Water conservancy project ecological wall
By designing protective walls, planting boxes and maintenance components in the ecological wall of water conservancy projects, and using water collection pipes and drainage pipe systems, the irrigation problem of vegetation when the river water is dry, automatic irrigation is achieved, and manpower and water resources are saved.
Patent Information
- Application Number
- CN202420463815.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-11
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-03-11
AI Technical Summary
The existing ecological wall of water conservancy projects is prone to death when the river water is dry, irrigation is difficult, manpower is consumed, and it is difficult to provide effective water supply.
An ecological wall structure including protective wall, planting box and maintenance components is designed to collect the river water from the water collection pipe, protective net cover and outlet hole, and use drainage pipes and diversion pipes to divert the water flow when the river water level is low. To the planting chamber, automatic irrigation is achieved.
It reduces the workload of manual watering, saves water resources, and ensures that vegetation has sufficient water supply under different water levels.
Smart Images

Figure CN222090262U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of ecological walls of water conservancy projects, and specifically relates to an ecological wall of water conservancy projects. Background Art
[0002] Ecological wall refers to a greening method that makes full use of different site conditions, selects climbing plants and other plants to plant and attaches or lays them on various structures and other spatial structures, including overpasses, building walls, slopes, river embankments, roofs, gates, flower stands, trellises, balconies, corridors, columns, fences, dead trees and various rockery and architectural facilities. Ecological walls can reduce noise, beautify the environment, purify the air, improve the quality of urban environment, increase green coverage, and improve the urban ecological environment. With the continuous improvement of water conservancy engineering technology, water conservancy ecological walls have become an effective means of preventing soil erosion in water conservancy engineering technology.
[0003] A patent with announcement number CN217839885U discloses an ecological wall for a water conservancy project, including a concrete casting base, the top of one end of the concrete casting base is a drainage area, drainage wells are opened at both ends of the drainage area, and seepage well covers are provided at the wellheads of the two drainage wells. The middle part of the concrete casting base is the main structure support area, and multiple rows of steel bars are arranged in the middle of the main structure support area, and two vegetation planting frames are arranged on the top of the steel bars.
[0004] However, the water conservancy project ecological wall in the above patent still has certain problems during use. When the river water is dry, the vegetation on the ecological wall is easy to die. Since it is difficult to irrigate the vegetation planted on the ecological wall, it requires a lot of manpower. Therefore, a water conservancy project ecological wall is proposed. Utility Model Content
[0005] The utility model provides a water conservancy project ecological wall, which solves the problem of a water conservancy project ecological wall in the related technology.
[0006] The technical solution of the utility model is as follows:
[0007] A water conservancy project ecological wall includes a slope body and:
[0008] An ecological wall mechanism, the ecological wall mechanism includes a protective wall, a planting box and a maintenance component. The protective wall is built in three steps on the slope surface of the slope body. The middle part of the protective wall is set as a sightseeing staircase. Two sections of the slope surfaces on both sides of the sightseeing staircase are respectively provided with planting cavities. The four planting cavities are symmetrically arranged along the middle part of the sightseeing staircase. The two ends of the top plane of the protective wall are respectively fixedly connected with planting boxes. The maintenance component is provided in two groups, and the maintenance component includes a collection box, a drainage pipe and a shunt pipe. A connecting component is provided at one end of the middle part of the protective wall close to the bottom.
[0009] Preferably, the collecting box is fixedly connected to the bottom of the planting box, the drainage tube is L-shaped, one end of the drainage tube is fixedly connected to the bottom of the collecting box, the other end of the drainage tube is connected to the planting cavity near the bottom of the protective wall, one end of the shunt tube is fixedly connected to the inside of the drainage tube, and the other end of the shunt tube is connected to the planting cavity near the planting box.
[0010] Preferably, a plurality of through holes in a rectangular array are provided at the bottom of the planting box, and the collecting box is arranged in the middle of the lower surface of the planting box, and the length of the collecting box is half of the length of the planting box.
[0011] Preferably, the connecting component includes a water collecting pipe, a protective net cover and a water outlet hole. The water collecting pipe passes through one side of the bottom of the protective wall and extends to the interior of the slope body. The protective net cover is fixedly connected to the water inlet of the water collecting pipe. There are several water outlet holes, which are arranged in a straight line on both sides of the water collecting pipe near the top. The water level of the river under normal conditions is higher than the top of the protective net cover.
[0012] Preferably, the collecting box is arranged in an inverted cone shape, and the two ends of the first step at the bottom of the protective wall are arranged in a staircase shape.
[0013] Preferably, a water inlet A and a water inlet B are respectively provided at both ends of the first and second step planes on the protective wall, and the bottoms of the water inlet A and the water inlet B are connected to a drain pipe, and the other end of the drain pipe is fixedly connected to the drain outlet fixedly arranged at the bottom of the protective wall.
[0014] The working principle and beneficial effects of the utility model are:
[0015] 1. In the utility model, under normal conditions, river water enters the water collecting pipe through the protective mesh cover, and overflows from a number of water outlets to moisten the slope body inside the protective wall, so that there is enough water in the slope body to supply the vegetation planted in the planting cavity and the planting box. When the river water level is lower than the bottom of the protective mesh cover and the vegetation dries up, the relevant personnel only need to irrigate the inside of the planting box on the top of the protective wall, and the excess water for irrigating the planting box falls into the collection box through the through holes at the bottom of the planting box and gathers. The water flow is then directly diverted to the roots of the vegetation planted in the planting cavity through the drainage pipe and the diversion pipe, so that the roots of the vegetation in the planting cavity can be irrigated by irrigating the vegetation in the planting box, thereby saving the workload of the relevant personnel for watering and saving a large amount of water resources. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] The utility model is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0017] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0018] Figure 2 It is a partial stereogram of the utility model;
[0019] Figure 3 This is a schematic diagram of the structure of the maintenance component of the utility model;
[0020] Figure 4 It is a partial cross-sectional view of the utility model;
[0021] In the figure: 1. Slope body; 2. Ecological wall structure; 3. Protective wall; 4. Planting cavity; 5. Sightseeing stairs; 6. Planting box; 7. Collection box; 8. Drainage pipe; 9. Diversion pipe; 10. Water collecting pipe; 11. Protective net cover; 12. Water outlet; 13. Water inlet A; 14. Drain pipe; 15. Drainage outlet; 16. Water inlet B. DETAILED DESCRIPTION
[0022] The following will be combined with the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] Example 1
[0024] like Figure 1~Figure 4 As shown, this embodiment proposes a water conservancy project ecological wall, including a slope body 1, characterized in that it also includes:
[0025] The ecological wall mechanism 2 includes a protective wall 3, a planting box 6 and a maintenance component. The protective wall 3 is built in three steps on the slope surface of the slope body 1. The middle part of the protective wall 3 is set as a sightseeing staircase 5. Planting cavities 4 are respectively opened on the two slope surfaces on both sides of the sightseeing staircase 5. The four planting cavities 4 are symmetrically arranged along the middle part of the sightseeing staircase 5. The two ends of the top plane of the protective wall 3 are respectively fixedly connected with the planting boxes 6. Two groups of maintenance components are arranged. The maintenance components include a collection box 7, a drainage pipe 8 and a shunt pipe 9. A connecting component is arranged at one end of the middle part of the protective wall 3 near the bottom.
[0026] Preferably, the collection box 7 is fixedly connected to the bottom of the planting box 6, the drainage pipe 8 is L-shaped, one end of the drainage pipe 8 is fixedly connected to the bottom of the collection box 7, and the other end of the drainage pipe 8 is connected to the planting cavity 4 near the bottom of the protective wall 3, one end of the shunt pipe 9 is fixedly connected to the inside of the drainage pipe 8, and the other end of the shunt pipe 9 is connected to the planting cavity 4 near the planting box 6. The purpose of this arrangement is to achieve the purpose of sending the water flowing into the collection box 7 to the planting cavity 4 through the action of the drainage pipe 8 and the shunt pipe 9.
[0027] Preferably, a plurality of through holes in a rectangular array are provided at the bottom of the planting box 6, and the collecting box 7 is arranged in the middle of the lower surface of the planting box 6, and the length of the collecting box 7 is half the length of the planting box 6. The purpose of this arrangement is to achieve the purpose of facilitating the collection box 7 to collect excess water from the planting box 6 through the through holes at the bottom of the planting box 6 and the size of the collecting box 7, and facilitating the vegetation inside the planting box 6 to absorb the moisture inside the slope body 1.
[0028] Preferably, the connecting component includes a water collecting pipe 10, a protective mesh cover 11 and a water outlet 12. The water collecting pipe 10 passes through one side of the bottom of the protective wall 3 and extends to the inside of the slope body 1. The protective mesh cover 11 is fixedly connected to the water inlet of the water collecting pipe 10. There are a plurality of water outlets 12, which are arranged in a straight line on both sides of the water collecting pipe 10 near the top. The water level of the river water under normal conditions is higher than the top of the protective mesh cover 11. The purpose of this arrangement is to achieve that under normal conditions, the river water enters the water collecting pipe 10 through the protective mesh cover 11, and overflows from a plurality of water outlets 12 to moisten the slope body 1 inside the protective wall 3, so that there is enough water in the slope body 1 to supply the vegetation planted in the planting cavity 4 and the planting box 6.
[0029] Preferably, the collecting box 7 is set to be inverted cone shape, and the two ends at the first step at the bottom of the protective wall 3 are set to be stair-shaped. The purpose of this setting is to facilitate the discharge of water from the collecting box 7.
[0030] In this embodiment, under normal conditions, river water enters the water collecting pipe 10 through the protective mesh cover 11, and overflows from a number of water outlets 12 to moisten the slope body 1 inside the protective wall 3, so that there is enough water in the slope body 1 to supply the vegetation planted in the planting cavity 4 and the planting box 6. When the river water level is lower than the bottom of the protective mesh cover 11 and the vegetation dries up, the relevant personnel only need to irrigate the inside of the planting box 6 on the top of the protective wall 3. The excess water for irrigating the planting box 6 falls into the collection box 7 through the through holes at the bottom of the planting box 6 and gathers. The water flow is then directly diverted to the roots of the vegetation planted in the planting cavity 4 through the drainage pipe 8 and the diversion pipe 9, so that the roots of the vegetation in the planting cavity 4 can be irrigated by irrigating the vegetation in the planting box 6, thereby saving the workload of the relevant personnel for watering and saving a large amount of water resources.
[0031] Example 2
[0032] like Figure 1~Figure 4 As shown, based on the same concept as the above-mentioned embodiment 1, this embodiment further proposes that a water outlet A13 and a water outlet B16 are respectively provided at both ends of the upper and second step planes of the protective wall 3, and the bottoms of the water outlet A13 and the water outlet B16 are both connected to the drain pipe 14, and the other end of the drain pipe 14 is fixedly connected to the drain outlet 15 fixedly arranged at the bottom of the protective wall 3.
[0033] In this embodiment, the water outlet A13 and the water outlet B16 are provided so that the river water accumulated in the planting cavity 4 can be discharged in time when the water level rises sharply during drainage, flood discharge, etc.
[0034] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A water conservancy project ecological wall, comprising a slope body (1), characterized in that: Also includes: An ecological wall mechanism (2) comprises a protective wall (3), a planting box (6) and a maintenance component. The protective wall (3) is constructed in three steps on the slope surface of a slope body (1). A sightseeing staircase (5) is arranged in the middle of the protective wall (3). Planting cavities (4) are respectively provided on the two slope surfaces on both sides of the sightseeing staircase (5). The four planting cavities (4) are symmetrically arranged along the middle of the sightseeing staircase (5). The two ends of the top plane of the protective wall (3) are respectively fixedly connected to the planting boxes (6). Two groups of maintenance components are provided. The maintenance components include a collection box (7), a drainage pipe (8) and a shunt pipe (9). A connecting component is provided at one end of the middle of the protective wall (3) close to the bottom.
2. The water conservancy project ecological wall according to claim 1, characterized in that: The collecting box (7) is fixedly connected to the bottom of the planting box (6); the drainage tube (8) is arranged in an L shape; one end of the drainage tube (8) is fixedly connected to the bottom of the collecting box (7); the other end of the drainage tube (8) is connected to the planting cavity (4) near the bottom of the protective wall (3); one end of the shunt tube (9) is fixedly connected to the inside of the drainage tube (8); the other end of the shunt tube (9) is connected to the planting cavity (4) near the planting box (6).
3. The water conservancy project ecological wall according to claim 1, characterized in that: The bottom of the planting box (6) is provided with a plurality of through holes in a rectangular array, the collecting box (7) is arranged in the middle of the lower surface of the planting box (6), and the length of the collecting box (7) is half the length of the planting box (6).
4. The water conservancy project ecological wall according to claim 1, characterized in that: The connecting component comprises a water collecting pipe (10), a protective mesh cover (11) and a water outlet hole (12); the water collecting pipe (10) passes through one side of the bottom of the protective wall (3) and extends into the interior of the slope body (1); the protective mesh cover (11) is fixedly connected to the water inlet of the water collecting pipe (10); a plurality of water outlet holes (12) are arranged in a straight line on both sides of the water collecting pipe (10) near the top; the water level of the river under normal conditions is higher than the top of the protective mesh cover (11).
5. The water conservancy project ecological wall according to claim 1, characterized in that: The collecting box (7) is configured to be in an inverted cone shape, and both ends of the first step at the bottom of the protective wall (3) are configured to be in a staircase shape.
6. The water conservancy project ecological wall according to claim 1, characterized in that: A water inlet A (13) and a water inlet B (16) are respectively provided at both ends of the upper and second step planes of the protective wall (3); the bottoms of the water inlet A (13) and the water inlet B (16) are both connected to a drainage pipe (14); the other end of the drainage pipe (14) is fixedly connected to a drainage outlet (15) fixedly provided at the bottom of the protective wall (3).
