used, the following steps are included:
[0021] S1: The feed conveyor roller 1 conveys the heated steel pipe to be quenched to the quenching unit;
[0022] S2: The loading flap 2 at the same station as the feeding conveyor roller 1 turns up the steel pipe to be quenched;
[0023] S3: The steel pipe to be quenched rolls obliquely downward along the loading flap 2 onto the short inclined platform 3 of the quenching water tank 5, and then rolls to the end of the turning arm of the turning device 6 at the blocking position, and pauses for less than 0.5 seconds;
[0024] S4: The turning arm of the turning device 6 continues to rotate downward to the material receiving position, and at the same time, the steel pipe to be quenched rolls downward along the turning arm of the turning device 6 to the quenching center position;
[0025] S5: The turning arm of the turning device 6 falls down to the quenching position, and the quenched steel pipe falls on the rotator 4 and rotates at high speed;
[0026] S6: the outer shower and inner spray device 7 starts to shower water on the outer wall and inner wall of the high-speed rotating steel pipe to be quenched, and at the same time, the water level in the quenching water tank 5 rises due to the water sprayed by the outer shower and inner spray device 7, so that the lower part of the steel pipe to be quenched is immersed in the water of the quenching water tank 5, so that the inner wall and the outer wall of the entire circumference of the steel pipe to be quenched are cooled rapidly at the same time, thereby completing the quenching;
[0027] S7: After the quenched steel pipe is quenched according to the production process, the external spraying and internal spraying device 7 stops spraying water on the outer wall and the inner wall of the steel pipe, and the turning hook of the turning device 6 rotates upward from the quenching position to the turning position to turn the quenched steel pipe onto the unloading inclined stand 8;
[0028] S8: The steel pipe rolls from the unloading inclined platform 8 to the transverse chain bed 9, and the transverse chain bed 9 transports the steel pipe to the unloading platform 10. Finally, the unloading flap 11 flips the steel pipe up to the unloading conveying roller 12, completing the entire quenching process.
[0029] The above is only a preferred specific implementation of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily thought of by any technician familiar with the technical field within the technical scope disclosed in the present invention should be included in the protection scope of the present invention.
Claims
1. A thick-walled steel pipe quenching unit, characterized in that: The invention comprises a feed conveying roller (1), a loading flap (2), a quenching water tank (5), a discharging inclined platform (8), a transverse chain bed (9), a discharging platform (10), a discharging flap (11) and a discharging conveying roller (12) which are sequentially arranged along an axis. A rotator (4) and a turner (6) are arranged on the upper inner side of the quenching water tank (5). The rotator (4) is close to the side of the loading flap (2). An external shower and internal sprayer (7) is arranged above the rotator (4). A short inclined platform (3) is arranged on the upper part of the side wall of the quenching water tank (5) close to the side of the loading flap (2). The short inclined platform (3) is located below the loading flap (2).
2. A thick-walled steel pipe quenching unit according to claim 1, characterized in that: The turning angle of the loading flap (2) is 7° to 9°, and the turning angle of the plane where the loading flap (2) is located is arranged parallel to the plane where the short inclined platform (3) is located.
3. A thick-walled steel pipe quenching unit according to claim 1, characterized in that: When the loading flap (2) is raised, its height is 10 to 20 mm higher than the upper surface of the short inclined platform (3) on the side wall of the quenching water tank (5).
4. A thick-walled steel pipe quenching unit according to claim 1, characterized in that: The turning arm of the material turner (6) can rotate around its rotation axis, and has four working positions, which are, from bottom to top, a quenching position, a material receiving position, a material blocking position and a material turning position.