Adjustable junction box

By designing an adjustable junction box, the length and position of the junction box is adjusted by adjusting the adjustment block and bolts, the problems of installation position control difficulties and plaster pollution are solved, and the plastering and cleaning work is achieved. The construction efficiency and adjustment blocks are improved. Durability.

CN222072690UActive Publication Date: 2024-11-26CCCC FOURTH HARBOR ENG CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420012550.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-03
Publication Date
2024-11-26
Estimated Expiration
2034-01-03

AI Technical Summary

Technical Problem

During construction, it is difficult to control the installation position of the junction box, which can easily lead to protrusion or depression of the junction box, affecting the plastering construction, and the unsettled plastering mortar can easily contaminate the interior of the junction box, increasing the workload of post-cleaning.

Method used

An adjustable junction box is designed, including a junction box base, adjustment block, adjustment bolt and sliding gasket. Through the coordination of the adjustment block and bolt, the overall length of the junction box is adjusted so that it is flush with the wall and applied. The end of the junction box is closed during the ash process to prevent mortar pollution and facilitate dismantling and reusing in the later stage.

Benefits of technology

The surface of the junction box is flush with the wall, avoiding pollution during the plastering process, reducing post-cleaning work, improving construction efficiency and plastering quality, and extending the service life of the adjustment block.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222072690U_ABST
    Figure CN222072690U_ABST
Patent Text Reader

Abstract

The utility model discloses an adjustable junction box, which can adjust the total length when the junction box is installed, so that the surface of the junction box is flush with a wall surface, and the junction box is prevented from interfering with wall surface plastering. In the wall plastering process, the end of the junction box is in a closed state, the interior of the junction box can be prevented from being polluted, and later cleaning work of the interior of the junction box is relieved; the adjustable junction box comprises a junction box base, an adjusting block, an adjusting bolt and a sliding gasket, the adjusting block is movably arranged in the junction box base, the adjusting block is connected with the junction box base through the adjusting bolt, and the adjusting block is sleeved with the sliding gasket.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of electromechanical construction in construction engineering, in particular to an adjustable junction box. Background Art

[0002] At present, the installation of household junction boxes in the construction industry is generally carried out by hanging them at the preset installation position of the wall through hard piping. During the construction stage of the masonry structure, the junction box is buried in the wall together with the masonry. During the installation of the junction box, it is difficult to control the installation position of the junction box, and it is very easy for the junction box to be recessed or protruding relative to the wall. During the plastering construction, if the junction box protrudes from the wall, it will affect the plastering construction; if the junction box is recessed in the wall, the plastering surface at the junction box is prone to collapse and uneven edges; moreover, since the unsolidified plastering mortar itself is fluid, it is very easy to cause pollution to the inside of the junction box. In the later stage of construction, the inside of the junction box needs to be cleaned, which increases the construction workload. Utility Model Content

[0003] At least one of the purposes of the present utility model is to provide an adjustable junction box, which can adjust the overall length of the junction box during installation so that the surface of the junction box is flush with the wall surface, thereby preventing the junction box from interfering with the wall plastering. During the wall plastering process, the end of the junction box is in a closed state, thereby preventing the inside of the junction box from being contaminated and reducing the cleaning work of the inside of the junction box at a later stage.

[0004] In order to achieve the above-mentioned purpose, the technical solution adopted by the utility model includes the following aspects.

[0005] An adjustable junction box comprises: a junction box base, an adjustment block, an adjustment bolt and a sliding gasket, wherein the adjustment block is movably arranged in the junction box base, the adjustment block and the junction box base are connected by the adjustment bolt, and the sliding gasket is sleeved on the adjustment block.

[0006] Preferably, the interior of the adjusting block is a hollow structure, and one or more second connecting columns are arranged on the inner wall of the first end of the adjusting block, the second connecting column and the first end of the adjusting block are perpendicular to each other, and an internal threaded hole that passes through the first end of the adjusting block is axially arranged in the middle of the second connecting column; a through hole is arranged at the second end of the adjusting block, and the through hole is coaxial with the second connecting column; a first connecting column is arranged on the inner wall of the second end of the junction box base, the first connecting column is coaxially arranged with the through hole, and an internal threaded hole is axially arranged in the middle of the first connecting column.

[0007] Preferably, a third connecting column is further provided on the inner wall of the first end of the adjusting block, and the second end of the removal bolt is screwed into the adjusting block through the third connecting column.

[0008] Preferably, the second end of the adjustment block is provided with a through hole coaxial with the third connecting column; the second end of the removal bolt is screwed out of the adjustment block through the through hole, and the second end of the removal bolt abuts against the inner wall of the second end of the junction box base.

[0009] Preferably, a circular baffle is provided at the first end of the removal bolt.

[0010] Preferably, four second connecting columns are arranged on the inner wall of the first end of the adjusting block, the four second connecting columns are arranged in a rectangular shape, and the third connecting column is arranged in the middle of the first end of the adjusting block.

[0011] Preferably, the sliding gasket is a rectangular ring structure, the inner surface size of the sliding gasket is matched with the surface size of the adjustment block, and the thickness of the sliding gasket is the same as the thickness of the junction box base.

[0012] Preferably, lubricating oil is applied on the inner surface of the sliding gasket.

[0013] Preferably, the junction box base is made of PVC, tinplate or stainless steel, and the adjustment block is made of the same material as the junction box base.

[0014] Preferably, the wall thickness of the adjusting block is 5-10 mm.

[0015] In summary, due to the adoption of the above technical solution, the utility model has at least the following beneficial effects:

[0016] By movably setting an adjustment block in the base of the junction box, the adjustment block can adjust the overall length of the adjustable junction box so that the surface of the junction box is flush with the wall, thereby preventing the junction box from interfering with the wall plastering process; the first end of the adjustment block is in a closed state, and during the wall plastering process, it can prevent the plastering mortar from flowing into the inside of the junction box to pollute the junction box, thereby avoiding the need to clean the mortar inside the junction box later.

[0017] The junction box base is connected to the adjustment block by adjusting bolts. The adjusting bolts can not only connect and fix the junction box base and the adjustment block, but also adjust the position of the adjustment block in the junction box, thereby increasing the flexibility of adjusting the adjustment block. By arranging removal bolts on the adjustment block, after the plaster mortar solidifies, the removal bolts can assist in removing the adjustment block, thereby making the adjustment block reusable.

[0018] By sleeved sliding gasket on the adjusting block, the adjusting block can be assisted to be removed, the friction resistance during the removal of the adjusting block can be reduced, the wear of the adjusting block can be reduced, and the durability of the adjusting block can be improved. During the removal of the adjusting block, the finished plaster layer can also be protected, and the appearance quality of the wall plastering can be improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1It is a front view of an adjustable junction box structure of an exemplary embodiment of the present utility model.

[0020] Figure 2 It is an AA cross-sectional view of the adjustable junction box structure of an exemplary embodiment of the present utility model.

[0021] Markings in the figure: 1-junction box base, 11-first connecting column, 2-adjusting block, 21-second connecting column, 22-through hole, 23-third connecting column, 3-adjusting bolt, 4-removal bolt, 5-sliding gasket. Implementation

[0022] The present invention is further described in detail below in conjunction with the accompanying drawings and embodiments to make the purpose, technical solutions and advantages of the present invention more clearly understood. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0023] refer to Figure 1 , Figure 2 The adjustable junction box of the exemplary embodiment of the utility model comprises a junction box base 1, an adjustment block 2, an adjustment bolt 3 and a sliding gasket 5, wherein the adjustment block 2 is movably arranged in the junction box base 1, the adjustment block 2 is connected to the junction box base 1 through the adjustment bolt 3, and the sliding gasket 5 is sleeved on the first end ( Figure 2 In the left and right direction, the left side of the adjustment block is the first end, and the right side is the second end).

[0024] The adjusting bolt 3 can not only connect the adjusting block 2 and the junction box base 1, so that the adjusting block 2 is kept at the preset position to prevent the wall plastering from affecting the position of the adjusting block 2, but also can adjust the position of the adjusting block 2 in the junction box base 1 so that the first end of the adjusting block 2 is flush with the wall. The first end surface of the adjusting block 2 is a closed surface. During the wall plastering process, the plastering mortar can be prevented from flowing into the adjusting block 2 and the junction box base 1 to pollute the junction box, thereby reducing the cleaning work inside the junction box in the later stage; the adjusting block 2 is movably arranged in the junction box base 1. After the wall plastering work at the junction box base 1 is completed, the adjusting block 2 can be circulated to other junction box base positions for use, so that the adjusting block 2 can be reused, thereby saving construction consumables; the sliding gasket 5 is sleeved on the adjusting block 2, which can prevent the plastering mortar from flowing into the gap between the adjusting block 2 and the wall and hardening, ensuring that the junction box cover is smoothly installed on the junction box base in the later stage, and ensuring the smooth progress of the wiring work in the junction box. The junction box base 1 is made of PVC, tinplate or stainless steel, and the adjustment block 2 is made of the same material as the junction box base 1 .

[0025] The sliding gasket 5 is a rectangular ring structure, the inner surface size of which is compatible with the surface size of the adjusting block 2, and the thickness of the sliding gasket 5 is the same as the thickness of the junction box base 1; the inner surface of the sliding gasket 5 is coated with lubricating oil, and the inner surface of the sliding gasket 5 is in contact with the surface of the adjusting block 2. The lubricating oil can reduce the friction between the sliding gasket 5 and the adjusting block 2, and after the wall is plastered, the difficulty of removing the adjusting block 2 can be reduced.

[0026] The interior of the adjustment block 2 is a hollow structure. One or more second connecting columns 21 are arranged on the inner wall of the first end of the adjustment block 2. The second connecting column 21 is perpendicular to the first end of the adjustment block 2. An internal threaded hole penetrating the first end of the adjustment block 2 is axially arranged in the middle of the second connecting column 21. A through hole 22 is arranged at the second end of the adjustment block 2. The through hole 22 is coaxial with the second connecting column 21. The second end of the junction box base 1 ( Figure 2 A first connecting column 11 is arranged on the inner wall of the junction box base (left and right direction, the left side is the first end, and the right side is the second end), the first connecting column 11 is coaxially arranged with the through hole 22, and an internal threaded hole is axially arranged in the middle of the first connecting column 11. The wall thickness of the adjustment block 2 is 5-10 mm. During the use of the adjustment block, the thicker wall thickness can improve the durability of the adjustment block and increase the number of turnover uses of the adjustment block.

[0027] The second end of the adjusting bolt 3 is screwed into the adjusting block 2 through the second connecting column 21 and passes through the adjusting block 2 through the through hole 22. Under the action of the second connecting column 21, the adjusting bolt 3 can maintain stability; after the second end of the adjusting bolt 3 is screwed into the first connecting column 11, the junction box base 1 and the adjusting block 2 can be connected and fixed. By adjusting the length of the adjusting bolt 3 screwed into the first connecting column 11, the distance between the second end of the adjusting block 2 and the second end of the junction box base 1 can be adjusted, so that the first end surface of the adjusting block 2 is flush with the wall during the wall plastering process.

[0028] A third connecting column 23 is also provided on the inner wall of the first end of the adjusting block 2, and a through hole coaxial with the third connecting column 23 is provided on the second end of the adjusting block 2; the second end of the removal bolt 4 is screwed into the adjusting block 2 through the third connecting column 23, and the adjusting block 2 is screwed out of the through hole, and the second end of the removal bolt 4 abuts against the inner wall of the second end of the junction box base 1. In the later process of removing the adjusting block 2, after the adjusting bolt 3 is completely screwed out of the first connecting column 11, the removal bolt 4 can be screwed to push the adjusting block 2 out of the junction box base 1, assisting in the removal of the adjusting block 2, and realizing the recycling of the adjusting block 2.

[0029] The second end of the removal bolt 4 may also be located inside the adjustment block 2. When the second end of the removal bolt 4 is located inside the adjustment block 2, the removal bolt 4 is partially screwed out of the adjustment block 2 by the first end of the removal bolt 4, and then the removal bolt 4 is pulled. The removal bolt 4 can drive the adjustment block 2 to slide out of the junction box base 1, thereby removing the adjustment block 2. A circular baffle (not shown in the figure) may also be provided at the first end of the removal bolt 4, which can assist in pulling the removal bolt 4, thereby improving the convenience of removing the adjustment block 2.

[0030] During the connection process, four second connecting columns 21 are arranged on the inner wall of the first end of the adjusting block 2. The four second connecting columns 21 are arranged in a rectangular shape to improve the stability of the connection between the adjusting block 2 and the junction box base 1; the third connecting column 23 is preferably arranged in the middle of the first end of the adjusting block 2.

[0031] The use process of the adjustable junction box of the utility model comprises: after the junction box base 1 is suspended and hoisted at a preset installation position of the wall by using piping, the wall is built, and after the wall is built, the second end of the adjustment block 2 is inserted into the adjustment box base 1 from the first end of the adjustment box base 1, and the adjustment block 2 and the junction box base 1 are connected by using the adjustment bolt 3; the distance between the second end of the adjustment block 2 and the second end of the junction box base 1 is the shortest in the initial state (the second end of the adjustment block is against the second connecting column of the junction box base), and then the adjustment block is adjusted by the adjustment bolt 3 2, so that the distance between the second end of the adjusting block 2 and the second end of the junction box base 1 gradually increases, so that the first end of the adjusting block 2 is flush with the wall; after the adjusting block 2 is adjusted into place, lubricating oil is applied to the inner wall of the sliding gasket 5, and then the sliding gasket 5 is sleeved on the adjusting block 2 by the first end of the adjusting block 2, and the second end of the sliding gasket 5 abuts against the first end of the adjusting box base 1; after the sliding gasket is installed, the wall is plastered, and after the wall is plastered, the adjusting bolt 3 is completely unscrewed from the first connecting column 11, and then the adjusting block 2 is removed by removing the bolt 4.

[0032] The above is only a detailed description of the specific implementation of the utility model, rather than a limitation of the utility model. Various substitutions, modifications and improvements made by technicians in the relevant technical field without departing from the principle and scope of the utility model should be included in the protection scope of the utility model.

Claims

1. An adjustable junction box, characterized in that: include: A junction box base (1), an adjustment block (2), an adjustment bolt (3) and a sliding gasket (5), wherein the adjustment block (2) is movably arranged in the junction box base (1), the adjustment block (2) and the junction box base (1) are connected via the adjustment bolt (3), and the sliding gasket (5) is sleeved on the adjustment block (2).

2. The adjustable junction box according to claim 1, characterized in that: The interior of the adjustment block (2) is a hollow structure; one or more second connecting columns (21) are arranged on the inner wall of the first end of the adjustment block (2); the second connecting columns (21) and the first end of the adjustment block (2) are perpendicular to each other; an internal threaded hole penetrating the first end of the adjustment block (2) is axially arranged in the middle of the second connecting column (21); a through hole (22) is arranged at the second end of the adjustment block (2); the through hole (22) is coaxial with the second connecting column (21); a first connecting column (11) is arranged on the inner wall of the second end of the junction box base (1); the first connecting column (11) and the through hole (22) are coaxially arranged; an internal threaded hole is axially arranged in the middle of the first connecting column (11).

3. The adjustable junction box according to claim 2, characterized in that: A third connecting column (23) is also provided on the inner wall of the first end of the adjusting block (2), and the second end of the removed bolt (4) is screwed into the adjusting block (2) through the third connecting column (23).

4. The adjustable junction box according to claim 3, characterized in that: The second end of the adjustment block (2) is provided with a through hole coaxial with the third connecting column (23); the second end of the removal bolt (4) is screwed out of the adjustment block (2) through the through hole, and the second end of the removal bolt (4) abuts against the inner wall of the second end of the junction box base (1).

5. The adjustable junction box according to claim 3, characterized in that: A circular baffle is provided at the first end of the removal bolt (4).

6. The adjustable junction box according to claim 3, characterized in that: Four second connecting columns (21) are arranged on the inner wall of the first end of the adjusting block (2), and the four second connecting columns (21) are arranged in a rectangular shape. The third connecting column (23) is arranged in the middle of the first end of the adjusting block (2).

7. The adjustable junction box according to any one of claims 1 to 6, characterized in that: The sliding gasket (5) is a rectangular ring structure, the inner surface size of the sliding gasket (5) is matched with the surface size of the adjustment block (2), and the thickness of the sliding gasket (5) is the same as the thickness of the junction box base (1).

8. The adjustable junction box according to any one of claims 1 to 6, characterized in that: Lubricating oil is applied to the inner surface of the sliding gasket (5).

9. The adjustable junction box according to any one of claims 2 to 6, characterized in that: The junction box base (1) is made of PVC, tinplate or stainless steel, and the adjustment block (2) is made of the same material as the junction box base (1).

10. The adjustable junction box according to any one of claims 2 to 6, characterized in that: The wall thickness of the adjustment block (2) is 5-10 mm.