Novel control cabinet system test platform

Through the new control cabinet system test platform, the PLC and human-computer interactive screen are used to realize the synchronous output of multiple signals, which solves the problems of analog signal jump and BCD signal operation difficulties in traditional tests, improves the test efficiency and safety, and realizes the Fine signal control.

CN222071088UActive Publication Date: 2024-11-26SIFANG-TBEA INTELLIGENT ELECTRICAL CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420806932.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-18
Publication Date
2024-11-26
Estimated Expiration
2034-04-18

AI Technical Summary

Technical Problem

In the traditional transformer control cabinet test, analog signal jump and BCD signal operation is difficult, and communication test is complicated, resulting in low test efficiency, high safety risks, and high personnel operation difficulty, unable to accurately control the signal size, which is prone to operating errors.

Method used

Design a new type of control cabinet system test platform, including PLC, oil pump fan control circuit, BCD circuit and signal circuit, realize the synchronous input and output of multiple signals through human-computer interactive screen, and use signal isolators to eliminate analog signal offset. Simplify operation and improve signal control accuracy.

Benefits of technology

The synchronous output adjustment of multiple signals is realized, which reduces human operation errors, improves test efficiency and safety, and can finely control analog signals, avoids signal delays, and simplifies the operation process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222071088U_ABST
    Figure CN222071088U_ABST
Patent Text Reader

Abstract

The utility model relates to a novel control cabinet system test platform. The novel control cabinet system test platform comprises a PLC, and an oil pump fan control loop, a BCD loop and a signal loop which are connected with the PLC. The oil pump fan control loop, the BCD loop and the signal loop are connected with a tested intelligent control cabinet. And the oil pump fan control loop, the BCD loop and the signal loop are connected with a power supply loop. According to the utility model, synchronous input and output of multipath digital quantity signals, analog quantity signals and BCD code signals are completed on a novel control cabinet system test platform, and real-time output adjustment of multipath signals by a single person can be realized through parameter change of a human-computer interaction interface.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the field of intelligent control cabinet manufacturing and relates to a comprehensive test device for digital quantity signal testing, analog quantity signal testing, BCD signal testing, and transformer cooler control logic testing, specifically a new control cabinet system test platform. Background Art

[0002] At present, the converter transformer intelligent control cabinet has more digital and analog signals than the traditional transformer control cabinet test signals. The real-time changes of oil temperature, winding, load and other signals need to be involved in the air cooling control logic of the control cabinet. At the same time, the change of the transformer gear signal affects the primary current change, affects the secondary load parameter change through the CT ratio, and then affects the air cooling start and stop control logic.

[0003] During the test, it is necessary to simulate the change of the state of the converter transformer in real time to start and stop the cooler oil pump fan to meet the heat dissipation requirements of the converter transformer. First of all, the slight jumps of signals such as oil temperature, winding, and load have a great impact on the control method. The traditional test process requires 6-8 external signal generators to simulate the top oil temperature, bottom oil temperature, winding oil temperature, CT current, and ambient temperature. However, the signal source of the traditional signal generator is unstable and there will be slight jumps, especially when the critical value of the air-cooled start-stop switching cannot be accurately controlled. The size of the analog quantity is difficult to operate, and it is difficult for personnel to operate 6-8 signal generators at the same time. Secondly, when simulating the BCD signal test, 2 sets of relay groups need to be connected externally, and each group of 6 relay switches is used to simulate double sets of BCD signals. During the test operation, the test personnel need to operate 2 sets of relay groups at the same time to send BCD signals to the control cabinet, and the operation interval of the 2 sets of signals cannot exceed 5 seconds, otherwise the system will determine that the transformer gear is not synchronized, causing the system alarm, resulting in frequent operational errors during the test process. Utility Model Content

[0004] In view of the problems of analog signal jump, BCD signal operation difficulty, and complex communication test in the prior art, the technical problem to be solved by the utility model is to provide a new control cabinet system test platform which improves test efficiency, has high safety and reliability, is easy to operate, and eliminates safety hazards.

[0005] The technical solution adopted by the utility model to achieve the above-mentioned purpose is: a new control cabinet system test platform, including PLC and the oil pump fan control circuit, BCD circuit and signal circuit connected thereto:

[0006] The oil pump fan control circuit, BCD circuit and signal circuit are connected to the intelligent control cabinet under test;

[0007] The oil pump fan control circuit, BCD circuit and signal circuit are connected with a power supply circuit.

[0008] The power supply circuit includes a first power supply branch:

[0009] The external power supply is connected to the PLC in sequence through the circuit breaker QA, the circuit breaker Q2, the parallel power module DP1 and the power module DP2, and the redundant module RM;

[0010] The two output ends of the AC / DC conversion circuit breaker Q2 are respectively connected to the input end of the power module DP1 and the input end of the power module DP2; the output end of the power module DP1 and the output end of the power module DP2 are respectively connected to the two input ends of the redundant module RM, and the output end of the redundant module RM is connected to the PLC, PLC digital module, and PLC analog module through a terminal block.

[0011] The output terminal of the PLC analog quantity module is connected to the analog quantity input module of the intelligent controller of the intelligent control cabinet under test through a signal isolator.

[0012] The power supply circuit includes a second power supply branch:

[0013] The external power supply is connected to the oil pump fan control circuit, BCD circuit, and signal circuit in sequence through the AC / DC conversion circuit breaker Q3, the power module DHP1, and multiple parallel DC control branches;

[0014] The DC control branch includes a contactor, and the output end of the contactor is connected to one of the oil pump fan control circuit, the BCD circuit, and the signal circuit through multiple groups of parallel output terminals.

[0015] The oil pump fan control circuit includes a plurality of intermediate relays;

[0016] The coil of the intermediate relay is connected to the auxiliary contact of the fan contactor of the intelligent control cabinet under test or the auxiliary contact of the oil pump contactor, the first normally open contact of the intermediate relay is connected to the digital quantity module input terminal of the PLC, and the second normally open contact is connected to the digital quantity input module of the intelligent controller under test.

[0017] The BCD circuit includes a plurality of BCD circuit intermediate relays;

[0018] The coil of the BCD loop intermediate relay is connected to the PLC digital quantity output module; the normally open contact of the BCD loop intermediate relay is connected to the BCD code digital quantity input module of the intelligent controller of the intelligent control cabinet under test.

[0019] The signal circuit includes a plurality of signal circuit intermediate relays;

[0020] The coil of the signal loop intermediate relay is connected to the input terminal of the PLC digital quantity module, and the normally open contact of the signal loop intermediate relay is connected to the auxiliary contact of the oil flow signal intermediate relay of the intelligent control cabinet.

[0021] A novel control cabinet system test platform also includes a host computer connected to a PLC. The host computer is a human-machine interaction screen.

[0022] The utility model has the following beneficial effects and advantages:

[0023] 1. The utility model completes the synchronous input and output of multi-channel digital signals, analog signals, and BCD code signals on the new control cabinet system test platform, and can realize the output adjustment of multi-channel signals by a single person in real time through the parameter change of the human-computer interaction interface;

[0024] 2. The utility model adopts a human-machine interactive screen, which can monitor the oil pump, fan and oil flow status of 7 groups of coolers at the same time; can output up to 12 analog signals at the same time through parameter setting; can output BCD code values ​​and calculate up to 2 BCD code signals at the same time through PLC internal program, avoiding signal delay caused by human factors;

[0025] 3. For the problem of tiny jumps in analog signals, add a signal isolator in the analog loop. Through signal isolation and loop voltage and current stabilization, eliminate the signal offset in the wiring loop and achieve fine control of the analog quantity. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a schematic diagram of the structural connection of the utility model;

[0027] Figure 2 It is the power circuit diagram;

[0028] Figure 3 This is the oil pump fan control circuit diagram;

[0029] Figure 4 It is a BCD circuit diagram;

[0030] Figure 5 is the signal loop diagram;

[0031] Figure 6 This is the connection diagram between the relay contacts of the oil pump fan control circuit and the control cabinet under test;

[0032] Figure 7 This is the connection diagram between the relay coil of the oil pump fan control circuit and the control cabinet under test;

[0033] Figure 8 It is the connection diagram between the BCD circuit relay contacts and the control cabinet under test;

[0034] Fig. 9 It is the connection diagram between the signal circuit relay contacts and the control cabinet under test;

[0035] Fig.10This is the connection diagram between the PLC analog output module and the control cabinet under test. DETAILED DESCRIPTION

[0036] The utility model is further described in detail below in conjunction with the accompanying drawings and embodiments.

[0037] A new control cabinet system test platform is built with PLC as the main core equipment. Through the human-machine interaction interface, test personnel can independently set output parameters according to project differences. The human-machine interaction interface communicates and exchanges data with PLC through the Modbus communication protocol. The human-machine interface displays the digital signal and analog signal of the converter transformer intelligent control cabinet collected by the current PLC in real time, and converts and displays the real-time data information of the transformer through internal program conversion. At the same time, the PLC digital control signal, analog output control signal, and BCD code signal are sent through the human-machine interface to set the oil temperature, winding, load and gear state parameters to the PLC device. The PLC device drives the intermediate relay in the test platform to output digital signals through the digital output module, and forms 4-20mA or 0-5V analog signals through data calculation and unit conversion to the converter transformer intelligent control cabinet, and performs transformer cooler start and stop logic control and signal testing.

[0038] The utility model discloses a new control cabinet system test platform. The test platform is designed to be movable, equipped with 4 universal wheels at the bottom of the platform and a trolley handle on the side of the platform, so that the platform can be moved in the workshop. The human-machine interaction interface is located above the entire platform, and through the upper door reversal and mechanical fixing device, it is fixedly displayed at 120° when in use. All operations and signal checks of the operator are completed through the human-machine interface operation, without additional buttons and indicator lights, and the operator's work surface is centralized and concise.

[0039] like Figure 1 As shown, a new control cabinet system test platform includes a PLC and an oil pump fan control circuit, a BCD circuit and a signal circuit connected thereto; the oil pump fan control circuit, the BCD circuit and the signal circuit are connected to the intelligent control cabinet under test; the oil pump fan control circuit, the BCD circuit and the signal circuit are connected to a power supply circuit.

[0040] like Figure 2 As shown, the power supply circuit includes a first power supply branch and a second power supply branch; the electrical connection of the first power supply branch is as follows:

[0041] The external power supply is connected to the PLC in sequence through the circuit breaker QA, the circuit breaker Q2, the parallel power module DP1 and the power module DP2, and the redundant module RM;

[0042] The two output ends of the AC / DC conversion circuit breaker Q2 are respectively connected to the input end of the power module DP1 and the input end of the power module DP2; the output end of the power module DP1 and the output end of the power module DP2 are respectively connected to the two input ends of the redundant module RM, and the output end of the redundant module RM is connected to the 24V terminal block, and the 24V is connected to the PLC and the PLC digital module and the PLC analog module through the terminal block.

[0043] The electrical connections of the second branch of the power supply are as follows:

[0044] The external power supply is connected to the oil pump fan control circuit, BCD circuit, and signal circuit in sequence through the AC / DC conversion circuit breaker Q3, the power module DHP1, and multiple parallel DC control branches;

[0045] The DC control branch includes a contactor, and the output end of the contactor is connected to one of the oil pump fan control circuit, the BCD circuit, and the signal circuit through multiple sets of parallel output terminals. Among them, the outputs A1+ and A1- are used to connect the oil pump fan control circuit, B1+ and B1- are used to connect the BCD circuit, and C1+ and C1- are used to connect the signal circuit.

[0046] like Figure 3 , Figure 6 , Figure 7 As shown, the oil pump fan control circuit includes relays K1~K14; one end of the coil of relays K1~K14 is connected to the power supply, and the other end is connected to the auxiliary contact of the fan contactor of the intelligent control cabinet under test or the auxiliary contact of the oil pump contactor, one normally open contact of relays K1~K14 is connected to the input terminal of the digital input module of the PLC, and one normally open contact is connected to the digital input module of the intelligent controller under test.

[0047] like Figure 4 , Figure 8 As shown, the BCD circuit includes intermediate relays KC1~KC6; one end of the coil of the intermediate relays KC1~KC6 is connected to the power supply, and the other end is connected to the PLC digital output module; the normally open contacts of the intermediate relays KC1~KC6 are connected to the BCD code digital input module of the intelligent controller of the intelligent control cabinet under test.

[0048] like Figure 5 , Fig. 9 As shown, the signal circuit includes multiple intermediate relays KC11~KC17; one end of the coil of the intermediate relay KC11~KC17 is connected to the power supply, and the other end is connected to the input terminal of the digital module of the PLC; the normally open contact of the intermediate relay KC11~KC17 is connected to the auxiliary contact of the oil flow signal intermediate relay of the intelligent control cabinet.

[0049] like Fig.10As shown, the analog output module terminal of the PLC is connected to the analog input module of the intelligent controller of the intelligent control cabinet under test through a signal isolator.

[0050] The working principle of the utility model is as follows:

[0051] The test started, according to Figure 2 First, close the power supply circuit breaker QA to provide 220V power to the test device. Close the 24V power supply circuit breaker Q2, and realize dual-channel 24V redundant power supply through dual-channel 24V power supplies DP1 and DP2 and redundant module RM. At this time, the PLC and human-machine interface are lit and working. Close the AC / DC conversion circuit breaker Q3 to realize 220VAC to 220VDC power supply conversion through DHP1. Close the DC control circuits QD1, QD2, QD3, and QD4 to supply power to the oil pump control circuit, fan control circuit, BCD circuit, and signal circuit respectively. Close the socket and lighting power supply Q1 to power the lights and sockets in the platform.

[0052] Start the intelligent control cabinet function test, manually input the oil temperature, winding, and load start-up analog values ​​of the air-cooled control cabinet in the touch screen human-machine interface according to the actual project requirements. This embodiment uses the Siemens KTP700 BasicPN touch screen. Fig.10 The PLC analog output module outputs 4-20mA analog signals corresponding to oil temperature, winding, and load. Through the signal isolator added in the loop, this embodiment uses the Phoenix MINI MCR-SL-RPS-II signal isolator, and the signal offset in the wiring loop is eliminated through signal isolation and loop voltage and current stabilization. The analog signal is connected to the analog input module of the intelligent controller of the intelligent control cabinet to be tested, and the intelligent control cabinet receives the analog signal to start and stop the air cooling system. Among them, the intelligent control cabinet adopts the TXKZ-20 model, which is the existing technology.

[0053] Enter the BCD code value in the touch screen human-machine interface, calculate according to the PLC autonomous program, and Figure 3 The PLC drives the coils of the intermediate relays KC1-KC6 of this platform to gain or lose power through the output points of the CPU's built-in relays. Figure 8 , the opening and closing of KC1-KC6 contacts realizes the analog output of BCD code. Similarly, this platform calculates through the internal program of PLC, according to Figure 4 By driving the relay output point of the PLC digital output module, the coil of the intermediate relay KC11-KC17 intermediate relay is powered on and off. Fig. 9, the opening and closing of KC11-KC17 contacts realize the analog output of oil flow signal. The CPU of this platform adopts Siemens CPU-1214C DC / DC / RLY model, the digital output module adopts Siemens SM1222-DO 16X24VDC model, and the intermediate relay adopts CR-M024DC4L model.

[0054] The start and stop signal test of the cooler of the tested intelligent control cabinet is based on Figure 6 After the tested intelligent control cabinet sends out the start signal of the cooler oil pump and fan, the signal is transmitted to this platform through the auxiliary contact of the contactor of the tested intelligent control cabinet, driving the coil of the intermediate relay K1-K14 of this platform to gain or lose power. Figure 3 PLC receives the opening and closing status of K1-K14 contacts to simulate the start and stop signals of the cooler oil pump and fan. The start and stop status of the oil pump and fan are displayed through the human-machine interface. Figure 5 The opening and closing states of the K1-K14 contacts are also fed back to the digital input module of the intelligent controller of the intelligent control cabinet under test, and the start and stop information of the cooler oil pump fan is fed back to the intelligent control cabinet under test. By comparing the consistency of the start and stop state information of the cooler of this platform and the intelligent control cabinet under test, it is possible to verify whether the start and stop design logic of the intelligent control cabinet under test meets the design requirements.

[0055] In the human-machine interactive screen, the status of the transformer cooler can be checked in real time. The operating status of the oil pump and fan is divided into stop status, fault status and normal status, which are displayed in gray, red and green in the human-machine interface respectively. The fan operation is not only displayed in green, but also in normal status. The actual signal received by the PLC is displayed and changed in real time. Figure 3 It can be seen from the PLC circuit loop that this platform can realize the collection of oil pumps, fans, and oil flow status of up to 7 groups of coolers. Second, the oil flow signal is received through the PLC. The oil flow signal time can be manually set through the human-machine interface. The oil flow signal is normal or not after the internal logic calculation of the PLC, and the oil flow status is displayed on the human-machine interaction screen. Third, the BCD code value can be manually input on the human-machine interaction screen, and the BCD code simulation test can be realized by driving the separation and combination logic of the intermediate relay through the internal program of the PLC. Figure 3 It can be seen from the PLC circuit loop that the entire control platform can realize the simultaneous driving of 2 groups of BCD codes. The 2 groups of BCD code drive relays work independently and do not affect each other. The driving delay of each group of BCD codes does not exceed 0.5 seconds.

[0056] In the human-computer interaction screen, you can trigger up to 12 analog signals at the same time by inputting numbers. The 12 analog signals are independent and do not affect each other. In order to avoid slight jumps, Fig. 9A signal isolator is added to the analog circuit, and the signal offset in the wiring circuit is eliminated through signal isolation and circuit voltage and current stabilization, so as to achieve fine control of the analog quantity. Each analog output parameter setting is divided into a preset value setting window, a given button, and a stop button. During the test, the parameters to be set can be preset in the preset value window. Up to 12 preset values ​​can be given at the same time. During the test, click the given button to trigger the analog signal to be sent out, and you can also click the stop button at any time to stop the trigger, so as to meet the test requirements that require multiple separation and combination of signals.

[0057] The structures such as the human-computer interaction screen involved in the present invention are conventional choices, and the present invention has no innovation in software and programming. It only protects structural technical features such as hardware connection relationships and positional relationships. Those skilled in the art can realize the functions of the present invention and solve the technical problems of the present invention through the structural features recorded in the present invention and combined with conventional programming logic.

Claims

1. A new control cabinet system test platform, characterized in that: Including PLC and its connected oil pump fan control circuit, BCD circuit and signal circuit: The oil pump fan control circuit, BCD circuit and signal circuit are connected to the intelligent control cabinet under test; The oil pump fan control circuit, BCD circuit and signal circuit are connected with a power supply circuit.

2. A new control cabinet system test platform according to claim 1, characterized in that: The power supply circuit includes a first power supply branch: The external power supply is connected to the PLC in sequence through the circuit breaker QA, the circuit breaker Q2, the parallel power module DP1 and the power module DP2, and the redundant module RM; The two output ends of the circuit breaker Q2 are respectively connected to the input end of the power module DP1 and the input end of the power module DP2; the output end of the power module DP1 and the output end of the power module DP2 are respectively connected to the two input ends of the redundant module RM, and the output end of the redundant module RM is connected to the PLC, the PLC digital module, and the PLC analog module.

3. A new control cabinet system test platform according to claim 2, characterized in that: The PLC analog quantity module output terminal is connected to the intelligent controller analog quantity input module of the intelligent control cabinet under test through a signal isolator.

4. A new control cabinet system test platform according to claim 1, characterized in that: The power supply circuit includes a second power supply branch: The external power supply is connected to the oil pump fan control circuit, BCD circuit, and signal circuit in sequence through the AC / DC conversion circuit breaker Q3, the power module DHP1, and multiple parallel DC control branches; The DC control branch includes a contactor, and the output end of the contactor is connected to one of the oil pump fan control circuit, the BCD circuit, and the signal circuit through multiple groups of parallel output terminals.

5. A new control cabinet system test platform according to claim 1, characterized in that: The oil pump fan control circuit includes a plurality of intermediate relays; The coil of the intermediate relay is connected to the auxiliary contact of the fan contactor of the intelligent control cabinet under test or the auxiliary contact of the oil pump contactor, the first normally open contact of the intermediate relay is connected to the digital quantity module input terminal of the PLC, and the second normally open contact is connected to the digital quantity input module of the intelligent controller under test.

6. A new control cabinet system test platform according to claim 1, characterized in that: The BCD circuit includes a plurality of BCD circuit intermediate relays; The coil of the BCD loop intermediate relay is connected to the PLC digital quantity output module; the normally open contact of the BCD loop intermediate relay is connected to the BCD code digital quantity input module of the intelligent controller of the intelligent control cabinet under test.

7. A novel control cabinet system test platform according to claim 1, characterized in that: The signal circuit includes a plurality of signal circuit intermediate relays; The coil of the signal loop intermediate relay is connected to the input terminal of the PLC digital quantity module, and the normally open contact of the signal loop intermediate relay is connected to the auxiliary contact of the oil flow signal intermediate relay of the intelligent control cabinet.

8. The novel control cabinet system test platform according to claim 1 is characterized in that: It also includes a host computer connected to the PLC.

9. A novel control cabinet system test platform according to claim 8, characterized in that: The host computer is a human-computer interaction screen.