Garbage cleaning and transporting structure for construction site

By using a combination design of atomized spray head and protective shell in the garbage removal structure of the construction site, the impact of dust on construction site personnel during garbage dumping is solved, and construction safety and environmental cleanliness are improved.

CN222081477UActive Publication Date: 2024-11-29安徽祥兴建设工程有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420070639.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-11
Publication Date
2024-11-29
Estimated Expiration
2034-01-11

AI Technical Summary

Technical Problem

During construction on construction sites, the dust generated when garbage dumping will affect the respiratory health and safety of construction sites, and the existing technology is difficult to effectively prevent dust from rushing into the eyes of people.

Method used

A garbage removal structure for construction sites was designed, and an atomized spray head and protective shell were installed on the right side of the garbage removal box. The piston plate was driven by the reciprocating screw to transfer water into the connecting pipe, and the dust was reduced by using the atomized spray head. , and protect the nozzle from collisions through protective shells.

Benefits of technology

It effectively avoids dust hitting the eyes of the construction site personnel, improves construction safety, and isolates dust when dumping garbage, ensuring the cleanliness of the construction site environment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222081477U_ABST
    Figure CN222081477U_ABST
Patent Text Reader

Abstract

The utility model discloses a garbage clearance structure for construction sites, which comprises a frame, universal wheels are mounted at the bottom of the frame, spindles are fixedly mounted on the front side and the rear side of a garbage clearance box, bearings of the spindles are mounted at the upper end of the frame, and a locking mechanism is connected between the frame and the garbage clearance box. Meanwhile, the right side of the lower end of the garbage collection and transportation box is attached to the upper end face of the rack; and the second connecting pipe is fixedly installed on the right side of the garbage collection and transportation box in an inverted-U shape, atomization nozzles are arranged on the side portion of the upper end of the second connecting pipe at equal intervals, the lower end of the second connecting pipe communicates with the first connecting pipe through a hose, and atomized liquid of the atomization nozzles prevents dust generated during pouring of the construction garbage from directly flapping to constructors. According to the garbage cleaning and transporting structure for the construction site, dust generated by garbage dumping is reduced through the atomizing spray head, meanwhile, the dust is prevented from directly catching eyes of workers on the construction site in the first time, and the safety is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of garbage removal and transportation, in particular to a garbage removal and transportation structure for a construction site. Background Art

[0002] During the construction process at a construction site, a large amount of garbage and waste will be generated, such as building material residues, packaging materials, waste bricks and gravel, etc. In order to maintain the cleanliness and safety of the construction site, garbage removal facilities are widely used in construction sites and can be designed according to the actual situation of the construction site. Common structures include garbage bins and garbage racks to avoid dangers and environmental pollution caused by excessive garbage stacking.

[0003] After the construction site workers transport the garbage to the recycling station, they can dump the garbage by flipping the transport box. For example, in the prior art, the patent application with the authorization publication number CN219408392UU and the authorization publication date 2023-07-25, entitled "A high-rise building construction garbage removal device", when arriving at the recycling station, the cylinder can be started to control the extension of the cylinder telescopic rod, and the cylinder telescopic rod drives the connecting block to move upward, thereby driving the first hopper to rotate, and the cylinder will also rotate at the same time, the construction garbage will push the first rotating plate to rotate, and the spring will deform. When all the construction garbage is poured out, the spring will recover, driving the first rotating plate to reverse and reset, and then the cylinder telescopic rod is controlled to shorten, and the cylinder telescopic rod drives the connecting block to move downward and reset, thereby driving the first hopper to reverse and reset, and the cylinder is also reversed and reset at the same time, and finally the cylinder can be closed;

[0004] When the above-mentioned device drives the first hopper to rotate and dump garbage, since most of the construction waste is waste stone residue, a large amount of dust is easily generated when the garbage falls out of the hopper. The dust fills the air, which will directly affect the respiratory health of the construction site workers. The dust can easily enter the eyes, causing the workers to close their eyes, posing a safety problem.

[0005] Therefore, we propose a garbage removal structure for construction sites to solve the problems mentioned above. Utility Model Content

[0006] 1. Technical problems to be solved by the utility model

[0007] The purpose of the utility model is to provide a garbage removal structure for construction sites to solve the current market problems raised by the above background technology.

[0008] 2. Technical solution

[0009] To achieve the above object, the present utility model provides the following technical solution: A garbage cleaning and transporting structure for a construction site, including a frame with universal wheels installed at the bottom. The upper end of the frame is provided with a garbage cleaning and transporting box, and main shafts are fixedly installed on both the front and rear sides of the garbage cleaning and transporting box. And the main shafts are installed on the upper end of the frame through bearings. Moreover, a locking mechanism is connected between the frame and the garbage cleaning and transporting box. At the same time, the right side of the lower end of the garbage cleaning and transporting box is in contact with the upper end surface of the frame, so that the garbage cleaning and transporting box can be tilted to the left to dump the construction site garbage.

[0010] A water tank and a suction box are installed at the lower end of the frame, and the water tank is located on the left side of the suction box. And a reciprocating lead screw is installed inside the suction box through a sealed bearing. Moreover, a first connecting pipe is connected and installed obliquely downward on the right side of the suction box through a one-way valve.

[0011] A second connecting pipe, which is fixedly installed in an inverted "U" shape on the right side of the garbage cleaning and transporting box. And atomizing nozzles are equidistantly arranged on the upper side of the second connecting pipe. And the lower end of the second connecting pipe is communicated with the first connecting pipe through a hose. The atomized liquid of the atomizing nozzles blocks the dust generated when dumping construction waste from directly hitting the construction workers.

[0012] Furthermore, a transmission belt assembly is connected between the end of the main shaft and the end of the reciprocating lead screw, and the diameter of the transmission wheel installed at the end of the main shaft is larger than the diameter of the transmission wheel installed at the end of the reciprocating lead screw.

[0013] Through the above technical solution, when the main shaft rotates slightly, the reciprocating lead screw can be driven to rotate multiple turns.

[0014] Furthermore, a piston plate is sleeved on the middle part of the reciprocating lead screw through a thread, and the outer wall of the piston plate is in contact with the inner wall of the suction box. And the suction box is communicated with the water tank through a one-way valve.

[0015] Through the above technical solution, after the reciprocating lead screw rotates, the piston plate can be driven to reciprocate, and the water liquid in the water tank is pumped into the first connecting pipe.

[0016] Furthermore, two suction boxes are symmetrically arranged about the center of the frame in the front and back, and the moving directions of the piston plates inside the front and back suction boxes are the same.

[0017] Through the above technical solution, it can be ensured that the atomizing nozzles are always in the atomizing operation state.

[0018] Furthermore, a protective shell is rotatably installed in the middle of the second connecting pipe through a damping bearing, and a through groove is opened on the side of the protective shell, and the width of the through groove is larger than the diameter of the atomizing nozzle.

[0019] Through the above technical solution, the atomizing nozzles can be protected by the protective shell.

[0020] 3. Beneficial effects

[0021] By adopting the technical solution provided by the utility model, compared with the prior art, the garbage removal structure for construction sites of the utility model can reduce the dust generated by the garbage dumping through the atomizing nozzle arranged on the second connecting pipe, and at the same time prevent the dust from directly hitting the eyes of the construction site personnel in the first time, thereby improving the safety. The specific contents are as follows:

[0022] (1) An atomizing nozzle is provided so that when the construction waste in the garbage collection box needs to be dumped, the lock of the garbage collection box is released through the locking mechanism, and then the staff drives the garbage collection box upward on the right side of the garbage collection box to rotate and dump the garbage in the garbage collection box. During the rotation of the garbage collection box, the main shaft drives the reciprocating screw to rotate through the transmission belt assembly, thereby driving the piston plate to reciprocate in the suction box, squeezing the water in the water tank into the second connecting pipe, and the dust generated by the garbage dumping is reduced by the atomizing nozzles arranged at equal intervals on the second connecting pipe. At the same time, since the second connecting pipe is installed at the handle on the right side of the garbage collection box, the dust can be prevented from directly hitting the eyes of the construction site personnel in the first time, thereby improving safety;

[0023] (2) A protective shell is provided so that when loading construction waste, the atomizing nozzle on the second connecting pipe can be protected by the protective shell to avoid being hit by the construction waste, and at the same time isolate the dust generated when loading the waste. Before dumping the waste, the protective shell can be rotated to expose the atomizing nozzle. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 This is a schematic diagram of the overall side-view stereoscopic structure of the utility model;

[0025] Figure 2 It is a schematic diagram of the three-dimensional structure of the second connecting pipe after the protective shell of the utility model rotates;

[0026] Figure 3 This is a schematic diagram of the three-dimensional structure of the utility model as a whole from another perspective;

[0027] Figure 4 It is a schematic diagram of the three-dimensional structure of the draw box of the utility model in side section.

[0028] In the figure: 1. frame; 2. garbage removal box; 3. main shaft; 4. reciprocating screw; 5. transmission belt assembly; 6. locking mechanism; 7. water tank; 8. suction box; 81. piston plate; 82. first connecting pipe; 9. second connecting pipe; 91. atomizing nozzle; 10. protective shell. DETAILED DESCRIPTION

[0029] In order to facilitate the understanding of the present invention, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0030] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "page", "bottom", "inside", "outside", "clockwise", "counterclockwise", etc., indicating directions or positional relationships, are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present invention.

[0031] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present utility model, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0032] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed", "provided with", etc. should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances. Example

[0033] See also Figure 1-4, A garbage removal structure for a construction site, including a frame 1 with universal wheels installed at the bottom. At the upper end of the frame 1, there is a garbage removal box 2. On both the front and rear sides of the garbage removal box 2, there are fixed main shafts 3, and the main shafts 3 are installed on the upper end of the frame 1 through bearings. Moreover, there is a locking mechanism 6 connected between the frame 1 and the garbage removal box 2. At the same time, the right side of the lower end of the garbage removal box 2 is in contact with the upper end surface of the frame 1, so that the garbage removal box 2 can dump construction site garbage to the left; at the lower end of the frame 1, there is a water tank 7 and a suction box 8, and the water tank 7 is located on the left side of the suction box 8. Inside the suction box 8, there is a reciprocating screw rod 4 installed through a sealed bearing. Moreover, at the lower right side of the suction box 8, there is a first connecting pipe 82 connected through a one-way valve; a second connecting pipe 9, which is fixedly installed on the right side of the garbage removal box 2 in an inverted "U" shape. At the upper side of the second connecting pipe 9, there are atomizing nozzles 91 arranged at equal intervals. And the lower end of the second connecting pipe 9 is connected to the first connecting pipe 82 through a hose. The atomized liquid from the atomizing nozzles 91 blocks the dust generated when dumping construction waste from directly flying towards the construction workers; between the end of the main shaft 3 and the end of the reciprocating screw rod 4, there is a transmission belt assembly 5, and the diameter of the transmission wheel installed at the end of the main shaft 3 is larger than the diameter of the transmission wheel installed at the end of the reciprocating screw rod 4; a piston plate 81 is threadedly sleeved on the middle part of the reciprocating screw rod 4, and the outer wall of the piston plate 81 is in contact with the inner wall of the suction box 8. And the suction box 8 is connected to the water tank 7 through a one-way valve; there are two suction boxes 8 symmetrically arranged about the center of the frame 1 in the front and back, and the moving directions of the piston plates 81 inside the front and back suction boxes 8 are the same;

[0034] Combined with Figure 1-4 As shown, when the device is pushed to the recycling place by using the handle on the frame 1 and the garbage removal box 2, before rotating the garbage removal box 2, the locking of the garbage removal box 2 is released through the locking mechanism 6. Subsequently, the staff rotates the garbage removal box 2 upward on the right side of the garbage removal box 2 to dump the garbage in the garbage removal box 2. During the rotation of the garbage removal box 2, the main shaft 3 drives the reciprocating screw rod 4 to rotate through the transmission belt assembly 5. The piston plate 81 threadedly sleeved on the outside of the reciprocating screw rod 4 reciprocates inside the suction box 8, squeezing the water liquid in the water tank 7 into the second connecting pipe 9 through the suction box 8 and the first connecting pipe 82. Then, the atomizing nozzles 91 arranged at equal intervals on the second connecting pipe 9 are used to reduce the dust generated by the garbage dumping. At the same time, since the second connecting pipe 9 is installed at the right side handle of the garbage removal box, it can prevent the dust from directly flying into the eyes of the construction workers in the first place, improving safety;

[0035] In the middle of the second connecting pipe 9, there is a protective shell 10 rotatably installed through a damping bearing. On the side of the protective shell 10, there is a through groove, and the width of the through groove is larger than the diameter of the atomizing nozzle 91;

[0036] Combined with Figure 1-2As shown, when loading construction waste, the atomizing nozzle 91 on the second connecting pipe 9 can avoid being hit by the construction waste under the protection of the protective shell 10, and at the same time isolate the dust generated when loading the waste. Before dumping the waste, the protective shell 10 can be rotated to expose the atomizing nozzle 91.

[0037] Working Principle: When using this construction site waste removal structure, such as Figure 1-4 As shown, first, when loading construction waste, the protective shell 10 is used to prevent the atomizing nozzle 91 from being hit by the construction waste, and at the same time, the dust generated when loading the waste is isolated. When it is necessary to dump the construction waste in the garbage collection box 2, the protective shell 10 is first rotated to expose the atomizing nozzle 91, and then the lock of the garbage collection box 2 is released through the locking mechanism 6, and the garbage collection box 2 is driven to rotate, and the garbage in the garbage collection box 2 is dumped out. During the rotation of the garbage collection box 2, the main shaft 3 drives the reciprocating screw 4 to rotate through the transmission belt assembly 5, and the water in the water tank 7 is squeezed into the second connecting pipe 9 through the piston plate 81, and then the dust generated by the garbage dumping is reduced through the atomizing nozzle 91, and at the same time, the dust is prevented from directly hitting the eyes of the construction site personnel at the first time, thereby improving safety.

[0038] The contents not described in detail in this specification belong to the prior art known to professional and technical personnel in this field.

[0039] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art may still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.

Claims

1. A garbage removal structure for a construction site, comprising a frame (1) with universal wheels mounted on the bottom, characterized in that: A garbage collection box (2) is provided at the upper end of the frame (1). The front and rear sides of the garbage collection box (2) are fixedly installed with main shafts (3), and the main shafts (3) are installed on the upper end of the frame (1) through bearings. A locking mechanism (6) is connected between the frame (1) and the garbage collection box (2). At the same time, the right side of the lower end of the garbage collection box (2) is in contact with the upper end surface of the frame (1) so that the garbage collection box (2) can dump construction waste to the left. A water tank (7) and a suction box (8) are installed at the lower end of the frame (1), and the water tank (7) is located on the left side of the suction box (8). A reciprocating lead screw (4) is installed inside the suction box (8) through a sealed bearing. A first connecting pipe (82) is installed in a communicating manner at the lower right side of the suction box (8) through a one-way valve. A second connecting pipe (9) is fixedly installed in an inverted "U" shape on the right side of the garbage collection box (2). Atomizing nozzles (91) are equidistantly arranged on the upper side of the second connecting pipe (9). The lower end of the second connecting pipe (9) is connected to the first connecting pipe (82) through a hose. The atomized liquid from the atomizing nozzles (91) blocks the dust generated when dumping construction waste from directly hitting the construction workers.

2. A construction site garbage removal structure according to claim 1, characterized in that: A transmission belt assembly (5) is connected between the end of the main shaft (3) and the end of the reciprocating lead screw (4). The diameter of the transmission wheel installed at the end of the main shaft (3) is larger than the diameter of the transmission wheel installed at the end of the reciprocating lead screw (4).

3. The garbage removal structure for construction sites according to claim 1, characterized in that: A piston plate (81) is sleeved on the middle part of the reciprocating lead screw (4) in a threaded manner. The outer wall of the piston plate (81) is in contact with the inner wall of the suction box (8). The suction box (8) is connected to the water tank (7) through a one-way valve.

4. The garbage removal structure for construction sites according to claim 1 is characterized in that: Two suction boxes (8) are symmetrically arranged before and after about the center of the frame (1), and the moving directions of the piston plates (81) inside the front and rear suction boxes (8) are the same.

5. The garbage removal structure for construction sites according to claim 1, characterized in that: A protective shell (10) is rotatably installed in the middle of the second connecting pipe (9) through a damping bearing. A through groove is provided on the side of the protective shell (10), and the width of the through groove is larger than the diameter of the atomizing nozzle (91).