Novel buoy
By adopting a structure of filling cavity and load-bearing cavity in the float, the weight of the load-bearing block is increased and a variety of features are set on the float body, the problem of float and steel load-bearing block falling off in seawater is solved, and the connection stability and structure are improved Strength, providing navigation guidance and service life extension effects.
Patent Information
- Application Number
- CN202420958716.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-06
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2034-05-06
AI Technical Summary
Existing floats and steel load-bearing blocks are prone to fall off due to wave impact or ship collision when floating in seawater for a long time, resulting in insufficient connection stability.
A new type of float is designed, adopting a structure of filling cavity and load-bearing cavity, increasing the weight of load-bearing blocks by filling cement, and clamping grooves, foam holes, communication grooves, indicator lamp posts, rubber fenders, etc. are installed on the float body. Features to improve connection stability and structural strength.
It effectively reduces the possibility of load-bearing blocks and float body falling off, provides navigation guidance information, extends the service life of float, and improves installation and maintenance efficiency.
Smart Images

Figure CN222080870U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of navigational markings, and in particular to a new type of buoy. Background Art
[0002] A buoy is a navigation mark floating on the water surface. It is anchored at a designated location and used to mark the range of a waterway, indicate shoals, obstructions, or indicate a surface navigation aid for special purposes.
[0003] In the related art, buoys are connected to steel load-bearing blocks through anchor chains and anchored at designated locations to mark waterways or indicate obstacles. Buoys and steel load-bearing blocks float in the sea for a long time, and are impacted by waves and collide with reefs or ships, causing the buoys and steel load-bearing blocks to fall off. There is still room for improvement. Utility Model Content
[0004] In order to increase the connection stability between the steel load-bearing block and the buoy during long-term floating in seawater and reduce the phenomenon of the steel load-bearing block falling off the buoy, the present application provides a new type of buoy.
[0005] This application provides a new type of buoy, which adopts the following technical solution:
[0006] A new type of buoy includes a buoy body with a filling cavity and a load-bearing block integrally arranged with the buoy body, wherein the load-bearing block is provided with a load-bearing cavity which is interconnected with the filling cavity and is used to fill cement, and a mud injection hole is provided on one side of the buoy body away from the load-bearing block.
[0007] By adopting the above technical solution, cement is filled into the load-bearing cavity from the mud injection hole to increase the weight of the load-bearing block. The buoy body and the load-bearing block are integrated into one piece, which increases the connection stability and integrity of the load-bearing block and the buoy body and reduces the possibility of the load-bearing block and the buoy body falling off due to long-term impact of waves or collision with ships.
[0008] Optionally, a foaming hole for injecting foaming material into the filling cavity is provided on a side of the buoy body away from the load-bearing block.
[0009] By adopting the above technical solution and setting the foaming holes, the staff can insert the foaming material from the foaming holes into the filling cavity. After heating, the foaming material expands to fill the entire filling cavity, thereby increasing the overall structural strength of the buoy body.
[0010] Optionally, the buoy body is provided with clamping grooves which are arranged at intervals and penetrate the circumferential side wall of the buoy body.
[0011] By adopting the above technical solution, multiple clamping grooves are arranged on the buoy body, which increases the contact area of the buoy body, making it easier for staff to clamp and remove the entire buoy body from the water, thereby improving the installation efficiency of the buoy body.
[0012] Optionally, a connecting groove penetrating the outer circumferential side wall of the buoy body is provided on a side of the buoy body away from the load-bearing block, and the mud injection hole is located on the bottom wall of the connecting groove.
[0013] By adopting the above technical solution and setting the connecting groove, when the buoy body floats in the water, water can enter the filling cavity along the connecting groove. When there is too much water in the buoy body, it can flow out from the foaming holes and the connecting groove, thereby increasing the fluidity inside the upper end of the buoy body.
[0014] Optionally, an indicator light column is provided on the buoy body, and the indicator light column is connected to a side of the buoy body away from the load-bearing block by bolts.
[0015] By adopting the above technical solution and setting the indicator light column, the entire buoy body can provide guidance information to the navigation personnel, making it easier for the navigation personnel to navigate on the water surface.
[0016] Optionally, the indicator light column is provided with a plurality of avoidance grooves for placing the screw heads of the bolts.
[0017] By adopting the above technical solution and setting the avoidance groove, the bolt head can be located in the avoidance groove, reducing the protrusion of the bolt head on the indicator light column, making it easier for staff to install the bolt on the indicator light column and the buoy body, thereby improving the installation efficiency of the bolt.
[0018] Optionally, a rubber fender is provided on the outer circumferential side wall of the buoy body.
[0019] By adopting the above technical solution, the rubber fender can surround the outer peripheral side wall of the buoy body, thereby protecting the buoy body; reducing the wear on the buoy body caused by the collision between the ship and the buoy body, thereby increasing the service life of the buoy body.
[0020] Optionally, a placement groove is provided on the outer circumferential side wall of the buoy body, the rubber fender is clamped in the placement groove and a portion of the rubber fender protrudes from the placement groove.
[0021] By adopting the above technical solution and setting the placement groove, part of the rubber fender can be snapped into the placement groove, thereby reducing the possibility of the rubber fender falling off.
[0022] In summary, the present application includes at least one of the following beneficial technical effects:
[0023] 1. By filling cement into the load-bearing cavity from the mud injection hole, the weight of the load-bearing block is increased, and the integral arrangement can increase the connection stability and integrity of the load-bearing block and the buoy body, and reduce the possibility of the load-bearing block and the buoy body falling off due to long-term impact of waves or collision with ships;
[0024] 2. The setting of the indicator light column enables the entire buoy body to provide guidance information for navigation personnel, making it easier for navigation personnel to navigate on the water surface;
[0025] 3. The setting of rubber fender is convenient for protecting the buoy body; it reduces the wear on the buoy body caused by the collision between the ship and the buoy body, and increases the service life of the buoy body. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is an overall structural diagram of a new type of buoy in an embodiment of the present application.
[0027] Figure 2 It is a cross-sectional view of a new type of buoy in an embodiment of the present application.
[0028] Figure 3 It is an exploded view of the buoy body and the indicator light column in the embodiment of the present application.
[0029] Figure 4 It is a side view of a new type of buoy in an embodiment of the present application.
[0030] Explanation of the accompanying reference numerals: 1. Buoy body; 11. Filling cavity; 12. Mud injection hole; 13. Foaming hole; 14. Installation groove; 15. Clamping groove; 16. Connecting groove; 17. Rubber fender; 18. Placement groove; 2. Load-bearing block; 21. Load-bearing cavity; 3. Indicator light column; 31. Avoidance groove; 32. Penetration hole. DETAILED DESCRIPTION
[0031] The following is combined with Figure 1-4 This application is described in further detail.
[0032] The present application embodiment discloses a new type of buoy. Figure 1 A novel buoy includes a buoy body 1, a bearing block 2 and an indicator light column 3. The buoy body 1 and the bearing block 2 are integrally arranged, and the indicator light column 3 is installed on a side of the buoy body 1 away from the bearing block 2, so as to facilitate guidance for navigation personnel.
[0033] Reference Figure 2 and Figure 3A filling cavity 11 is provided in the buoy body 1 for the foaming material to fill the entire filling cavity 11. A bearing cavity 21 is provided in the load-bearing block 2, and the bearing cavity 21 and the filling cavity 11 are connected to each other, so that cement can fill the entire load-bearing block 2. A mud injection hole 12 is provided on the side of the buoy body 1 away from the load-bearing block 2, and the mud injection hole 12 connects the filling cavity 11 and the load-bearing cavity 21, so that the staff can inject cement into the load-bearing cavity 21 through the mud injection hole 12, thereby facilitating the buoy body 1 to float stably in the water.
[0034] Reference Figure 2 and Figure 3 A foaming hole 13 is provided on one side of the buoy body 1 away from the load-bearing block 2. The foaming hole 13 and the filling cavity 11 are interconnected, so that the staff can fill the foaming material into the filling cavity 11 through the foaming hole 13. The foaming material expands after heating and further fills the filling cavity 11. In the embodiment of the present application, the number of the foaming holes 13 is four and they are evenly distributed on one side of the buoy body 1.
[0035] Reference Figure 3 and Figure 4 A plurality of mounting grooves 14 are provided on two opposite side walls of the buoy body 1, so that the staff can install the lifting ring on the buoy body 1. In the embodiment of the present application, there are eight mounting grooves 14, four of which are located on the side of the buoy body 1 close to the load-bearing block 2, and the other four are located on the side of the buoy body 1 away from the load-bearing block 2, so that the lifting ring can be installed on both sides of the buoy body 1.
[0036] Reference Figure 3 and Figure 4 A plurality of clamping grooves 15 are provided on the side of the buoy body 1 close to the load-bearing block 2, and the clamping grooves 15 penetrate the outer circumferential side wall of the buoy body 1, so that the staff can clamp and take out the buoy body 1 from the water. In the embodiment of the present application, the number of the clamping grooves 15 is four and they are evenly arranged. A connecting groove 16 is provided on the side of the buoy body 1 away from the load-bearing block 2, and the two ends of the connecting groove 16 penetrate the outer circumferential side wall of the buoy body 1, wherein two mounting grooves 14 are located on the bottom wall of the connecting groove 16, so that water can flow between the buoy body 1 and the indicator light column 3.
[0037] Reference Figure 3 The indicator light column 3 is provided with a plurality of avoidance grooves 31 at one end close to the buoy body 1. The number of the avoidance grooves 31 is six and they are evenly arranged along the circumference of the indicator light column 3. The indicator light column 3 is provided with a plurality of through holes 32 evenly arranged on the bottom wall of the avoidance grooves 31. The cross sections of the indicator light column 3 and the buoy body 1 are perpendicular to each other, so that the staff can conveniently pass the through holes 32 through bolts and then thread them to the buoy body 1, so that the indicator light column 3 can be fixed to the buoy body 1.
[0038] Reference Figure 3The outer peripheral side wall of the buoy body 1 is provided with a rubber fender 17, which can reduce the wear of the buoy body 1 when a ship collides with the buoy body 1. A placement groove 18 is provided on the outer peripheral side wall of the buoy body 1, and part of the rubber fender 17 is clamped in the placement groove 18, and part of the rubber fender 17 protrudes from the placement groove 18, so that the rubber fender 17 can protect the buoy body 1 and reduce the possibility of the rubber fender 17 falling off from the buoy body 1.
[0039] The implementation principle of a new type of buoy in the embodiment of the present application is: first, cement is injected into the load-bearing cavity 21 from the mud injection hole 12, and then the foaming material is put into the filling cavity 11 from the foaming hole 13, and then heated to make the foaming material expand and fill the filling cavity 11. The staff then connects it to the buoy body 1 through bolt threads, installs components that control the operation of the indicator light inside the indicator light column 3, and then installs a lifting ring in the installation groove 14, and the assembly is completed.
[0040] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A new type of buoy, characterized by: The buoy body (1) comprises a filling cavity (11) and a load-bearing block (2) integrally arranged with the buoy body (1); a load-bearing cavity (21) which is in communication with the filling cavity (11) and is used for filling cement is provided in the load-bearing block (2); and a mud injection hole (12) is provided on a side of the buoy body (1) away from the load-bearing block (2).
2. A new type of buoy according to claim 1, characterized in that: A foaming hole (13) for injecting foaming material into the filling cavity (11) is provided on a side of the buoy body (1) away from the load-bearing block (2).
3. A new type of buoy according to claim 2, characterized in that: The buoy body (1) is provided with clamping grooves (15) arranged at intervals and penetrating the circumferential side wall of the buoy body (1).
4. A new type of buoy according to claim 1, characterized in that: A communication groove (16) penetrating the outer peripheral side wall of the buoy body (1) is provided on a side of the buoy body (1) away from the load-bearing block (2).
5. A new type of buoy according to claim 4, characterized in that: The buoy body (1) is provided with an indicator light column (3), and the indicator light column (3) is connected to a side of the buoy body (1) away from the load-bearing block (2) via bolts.
6. A new type of buoy according to claim 5, characterized in that: The indicator light column (3) is provided with a plurality of avoidance grooves (31) for placing the screw heads of the bolts.
7. A new type of buoy according to claim 1, characterized in that: A rubber fender (17) is sleeved on the outer peripheral side wall of the buoy body (1).
8. A new type of buoy according to claim 7, characterized in that: A placement groove (18) is provided on the outer peripheral side wall of the buoy body (1), and the rubber fender (17) is snap-fitted into the placement groove (18) and a portion of the rubber fender (17) protrudes from the placement groove (18).