Dustproof cover for drilling of road grouting drilling machine

By designing a hollow frustum-shaped dust cover and a limiting steel ring structure, the problems of dust cover sealing and durability were solved, achieving effective dust prevention and convenient debris cleaning, thus improving the construction efficiency and environmental protection of road grouting drilling rigs.

CN222066683UInactive Publication Date: 2024-11-26OCEAN UNIV OF CHINA +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421426146.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-21
Publication Date
2024-11-26
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing dust covers have insufficient sealing performance, poor durability, and are inconvenient to operate during road grouting drilling operations, resulting in serious dust leakage, which affects the environment and construction efficiency.

Method used

A dust cover was designed, comprising a hollow frustum-shaped cover body, a limiting ring, and a rubber ring. The sealing and ease of operation are achieved through the limiting steel ring and the lifting motor. The sloping design of the inner wall of the cover prevents dust accumulation and makes it easy to clean debris.

Benefits of technology

It effectively prevents dust leakage, improves sealing performance and durability, reduces maintenance costs, ensures a clean and safe construction environment, and improves construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222066683U_ABST
    Figure CN222066683U_ABST
Patent Text Reader

Abstract

The utility model discloses a dustproof cover for drilling of a road grouting drilling machine. The dustproof cover comprises a vehicle body assembly, a drilling assembly and a dustproof assembly. The vehicle body assembly is connected with the drilling assembly, a dustproof assembly is arranged on the outer side of the drilling assembly and comprises a dustproof cover, the dustproof cover comprises at least two cover bodies, the cover bodies are annularly arranged, and limiting rings are arranged in the middles of the cover bodies and movably connected with the cover bodies; the upper side of the cover body is connected with a lifting rope, and the upper side of the lifting rope is connected with a lifting motor which is arranged on the drilling assembly. The dust cover adopts a unique design structure, so that the sealing performance is obviously improved, and dust leakage is effectively prevented. Meanwhile, due to the excellent durability and operability of the dustproof cover, stable operation of the dustproof cover in a severe environment is ensured, and the maintenance cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of road construction, in particular to a dust cover for drilling holes of a road grouting drill. Background Art

[0002] With the rapid development of modern road construction technology, road grouting drills are key equipment in road construction, and their drilling quality plays a pivotal role in construction. However, during the drilling operation of road grouting drills, a large amount of dust and debris are often generated. These dusts not only cause serious pollution to the environment, but also threaten the health of construction workers; and the debris pollutes the road surface and causes trouble for later cleaning. Therefore, it is particularly important to develop a dust cover that can effectively prevent dust leakage.

[0003] At present, the dust covers on the market mainly reduce the spread of dust by physical barriers, but the effect is not ideal. They generally have problems such as insufficient sealing performance, poor durability, and inconvenient operation. Dust easily leaks from the gaps, resulting in a significant reduction in the dustproof effect; poor durability makes the dust cover easy to be damaged in harsh environments, increasing maintenance costs; inconvenient operation reduces construction efficiency.

[0004] To solve these problems, dust cover technology is developing in the direction of improving sealing performance, enhancing durability and simplifying operation. With the enhancement of environmental awareness and the advancement of science and technology, dust covers must not only be able to effectively prevent dust leakage, but also have better durability and ease of use. In addition, the development of intelligent control technology also makes it possible for dust covers to be intelligent. Utility Model Content

[0005] The purpose of the utility model is to provide a dust cover for road grouting drilling rig drilling, which adopts a unique design structure, significantly improves the sealing performance, and effectively prevents dust leakage. At the same time, its excellent durability and easy operation ensure the stable operation of the dust cover in harsh environments and reduce maintenance costs. The proposal of this innovative solution is of great significance for protecting the environment and improving construction efficiency and quality, and is an indispensable equipment in the drilling operation of road grouting drilling rigs.

[0006] The utility model provides the following technical solutions:

[0007] A dust cover for drilling a road grouting drill comprises a body assembly, a drilling assembly, and a dust cover assembly; the body assembly is connected to the drilling assembly, and a dust cover assembly is arranged outside the drilling assembly. The dust cover assembly comprises a dust cover, and the dust cover comprises at least two cover bodies, which are arranged in an annular manner, and a limiting ring is arranged in the middle of the cover bodies, and the limiting ring is movably connected to the cover bodies; a lifting rope is connected to the upper side of the cover body, and a lifting motor is connected to the upper side of the lifting rope, and the lifting motor is arranged on the drilling assembly.

[0008] The accommodating space is large, wherein the space between the upper surface and the lower surface of the dust cover body is spacious enough to accommodate the thick dust and debris generated by drilling of the roadbed, and the inner wall of the dust cover body is provided with a slope design to prevent dust accumulation.

[0009] The dust cover can be easily cleaned by fixing the lifting rope when the dust cover is in the closed position to prevent the dust cover from opening uncontrollably. The dust cover can be opened by lifting the lifting rope at the designated waste point, which is convenient for cleaning the dust and debris inside. Then, the lifting rope is lowered to reset the dust cover naturally and tightly surround the drill pipe.

[0010] Preferably, the drilling assembly includes a hydraulic rod, an oil pump, and a column; the hydraulic rod is connected to a drill rod propeller through a column, the drill rod propeller is connected to a drill rod, a limit steel ring is sleeved on the drill rod, and the limit steel ring is arranged inside a dust cover. The vehicle body assembly includes a vehicle body, a walking track is arranged on the lower side of the vehicle body; hydraulic struts are arranged at both ends of the vehicle body, an oil pump motor, an operating table, and an electric box are arranged on the upper side of the vehicle body in sequence, and an air compressor is arranged on the lower side of the electric box.

[0011] The vehicle body is used to control the entire device to reach the designated working area. The vehicle body is fixed by hydraulic supports, and the height and position of the columns are adjusted by hydraulic supports. After the position is determined, the columns are connected to the drill rod thrusters, and the drilling components are controlled by the drill rod thrusters for construction operations.

[0012] Preferably, the dust cover is a hollow frustum, and the diameter of the upper surface of the frustum is smaller than the diameter of the lower surface.

[0013] The upper surface of the dust cover is provided with a limiting ring whose inner diameter is slightly larger than the outer diameter of the drill rod, and the inner diameter of the limiting ring is smaller than a limiting steel ring at the bottom of the drill rod; it is arranged on the lower surface of the dust cover body, and its inner diameter is consistent with the drill bit. When the drill rod drives the drill bit to rise, the drill bit and the rubber ring are tightly combined to prevent dust and debris from leaking;

[0014] Preferably, the cover body and the limiting ring are connected by a loose-leaf hinge, and a rubber ring is provided on the outer edge of the cover. The specially made rubber ring on the edge fits tightly when the dust cover is closed to form a seamless protective layer. The inner diameter of the limiting ring is smaller than the outer diameter of the limiting steel ring; the limiting steel ring is arranged inside the dust cover.

[0015] Preferably, the upper end of the drill rod is connected to a drill rod thruster, and the lower end of the drill rod is connected to a drill bit, the diameter of the drill bit is larger than the drill rod; the size of the drill rod matches the inner diameter of the limiting ring, the drill rod passes through the limiting ring, and the drill bit passes through the lower surface of the dust cover.

[0016] The limit steel ring blocks the drill bit from moving upward and prevents it from exceeding the dust cover, ensuring that the debris can be collected smoothly inside the dust cover. At the same time, the through holes on the upper and lower surfaces of the dust cover are adapted to the drill bit diameter and drill rod size, respectively, ensuring good sealing of the dust cover.

[0017] The beneficial effects of the utility model are:

[0018] It has good dustproof effect, the cover is sturdy and durable, and the special rubber ring on the edge fits tightly when the dust cover is closed to form a seamless protective layer, which effectively prevents the leakage of dust, debris and other particles, ensuring the cleanliness and safety of the external environment.

[0019] The debris cleaning is simple. At the designated waste point, the lifting rope can be easily lifted through the lifting device, and the dust cover can be turned outward to open, which is convenient for cleaning the dust and debris inside. Then, the lifting rope is lowered, and the cover is naturally reset, tightly surrounding the drill rod to ensure the continuity of the drilling operation. The whole operation process is simple, convenient, efficient and practical.

[0020] Large internal space: The dust cover has a spacious internal space, which is enough to accommodate the thick dust and debris generated by roadbed drilling to meet temporary storage needs. The unique slope design of the inner wall effectively prevents dust accumulation, ensures that the inside of the dust cover is clean and free of residue, and provides a more efficient and safe operating environment for drilling operations.

[0021] The structure is simple. The limit steel ring is used to block the drill bit so that it will not exceed the position of the dust cover when it moves upward, ensuring that the debris can be smoothly collected inside the dust cover. At the same time, the through holes on the upper and lower surfaces of the dust cover are respectively adapted to the drill bit diameter and the drill rod size, ensuring good sealing of the dust cover. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a schematic diagram of using the dust cover provided by the utility model to perform construction during road grouting and drilling;

[0023] Figure 2 It is a cross-sectional schematic diagram of a dust cover for drilling holes of a road grouting drill provided by the utility model;

[0024] Figure 3 This is a schematic diagram of the appearance of a dust cover for drilling holes in a road grouting drill provided by the utility model;

[0025] Figure 4 This is a schematic diagram of dust discharge from a dust cover used for drilling holes in a road grouting drill provided by the utility model;

[0026] Figure 5 It is a schematic diagram of a single piece of a dust cover for drilling holes of a road grouting drill provided by the utility model;

[0027] Among them, 1, drill bit 2, rubber ring 3, cover body 4, loose-leaf 5, lifting rope 6, drill rod 7, limiting steel ring 8, pulling motor 9, drill rod thruster 10, column 11, hydraulic support 12, walking track 13, electric box 14, operating table 15, oil pump motor 16, hydraulic rod 17, air compressor 18, oil pump 19, fixing rivet 20, limiting ring 21, vehicle body. DETAILED DESCRIPTION

[0028] The structures, proportions, sizes, etc. illustrated in the drawings of this specification are only used to match the contents disclosed in the specification for people familiar with this technology to understand and read, and are not used to limit the limiting conditions that can be implemented in this utility model, so they have no substantial technical significance. Any modification of the structure, change of the proportional relationship, or adjustment of the size, without affecting the effects that can be produced by the utility model and the purposes that can be achieved, should still fall within the scope of the technical content disclosed in this utility model. At the same time, the terms such as "upper", "lower", "left", "right", "middle" and "one" quoted in this specification are only for the convenience of description, and are not used to limit the scope of the implementation of this utility model. The change or adjustment of their relative relationship should also be regarded as the scope of the implementation of this utility model without substantial changes in the technical content. Various schemes and features of this application are described here with reference to the drawings.

[0029] See also Figure 1-Figure 5 , a dust cover for drilling holes with a road grouting drill, comprising a body assembly, a drilling assembly, and a dust cover assembly; the body assembly is connected to the drilling assembly, and a dust cover assembly is arranged on the outside of the drilling assembly. The dust cover assembly comprises a dust cover, and the dust cover comprises four cover bodies 3, and the four cover bodies 3 are arranged in a ring shape to form a truncated cone together. The dust cover is a hollow truncated cone, and the diameter of the upper surface of the truncated cone is smaller than the diameter of the lower surface. A rubber ring 2 is arranged on the outer edge of the cover body 3, and the special rubber ring 2 on the edge fits tightly when the dust cover is closed to form a seamless protective layer; a limiting ring 20 is arranged in the middle of the cover body 3, and the limiting ring 20 is connected to the cover body 3 by a loose-leaf 4; a lifting rope 5 is connected to the upper side of the cover body 3, and a lifting motor 8 is connected to the upper side of the lifting rope 5. The lifting motor 8 rotates and pulls the lifting rope 5, so that the lower end of the cover body 3 is opened, as shown in FIG. Figure 4 As shown; the internal dust and debris can be cleaned. After the cleaning is completed, the lifting rope 5 is lowered, and the cover body 3 is naturally reset, tightly surrounding the drill rod to ensure the continuity of the drilling operation.

[0030] The drilling assembly includes a hydraulic rod 16, an oil pump 18, a column 10, and a drill rod thruster 9; the hydraulic rod 16 is connected to the drill rod thruster 9 through the column 10, and the lower end of the drill rod thruster 9 is connected to the drill rod 6, and a limit steel ring 7 is provided on the drill rod 6. The limit steel ring 7 blocks the drill bit 1 from moving upward and ensures that the debris can be smoothly collected inside the dust cover; at the same time, the through holes on the upper and lower surfaces of the dust cover are adapted to the diameter of the drill bit 1 and the size of the drill rod 6, respectively; a limit ring 20 with an inner diameter slightly larger than the outer diameter of the drill rod 6 is provided on the upper surface of the dust cover, and the inner diameter of the limit ring 20 is smaller than the limit steel ring 7 at the bottom of the drill rod; it plays a role in limiting the drill bit 1 and ensuring the good sealing of the dust cover.

[0031] The vehicle body assembly includes a vehicle body 21, and a walking track 12 is arranged on the lower side of the vehicle body 21; hydraulic pillars 11 are arranged at both ends of the vehicle body 21, and the hydraulic pillars 11 are used to fix the vehicle body. The upper side of the vehicle body 21 is sequentially provided with an oil pump motor 15, an operating table 14, and an electric box 13, and an air compressor 17 is arranged on the lower side of the electric box 13. The operating table 14 is used for staff operation, and the electric box 13 is electrically connected to other devices to supply power to the entire device. The oil pump 18 is connected to the column 10 through a fixed rivet 19, and the hydraulic rod 16 connected to the output end of the oil pump 18 is used to adjust the height, and the hydraulic rod 16 connected to the vehicle body 21 is used to adjust the horizontal position. The vehicle body is used to control the entire device to reach the designated working area, and the drilling assembly is used to perform construction operations.

[0032] based on Figure 1 , based on the structure of the utility model, the specific construction steps are:

[0033] S1: Locate the grouting hole and fix the device provided by the utility model on the hole through the vehicle body.

[0034] When the lifting motor loosens the rope, the cover will rotate downward around the limit ring under its own gravity until it is tightly connected to form a whole. Then, the drill rod is lowered until the lower surface of the dust cover is close to the ground, ready for drilling operations.

[0035] S2: The drill rod rotates downward to start drilling.

[0036] During the drilling process, since the diameter of the drill bit is slightly larger than the drill rod, when the drill bit starts to drill, the dust and debris generated will be ejected through the gap between the drill rod and the hole wall. These dust and debris are then cleverly guided into the interior of the dust cover and temporarily stored there, effectively preventing them from polluting the surrounding environment.

[0037] S3: Lift the drill rod and drilling is completed.

[0038] When the drill rod reaches the predetermined drilling depth accurately, the drilling operation is successfully completed. Subsequently, the drill rod begins to move upward, lifting the dust and debris accumulated in the hole and smoothly guiding them into the dust cover. During this process, the special design of the drill bit ensures that it is tightly attached to the rubber ring on the lower surface of the cover, effectively preventing the leakage of dust and debris, and further ensuring the cleanliness and safety of the working environment.

[0039] S4: Move the drilling machine and clear out the dust and debris.

[0040] After completing the drilling task, the drill rod continues to move upward, and the limit steel ring on it accurately catches the lower side of the limit ring on the cover. Then, the cover is lifted smoothly by the drill rod and accurately moved to the waste delivery point. During this process, the operator accurately controls the lifting motor, pulls the lifting rope, and guides the cover to cleverly rotate upward around the limit ring to ensure that dust and debris can be smoothly poured into the designated waste collection location.

[0041] It should be understood that various modifications may be made to the embodiments of the present application. Therefore, the above description should not be considered as limiting, but only as an example of an embodiment. Other modifications within the scope and spirit of the present application will occur to those skilled in the art.

[0042] The above embodiments are only exemplary embodiments of the present application and are not intended to limit the present application. The protection scope of the present application is defined by the claims. Those skilled in the art may make various modifications or equivalent substitutions to the present application within the essence and protection scope of the present application, and such modifications or equivalent substitutions shall also be deemed to fall within the protection scope of the present application.

Claims

1. A dust cover for drilling holes in a road grouting drill, characterized in that: It includes a vehicle body component, a drilling component, and a dustproof component; the vehicle body component is connected to the drilling component, and a dustproof component is arranged on the outside of the drilling component; the dustproof component includes a dust cover, and the dust cover includes at least two cover bodies, which are arranged in a ring shape, and a limiting ring is arranged in the middle of the cover body, and the limiting ring is movably connected to the cover body; a lifting rope is connected to the upper side of the cover body, and a lifting motor is connected to the upper side of the lifting rope, and the lifting motor is arranged on the drilling component.

2. The dust cover for road grouting drilling rig drilling according to claim 1, characterized in that: The drilling assembly comprises a hydraulic rod, an oil pump and a column; the hydraulic rod is connected to a drill rod thruster through the column, the drill rod thruster is connected to the drill rod, and a limiting steel ring is sleeved on the drill rod.

3. The dust cover for road grouting drilling rig drilling according to claim 1, characterized in that: The vehicle body assembly comprises a vehicle body, a walking track is arranged at the lower side of the vehicle body; hydraulic struts are arranged at both ends of the vehicle body, an oil pump motor, an operating table and an electric box are arranged in sequence at the upper side of the vehicle body, and an air compressor is arranged at the lower side of the electric box.

4. The dust cover for road grouting drilling rig drilling according to claim 1, characterized in that: The dust cover is a hollow truncated cone, and the diameter of the upper surface of the truncated cone is smaller than the diameter of the lower surface.

5. The dust cover for road grouting drilling rig drilling according to claim 1, characterized in that: The cover body and the limiting ring are connected via a loose-leaf hinge.

6. The dust cover for road grouting drilling rig drilling according to claim 1, characterized in that: The outer edge of the cover is provided with a rubber ring.

7. The dust cover for road grouting drilling rig drilling according to claim 1, characterized in that: The inner diameter of the limiting circular ring is smaller than the outer diameter of the limiting steel ring; the limiting steel ring is arranged inside the dust cover.

8. The dust cover for road grouting drilling rig drilling according to claim 2, characterized in that: The upper end of the drill rod is connected to the drill rod thruster, and the lower end of the drill rod is connected to the drill bit, the diameter of the drill bit is larger than the drill rod; the size of the drill rod is matched with the inner diameter of the limiting ring, the drill rod passes through the limiting ring, the limiting ring is arranged in the dust cover, and the drill bit passes through the lower surface of the dust cover.

9. The dust cover for road grouting drilling rig drilling according to claim 1, characterized in that: The number of the cover bodies is 4.