Pipeline stabilizing structure
Through the inverted U-shaped anchor structure and sliding positioning mechanism, the problem of pipeline sliding in the slope environment is solved, and the stable fixation and counter-welding of the pipeline in the slope groove is realized, which reduces construction costs and preparation work, and improves construction efficiency and Security.
Patent Information
- Application Number
- CN202420817054.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-19
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2034-04-19
AI Technical Summary
There are sliding problems in pipeline installation and docking in slope environments, which increases construction difficulty and cost. The existing technology requires a lot of preparation and high-cost prefabricated parts.
The inverted U-shaped anchor structure is adopted, including slide rods, drill rods, positioning screws and limiting components. The stable fixation and moving counter-welding of the pipeline are achieved through the jack and rope mechanism, reducing the use of prefabricated parts.
Effectively prevent pipes from sliding, simplifying the pipe counterpart process in slope grooves, reducing construction costs and preparation workload, and improving construction efficiency and safety.
Smart Images

Figure CN222067805U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of pipeline laying, in particular to a pipeline stabilizing structure. Background Art
[0002] Construction is carried out in a complex geographical environment with diverse construction environments. In flat areas or places with relatively small angles, pipe docking can be carried out using a pipe docking machine, and then the docked pipes are manually welded and installed. However, in sloped environments, the installation and docking of large pipes has always been problematic, as it is necessary to consider the sliding caused by the gravity of the large pipes themselves, as well as the accurate docking of the previously installed pipes and the pipes to be docked, which greatly increases the difficulty of construction.
[0003] The patent document with application number CN202011361158.3 and titled "Slope Section Water Supply Pipeline and Construction Method Thereof" discloses a slope section water supply pipeline and its construction method which are easy to construct, have a safe and stable foundation, and can be quickly and accurately connected. During construction, according to the terrain conditions on site, trenches are excavated from bottom to top along the entire slope. The trench excavation is closely combined with the development of the construction work zone, and the excavated earth and stone are directly used to fill the work zone; in the excavated trench, a base groove is excavated at a certain distance according to the length of the long-distance steel pipe unit, and each side is widened and the bottom is deepened; the anti-slip precast concrete base processed in the factory is installed in the base groove: first, a cushion layer is laid in the base groove, and then the anti-slip precast concrete base is fixed in the base groove with expansion anchor rods, and finally the base groove is backfilled and compacted with soil; the pipe support pads processed in the factory are installed in the corresponding positions of the trench: first, a cushion layer is laid at the corresponding positions of the trench, and the pipe support pads are firmly fixed at the corresponding positions of the trench with expansion anchor rods; the pipe joints are installed on the anti-slip precast concrete base: the screw holes inserted into the ear plates correspond to the screw holes on the cup wall, and then the screws are inserted through and the nuts are tightened. And pour concrete into the space enclosed by the cup wall through the concrete injection port until the concrete overflows from the overflow port; hoist the long-distance steel pipe unit between the installed pipe joints: first temporarily fix the long-distance steel pipe unit on the semi-annular steel casing of the two pipe joints, and then use the lifting airbag to adjust the height of the long-distance steel pipe unit on the pipe support pad, and then use the steel wedge to adjust the lateral position of the long-distance steel pipe unit. After the position is determined, deflate and withdraw the lifting airbag, and then install the other half of the semi-annular steel casing on the upper part of the semi-annular steel casing, tighten it with bolts to form a closed steel casing, and then weld the steel wedge to the embedded steel plate, and seal and weld the long-distance steel pipe unit to the closed steel casing; complete the installation of the anti-slip prefabricated concrete base, pipe support pad, pipe joint and long-distance steel pipe unit in the entire slope section in turn, and then backfill the trench with soil and compact it to complete the construction of the water supply pipeline in the slope section. This solution requires the use of a prefabricated anti-slip prefabricated concrete base, which is fixed to the slope base groove using expansion anchors. It also requires the use of pipe joints to achieve pipe docking. Therefore, the amount of preparation work before laying the pipes is large and the cost of laying the pipes is high.
[0004] The patent document with application number CN202110165018.7 and titled "A method for jacking pipelines in open trenches" discloses a pipeline laying method in which pipelines are placed into a trench one by one and jacked up using equipment. During construction, the trench is excavated and the inspection well floor is cast: the trench is excavated according to the designed excavation position, the trench is excavated the distance of a well section, and the end of the trench is set as a slope; after the trench excavation is completed, the inspection well floor is cast at the designed position of the inspection well, and a plurality of mounting holes are opened on the top surface of one end of the inspection well floor close to the slope, and the plurality of mounting holes are opened in a direction perpendicular to the length of the trench; installing the backrest: the backrest is installed at the position where the slope is set at the end of the trench, and the backrest is installed on the inspection well floor On top; Install the elevation control device: Install the elevation control piece at the bottom of the trench. The elevation control piece is a long strip. The elevation control piece is buried in the bottom of the trench. The elevation of the top surface of the elevation control piece is the elevation of the bottom surface of the pipeline; Install the brim: Use the lifting equipment to lower the first pipe, and install the brim at the bottom of the front end of the first pipe. The brim is semicircular in shape, and the two ends of the brim are bent upward; Pipeline jacking: After the brim is installed, start jacking the first pipe. After the first pipe is jacked, lower the second pipe and continue jacking until the first section of the well is jacked; Inspection well construction and trench backfilling: After the pipeline is jacked, remove the backrest, build the inspection well chamber on the bottom plate of the inspection well, and backfill the trench after the inspection well chamber is built. In this scheme, it is necessary to set up an installation elevation control piece for supporting the pipeline and a backrest for jacking the pipeline. This construction method also requires a lot of preparation work before laying the pipeline, and the cost of laying the pipeline is relatively high. Utility Model Content
[0005] The technical problem to be solved by the utility model is to provide a pipeline stabilizing structure which can reduce pipeline laying costs and facilitate butt welding of pipelines in slope grooves.
[0006] In order to achieve the above purpose, the technical solution provided by the utility model is:
[0007] A pipeline stabilization structure includes an inverted U-shaped anchor, a sliding rod is arranged in the anchor, the sliding rod is perpendicular to the straight part of the anchor, a drill rod is fixed on the sliding rod, the drill rod is slidably connected to the anchor, the drill rod is parallel to the straight part of the anchor, a first support plate and a second support plate are respectively fixed to the opposite end faces of the vertical parts of the sliding rod and the anchor, a support plate is fixed on the side of the vertical part of the anchor facing away from the sliding rod, a rope pulley is rotatably connected to the support plate, a fixed column is fixed on the sliding rod, and a limiting assembly is installed on the side of the vertical part of the anchor facing away from the sliding rod; it also includes a pipe clamp fixed on the pipeline, a pull rope is fixed on the pipe clamp, and the pull rope is fixedly connected to the fixed column after passing around the rope pulley.
[0008] Specifically, the free ends of the two straight portions of the anchor are pointed ends.
[0009] Specifically, a plurality of positioning screws are threadedly connected to the slide rod, the positioning screws are parallel to the drill rods, and the positioning screws penetrate the slide rod.
[0010] Specifically, the limiting assembly includes a branch pipe fixed on the vertical part of the anchor, the branch pipe is perpendicular to the vertical part of the anchor, one side of the double-end screw is threadedly connected to the branch pipe, the branch pipe is concentric with the double-end screw, the other side of the double-end screw is threadedly connected to a sleeve, the sleeve is concentric with the double-end screw, and the side of the sleeve away from the branch pipe is rotatably connected to a guide wheel.
[0011] Specifically, a polished rod is fixed on the branch pipe, the polished rod is parallel to the branch pipe, a fixing sleeve is fixed on the sleeve, the polished rod passes through the fixing sleeve, and the polished rod is slidably connected with the fixing sleeve.
[0012] Compared with the prior art, the beneficial effects of the utility model are:
[0013] 1. The utility model can effectively stabilize the pipeline in the slope groove and prevent the pipeline in the slope groove from sliding and causing safety accidents.
[0014] 2. When the pipes in the slope groove are connected, the stable structure can make the pipes move in the slope groove, which is convenient for connecting the upper and lower pipes and facilitating the assembly, welding and fixing of the pipes.
[0015] 3. When the pipe in the slope groove is moved for docking, the drill rod can be inserted into the side wall of the slope groove. At the same time, the anchor can be prevented from being pulled out of the side wall of the slope groove under the action of the limit assembly and the pipe in close contact. The anchor has good stability during the process of moving the pipe for docking. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of the utility model.
[0017] Figure 2 Schematic diagram of stabilizing a pipeline in a sloped trench.
[0018] Figure 3 for Figure 2 Magnified view of area A.
[0019] Figure 4 A schematic diagram of a limiter assembly.
[0020] The names of the parts in the attached drawings are:
[0021] 1 Anchor
[0022] 2 Drill rod
[0023] 3 Sliders
[0024] 4 Positioning screw
[0025] 5 Fixed column
[0026] 6 First pallet
[0027] 7 Second pallet
[0028] 8 Jack
[0029] 9 boards
[0030] 10. Rope pulley
[0031] 11 Branch pipe
[0032] 12 Casing
[0033] 13 Guide wheel
[0034] 14 Double-ended lead screw
[0035] 15 Slope groove
[0036] 16 Pipe
[0037] 17 Pipe clamp
[0038] 18 Pull rope
[0039] 19 Bare
[0040] 20 Fixed sleeve. DETAILED DESCRIPTION
[0041] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0042] Example 1: Reference Figure 1-Figure 3 As shown, a pipeline stabilizing structure includes an inverted U-shaped anchor 1, wherein the free ends of the two straight parts of the anchor 1 are pointed ends. A slide bar 3 is arranged inside the anchor 1, and the slide bar 3 is perpendicular to the straight part of the anchor 1. A plurality of positioning screws 4 are threadedly connected to the slide bar 3, and the positioning screws 4 are parallel to the drill rod 2, and the positioning screws 4 pass through the slide bar 3. The drill rod 2 is fixed on the slide bar 3, and the drill rod 2 is slidably connected to the anchor 1, and the drill rod 2 is parallel to the straight part of the anchor 1. A first support plate 6 and a second support plate 7 are respectively fixed to the opposite end surfaces of the slide bar 3 and the vertical part of the anchor 1. A support plate 9 is fixed to the side of the vertical part of the anchor 1 facing away from the slide bar 3, and a rope pulley 10 is rotatably connected to the support plate 9. A fixing column 5 is fixed to the slide bar 3.
[0043] A pipeline stabilizing structure also includes a pipe clamp 17 fixed on the pipeline 16, a pull rope 18 is fixed on the pipe clamp 17, and the pull rope 18 is fixedly connected to the fixing column 5 after passing through the rope wheel 10. A rubber is fixed inside the pipe clamp 17. The rubber can protect the pipeline 16 after the pipe clamp 17 is fixed on the pipeline 16.
[0044] Reference Figure 2 and Figure 3 As shown, when stabilizing the pipe 16 in the slope groove 15, multiple anchors 1 are installed in the slope groove 15 on the left and right sides of the pipe 16, and the number of anchors 1 on the left and right sides of the pipe 16 is equal and one-to-one corresponding. Both straight parts of the anchor 1 are inserted into the side wall of the slope groove 15.
[0045] Then, a pipe clamp 17 is fixed on the pipe 16 between the left and right anchors 1 , and then a pull rope 18 is fixed on the pipe clamp 17 , and the pull rope 18 is made to pass around the rope wheel 10 and then be fixedly connected to the fixing column 5 .
[0046] In order to facilitate the subsequent movement of the pipeline 16, the pipe clamp 17 and the anchor 1 are arranged in an up-down offset manner.
[0047] When it is necessary to align the pipes 16 on the upper and lower sides of the slope groove 15, put the jack 8 between the slide bar 3 and the vertical part of the anchor 1, and use the first support plate 6 and the second support plate 7 to support the jack 8, so that the base of the jack 8 is tightly against the vertical part of the anchor 1, and the telescopic end of the jack 8 is tightly against the slide bar 3, and the jack 8 is started at the same time, so that the slide bar 3 is away from the vertical part of the anchor 1. In the process of the slide bar 3 being away from the vertical part of the anchor 1, the pipe 16 can move upward in the slope groove 15. When the pipes 16 on the upper and lower sides of the slope groove 15 are in contact, the pipes 16 can be assembled and welded. In the process of the slide bar 3 being away from the vertical part of the anchor 1, the drill rod 2 can be inserted into the side wall of the slope groove 15, thereby improving the stability of the anchor 1.
[0048] After the pipe 16 is aligned, the positioning screw 4 is rotated so that the positioning screw 4 is pressed against the vertical portion of the anchor 1. At this time, the slide bar 3 is stabilized and cannot move toward the pipe 16. Then the jack 8 can be removed from between the slide bar 3 and the anchor 1.
[0049] Embodiment 2: Based on Embodiment 1, refer to Figure 1-Figure 4As shown, a limit assembly is installed on the side of the vertical portion of the anchor 1 facing away from the slide rod 3. The limit assembly includes a branch pipe 11 fixed to the vertical portion of the anchor 1, the branch pipe 11 is perpendicular to the vertical portion of the anchor 1, one side of a double-end lead screw 14 is threadedly connected in the branch pipe 11, the branch pipe 11 is concentric with the double-end lead screw 14, the other side of the double-end lead screw 14 is threadedly connected with a sleeve 12, the sleeve 12 is concentric with the double-end lead screw 14, and the side of the sleeve 12 away from the branch pipe 11 is rotatably connected with a guide wheel 13. A light rod 19 is fixed on the branch pipe 11, the light rod 19 is parallel to the branch pipe 11, a fixed sleeve 20 is fixed on the sleeve 12, the light rod 19 passes through the fixed sleeve 20, and the light rod 19 and the fixed sleeve 20 are slidably connected.
[0050] In this embodiment, in order to ensure that the straight portion of the anchor 1 will not withdraw from the side wall of the slope groove 15 during the insertion of the drill rod 2 into the side wall of the slope groove 15, a limit assembly is provided. Before the sliding rod 3 is pushed to move by the jack 8, the double-ended lead screw 14 is rotated so that the sleeve 12 is away from the branch pipe 11, and the guide wheel 13 is in contact with the outer edge of the pipeline 16. During the rotation of the double-ended lead screw 14, the cooperation of the light rod 19 and the fixed sleeve 20 can prevent the branch pipe 11 and the sleeve 12 from rotating relative to each other. After the guide wheel 13 contacts the pipeline 16, the pipeline 16 is restricted between the anchors 1 on the left and right sides, and the pipeline 16 can only move in its axial direction. Therefore, when the sliding rod 3 moves and the drill rod 2 is inserted into the side wall of the slope groove 15, the straight portion of the anchor 1 will not withdraw from the side wall of the slope groove 15. The stability of the anchor 1 can be further improved during the movement of the pipeline 16 in the axial direction of the pipeline 16 in the slope groove 15.
[0051] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A pipeline stabilizing structure, comprising an inverted U-shaped anchor (1), characterized in that: The anchor (1) is provided with a slide bar (3), the slide bar (3) is perpendicular to the straight part of the anchor (1), a drill rod (2) is fixed on the slide bar (3), the drill rod (2) is slidably connected to the anchor (1), the drill rod (2) is parallel to the straight part of the anchor (1), a first support plate (6) and a second support plate (7) are respectively fixed on the opposite end surfaces of the vertical parts of the slide bar (3) and the anchor (1), a support plate (9) is fixed on the side of the vertical part of the anchor (1) facing away from the slide bar (3), a rope wheel (10) is rotatably connected to the support plate (9), a fixed column (5) is fixed on the slide bar (3), and a limiting assembly is installed on the side of the vertical part of the anchor (1) facing away from the slide bar (3); it also includes a pipe clamp (17) fixed on the pipeline (16), a pull rope (18) is fixed on the pipe clamp (17), and the pull rope (18) is fixedly connected to the fixed column (5) after passing through the rope wheel (10).
2. A pipeline stabilizing structure according to claim 1, characterized in that: The free ends of the two straight parts of the anchor (1) are pointed ends.
3. A pipeline stabilizing structure according to claim 1, characterized in that: The slide rod (3) is threadedly connected with a plurality of positioning screws (4), the positioning screws (4) are parallel to the drill rod (2), and the positioning screws (4) penetrate the slide rod (3).
4. A pipeline stabilizing structure according to claim 1, characterized in that: The limiting assembly comprises a branch pipe (11) fixed to the vertical portion of the anchor (1), the branch pipe (11) being perpendicular to the vertical portion of the anchor (1), one side of a double-end lead screw (14) being threadedly connected in the branch pipe (11), the branch pipe (11) and the double-end lead screw (14) being concentric, the other side of the double-end lead screw (14) being threadedly connected to a sleeve (12), the sleeve (12) being concentric with the double-end lead screw (14), and the side of the sleeve (12) away from the branch pipe (11) being rotatably connected to a guide wheel (13).
5. A pipeline stabilizing structure according to claim 4, characterized in that: A polished rod (19) is fixed on the branch pipe (11), the polished rod (19) is parallel to the branch pipe (11), a fixing sleeve (20) is fixed on the sleeve (12), the polished rod (19) passes through the fixing sleeve (20), and the polished rod (19) and the fixing sleeve (20) are slidably connected.
6. A pipeline stabilizing structure according to claim 4, characterized in that: A rubber sheet is fixed on the inner side of the pipe hoop (17).