Ventilation-rate-adjustable double-layer wind-proof snow barrier utilizing old wave-shaped beam guardrail plate
By using old corrugated beam guardrails to build a double-layer windproof snow barrier with adjustable ventilation on the expressway, the safety problems of the expressway in strong winds and snow blowing disasters are solved, and a low-carbon and environmentally friendly design and efficient windproof snow protection are achieved. Effect.
Patent Information
- Application Number
- CN202420734808.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-10
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2034-04-10
AI Technical Summary
The existing corrugated beam guardrails and windbreakers cannot meet the comprehensive needs of highway safety protection, wind protection, snow resistance and green economy, especially in strong winds and wind-blown snow disasters.
The old corrugated beam guardrail is used to build a double-layer wind-proof snow barrier with an adjustable ventilation rate. Through the combination of truss structure, anti-slip clamp, transition column and cable-stayed cable, the height and ventilation rate of the wind-proof snow barrier are realized. Enhance windproof and adaptability.
Improve the strength and stability of the wind-proof snow barrier, adapt to steep slope sections, reduce the reuse cost of old corrugated beam guardrails during the renovation and expansion of highways, realize a low-carbon and environmentally friendly green road design, and enhance wind-proof and snow-proof ability.
Smart Images

Figure CN222065240U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of traffic engineering, in particular to a double-layer wind and snow barrier with adjustable air permeability which utilizes an old corrugated beam guardrail plate. Background Art
[0002] Expressways are characterized by high grade, strict operating conditions, and great impact from strong winds, sand and snow. Therefore, in the entire life cycle of expressway engineering design, construction and operation, the prevention and control of wind and snow disasters is a realistic problem that needs to be paid attention to and urgently solved. As an important traffic safety facility, wind and snow fences are of great significance in preventing accidents, reducing accident losses, and protecting the safety of life and property.
[0003] Strong winds have a great impact on highway construction, maintenance, operation and driving safety. Strong winds are often accompanied by sandstorms, especially strong crosswinds with a perpendicular angle between the line direction and the main wind. These winds will not only cause accidents such as overturned vehicles, low visibility, vehicle shutdowns, and traffic interruptions, but will also cause wind erosion of the roadbed and damage the roadbed slopes and ancillary facilities.
[0004] Blowing snow, also known as snow flow, is widely distributed and occurs frequently around the world, with great impact on the natural environment and social economy. The occurrence of blowing snow is restricted by many factors, including topography, wind field conditions, ground roughness, snowfall, and the physical and mechanical properties of snow. It involves the multi-field coupling of wind field-snow particles-temperature-humidity field, and has the scientific commonality of randomness and multi-scale. So far, there is still a lack of systematic solutions. When the snow flow reaches the road, the wind speed is reduced by factors such as terrain and vegetation. When the wind speed is less than the starting wind speed of the snow particles, the snow particles are deposited on the road surface, reducing driving visibility. The snow accumulates thicker and thicker, gradually burying the road, and finally forming a serious snow blockage, interrupting traffic.
[0005] The corrugated beam guardrail is the most widely used form of guardrail. Early guardrail panels were mainly two-wave panels. In highway reconstruction and expansion projects, due to the influence of factors such as design speed and truck ratio, the protection level of existing guardrails no longer meets the requirements of existing specifications. Currently, the most widely used in highway reconstruction and expansion projects is the three-wave panel, which has led to the elimination of a large number of existing two-wave panels, resulting in a backlog of waste two-wave panels. At the same time, the corrugated beam guardrail lacks consideration for the impact of wind and snow in its application. The size of the gap under the corrugated beam guardrail (the height from the bottom of the beam to the roadbed surface) affects the movement of wind and snow flow, causing a large amount of snow particles to be deposited on the road lane behind the guardrail, which has become the main reason for aggravating wind and snow disasters on highway pavements.
[0006] At present, the main solutions to the problem of vehicle driving safety in crosswind environments are: formulating reasonable driving management measures (speed limit operation), reliable engineering measures (windbreaks), and optimizing vehicle design (aerodynamic shape, suspension adjustment). By limiting the speed of vehicles, the operating efficiency of highways is directly reduced, causing traffic jams and bringing great inconvenience to passengers. The existing windbreaks are expensive to build, and cannot meet the requirements of sand and wind and snow protection at the same time. They have poor adaptability and are difficult to adapt to steep slopes.
[0007] In summary, the existing corrugated beam guardrails, windbreaks, etc. cannot simultaneously meet the comprehensive needs of safety protection, windbreaks, snowbreaks, and green economy. Therefore, how to efficiently, economically, and greenly utilize the existing corrugated beam guardrails, improve the strength of windbreaks, and enhance their protection capabilities and adaptability so that they can simultaneously meet the needs of windbreaks and snowbreaks is an urgent problem to be solved. Utility Model Content
[0008] The purpose of the utility model is to provide a double-layer wind and snow barrier with adjustable air permeability using old corrugated beam guardrail plates, mainly to solve the problems of insufficient utilization, high utilization cost and single access of existing old corrugated beam guardrail plates in the process of highway reconstruction and expansion. At the same time, in view of the harm of strong wind weather to highways, a new type of wind barrier is developed by fully utilizing the shape advantages of old corrugated beam guardrail plates.
[0009] In order to achieve the above purpose, the technical solution adopted by the utility model is as follows:
[0010] A double-layer wind and snow barrier with adjustable air permeability using old corrugated beam guardrail panels, comprising a truss structure, wherein the truss structure comprises steel pipe columns and transverse connecting rods, the steel pipe columns are connected to the wind and snow barrier foundation via a stiffening flange and a base flange; the steel pipe columns are connected to the old corrugated beam guardrail panels via anti-skid hoops; and a diagonal cable is connected to the windward side of the steel pipe columns.
[0011] A further improvement of the utility model is that the steel pipe column includes a standard section steel pipe column and a transition section steel pipe column, and the transverse connecting rod includes a 1# transverse connecting rod and a 2# transverse connecting rod;
[0012] The standard section steel pipe columns, transition section steel pipe columns and 1# transverse connecting rods and 2# transverse connecting rods are connected by welding; wherein, 1# transverse connecting rods and 2# transverse connecting rods are arranged between two standard section steel pipe columns or two transition section steel pipe columns, and the specific positions are: from the installation gap center of the windward side corrugated beam guardrail plate to the installation gap center of the leeward side corrugated beam guardrail plate, or from the installation gap center of the leeward side corrugated beam guardrail plate to the installation gap center of the windward side corrugated beam guardrail plate.
[0013] A further improvement of the utility model is that the transition section steel pipe column is higher than the standard section steel pipe column, and the higher length is: the height of one corrugated beam guardrail plate plus the height of the gap between two corrugated beam guardrail plates.
[0014] A further improvement of the utility model is that, in order to increase the welding area, the ends of the 1# transverse connecting rod and the 2# transverse connecting rod are cut into a set angle.
[0015] A further improvement of the utility model is that the foundation of the wind and snow barrier fence is composed of a concrete foundation, a gravel cushion layer, a foundation flange, a base flange, a stiffening flange, anchor bolts, leveling nuts and foundation steel pipe piles; the foundation flange is placed at the bottom of the concrete foundation and is connected to the anchor bolts through leveling nuts; foundation steel pipe piles are provided at the bottom of the wind and snow barrier fence foundation; the steel pipe columns are welded to the stiffening flanges; the stiffening flanges are welded to the ribs on the sides of the columns, and the stiffening flanges and the base flanges are connected through anchor bolts and fastening nuts.
[0016] A further improvement of the utility model is that the anti-slip hoop comprises a hoop, a hoop bottom lining and a reinforcement beam;
[0017] A clamp rubber gasket is arranged between the contact surface of the clamp and the steel pipe column, and a clamp bottom lining rubber gasket is arranged between the contact surface of the clamp bottom lining and the steel pipe column; and a reinforcement beam is arranged on the back of the clamp bottom lining.
[0018] A further improvement of the utility model is that the clamp rubber gasket and the clamp bottom lining rubber gasket are respectively installed on the inner sides of the clamp and the clamp bottom lining, and are reversed on the outer sides of the clamp and the clamp bottom lining to prevent falling off.
[0019] A further improvement of the utility model is that the old corrugated beam guardrail plate is installed on the windward side and the leeward side of the steel pipe column through anti-skid clamps.
[0020] A further improvement of the utility model is that the old corrugated beam guardrail plates are installed on the steel pipe columns in an alternating manner, one positive and one negative, and the windward side and the leeward side are installed in a staggered manner.
[0021] A further improvement of the utility model is that the inclined cable is composed of a cable steel bundle, embedded steel bars and an inclined cable anchoring foundation, the angle between the cable steel bundle and the ground is 30° to 45°, and the embedded steel bars are HPB300 grade steel bars.
[0022] The utility model has at least the following beneficial technical effects:
[0023] The utility model aims at the practical problems of preventing and controlling wind-blown sand and snow disasters in the whole life cycle of highway engineering design, construction and operation, as well as the common problems of high utilization cost, single utilization method and low utilization rate of existing old corrugated beam guardrails in the process of highway reconstruction and expansion, and provides a double-layer wind and snow barrier with adjustable air permeability using old corrugated beam guardrails. Compared with the existing technology, the wind and snow fence first solves the problems of low reuse rate, high reuse cost and single channel of the existing old corrugated beam guardrail in the process of highway reconstruction and expansion, realizes the design principles of low-carbon environmental protection and green highway, and provides new ideas and methods for the reuse of corrugated beams; secondly, because the wind fence adopts anti-slip clamps and transition columns, the wind fence has adjustable air permeability and effective height, which can adapt to the road sections with steeper slopes; thirdly, the wind and snow fence makes full use of the shape advantage of the corrugated beam plate, and the installation form of one positive and one negative produces more turbulent areas. Under the condition of the same air permeability, the wind fence has better windproof effect and is more economical; finally, the wind and snow fence adopts a truss structure and double-layer installation, combined with inclined cables, which makes the wind fence stronger and more stable.
[0024] In summary, the utility model not only solves the problem of wind and sand prevention on highways in strong wind weather, but also can adapt to windy and snowy sections, and at the same time solves the problem of snow accumulation on the road behind the corrugated beam guardrail in windy and snowy sections. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] The accompanying drawings are used to provide a further understanding of the utility model and constitute a part of the specification. They are used together with the examples of the utility model to introduce the utility model and do not constitute a limitation of the utility model.
[0026] Figure 1 It is a schematic diagram of the structure and horizontal installation position of an example of the utility model.
[0027] Figure 2 It is a schematic diagram of the longitudinal arrangement of an example of the utility model.
[0028] Figure 3 This is a schematic diagram of an example truss structure of the present utility model.
[0029] Figure 4 This is a schematic diagram of the installation of an old corrugated beam guardrail plate in an example of the utility model, one positive and one negative.
[0030] Figure 5 This is a schematic diagram of an example anti-slip hoop and a reinforced crossbeam of the utility model, wherein Figure 5 (a) is the front view of the clamp and the clamp rubber gasket. Figure 5 (b) is a top view of the clamp and the clamp rubber gasket. Figure 5 (c) is a cross-sectional view of the clamp rubber gasket. Figure 5 (d) is the front view of the clamp base and the clamp base rubber gasket. Figure 5 (e) is a top view of the clamp base and the clamp base rubber gasket. Figure 5 (f) is the structural diagram of the reinforced beam. Figure 5 (g) is the side view of the reinforced beam.
[0031] Figure 6 This is a schematic diagram of the forward connection between the anti-skid hoop and the old corrugated beam guardrail of the utility model, wherein Figure 6 (a) Main view, Figure 6 (b) is a top view, Figure 6 (c) is a side view.
[0032] Figure 7 This is a schematic diagram of the reverse connection between the anti-slip hoop and the old corrugated beam guardrail of the utility model, wherein Figure 7 (a) Main view, Figure 7 (b) is a top view, Figure 7 (c) is a side view.
[0033] Figure 8 It is a schematic diagram of the example basis of the utility model, wherein Figure 8 (a) Main view, Figure 8 (b) is a side view.
[0034] Fig. 9 This is a schematic diagram of the connection between the foundation and the column of the utility model, wherein Fig. 9 (a) Main view, Fig. 9 (b) is a top view.
[0035] Fig.10 Schematic diagram of an example of a stay cable of the utility model, wherein Fig.10 (a) Main view, Fig.10 (b) is a top view.
[0036] Description of reference numerals:
[0037] 100-wind and snow barrier foundation; 101-concrete foundation; 102-gravel cushion; 103-foundation flange; 104-base flange; 105-reinforcement flange; 106-anchor bolts; 107-leveling bolts; 108-ribs; 109-foundation steel pipe piles; 200-truss structure; 201-standard steel pipe columns; 202-transition steel pipe columns; 203-1# transverse connecting rod; 204-2# transverse connecting rod; 300-old corrugated beam guardrail Plate; 301-forward installation of old corrugated beam guardrail plate; 302-reverse installation of corrugated beam guardrail plate; 400-anti-slip clamp; 401-clamp; 402-clamp rubber gasket; 403-clamp bottom lining; 404-clamp bottom lining rubber gasket; 405-reinforcement beam; 406-old corrugated beam guardrail plate connecting bolt; 407-clamp reinforcement bolt; 408-beam gasket; 500-inclined cable; 501-cable steel bundle; 502-embedded steel bars; 503-inclined cable anchor foundation. DETAILED DESCRIPTION
[0038] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0039] The purpose of the utility model is to provide a double-layer wind and snow barrier with adjustable air permeability using old corrugated beam guardrails to solve the problems existing in the above-mentioned prior art. The double-layer wind and snow barrier with adjustable air permeability is formed by transforming the waste two-wave corrugated beam guardrails, which not only meets the environmental protection requirements, but also has the advantages of fast construction, quick installation, and convenient inspection and maintenance.
[0040] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0041] This embodiment discloses a double-layer wind and snow barrier with adjustable air permeability using old corrugated beam guardrail panels. Figure 1 , Figure 2 , Figure 3As shown, it includes: a truss structure 200, the truss structure 200 includes a standard section steel pipe column 201, a transition section steel pipe column 202, a 1# transverse connecting rod 203 and a 2# transverse connecting rod 204; the standard section steel pipe column 201, the transition section steel pipe column 202 and the 1# transverse connecting rod 203, the 2# transverse connecting rod 204 are connected by welding, wherein the 1# transverse connecting rod 203 and the 2# transverse connecting rod 204 are arranged between two standard section steel pipe columns 201 or two transition section steel pipe columns 202, and the specific position is: from the center of the installation gap of the windward side corrugated beam guardrail plate to the center of the installation gap of the leeward side corrugated beam guardrail plate, or from the center of the installation gap of the leeward side corrugated beam guardrail plate to the center of the installation gap of the windward side corrugated beam guardrail plate. Because the windward side corrugated beam plate and the leeward side corrugated beam plate are installed in an offset manner, the distance from the center of the windward side gap to the center of the windward side gap is not equal to the distance from the center of the leeward side gap to the center of the windward side gap. Therefore, in general, the lengths of the 1# transverse connecting rod 203 and the 2# transverse connecting rod 204 are not the same.
[0042] To increase the welding area, the ends of the 1# transverse connecting rod 203 and the 2# transverse connecting rod 204 are cut into a set angle. To adapt to the steep slope terrain, the transition section steel pipe column 202 is higher than the standard section steel pipe column 201, and the height of the higher length is: the height of a corrugated beam guardrail plus the height of the gap between two corrugated beam guardrails. The transition section is transitioned by digging steps, such as Figure 2 As shown, the step height is equal to the length of the transition section steel pipe column 202 minus the length of the standard section steel pipe column 201. The setting of the transition section steel pipe column 202 enables the wind and snow barrier to adapt not only to gentle, continuous uphill and continuous downhill sections, but also to local undulating sections, which greatly enhances the applicability of the wind and snow barrier.
[0043] The connection between the truss structure 200 and the wind and snow barrier foundation 100 is as follows: Figure 8 , Fig. 9As shown, the wind and snow barrier foundation 100 is composed of a concrete foundation 101, a gravel cushion layer 102, a foundation flange 103, a base flange 104, a stiffening flange 105, an anchor bolt 106, a leveling nut 107 and a foundation steel pipe pile 109; the foundation flange 103 is placed at the bottom of the concrete foundation 101 and connected to the anchor bolt 106 through a nut, and the foundation flange 103 not only enhances the pull-out resistance of the anchor bolt 106, but also facilitates construction and improves construction efficiency; the base flange 104 is connected to the anchor bolt 106 through a leveling nut 107, and the setting of the leveling nut 107 makes the leveling of the base flange 104 more convenient, accurate and efficient. A foundation steel pipe pile 109 is provided at the bottom of the wind and snow barrier foundation 100, and the setting of the foundation steel pipe pile 109 not only enhances the bearing capacity of the foundation, but also enhances the overall stability of the wind and snow barrier. After the plane position, elevation and horizontality of the foundation flange 103, the base flange 104, the anchor bolts 106 and the leveling nuts 107 are accurately adjusted, concrete is poured. When the concrete strength reaches more than 80% of the design strength, the standard section steel pipe column 201 and the transition section steel pipe column 202 can be installed; the bottom of the column is welded to the stiffening flange 105, the stiffening flange 105 is welded to the side of the column with ribs 108, and the stiffening flange 105 and the base flange 104 are connected by anchor bolts 106 and fastening nuts.
[0044] The anti-skid hoop 400 is composed of a hoop 401, a hoop rubber gasket 402, a hoop base 403, a hoop base rubber gasket 404 and a reinforcement beam 405. Figure 5 As shown, the application of the anti-skid hoop 400 not only eliminates the problem of reduced structural strength caused by punching and welding of the column when installing the column and the corrugated beam plate, but also, because the anti-skid hoop is easy to install, the installation position of the corrugated beam plate can be adjusted, so that the air permeability and board height of the wind and snow barrier can be adjusted. The application of the reinforced crossbeam 405, the hoop rubber gasket 402 and the hoop bottom lining rubber gasket 404 enhances the anti-skid performance of the anti-skid hoop 400, improves the durability of the wind and snow barrier, and extends the service life.
[0045] The reinforcement beam 405 is arranged on the back of the hoop base 403. Figure 6 Figure 7 As shown, from the inside to the outside, they are, the clamp, the clamp rubber gasket, the column, the clamp bottom lining rubber gasket, the clamp bottom lining, and the reinforcement beam. When installed in the forward direction, the reinforcement beam is provided with 18×50 screw holes and reinforcement bolt holes, and the reinforcement beam is connected to the clamp, the clamp bottom lining, and the corrugated beam guardrail with connecting bolts and reinforcement bolts; when installed in the reverse direction, the 18×50 screw holes of the reinforcement beam are removed and replaced with reinforcement bolt holes, and the reinforcement beam is connected to the clamp, the clamp bottom lining, and the corrugated beam guardrail with reinforcement bolts; the application of the reinforcement beam makes the clamp bottom lining not easy to deform, enhances the anti-slip performance of the anti-slip clamp, and at the same time increases the contact area of the corrugated beam guardrail, thereby improving the connection performance of the corrugated beam guardrail.
[0046] The old corrugated beam guardrail plate 300 is connected to the steel pipe column through the anti-slip clamp 400, such as Figure 6 , Figure 7 As shown, the utility model makes full use of the shape advantage of the old corrugated beam guardrail 300, and installs one positive and one negative at intervals on the steel pipe column to generate more turbulent areas (small vortices) to enhance the windproof effect. Under the condition of the same air permeability, the windproof effect is better. The principle of installing one positive and one negative at intervals to enhance the windproof effect is as follows Figure 4 The old corrugated beam guardrail plate 301 is installed forwardly and connected with the anti-skid hoop 400 through the existing 18×50 screw holes of the corrugated beam plate, as shown in FIG. Figure 6 As shown, the old corrugated beam guardrail plate connecting bolts 406 are used to connect the forward-installed old corrugated beam guardrail plate 301, the reinforcement beam 405, the hoop 401 and the hoop backing 403. A crossbeam gasket 408 is provided between the old corrugated beam guardrail plate connecting bolts 406 and the forward-installed old corrugated beam guardrail plate 301, and the hoop reinforcement bolts 407 are used to enhance the connection effect. The connection method of the reverse-installed old corrugated beam guardrail plate 302 and the hoop 400 is similar to that of the forward installation, such as Figure 7 As shown, since the existing bolt holes of the reversely installed old corrugated beam guardrail plate cannot be used, new holes need to be drilled, and the size of the clamp 400 is increased accordingly. The reversely installed old corrugated beam guardrail plate 302 is connected to the clamp using two clamp reinforcement bolts 407.
[0047] By adding a stay cable 500 on the windward side, Figure 1 As shown, in order to enhance the wind resistance of the utility model, the inclined cable 500 is composed of a cable steel bundle 501, embedded steel bars 502 and an inclined cable anchoring foundation 503. The angle between the cable steel bundle 501 and the ground is 30° to 45°. The cable steel bundle 501 is provided with a cable fastener to facilitate fastening the cable steel bundle during maintenance. The embedded steel bars 502 are HPB300 grade steel bars, and the use of cold-processed steel bars is strictly prohibited.
[0048] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A double-layer wind and snow barrier with adjustable air permeability using old corrugated beam guardrails, characterized in that: The invention comprises a truss structure, wherein the truss structure comprises a steel pipe column and a transverse connecting rod, wherein the steel pipe column is connected to a wind and snow barrier foundation (100) via a reinforcing flange (105) and a base flange (104); the steel pipe column is connected to an old corrugated beam guardrail plate (300) via an anti-skid clamp (400); and a stay cable (500) is connected to the windward side of the steel pipe column.
2. The air permeability adjustable double-layer wind and snow barrier using old corrugated beam guardrail according to claim 1 is characterized in that: The steel tube column comprises a standard section steel tube column (201) and a transition section steel tube column (202), and the transverse connecting rod comprises a 1# transverse connecting rod (203) and a 2# transverse connecting rod (204); The standard section steel pipe column (201), the transition section steel pipe column (202) and the 1# transverse connecting rod (203) and the 2# transverse connecting rod (204) are connected by welding; wherein the 1# transverse connecting rod (203) and the 2# transverse connecting rod (204) are arranged between two standard section steel pipe columns (201) or two transition section steel pipe columns (202), and the specific position is: from the installation gap center of the windward side corrugated beam guardrail plate to the installation gap center of the leeward side corrugated beam guardrail plate, or from the installation gap center of the leeward side corrugated beam guardrail plate to the installation gap center of the windward side corrugated beam guardrail plate.
3. The air permeability adjustable double-layer wind and snow barrier using old corrugated beam guardrail according to claim 2 is characterized in that: The transition section steel pipe column (202) is higher than the standard section steel pipe column (201), and the height of the higher section steel pipe column (202) is equal to the height of one corrugated beam guardrail plate plus the height of the gap between two corrugated beam guardrail plates.
4. The air permeability adjustable double-layer wind and snow barrier using old corrugated beam guardrail according to claim 2 is characterized in that: In order to increase the welding area, the ends of the 1# transverse connecting rod (203) and the 2# transverse connecting rod (204) are cut into a set angle.
5. The air permeability adjustable double-layer wind and snow barrier using old corrugated beam guardrail according to claim 1 is characterized in that: The wind and snow barrier foundation (100) is composed of a concrete foundation (101), a gravel cushion layer (102), a foundation flange (103), a base flange (104), a stiffening flange (105), anchor bolts (106), a leveling nut (107) and a foundation steel pipe pile (109); the foundation flange (103) is placed at the bottom of the concrete foundation (101) and connected to the anchor bolt (106) through the leveling nut (107); a foundation steel pipe pile (109) is arranged at the bottom of the wind and snow barrier foundation (100); a steel pipe column is welded to the stiffening flange (105); a rib (108) is welded between the stiffening flange (105) and the side of the column; and the stiffening flange (105) and the base flange (104) are connected through the anchor bolt (106) and a fastening nut.
6. The air permeability adjustable double-layer wind and snow barrier using old corrugated beam guardrail according to claim 1, characterized in that: The anti-slip hoop (400) comprises a hoop (401), a hoop base (403) and a reinforcement beam (405); A hoop rubber gasket (402) is provided between the contact surface between the hoop (401) and the steel pipe column, and a hoop bottom lining rubber gasket (404) is provided between the contact surface between the hoop bottom lining (403) and the steel pipe column; and a reinforcement beam (405) is provided on the back of the hoop bottom lining (403).
7. The air permeability adjustable double-layer wind and snow barrier using old corrugated beam guardrail according to claim 6, characterized in that: The clamping hoop rubber gasket (402) and the clamping hoop bottom lining rubber gasket (404) are respectively installed on the inner sides of the clamping hoop (401) and the clamping hoop bottom lining (403), and are reversed on the outer sides of the clamping hoop (401) and the clamping hoop bottom lining (403) to prevent them from falling off.
8. The air permeability adjustable double-layer wind and snow barrier using old corrugated beam guardrail according to claim 1, characterized in that: The old corrugated beam guardrail plate (300) is installed on the windward side and the leeward side of the steel pipe column through the anti-skid hoop (400).
9. The air permeability adjustable double-layer wind and snow barrier using old corrugated beam guardrail according to claim 8, characterized in that: The old corrugated beam guardrail plate (300) is installed on the steel pipe column in a positive and negative manner, and the windward side and the leeward side are staggered.
10. The air permeability adjustable double-layer wind and snow barrier using old corrugated beam guardrail according to claim 1, characterized in that: The inclined cable (500) is composed of a cable steel bundle (501), embedded steel bars (502) and an inclined cable anchoring foundation (503). The angle between the cable steel bundle (501) and the ground is 30° to 45°, and the embedded steel bars (502) are HPB300 grade steel bars.
