Permeable terrace structure and mountain sponge urban park structure
By introducing components such as a solidified impermeable base layer and a high-titanium blast furnace slag crushed stone cushion layer into the permeable pavement, combined with drainage ditches and water storage tanks, the problem of insufficient waterproofing of the base layer is solved, enabling effective water storage and transportation, and improving the stability and durability of the structure.
Patent Information
- Application Number
- CN202420606144.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-27
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2034-03-27
AI Technical Summary
The existing permeable pavement base layer lacks waterproof performance, which leads to prolonged water immersion, causing the base soil to soften and settle, and the structure is prone to cracking, with poor durability, making it unable to effectively store and transport water.
The permeable pavement structure consists of a solidified impermeable base layer, a high-titanium blast furnace slag crushed stone cushion layer, a high-titanium blast furnace slag permeable concrete base layer, a cement-based crushed stone permeable concrete surface layer, and a cover sealing layer. Combined with segmented drainage ditches and water storage tanks, a water circulation system is formed.
It achieves waterproofing of the base layer, avoids soil softening and settlement, and stores water during heavy rainfall and supplies water for irrigation during dry seasons through the design of drainage ditches and reservoirs, reducing costs and improving the stability and durability of the structure.
Smart Images

Figure CN222065069U_ABST
Abstract
Description
Technical Field
[0001] The utility model discloses a permeable floor structure and a mountain sponge city park structure, belonging to the technical field of construction engineering. Background Art
[0002] The existing permeable floor is generally directly laid on the roughly rolled plain soil roadbed with a 50mm thick permeable concrete structure layer. The strength of the permeable concrete structure layer is usually between 10MPa and 15MPa. Then the permeable concrete surface layer is sprayed with a colored topcoat sealant; or a 30mm to 50mm thick crushed stone cushion is rolled and laid between the permeable concrete structure layer and the plain soil base. Since the base layer does not have waterproof properties, the water that penetrates from the upper part will cause the base soil to soften and settle and deform seriously after a long time of infiltration. At the same time, due to the small thickness and insufficient strength of the permeable concrete during the construction process, combined with the softening of the base layer, the structural layer is often accompanied by cracking or breaking. It cannot play a good role in transporting and storing water, and has poor durability.
[0003] In the construction of sponge cities, water absorption, transportation and storage routes are reasonably designed in different regions, closely following the core idea of sponge cities, and permeable floors are one of the main components. The existing ecological permeable concrete is a mixed material composed of cement, water, permeable concrete reinforcing agent, high-quality aggregates of the same particle size or discontinuous grading, and a certain porosity, and the surface is sprayed with colorful covering agents. The application scenarios are light-load roads such as park pedestrian walkways, bicycle lanes, and light vehicle aisles in communities. It can achieve drainage, anti-skid, sound absorption, noise reduction, and water seepage effects, improve the surface ecological cycle, facilitate traffic safety, protect the living environment, and solve the negative impact caused by large-scale modern urban construction. In the design and construction of mountain sponge cities, the reasonable design of good water absorption, transportation and storage routes is the core idea of sponge cities. Especially for mountainous cities, the terrain height difference of such cities varies greatly, the water is at the foot of the mountain, and the high-altitude areas are seriously short of water. The irrigation water in urban parks in high terrain is short of water and the cost is high. Utility Model Content
[0004] The technical problem to be solved by the utility model is that the base of the existing structure does not have waterproof performance, and the water that penetrates from the upper part causes the base soil to soften and the settlement and deformation to be serious due to long-term infiltration.
[0005] The technical solution adopted by the utility model to solve its technical problems is: a permeable floor structure, including a solidified anti-seepage base layer, a high-titanium blast furnace slag crushed stone cushion layer, a high-titanium blast furnace slag permeable concrete base layer, a cement-based crushed stone permeable concrete surface layer and a cover sealing layer which are arranged in sequence from bottom to top.
[0006] Wherein, the thickness of the solidified anti-seepage base layer in the above structure is 45 to 50 mm.
[0007] Wherein, the thickness of the high-titanium blast furnace slag crushed stone cushion layer in the above structure is 145-150 mm, and the particle size range of the high-titanium blast furnace slag particles is 5 mm-35 mm.
[0008] Furthermore, the high-titanium blast furnace slag crushed stone cushion layer in the above structure is compacted by a roller after being leveled.
[0009] Among them, the high-titanium blast furnace slag permeable concrete base layer in the above structure has a thickness of 95 to 100 mm, a strength not less than C20, a porosity of 15% to 20%, and a high-titanium blast furnace slag particle size range of 6 mm to 10 mm.
[0010] Among them, the cement-based crushed stone permeable concrete surface layer in the above structure has a thickness of 55 to 60 mm and a strength of not less than C20; the aggregate is granite crushed stone or quartz crushed stone, and the particle size is 3 to 6 mm.
[0011] Wherein, the above structure also includes a water reservoir, and segmented water ditches are arranged at intervals on the solidified anti-seepage base layer, and the segmented water ditches are connected to the water reservoir.
[0012] Furthermore, the segmented water guide ditch in the above structure is formed by a concave upper end surface of the solidified anti-seepage base layer.
[0013] Furthermore, the spacing between adjacent segmented water ditches in the above structure is 100 to 200 meters.
[0014] A mountain sponge city park structure comprises a sidewalk, wherein the sidewalk is paved with any one of the above-mentioned permeable floor structures.
[0015] The beneficial effects of the utility model are as follows: the solidified anti-seepage base of the structure is waterproof, so that water cannot directly enter the soil layer, ensuring the structural stability of the roadbed. A concave segmented water diversion ditch is set on the solidified anti-seepage base, and the water area transported from high to low by the large-pore graded high-titanium blast furnace slag crushed stone cushion layer according to the terrain is guided into the reservoir for storage, which is used for water collection in the area and for vegetation irrigation. This structural setting allows water to be retained and stored in different areas during heavy rainfall, and low-cost water supply and irrigation during dry periods, forming a water cycle. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of the permeable floor structure of the utility model.
[0017] Figure 2 This is a schematic diagram of the structure of the mountain sponge city park of the utility model.
[0018] Marked in the figure are: 1 is the sidewalk, 11 is the high-titanium blast furnace slag crushed stone cushion layer, 12 is the high-titanium blast furnace slag permeable concrete base layer, 13 is the cement-based crushed stone permeable concrete surface layer, 14 is the cover sealing layer, 15 is the solidified anti-seepage base layer, 2 is the segmented water diversion ditch, 3 is the reservoir, and 4 is the vegetation. DETAILED DESCRIPTION
[0019] The utility model is further described below in conjunction with the accompanying drawings.
[0020] like Figure 1 and Figure 2 As shown, a permeable floor structure of the utility model includes a solidified anti-seepage base layer 15, a high-titanium blast furnace slag crushed stone cushion layer 11, a high-titanium blast furnace slag permeable concrete base layer 12, a cement-based crushed stone permeable concrete surface layer 13 and a cover sealing layer 14, which are arranged in sequence from bottom to top. It can be understood by those skilled in the art that the permeable floor structure of the present structure mainly includes a solidified anti-seepage base layer 15, a high-titanium blast furnace slag crushed stone cushion layer 11, a high-titanium blast furnace slag permeable concrete base layer 12, a cement-based crushed stone permeable concrete surface layer 13 and a cover sealing layer 14, which are arranged in sequence from bottom to top. The cover sealing layer 14 is sealed with a permeable concrete cover agent (sealing agent). This layer can be selected from a variety of colors to make the surface of the permeable concrete colorful and bright, and at the same time has the performance of protecting the permeable floor, so that the permeable floor surface layer is durable and does not lose particles. The high-titanium blast furnace slag crushed stone cushion layer 11, the high-titanium blast furnace slag permeable concrete base layer 12, and the cement-based crushed stone permeable concrete surface layer 13 mainly play a structural and permeable role. The solidified anti-seepage base layer 15 is actually laid on the solid soil layer. The anti-seepage base layer uses a soil solidifier to solidify and compact the soil, so that it has both a certain strength and good waterproofness, specifically to prevent water from infiltrating into the base layer to cause the roadbed to soften, thereby extending the service life.
[0021] Preferably, the thickness of the solidified anti-seepage base layer 15 in the above structure is 45 to 50 mm. Those skilled in the art will appreciate that the preferred thickness of the solidified anti-seepage base layer 15 of the present structure is 45 to 50 mm to ensure the protective effect. The method of solidifying the anti-seepage base layer 15 is to add 3% to 6% of the mass of soil particles in cement or lime, and mix the soil solidifier and water in a ratio of 1:5 to 1:10 to prepare a solution, the mass of the solution is about 9% to 11% of the mass of the soil particles, and the solidified soil after mixing is leveled and compacted with a 5T roller.
[0022] Preferably, the thickness of the high-titanium blast furnace slag crushed stone cushion layer 11 in the above structure is 145-150 mm, and the particle size range of the high-titanium blast furnace slag is 5 mm-35 mm. It can be understood by those skilled in the art that, considering the integrity of the permeable structure, the functions of water storage and horizontal water transportation are met. Therefore, it is actually preferred that the thickness of the high-titanium blast furnace slag crushed stone cushion layer 11 is 145-150 mm, and a large-pore graded high-titanium blast furnace slag crushed stone cushion layer 11 is actually used, and the particle size range of the high-titanium blast furnace slag particles in this layer is actually preferred to be 5 mm-35 mm.
[0023] Preferably, the high titanium blast furnace slag crushed stone cushion layer 11 in the above structure is compacted by a roller after being leveled. Those skilled in the art will appreciate that, in order to ensure the laying strength, it is preferred that the high titanium blast furnace slag crushed stone cushion layer 11 is compacted by a 5T roller after being leveled.
[0024] Preferably, the high-titanium blast furnace slag permeable concrete base 12 in the above structure has a thickness of 95 to 100 mm, a strength not less than C20, a porosity of 15% to 20%, and a high-titanium blast furnace slag particle size range of 6 mm to 10 mm. It can be understood by those skilled in the art that in order to meet the functional requirements of strength and permeability, the problems of aesthetics and comfort are not considered too much, and the production cost is reduced while meeting the functional requirements. Therefore, the preferred high-titanium blast furnace slag permeable concrete base 12 of this structure is 95 to 100 mm thick, and this layer is actually a cement-based macroporous natural color high-titanium blast furnace slag permeable concrete structure layer. The specific method is to lay and level the evenly mixed permeable concrete mixture as required, and then vibrate it with a flat plate. Ensure that the strength of this layer is not less than C20 (that is, the compressive strength is not less than 20 MPa), the porosity is 15% to 20% (to ensure permeability), and the particle size range of the high-titanium blast furnace slag particles of this layer is 6 mm to 10 mm.
[0025] Preferably, the cement-based crushed stone permeable concrete surface layer 13 in the above structure has a thickness of 55 to 60 mm and a strength of not less than C20; the aggregate is selected from granite crushed stone or quartz crushed stone, and the particle size is 3 to 6 mm. It can be understood by those skilled in the art that in order to meet the strength requirements, it is also necessary to meet the requirements of good permeability and good surface quality. The preferred cement-based crushed stone permeable concrete surface layer 13 of this structure has a thickness of 55 to 60 mm. In practice, the evenly mixed permeable concrete mixture is laid and leveled as required, and then vibrated with a flat plate. The strength of this layer is not less than C20 (that is, the compressive strength is not less than 20 MPa), and the aggregate is selected from granite crushed stone or quartz crushed stone, and the particle size is between 3 mm and 6 mm.
[0026] Preferably, the above structure also includes a water reservoir 3, and segmented water ditches 2 are arranged at intervals on the solidified anti-seepage base layer 15, and the segmented water ditches 2 are connected to the water reservoir 3. Those skilled in the art can understand that in order to achieve water collection and irrigation of vegetation 4, the present structure is also provided with a water reservoir 3, and the water reservoir 3 can actually be arranged near the permeable floor, and the water reservoir 3 can actually be arranged at intervals along both sides of the permeable floor, and the number and spacing can be determined according to actual conditions. At the same time, segmented water ditches 2 are arranged at intervals on the solidified anti-seepage base layer 15, so that the segmented water ditches 2 are connected to the corresponding water reservoir 3. This structural setting can allow the water above to pass through the entire permeable floor structure through the segmented water ditches 2 and enter the water reservoir 3 for storage, and be used for irrigation of vegetation 4 in the area, without the need to set up a separate irrigation waterway, which greatly reduces the cost.
[0027] Preferably, the segmented water guide ditch in the above structure is formed by the upper end surface of the solidified anti-seepage base being concave. Those skilled in the art can understand that this structure is only a preferred segmented water guide ditch 2, specifically formed by the upper end surface of the solidified anti-seepage base 15 being concave, to reduce construction costs.
[0028] Preferably, the spacing between adjacent segmented water ditches in the above structure is 100 to 200 meters. Those skilled in the art can understand that, in order to ensure the permeability and water collection effect, the structure is preferably provided with a U-shaped concave segmented water ditches 2 on the solidified anti-seepage base layer 15 on the road 1 every 100 to 200 meters according to the terrain changes, and the water area transported from the large-pore graded high-titanium blast furnace slag crushed stone cushion layer from high to low according to the terrain is introduced into the reservoir 3 for storage, and used for irrigation preparation in the area.
[0029] A mountain sponge city park structure, including a sidewalk 1, wherein the sidewalk 1 is paved with any one of the above-mentioned permeable floor structures. It can be understood by those skilled in the art that the existing mountainous cities have large terrain height differences, water is at the foot of the mountain, and there is a serious water shortage in high-altitude areas. Urban parks in high terrain are short of irrigation water and have high costs. The urban park mainly includes a sidewalk 1 and vegetation 4. Taking into account the maintenance of the sidewalk 1 and the irrigation of vegetation 4 in some parks with higher geographical locations, the preferred sidewalk 1 of this structure is paved with any one of the above-mentioned permeable floor structures. This structural setting ensures the structural stability of the roadbed of the sidewalk 1. At the same time, water can be temporarily stored in the reservoir 3 for irrigation of vegetation 4 in the area. There is no need to set up a separate irrigation waterway, which greatly reduces costs.
Claims
1. A permeable floor structure, characterized by: The invention comprises a solidified anti-seepage base layer (15), a high-titanium blast furnace slag crushed stone cushion layer (11), a high-titanium blast furnace slag permeable concrete base layer (12), a cement-based crushed stone permeable concrete surface layer (13) and a cover sealing layer (14) which are arranged in sequence from bottom to top.
2. A permeable floor structure as claimed in claim 1, characterized in that: The thickness of the solidified anti-seepage base layer (15) is 45-50 mm.
3. A permeable floor structure as claimed in claim 1, characterized in that: The thickness of the high-titanium blast furnace slag crushed stone cushion layer (11) is 145-150 mm, and the particle size range of the high-titanium blast furnace slag particles is 5 mm-35 mm.
4. A permeable floor structure as claimed in claim 3, characterized in that: The high-titanium blast furnace slag crushed stone cushion layer (11) is leveled and compacted using a roller.
5. A permeable floor structure as claimed in claim 1, characterized in that: The high-titanium blast furnace slag permeable concrete base (12) has a thickness of 95-100 mm, a strength not less than C20, a porosity of 15%-20%, and a particle size range of the high-titanium blast furnace slag particles of 6 mm-10 mm.
6. A permeable floor structure as claimed in claim 1, characterized in that: The cement-based crushed stone permeable concrete surface layer (13) has a thickness of 55-60 mm and a strength of not less than C20; the aggregate is selected from granite crushed stone or quartz crushed stone, and the particle size is 3-6 mm.
7. A permeable floor structure as claimed in claim 1, characterized in that: It also comprises a water reservoir (3), and segmented water ditches (2) are arranged at intervals on the solidified anti-seepage base layer (15), and the segmented water ditches (2) are connected to the water reservoir (3).
8. A permeable floor structure as claimed in claim 7, characterized in that: The segmented water guide ditch (2) is formed by a concave upper end surface of the solidified anti-seepage base layer (15).
9. A permeable floor structure as claimed in claim 7, characterized in that: The distance between adjacent segmented water diversion ditches (2) is 100 to 200 meters.
10. A mountain sponge city park structure, comprising a walkway (1), characterized in that: The sidewalk (1) is paved with any one of the permeable floor structures described in claims 1 to 9.