Freezing water sealing and frost heaving prevention and treatment structure for underwater butt joint shield

By setting up three-circle freezing pipes and cold liquid circulation systems in the shield ground docking construction, the freezing and swelling force is solved, and the uneven deformation of the ground caused by the shield freezing and swelling is achieved, and the effect of freezing and swelling is reduced. Construction costs and soil disturbances.

CN222066736UActive Publication Date: 2024-11-26SHENZHEN UNIV +1
View PDF 0 Cites 3 Cited by

Patent Information

Application Number
CN202420919922.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-25
Publication Date
2024-11-26
Estimated Expiration
2034-04-25

AI Technical Summary

Technical Problem

The freezing and swelling phenomenon during shield meshes docking construction leads to uneven deformation of the upper strata, causing damage to buildings or underground pipelines. The existing freezing and swelling control methods are costly and have a great disturbance to the soil, making it difficult to effectively prevent and control it.

Method used

The underwater docking shield freeze sealing and freezing control structure is adopted. Three circles of freezing tubes are set up on the outer periphery of the shield machine first and then later, and the cold liquid circulation system is frozen in layer by layer, in the order of inside first, then outside, first down and then up Transfer freezing force, reduce the freezing amount at the bottom of the tunnel and control the freezing bulge.

Benefits of technology

It reduces the freezing and swelling at the bottom of the tunnel, reduces disturbance to the surrounding soil, and prevents the bottom of the tunnel from being lifted up. It is simple to operate, has low operating costs and strong adaptability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222066736U_ABST
    Figure CN222066736U_ABST
Patent Text Reader

Abstract

The utility model provides an underwater butt joint shield freezing water sealing and frost heaving prevention and treatment structure which comprises freezing pipes and a cold liquid circulation system, a freezing wall is formed in the area where the freezing pipes act, the freezing pipes are communicated with the cold liquid circulation system, three circles of freezing pipes are arranged in surrounding rock on the periphery of a preceding shield tunneling machine, and the freezing pipes are communicated with the cold liquid circulation system. The three circles of freezing pipes in the surrounding rock corresponding to the preceding shield tunneling machine are respectively a preceding inner ring freezing pipe, a preceding middle ring freezing pipe and a preceding outer ring freezing pipe from inside to outside, and three circles of freezing pipes are arranged in the surrounding rock on the periphery of the following shield tunneling machine. The three circles of freezing pipes in the surrounding rock corresponding to the backward shield tunneling machine are respectively a backward inner ring freezing pipe, a backward middle ring freezing pipe and a backward outer ring freezing pipe from inside to outside. The structure is used for freezing surrounding rock on the periphery of the shield tunneling machine, disturbance to surrounding soil is reduced, the bottom of a tunnel is prevented from being lifted up, further development of frost heaving is controlled in time, and the deviation rectifying capacity and adaptability are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of geotechnical engineering tests, in particular to an underwater butt-jointed shield freezing water sealing and frost heave prevention and control structure. Background Art

[0002] With the continuous development of urban rail construction, shield construction methods have gradually attracted people's attention due to their advanced construction technology and constantly improving construction techniques, and have become the main construction method for urban tunnels. When the shield machine cannot reach the shield receiving shaft in one go, the shield underground docking technology is often used to complete the disassembly of the shield machine. Shield underground docking is a construction method in which two shield machines excavate towards each other to the joint location, and then the shield is disassembled and the entire tunnel is penetrated in the stratum. Due to the advantages of shield underground docking construction such as not being restricted by ground buildings (structures), not requiring the setting up of working pits and being able to freely choose the docking location, and having little impact on the surrounding environment, it is often used in the following three situations: (1) When the continuous construction length of a single tunnel is relatively long, in order to shorten the construction period, two shield machines are used to dig simultaneously from both ends and complete the shield underground docking in the middle of the tunnel; (2) When it is inconvenient to set up a vertical shaft or it is impossible to reach the receiving shaft position due to construction reasons, such as when the tunnel is located in a river, lake, seabed or mountain; (3) When the tunnel is long and buried deep, and it is not economical to set up a separate receiving shaft, shield underground docking is often used to complete the tunnel penetration.

[0003] The construction of shield underground docking requires the reinforcement of the strata at the construction location to ensure the stability of the construction working surface. When the geological conditions in the construction area are poor, the shield diameter is large, or the ground does not meet the construction conditions, artificial freezing is generally used to reinforce the strata, forming a closed freezing curtain at the shield docking position to resist the surrounding water and soil pressure and isolate groundwater. At the same time, due to the limitations of construction environment conditions, divergent freezing pipes need to be constructed from the inside of the two shield machines to the outside during freezing construction, and a rugby-shaped freezing curtain is formed at the intersection of the shields through freezing construction. However, during the shield docking freezing reinforcement process, the construction boundary conditions are complex, the number of freezing pipes arranged obliquely outside the shield is large, and the frozen wall is small in size and irregular in shape, resulting in frost heave of the frozen wall, which causes elastic and plastic deformation of the upper strata.

[0004] Frost heave refers to the phenomenon that during the freezing process of soil, the internal water (in-situ water and migrated water) freezes into ice, forming ice intrusions in the form of porous ice, ice lenses, and segregated ice layers, causing relative displacement between soil particles and causing the volume of the soil to expand. According to different freezing methods, it can be divided into volume expansion caused by phase change of in-situ water and segregated frost heave caused by the accumulation of migrated water, among which segregated frost heave is the main cause. Since the construction area of ​​the freezing method in urban underground projects is close to the surface, excessive frost heave can cause uneven deformation of the upper strata, causing damage to upper buildings or nearby underground pipelines. It causes huge losses and adverse effects on the national economy.

[0005] In order to prevent the occurrence of frost heave disease, the existing frost heave control methods include: (1) curtain grouting method; (2) rapid freezing method; (3) pressure relief hole method; However, the above methods are costly and cause disturbance to the surrounding soil, which is not conducive to the stability and safety of the structure.

[0006] In view of the above reasons, an underwater docking shield freezing water sealing and frost heave prevention and control structure is needed to increase the means of frost heave control. Utility Model Content

[0007] The utility model aims to provide an underwater shield freezing water sealing and frost heave prevention and control structure, which is used to freeze the surrounding rock of the shield machine, thereby reducing the frost heave amount at the bottom of the tunnel, controlling the frost heave bulge, and reducing the disturbance to the surrounding soil.

[0008] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0009] The invention discloses an underwater shield docking freezing water sealing and frost heave prevention and control structure, wherein a leading shield machine and a trailing shield machine are docked at a docking point in a shield tunnel, and comprise freezing pipes and a cold liquid circulation system, wherein the area where the freezing pipes act forms a freezing wall, and the freezing pipes are connected to the cold liquid circulation system, and three circles of freezing pipes are arranged in the surrounding rock around the leading shield machine, and the three circles of freezing pipes in the surrounding rock corresponding to the leading shield machine are respectively, from inside to outside, an leading inner ring freezing pipe, a leading middle ring freezing pipe and a leading outer ring freezing pipe, and three circles of freezing pipes are arranged in the surrounding rock around the trailing shield machine, and the three circles of freezing pipes in the surrounding rock corresponding to the trailing shield machine are respectively, from inside to outside, a trailing inner ring freezing pipe, a trailing middle ring freezing pipe and a trailing outer ring freezing pipe.

[0010] Furthermore, in the above-mentioned underwater docking shield freezing water sealing and frost heave prevention structure, one end of the leading outer ring freezing pipe is in contact with the shield shell at the shield tail of the leading shield machine, and the other end extends toward the docking point and away from the leading shield machine, one end of the leading middle ring freezing pipe is in contact with the shield shell at the shield tail of the leading shield machine, and the other end extends toward the docking point and away from the leading shield machine, one end of the leading inner ring freezing pipe is in contact with the shield shell at the shield tail of the leading shield machine, and the other end extends toward the docking point and away from the leading shield machine, there is a distance between one end of the leading outer ring freezing pipe and one end of the leading middle ring freezing pipe, and one end of the leading middle ring freezing pipe and the leading inner ring freezing pipe are There is a distance between one end of the ring freezing pipe; one end of the rear outer ring freezing pipe is in contact with the shield shell at the shield tail of the rear shield machine, and the other end extends toward the docking point and away from the rear shield machine, one end of the rear middle ring freezing pipe is in contact with the shield shell at the shield tail of the rear shield machine, and the other end extends toward the docking point and away from the rear shield machine, one end of the rear inner ring freezing pipe is in contact with the shield shell at the shield tail of the rear shield machine, and the other end extends toward the docking point and away from the rear shield machine, there is a distance between one end of the rear outer ring freezing pipe and one end of the rear middle ring freezing pipe, and there is a distance between one end of the rear middle ring freezing pipe and one end of the rear inner ring freezing pipe.

[0011] Furthermore, in the above-mentioned underwater docking shield freezing water sealing and frost heave prevention structure, the freezing pipes in the same circle are evenly distributed along the circumference of the shield tunnel, and the spacing between one end of two adjacent preceding inner ring freezing pipes is 1.5m to 2m, and the number of the preceding middle ring freezing pipe, the preceding outer ring freezing pipe, the following inner ring freezing pipe, the following middle ring freezing pipe and the following outer ring freezing pipe are all consistent with that of the preceding inner ring freezing pipe.

[0012] Furthermore, in the above-mentioned underwater docking shield freezing water sealing and frost heave prevention structure, the angle α between the axis of the leading outer ring freezing pipe and the axis of the shield tunnel is 25°~35°, the angle β between the axis of the leading middle ring freezing pipe and the axis of the shield tunnel is 20°~25°, the angle γ between the axis of the leading inner ring freezing pipe and the axis of the shield tunnel is 10°~20°, the angle δ between the axis of the trailing outer ring freezing pipe and the axis of the shield tunnel is 25°~35°, the angle ε between the axis of the trailing middle ring freezing pipe and the axis of the shield tunnel is 20°~25°, the angle ζ between the axis of the trailing inner ring freezing pipe and the axis of the shield tunnel is 10°~20°, α>β>γ, δ>ε>ζ.

[0013] Furthermore, in the above-mentioned underwater docking shield freezing water sealing and frost heave prevention structure, it also includes a temperature measuring tube. The surrounding rock of the outer periphery of the leading shield machine is provided with at least one circle of the temperature measuring tube, and the surrounding rock of the outer periphery of the trailing shield machine is provided with at least one circle of the temperature measuring tube. The temperature measuring tube includes an outer ring temperature measuring tube and an inner ring temperature measuring tube. The outer ring temperature measuring tube is arranged on the periphery of the leading outer ring freezing tube and / or the trailing outer ring freezing tube, and the inner ring temperature measuring tube is arranged on the inner side of the leading inner ring freezing tube and / or the trailing inner ring freezing tube; one end of the temperature measuring tube is in contact with the shield shell of the leading shield machine or the trailing shield machine, and the other end extends toward the docking point and away from the shield tunnel.

[0014] Furthermore, in the above-mentioned underwater docking shield freezing water sealing and frost heave prevention structure, a circle of the outer ring temperature measuring tube is arranged on the periphery of the preceding outer ring freezing pipe, a circle of the outer ring temperature measuring tube is arranged on the periphery of the succeeding outer ring freezing pipe, and a circle of the inner ring temperature measuring tube is arranged on the inner side of the succeeding inner ring freezing pipe. The angle η between the axis of the outer ring temperature measuring tube on the periphery of the preceding outer ring freezing pipe and the axis of the shield tunnel is 25°~45°, the angle θ between the axis of the inner ring temperature measuring tube on the inner side of the succeeding inner ring freezing pipe and the axis of the shield tunnel is 10°~20°, and the angle ι between the axis of the outer ring temperature measuring tube on the periphery of the succeeding outer ring freezing pipe and the axis of the shield tunnel is 25°~45°.

[0015] Furthermore, in the above-mentioned underwater docking shield freezing water sealing and frost heave prevention structure, on the same vertical section within the freezing wall, the centers of the three circles formed by the three circles of the freezing pipes are all located on the axis of the shield tunnel, and the three freezing pipes located on the same radius form a row of freezing pipes, and the row of freezing pipes together form a freezing area. A total of four freezing areas are formed in the freezing wall, and the four freezing areas are respectively an upper freezing area located above the shield tunnel, a lower freezing area located below the shield tunnel, and a left freezing area and a right freezing area located on both sides of the shield tunnel. The lower freezing area accounts for 1 / 6 to 1 / 4 of the total number of all the freezing pipes, and the upper freezing area accounts for 1 / 4 to 1 / 3 of the total number of all the freezing pipes.

[0016] Furthermore, in the above-mentioned underwater docking shield freezing water sealing and frost heave prevention structure, 8 to 9 freezing pipes in the same circle of freezing pipes form a freezing unit, all the freezing pipes in a freezing unit are located in the same freezing area, and each freezing unit is docked with a cold liquid circulation system.

[0017] Furthermore, in the above-mentioned underwater docking shield freezing water sealing and frost heave prevention structure, when freezing the frozen wall, the surrounding rock of the lower freezing zone is frozen first, then the surrounding rock of the left freezing zone and the surrounding rock of the right freezing zone are frozen, and finally the surrounding rock of the upper freezing zone is frozen; in each of the freezing areas in the surrounding rock corresponding to the leading shield machine, the leading inner ring freezing pipe is frozen first, then the leading middle ring freezing pipe is frozen, and finally the leading outer ring freezing pipe is frozen; in each of the freezing areas in the surrounding rock corresponding to the trailing shield machine, the trailing inner ring freezing pipe is frozen first, then the trailing middle ring freezing pipe is frozen, and finally the trailing outer ring freezing pipe is frozen.

[0018] Furthermore, in the above-mentioned underwater docking shield freezing water sealing and frost heave prevention and control structure, the freezing pipe is a seamless steel pipe with a diameter of φ108 or φ89.

[0019] It can be seen from the analysis that the utility model discloses an underwater docking shield freezing water sealing and frost heave prevention and control structure, which is used to freeze the surrounding rock of the shield machine, freeze the freezing pipe in layers and steps, and supply the freezing pipe with freezing liquid in sequence according to the freezing order of first inside and then outside, first bottom and then top, so that the frost heave force accumulated during the freezing process is transmitted and diffused along both sides of the tunnel, thereby reducing the frost heave amount at the bottom of the tunnel, controlling the frost heave bulge, reducing the disturbance to the surrounding soil, and preventing the bottom of the tunnel from lifting. The flow rate, flow rate and temperature of the cold liquid in each cold liquid circulation system can be controlled individually, and can be adjusted according to the actual working conditions, so as to timely control the further development of frost heave and improve the correction ability and adaptability. The structure is simple to operate, has low operating costs, and is easy to promote. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] The drawings constituting part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments and descriptions of the present invention are used to explain the present invention and do not constitute an improper limitation on the present invention. Among them:

[0021] Figure 1 It is a schematic diagram of the side cross-section structure of an embodiment of the utility model.

[0022] Figure 2 It is a schematic diagram of the front cross-section structure of an embodiment of the utility model.

[0023] Figure 3 This is a schematic diagram of the distribution structure of freezing pipes and temperature measuring pipes corresponding to the leading shield machine of an embodiment of the utility model.

[0024] Figure 4 This is a schematic diagram of the distribution structure of freezing pipes and temperature measuring pipes corresponding to a rear-traveling shield machine according to an embodiment of the utility model.

[0025] Explanation of the accompanying reference numerals: 1 leading shield machine; 2 trailing shield machine; 3 leading inner ring freezing pipe; 4 leading middle ring freezing pipe; 5 leading outer ring freezing pipe; 6 outer ring temperature measuring pipe; 7 freezing wall; 8 inner ring temperature measuring pipe; 9 trailing inner ring freezing pipe; 10 trailing middle ring freezing pipe; 11 trailing outer ring freezing pipe; 12 freezing unit; 13 freezing row pipe; 14 tunnel lining; 15 shield shell; 16 upper freezing zone; 17 lower freezing zone; 18 left freezing zone; 19 right freezing zone. DETAILED DESCRIPTION

[0026] The present invention will be described in detail below with reference to the accompanying drawings and in conjunction with embodiments. Each example is provided by way of explanation of the present invention and does not limit the present invention. In fact, it will be clear to those skilled in the art that modifications and variations may be made in the present invention without departing from the scope or spirit of the present invention. For example, a feature shown or described as a part of one embodiment may be used in another embodiment to produce yet another embodiment. Therefore, it is desired that the present invention includes such modifications and variations within the scope of the appended claims and their equivalents.

[0027] In the description of the present invention, the terms "longitudinal", "lateral", "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings. They are only for the convenience of describing the present invention and do not require that the present invention must be constructed and operated in a specific orientation. Therefore, they cannot be understood as limitations on the present invention. The terms "connected", "connected" and "set" used in the present invention should be understood in a broad sense. For example, they can be fixed connections or detachable connections; they can be directly connected or indirectly connected through intermediate components; they can be wired electrical connections, radio connections, or wireless communication signal connections. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.

[0028] One or more examples of the utility model are shown in the attached drawings. The detailed description uses numbers and letters to refer to the features in the drawings. Similar or similar marks in the drawings and descriptions have been used to refer to similar or similar parts of the utility model. As used herein, the terms "first", "second", and "third" etc. are used interchangeably to distinguish one component from another, and are not intended to indicate the position or importance of individual components.

[0029] like Figures 1 to 4 As shown, according to an embodiment of the utility model, an underwater butt-jointed shield freezing water sealing and frost heave prevention structure is provided, wherein the leading shield machine 1 and the trailing shield machine 2 are butted at the butt joint in the shield tunnel, as shown in FIG. Figure 1As shown, it includes freezing pipes and a cold liquid circulation system. The area where the freezing pipes act forms a freezing wall 7, and the freezing pipes are connected to the cold liquid circulation system. Three circles of freezing pipes are set in the surrounding rock around the leading shield machine 1, and three circles of freezing pipes are set in the surrounding rock around the trailing shield machine 2. The three circles of freezing pipes in the surrounding rock corresponding to the leading shield machine 1 are respectively: the leading inner ring freezing pipe 3, the leading middle ring freezing pipe 4 and the leading outer ring freezing pipe 5 from inside to outside, and the three circles of freezing pipes in the surrounding rock corresponding to the trailing shield machine 2 are respectively: the trailing inner ring freezing pipe 9, the trailing middle ring freezing pipe 10 and the trailing outer ring freezing pipe 11 from inside to outside. When the prevention and control structure is used to freeze the surrounding rock around the leading shield machine 1 and the trailing shield machine 2, the cold liquid circulation system supplies the freezing liquid to the freezing pipe in sequence from the inside to the outside, so that the surrounding rock around the leading shield machine 1 and the trailing shield machine 2 is frozen in sequence from the inside to the outside, and the accumulated frost heave force during the freezing process is transmitted and diffused along both sides of the tunnel, thereby reducing the frost heave amount at the bottom of the tunnel and preventing the bottom of the tunnel from lifting up. The structure is used to freeze the surrounding rock as a means of freezing water sealing and frost heave prevention and control, without disturbing the surrounding soil, which increases the stability and safety factor of the structure.

[0030] Furthermore, the freezing pipe is inclined relative to the axis of the shield tunnel, one end of the leading outer ring freezing pipe 5 contacts the shield shell 15 at the shield tail of the leading shield machine 1, and the other end extends toward the docking position and away from the leading shield machine 1, one end of the leading middle ring freezing pipe 4 contacts the shield shell 15 at the shield tail of the leading shield machine 1, and the other end extends toward the docking position and away from the leading shield machine 1, one end of the leading inner ring freezing pipe 3 contacts the shield shell 15 at the shield tail of the leading shield machine 1, and the other end extends toward the docking position and away from the leading shield machine 1, there is a distance between one end of a leading outer ring freezing pipe 5 and one end of a leading middle ring freezing pipe 4 located on a straight line parallel to the axis of the shield tunnel, and there is a distance between one end of a leading middle ring freezing pipe 4 and one end of a leading inner ring freezing pipe 3 located on a straight line parallel to the axis of the shield tunnel. There is a distance between one end and one end of a rear outer ring freezing pipe 11; one end of the rear outer ring freezing pipe 11 contacts the shield shell 15 at the shield tail of the rear shield machine 2, and the other end extends toward the docking point and away from the rear shield machine 2; one end of the rear middle ring freezing pipe 10 contacts the shield shell 15 at the shield tail of the rear shield machine 2, and the other end extends toward the docking point and away from the rear shield machine 2; one end of the rear inner ring freezing pipe 9 contacts the shield shell 15 at the shield tail of the rear shield machine 2, and the other end extends toward the docking point and away from the rear shield machine 2; there is a distance between one end of a rear outer ring freezing pipe 11 and one end of a rear middle ring freezing pipe 10 located on a straight line parallel to the axis of the shield tunnel; there is a distance between one end of a rear middle ring freezing pipe 10 and one end of a rear inner ring freezing pipe 9 located on a straight line parallel to the axis of the shield tunnel.

[0031] like Figure 1As shown, the other end of the rear outer ring freezing pipe 11 is located between the other end of the preceding outer ring freezing pipe 5 and the other end of the preceding middle ring freezing pipe 4, the other end of the rear middle ring freezing pipe 10 is located between the other end of the preceding middle ring freezing pipe 4 and the other end of the preceding inner ring freezing pipe 3, and the other end of the rear inner ring freezing pipe 9 is located on the inner side of the other end of the preceding inner ring freezing pipe 3.

[0032] Furthermore, the freezing pipes in the same circle are evenly distributed along the circumference of the shield tunnel, the spacing between one end of two adjacent leading inner ring freezing pipes 3 is 1.5m to 2m, and the number of leading middle ring freezing pipes 4, leading outer ring freezing pipes 5, trailing inner ring freezing pipes 9, trailing middle ring freezing pipes 10 and trailing outer ring freezing pipes 11 is consistent with the number of leading inner ring freezing pipes 3. In one embodiment of the utility model, the outer diameter of the leading shield machine and the trailing shield machine is 16m, and the number of leading inner ring freezing pipes 3, leading middle ring freezing pipes 4, leading outer ring freezing pipes 5, trailing inner ring freezing pipes 9, trailing middle ring freezing pipes 10 and trailing outer ring freezing pipes 11 is 56.

[0033] Furthermore, if Figure 3 As shown, the angle α between the axis of the first outer ring freezing pipe 5 and the axis of the shield tunnel is 25° to 35° , The included angle β between the axis of the first middle ring freezing pipe 4 and the axis of the shield tunnel is 20° to 25°, and the included angle γ between the axis of the first inner ring freezing pipe 3 and the axis of the shield tunnel is 10° to 20°. Figure 4 As shown, the angle δ between the axis of the rear outer ring freezing pipe 11 and the axis of the shield tunnel is 25°~35°, the angle ε between the axis of the rear middle ring freezing pipe 10 and the axis of the shield tunnel is 20°~25°, the angle ζ between the axis of the rear inner ring freezing pipe 9 and the axis of the shield tunnel is 10°~20°, α>β>γ, δ>ε>ζ. In one embodiment of the utility model, α=29.0°, β=24.8°, γ=17.7°, δ=29.7°, ε=22.9°, ζ=12.5°.

[0034] Furthermore, it also includes temperature measuring tubes. The surrounding rock of the leading shield machine 1 is provided with at least one circle of temperature measuring tubes, and the surrounding rock of the trailing shield machine 2 is provided with at least one circle of temperature measuring tubes. The temperature measuring tubes include an outer ring temperature measuring tube 6 and an inner ring temperature measuring tube 8. The outer ring temperature measuring tube 6 is arranged on the periphery of the leading outer ring freezing tube 5 and / or the trailing outer ring freezing tube 11, and the inner ring temperature measuring tube 8 is arranged on the inner side of the leading inner ring freezing tube 3 and / or the trailing inner ring freezing tube 9; one end of the temperature measuring tube is in contact with the shield shell 15 of the leading shield machine 1 or the trailing shield machine 2, and the other end extends toward the docking point and away from the shield tunnel.

[0035] In one embodiment of the utility model, an outer ring temperature measuring tube 6 is arranged around the outer ring freezing tube 5, an outer ring temperature measuring tube 6 is arranged around the outer ring freezing tube 11, and an inner ring temperature measuring tube 8 is arranged inside the inner ring freezing tube 9. Figure 3 As shown, the angle η between the axis of the outer ring temperature measuring tube 6 outside the first outer ring freezing tube 5 and the axis of the shield tunnel is 25° to 45°. Figure 4 As shown, the angle θ between the axis of the inner ring temperature measuring tube 8 on the inner side of the rear inner ring freezing tube 9 and the axis of the shield tunnel is 10° to 20°, and the angle ι between the axis of the outer ring temperature measuring tube 6 on the periphery of the rear outer ring freezing tube 11 and the axis of the shield tunnel is 25° to 45°. In one embodiment of the utility model, η=31.6°, θ=12.5°, ι=32.8°. Such an arrangement can ensure real-time monitoring of the temperature inside the freezing wall 7.

[0036] Furthermore, on the same vertical section in the freezing wall 7, the centers of the three circles formed by the three circles of freezing pipes are all located on the axis of the shield tunnel, and the three freezing pipes located on the same radius form a row of freezing pipes. Multiple rows of freezing pipes together form a freezing area, and a total of four freezing areas are formed in the freezing wall 7. The four freezing areas are the upper freezing area 16 located above the shield tunnel, the lower freezing area 17 located below the shield tunnel, and the left freezing area 18 and the right freezing area 19 located on both sides of the shield tunnel. The lower freezing area 17 accounts for 1 / 6 to 1 / 4 of the total number of all freezing pipes, and the upper freezing area 16 accounts for 1 / 4 to 1 / 3 of the total number of all freezing pipes. 8 to 9 freezing pipes in the same circle of freezing pipes form a freezing unit 12. All freezing pipes in a freezing unit 12 are located in the same freezing area. A freezing area includes multiple freezing units 12. A freezing unit 12 corresponds to a cold liquid circulation system. Each freezing unit 12 is connected to a cold liquid circulation system through a freezing pipe 13. The flow rate, flow rate and temperature of the cold liquid in each freezing unit 12 can be controlled individually through the cold liquid circulation system, and can be adjusted according to actual working conditions to timely control the further development of frost heave and improve the correction ability and adaptability. Such a setting can realize the freezing of surrounding rocks in layers and steps in the order of first inside and then outside, first bottom and then top.

[0037] like Figure 2As shown, in one embodiment of the utility model, the number of leading inner ring freezing pipes 3 is 56, and the number of leading middle ring freezing pipes 4, leading outer ring freezing pipes 5, trailing inner ring freezing pipes 9, trailing middle ring freezing pipes 10 and trailing outer ring freezing pipes 11 are all consistent with the number of leading inner ring freezing pipes 3. Due to the symmetrical arrangement, taking the distribution of freezing pipes corresponding to the leading shield machine 1 as an example: on the vertical section perpendicular to the axial direction of the shield tunnel in the freezing wall 7, the centers of the three circles formed by the three circles of freezing pipes are located at the same point, and a leading inner ring freezing pipe 3, a leading middle ring freezing pipe 4 and a leading outer ring freezing pipe 5 located on the same radius form a row of freezing pipes, and multiple rows of freezing pipes form a freezing area. The freezing pipes corresponding to the leading shield machine 1 form a total of four freezing areas, namely, the upper freezing area 16, the lower freezing area 17, the left freezing area 18, and the right freezing area 19. The 16 rows of freezing pipes located above the shield tunnel form the upper freezing area 16, and the 8 rows of freezing pipes located below the shield tunnel form the lower freezing area. The freezing zone 17 has 16 rows of freezing pipes in the left freezing zone 18 and 16 rows of freezing pipes in the right freezing zone 19. In the same freezing area, 8 preceding inner ring freezing pipes 3 form a freezing unit 12, 8 preceding middle ring freezing pipes 4 form a freezing unit 12, and 8 preceding outer ring freezing pipes 5 form a freezing unit 12. A total of 21 freezing units 12 are formed in the four freezing areas (the upper freezing zone 16, the left freezing zone 18 and the right freezing zone 19 form 6 freezing units 12 respectively, and the lower freezing zone 17 forms 3 freezing units 12). Each freezing unit 12 is connected in series by 8 to 9 freezing pipes in each circle and is connected to the cold liquid circulation system main pipe to form multiple sets of independent cold liquid circulation units.

[0038] Furthermore, when the freezing wall 7 is frozen using this structure, the surrounding rock of the lower freezing zone 17 is frozen first, then the surrounding rock of the left freezing zone 18 and the right freezing zone 19, and finally the surrounding rock of the upper freezing zone 16; in each freezing area within the surrounding rock corresponding to the leading shield machine 1, the leading inner ring freezing pipe 3 is frozen first, then the leading middle ring freezing pipe 4 is frozen, and finally the leading outer ring freezing pipe 5 is frozen; in each freezing area within the surrounding rock corresponding to the trailing shield machine 2, the trailing inner ring freezing pipe 9 is frozen first, then the trailing middle ring freezing pipe 10 is frozen, and finally the trailing outer ring freezing pipe 11 is frozen.

[0039] Furthermore, a tunnel lining 14 is provided inside the surrounding rock at the connection with the freezing wall 7 .

[0040] Furthermore, the freezing pipe is a seamless steel pipe with a diameter of φ108 or φ89.

[0041] When the structure is used to freeze the surrounding rock, the freezing pipes are frozen in layers and steps, and the freezing liquid is supplied to the freezing pipes in sequence according to the freezing order of first inside and then outside, and first bottom and then top. That is, the freezing order in the freezing wall 7 is the lower freezing zone 17, the left freezing zone 18 and the right freezing zone 19, and finally the upper freezing zone 16. The freezing order in each freezing zone is the first inner ring freezing pipe 3 and the rear inner ring freezing pipe 9, the first middle ring freezing pipe 4 and the rear middle ring freezing pipe 10, the first outer ring freezing pipe 5 and the rear outer ring freezing pipe 11. The frost heave force accumulated in the freezing process is transmitted and diffused along both sides of the tunnel, thereby reducing the frost heave amount at the bottom of the tunnel, controlling the frost heave bulge, reducing the disturbance to the surrounding soil, and preventing the bottom of the tunnel from lifting.

[0042] From the above description, it can be seen that the above embodiments of the utility model achieve the following technical effects:

[0043] An underwater docking shield freezing water sealing and frost heave prevention and control structure is used to freeze the surrounding rock of the shield machine, freeze the freezing pipes in layers and steps, and supply freezing liquid to the freezing pipes in the order of freezing from inside to outside and from bottom to top. The accumulated frost heave force during the freezing process is transmitted and diffused along both sides of the tunnel, thereby reducing the frost heave amount at the bottom of the tunnel, controlling the frost heave bulge, reducing the disturbance to the surrounding soil, and preventing the bottom of the tunnel from lifting. The flow rate, flow velocity and temperature of the cold liquid in each cold liquid circulation system can be controlled individually and adjusted according to the actual working conditions to timely control the further development of frost heave and improve the correction ability and adaptability. The structure is simple to operate, has low operating costs, and is easy to promote.

[0044] The above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. For those skilled in the art, the utility model may have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.

Claims

1. An underwater shield docking freezing water sealing and frost heave prevention structure, wherein the leading shield machine and the following shield machine are docked at the docking point in the shield tunnel, characterized in that: Including freezing pipe and cold liquid circulation system, The area where the freezing pipe acts forms a freezing wall, and the freezing pipe is connected to the cold liquid circulation system; Three circles of freezing pipes are arranged in the surrounding rock around the leading shield machine, and the three circles of freezing pipes in the surrounding rock corresponding to the leading shield machine are respectively: leading inner ring freezing pipes, leading middle ring freezing pipes and leading outer ring freezing pipes from inside to outside; Three circles of freezing pipes are arranged in the surrounding rock around the rear shield machine. The three circles of freezing pipes in the surrounding rock corresponding to the rear shield machine are respectively: rear inner ring freezing pipes, rear middle ring freezing pipes and rear outer ring freezing pipes from inside to outside.

2. The underwater docking shield freezing water sealing and frost heave prevention structure according to claim 1 is characterized in that: One end of the leading outer ring freezing pipe contacts the shield shell at the shield tail of the leading shield machine, and the other end extends toward the butt joint and away from the leading shield machine; One end of the leading middle ring freezing pipe contacts the shield shell at the shield tail of the leading shield machine, and the other end extends toward the butt joint and away from the leading shield machine; One end of the leading inner ring freezing pipe contacts the shield shell at the shield tail of the leading shield machine, and the other end extends toward the butt joint and away from the leading shield machine; There is a distance between one end of the preceding outer ring freezing pipe and one end of the preceding middle ring freezing pipe, and there is a distance between one end of the preceding middle ring freezing pipe and one end of the preceding inner ring freezing pipe; One end of the rear outer ring freezing pipe contacts the shield shell at the shield tail of the rear shield machine, and the other end extends toward the butt joint and away from the rear shield machine; One end of the rear mid-ring freezing pipe contacts the shield shell at the shield tail of the rear shield machine, and the other end extends toward the butt joint and away from the rear shield machine; One end of the rear inner ring freezing pipe contacts the shield shell at the shield tail of the rear shield machine, and the other end extends toward the butt joint and away from the rear shield machine; There is a distance between one end of the rear outer ring freezing pipe and one end of the rear middle ring freezing pipe, and there is a distance between one end of the rear middle ring freezing pipe and one end of the rear inner ring freezing pipe.

3. The underwater docking shield freezing water sealing and frost heave prevention structure according to claim 1 is characterized in that: The freezing pipes in the same circle are evenly distributed along the circumference of the shield tunnel. The spacing between one ends of two adjacent leading inner ring freezing pipes is 1.5m to 2m. The number of the leading middle ring freezing pipe, the leading outer ring freezing pipe, the trailing inner ring freezing pipe, the trailing middle ring freezing pipe and the trailing outer ring freezing pipe is consistent with that of the leading inner ring freezing pipe.

4. The underwater docking shield freezing water sealing and frost heave prevention structure according to claim 1 is characterized in that: The angle α between the axis of the first outer ring freezing pipe and the axis of the shield tunnel is 25° to 35°; The angle β between the axis of the preceding middle ring freezing pipe and the axis of the shield tunnel is 20° to 25°; The angle γ between the axis of the preceding inner ring freezing pipe and the axis of the shield tunnel is 10° to 20°; The angle δ between the axis of the rear outer ring freezing pipe and the axis of the shield tunnel is 25° to 35°; The angle ε between the axis of the rear middle ring freezing pipe and the axis of the shield tunnel is 20° to 25°; The angle ζ between the axis of the rear inner ring freezing pipe and the axis of the shield tunnel is 10° to 20°; α>β>γ, δ>ε>ζ.

5. The underwater docking shield freezing water sealing and frost heave prevention structure according to claim 1 is characterized in that: It also includes temperature measuring tubes, the surrounding rock around the leading shield machine is provided with at least one circle of the temperature measuring tubes, and the surrounding rock around the trailing shield machine is provided with at least one circle of the temperature measuring tubes; The temperature measuring tube comprises an outer ring temperature measuring tube and an inner ring temperature measuring tube, wherein the outer ring temperature measuring tube is arranged on the periphery of the preceding outer ring freezing tube and / or the succeeding outer ring freezing tube; The inner ring temperature measuring tube is arranged on the inner side of the preceding inner ring freezing tube and / or the succeeding inner ring freezing tube; One end of the temperature measuring tube contacts the shield shell of the preceding shield machine or the succeeding shield machine, and the other end extends toward the butt joint and away from the shield tunnel.

6. The underwater docking shield freezing water sealing and frost heave prevention structure according to claim 5 is characterized in that: The outer ring freezing pipe of the leading row is provided with a circle of the outer ring temperature measuring pipe, the outer ring freezing pipe of the trailing row is provided with a circle of the outer ring temperature measuring pipe, and the inner side of the trailing row inner ring freezing pipe is provided with a circle of the inner ring temperature measuring pipe; The angle η between the axis of the outer ring temperature measuring tube on the periphery of the first outer ring freezing tube and the axis of the shield tunnel is 25° to 45°; The angle θ between the axis of the inner ring temperature measuring tube on the inner side of the rear inner ring freezing tube and the axis of the shield tunnel is 10° to 20°; The angle ι between the axis of the outer ring temperature measuring tube at the periphery of the rear outer ring freezing tube and the axis of the shield tunnel is 25° to 45°.

7. The underwater docking shield freezing water sealing and frost heave prevention structure according to claim 1 is characterized in that: On the same vertical cross section in the freezing wall, the centers of the three circles formed by the three circles of freezing pipes are all located on the axis of the shield tunnel, and the three freezing pipes located on the same radius form a row of freezing pipes, and multiple rows of freezing pipes together form a freezing area, and a total of four freezing areas are formed in the freezing wall; The four freezing areas are respectively an upper freezing area located above the shield tunnel, a lower freezing area located below the shield tunnel, and a left freezing area and a right freezing area located on both sides of the shield tunnel; The lower freezing zone accounts for 1 / 6 to 1 / 4 of the total number of all the freezing pipes; The upper freezing zone accounts for 1 / 4 to 1 / 3 of the total number of all the freezing pipes.

8. The underwater docking shield freezing water sealing and frost heave prevention structure according to claim 7 is characterized in that: The 8 to 9 freezing pipes in the same circle of freezing pipes form a freezing unit, all the freezing pipes in a freezing unit are located in the same freezing area, and each freezing unit is connected to a cold liquid circulation system.

9. The underwater docking shield freezing water sealing and frost heave prevention structure according to claim 8, characterized in that: When freezing the frozen wall, first freeze the surrounding rock of the lower frozen zone, then freeze the surrounding rock of the left frozen zone and the surrounding rock of the right frozen zone, and finally freeze the surrounding rock of the upper frozen zone; In each of the freezing areas in the surrounding rock corresponding to the leading shield machine, first freeze the leading inner ring freezing pipe, then freeze the leading middle ring freezing pipe, and finally freeze the leading outer ring freezing pipe; In each of the freezing areas in the surrounding rock corresponding to the rear shield machine, the rear inner ring freezing pipe is frozen first, then the rear middle ring freezing pipe is frozen, and finally the rear outer ring freezing pipe is frozen.

10. The underwater butt-jointed shield freezing water sealing and frost heave prevention structure according to claim 1, characterized in that: The freezing pipe is a seamless steel pipe with a diameter of φ108 or φ89.

Citation Information

Cited By

  • Construction method for asynchronous underground shield docking

    AU2025201706B1

  • Shield tunnel butt joint section frozen soil reinforcement monitoring and evaluating method

    CN121385267A

  • A method for monitoring and evaluating the reinforcement of frozen soil of a shield tunnel butt joint section

    CN121385267B