Projection welding clamp for projection welding of fuel distribution pipe
By designing a convex welding fixture for fuel distribution pipes, the clamping assembly is used to realize one-time alignment welding of the distribution pipe body, oil inlet pipe and wire harness bracket, which solves the problems of low production efficiency and high cost caused by multiple welding in the prior art. Improve product quality and production efficiency.
Patent Information
- Application Number
- CN202323477752.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-20
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2033-12-20
AI Technical Summary
In the existing fuel distribution pipe assembly process, the assembly of the distribution pipe body, oil inlet pipe and wire harness bracket requires multiple welding, resulting in low production efficiency, high cost and difficult to control product quality.
A fuel distribution tube projection welding fixture is designed, including a clamping assembly for clamping the distribution tube body, oil inlet pipe and wire harness bracket. Through the synergy of the clamping assembly, the three are aligned and welded at one time, reducing assembly. Error, improve accuracy and production efficiency.
One-time convex welding of the distribution pipe body, oil inlet pipe and wire harness bracket is realized, reducing production costs and improving assembly accuracy and production efficiency.
Smart Images

Figure CN222094964U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of projection welding fixtures for fuel distribution pipes used in automobile engines, in particular to a projection welding fixture for projection welding of fuel distribution pipes. Background Art
[0002] At present, the domestic fuel distribution pipe assembly process, such as the assembly of low-pressure fuel distribution pipe (including distribution pipe body, fuel inlet pipe and wiring harness bracket), adopts multi-step welding, which is completed by multi-step assembly. The labor cost is high and the production efficiency is low. Due to the numerous processes, the accumulation of assembly errors makes it difficult to control product quality. For example, according to the existing process, it is divided into two steps, the first step is the projection welding of the wiring harness bracket and the distribution pipe assembly, and the second step is the projection welding of the distribution pipe assembly and the fuel inlet pipe assembly.
[0003] Therefore, how to achieve one-time projection welding of the distribution pipe body, the oil inlet pipe and the wiring harness bracket becomes a technical problem that needs to be solved. Utility Model Content
[0004] The utility model aims to provide a projection welding fixture for projection welding of a fuel distribution pipe, mainly to solve the problem of how to realize one-time projection welding of a distribution pipe body, a fuel inlet pipe and a wiring harness bracket in the above-mentioned prior art.
[0005] In order to achieve the above-mentioned purpose, the technical solution adopted by the utility model is: a projection welding fixture for projection welding of a fuel distribution pipe, the fuel distribution pipe includes a distribution pipe body, an oil inlet pipe connected to the distribution pipe body and a wiring harness bracket, characterized in that: the projection welding fixture includes a first clamping assembly for clamping the distribution pipe body, a second clamping assembly for clamping the oil inlet pipe, and a third clamping assembly for clamping the wiring harness bracket, after the first clamping assembly clamps the distribution pipe body, the second clamping assembly clamps the oil inlet pipe and the third clamping assembly clamps the wiring harness bracket, the oil inlet pipe corresponds to the oil inlet hole of the distribution pipe body, and the wiring harness bracket corresponds to the installation position of the wire speed bracket on the distribution pipe body.
[0006] Furthermore, the first clamping assembly includes a first positioning member, a first cylinder and a first auxiliary positioning member for clamping the two ends of the distribution pipe body. The movable end of the first cylinder is connected to the first push block. The first push block, driven by the first cylinder, cooperates with the first auxiliary positioning member to clamp the side of the distribution pipe body.
[0007] Furthermore, an L-shaped positioning plate for longitudinally positioning the distribution pipe body is provided on the side of the first auxiliary positioning member facing the distribution pipe body.
[0008] Further, the second clamping assembly includes a second positioning member, a second lower electrode and a second cylinder, and the movable end of the second cylinder is connected to the second push rod;
[0009] The second positioning member is provided with a second concave positioning portion A for positioning one end of the oil inlet pipe;
[0010] The second lower electrode is provided with a second concave positioning portion B for positioning the other end of the oil inlet pipe. The second push rod, driven by the second cylinder, cooperates with the second concave positioning portion B to clamp the other end of the oil inlet pipe.
[0011] Furthermore, the second clamping assembly includes a second limiting member, and the second push rod is provided with a second limiting rod. When the second push rod cooperates with the second concave positioning portion B to clamp the other end of the oil inlet pipe, the second limiting rod abuts against the second limiting member.
[0012] Further, the third clamping assembly includes a third lower electrode, a third fixing member for fixing the third cylinder, a fourth fixing seat and a fourth cylinder, a third positioning through hole is provided on the top of the third fixing member, a third positioning pin is connected to the movable end of the third cylinder, and the third positioning pin is telescopically movable in the third positioning through hole;
[0013] The movable end of the fourth cylinder is connected to the fourth connecting part, the fourth connecting part is connected to one end of the third connecting rod, the other end of the third connecting rod is connected to the third clamping block, and the middle part of the third connecting rod is connected to the fourth fixing seat;
[0014] The third clamping block corresponds to the third positioning pin, and the third clamping block and the third fixing piece clamp the wiring harness bracket together.
[0015] Furthermore, a third groove is provided at the bottom of the third clamping block, and the third groove corresponds to the third positioning pin;
[0016] And / or a third strip hole is provided at one end of the third connecting rod, the fourth connecting portion is connected to a fourth connecting shaft, and the fourth connecting shaft is slidably connected to the third strip hole;
[0017] and / or the middle portion of the third connecting rod is axially connected to the fourth fixing seat;
[0018] and / or the top of the third fixing member is inclined;
[0019] And / or a third limiting protrusion is provided on the top of the third fixing piece for positioning both sides of the wiring harness bracket.
[0020] Furthermore, the projection welding fixture also includes a fifth positioning bracket, and a fifth concave positioning portion for positioning the injector seat on the distribution pipe body is provided on the top of the fifth positioning bracket.
[0021] Furthermore, the projection welding fixture further comprises an upper top plate and a lower bottom plate, and a guide column is provided between the upper top plate and the lower bottom plate;
[0022] A second upper electrode and a third upper electrode are provided at the bottom of the upper top plate, the second upper electrode corresponds to the second lower electrode, and the third upper electrode corresponds to the third lower electrode;
[0023] The upper top plate moves up and down along the guide column with the upper electrode;
[0024] And / or an upper limit column is provided at the bottom of the upper top plate, and a lower limit column is provided at the top of the lower bottom plate, and the upper limit column and the lower limit column are in corresponding positions;
[0025] A first positioning member, a first auxiliary positioning member, a second positioning member, a second lower electrode, a second limiting member, a third lower electrode, a third fixing member, a fourth fixing seat and a fourth cylinder are connected to the lower base plate;
[0026] The first cylinder is fixed on the lower base plate through a first connecting member, and the second cylinder is fixed on the lower base plate through a second connecting member.
[0027] Furthermore, there are two first positioning members, which are distributed at both ends of the distribution pipe body;
[0028] Two sets of first cylinders and first auxiliary positioning members are located on both sides of the fifth positioning bracket;
[0029] A set of second positioning members, a second lower electrode and a second cylinder, corresponding to the position on the distribution pipe body for welding the oil inlet pipe;
[0030] The three groups of the third lower electrode, the third fixing member, the fourth fixing seat and the fourth cylinder respectively correspond to three positions on the distribution pipe body for welding the wiring harness bracket.
[0031] In view of the above technical features, the utility model has the following advantages:
[0032] 1. The utility model is a projection welding fixture for projection welding of a fuel distribution pipe. The first clamping assembly, the second clamping assembly and the third clamping assembly are used to clamp the distribution pipe body and the oil inlet pipe, and the distribution pipe body and the wiring harness bracket (the clamping operation can be achieved step by step or simultaneously, and finally all three are in a clamped state), so as to achieve one-time projection welding of the distribution pipe body, the oil inlet pipe and the wiring harness bracket, complete the assembly, reduce the errors caused by multiple assemblies, and improve the assembly accuracy. The projection welding fixture is reasonably designed, accurately positioned, easy to operate, and improves production efficiency at the same time. It also greatly improves production efficiency and reduces production costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 It is a structural schematic diagram of a projection welding fixture for projection welding of a fuel distribution pipe in specific embodiment 1 (stereoscopic diagram, without showing the first positioning member and without installing the fuel distribution pipe);
[0034] Figure 2 is a front view of a projection welding fixture for projection welding of a fuel distribution pipe in specific embodiment 1;
[0035] Figure 3is a top view of a projection welding fixture for projection welding of a fuel distribution pipe in specific embodiment 1 (the upper top plate is not shown. The first positioning member is not shown, and the fuel distribution pipe is not installed);
[0036] Figure 4 yes Figure 2 Middle CC section view;
[0037] Figure 5 It is a stereoscopic view of a projection welding fixture for projection welding of a fuel distribution pipe in specific embodiment 1 (installing the fuel distribution pipe);
[0038] Figure 6 is a structural schematic diagram of the second clamping assembly clamping the oil inlet pipe in specific embodiment 1;
[0039] Figure 7 It is a schematic diagram of the structure of the third clamping assembly clamping the wiring harness bracket in specific embodiment 1.
[0040] In the figure: 1, upper top plate; 1-1, upper limit post; 1-2, second upper electrode; 1-3, third upper electrode;
[0041] 2. Lower base plate; 2-1. Lower limit column;
[0042] 3. Guide column;
[0043] 4. A first positioning member;
[0044] 5. First auxiliary positioning member; 5-1. L-shaped positioning plate;
[0045] 6. First cylinder; 6-1. First push block; 6-2. First connecting member;
[0046] 7. Second positioning member; 7-1. Second concave positioning portion A;
[0047] 8. second lower electrode; 8-1. second concave positioning portion B;
[0048] 9. Second cylinder; 9-1. Second connecting member; 9-2. Second push rod;
[0049] 10. Second limiting member; 10-1. Second limiting rod;
[0050] 11. a third lower electrode;
[0051] 12. third fixing member; 12-1. third positioning through hole; 12-2. inclined surface; 12-3. third limiting protrusion;
[0052] 13. The third cylinder; 13-1. The third positioning pin;
[0053] 14. Fourth fixing seat;
[0054] 15. fourth cylinder; 15-1. fourth connecting portion;
[0055] 16. The third connecting rod; 16-1. The third clamping block; 16-2. The third groove; 16-3. The third strip hole; 16-4. The fourth connecting shaft.
[0056] 17. Distribution pipe body; 17-1. Injector seat; 17-2. Stop ear;
[0057] 18. Oil inlet pipe; 18-1. One end of the oil inlet pipe; 18-2. The other end of the oil inlet pipe;
[0058] 19. Wire harness bracket; 19-1. Positioning hole;
[0059] 20. Fifth positioning bracket; 20-1. Fifth concave positioning portion. DETAILED DESCRIPTION
[0060] The present invention is further described below in conjunction with specific embodiments. It should be understood that these embodiments are only used to illustrate the present invention and are not used to limit the scope of the present invention. In addition, it should be understood that after reading the content taught by the present invention, those skilled in the art can make various changes or modifications to the present invention, and these equivalent forms also fall within the scope defined by the claims attached to this application.
[0061] See also Figures 1 to 7 , Specific embodiment 1, this embodiment 1 provides a projection welding fixture for projection welding of a fuel distribution pipe, the fuel distribution pipe includes a distribution pipe body 17, an oil inlet pipe 18 connected to the distribution pipe body 17, and a harness bracket 19, characterized in that: the projection welding fixture includes a first clamping assembly for clamping the distribution pipe body 17, a second clamping assembly for clamping the oil inlet pipe 18, and a third clamping assembly for clamping the harness bracket 19, after the first clamping assembly clamps the distribution pipe body 17, the second clamping assembly clamps the oil inlet pipe 18, and the third clamping assembly clamps the harness bracket 19, the oil inlet pipe 18 corresponds to the oil inlet hole of the distribution pipe body 17, and the harness bracket 19 corresponds to the installation position of the wire speed bracket on the distribution pipe body 17. In this way, the positions of the distribution pipe body 17, the oil inlet pipe 18 and the harness bracket 19 can be aligned, the positioning accuracy is improved, and it is convenient to use the projection welding process to weld the distribution pipe body 17, the oil inlet pipe 18 and the harness bracket 19 into one piece at one time, which is simple to operate, has higher production efficiency, and reduces production costs.
[0062] The projection welding fixture also includes an upper top plate 1 and a lower bottom plate 2, a guide column 3 is arranged between the upper top plate 1 and the lower bottom plate 2, and a first clamping assembly, a second clamping assembly and a third clamping assembly are all located between the upper top plate 1 and the lower bottom plate 2.
[0063] The first clamping assembly includes a first positioning member 4, a first cylinder 6 and a first auxiliary positioning member 5 for clamping the two ends of the distribution pipe body 17. The movable end of the first cylinder 6 is connected to the first push block 6-1. The first push block 6-1, driven by the first cylinder 6, cooperates with the first auxiliary positioning member 5 to clamp the side of the distribution pipe body 17.
[0064] The first auxiliary positioning member 5 is provided with an L-shaped positioning plate 5-1 for longitudinally positioning the distribution pipe body 17 on the side facing the distribution pipe body 17. When the fuel distribution pipe is installed on the projection welding fixture, the distribution pipe body 17 (actually the injector seat 17-2 on the distribution pipe body) is aligned with the L-shaped positioning plate 5-1, and the injector seat 17-2 of the distribution pipe body 17 is longitudinally positioned by the L-shaped positioning plate 5-1. The longitudinal direction refers to the direction in which the first push block 6-1 moves, so that the distribution pipe body 17 is aligned with the first push block 6-1. The first cylinder 6 drives the first push block 6-1, and cooperates with the L-shaped positioning plate 5-1 to clamp and fix the distribution pipe body 17. The whole process is simple, efficient and convenient.
[0065] The fuel distribution pipe is installed on the projection welding fixture, which means that the wiring harness bracket 19 is placed on the third lower electrode 11, and the other end 18-2 of the fuel inlet pipe is inserted into the second concave positioning part B8-1 of the second lower electrode 8. The distribution pipe body 17 is placed on the wiring harness bracket 19 and the other end 18-2 of the fuel inlet pipe. The first positioning piece 4, the third lower electrode 11 and the wiring harness bracket 19, the second lower electrode 8 and the other end 18-2 of the fuel inlet pipe jointly pre-position the distribution pipe body 17 in the vertical direction. When the corresponding upper and lower electrodes are molded and projection welded, the distribution pipe body 17 is clamped.
[0066] At the same time, the L-shaped positioning plate 5-1 can also play an anti-error function for the installation of the distribution pipe body 17. A stop ear 17-2 is provided on the injector seat 17-1. Only when the stop ear 17-2 is facing upward, the edge of the end of the corresponding injector seat 17-1 (for example, the outermost injector seat at both ends) is against the bottom of the L-shaped positioning plate 5-1, and the corresponding injector seat 17-1 is stuck into the fifth concave positioning portion 20-1 of the fifth positioning bracket 20.
[0067] The projection welding fixture also includes a fifth positioning bracket 20, and a fifth concave positioning portion 20-1 is provided on the top of the fifth positioning bracket 20 for positioning the injector seat 17-1 on the distribution pipe body 17. For example, the fifth concave positioning portion 20-1 is a concave-shaped card slot, which indirectly fixes and positions the distribution pipe body 17 by fixing the injector seat 17-1, so that the position of the distribution pipe body 17 is more stable and the upper and lower electrodes can be aligned more accurately.
[0068] The second clamping assembly includes a second positioning member 7, a second lower electrode 8 and a second cylinder 9, and the movable end of the second cylinder 9 is connected to the second push rod 9-2; the second positioning member 7 is provided with a second concave positioning portion A7-1 for positioning one end 18-1 of the oil inlet pipe; the second lower electrode 8 is provided with a second concave positioning portion B8-1 for positioning the other end 18-2 of the oil inlet pipe, and the second push rod 9-2, driven by the second cylinder 9, cooperates with the second concave positioning portion B8-1 to clamp the other end 18-2 of the oil inlet pipe. When installing the oil inlet pipe 18, first place one end 18-1 of the oil inlet pipe on the second concave positioning portion A7-1, then insert the other end 18-2 of the oil inlet pipe into the second concave positioning portion B8-1, and then use the second push rod 9-2 to press the other end 18-2 of the oil inlet pipe to help fix the position of the oil inlet pipe 18 and ensure that the other end 18-2 of the oil inlet pipe is aligned with the position on the distribution pipe body 17 for installing the oil inlet pipe 18, so as to facilitate the subsequent use of the projection welding process to achieve welding between the oil inlet pipe 18 and the distribution pipe body 17.
[0069] The second clamping assembly includes a second limiting member 10, and a second limiting rod 10-1 is provided on the second push rod 9-2. When the second push rod 9-2 cooperates with the second concave positioning portion B8-1 to clamp the other end 18-2 of the oil inlet pipe, the second limiting rod 10-1 is abutted against the second limiting member 10 to limit the second push rod 9-2. At the same time, the second push rod 9-2 cooperates with the second concave positioning portion B8-1 to clamp the other end 18-2 of the oil inlet pipe.
[0070] The third clamping assembly includes a third lower electrode 11, a third fixing member 12 for fixing the third cylinder 13, a fourth fixing seat 14 and a fourth cylinder 15. A third positioning through hole 12-1 is provided on the top of the third fixing member 12. The movable end of the third cylinder 13 is connected to the third positioning pin 13-1. The third positioning pin 13-1 telescopes and moves in the third positioning through hole 12-1, that is, as the movable end of the third cylinder 13 telescopes, the third positioning pin 13-1 telescopes and moves in the third positioning through hole 12-1. When the third positioning pin 13-1 is in an extended state, the third positioning pin 13-1 protrudes from the third positioning through hole 12-1 and can be embedded in the positioning hole 19-1 of the wiring harness bracket 19 on the top of the third fixing member 12 to realize the positioning function of the wiring harness bracket 19. When the third positioning pin 13-1 is in a retracted state, the third positioning pin 13-1 retracts into the third positioning through hole 12-1, which is convenient for removing the wiring harness bracket 19 from the top of the third fixing member 12. When the harness bracket 19 is placed on the third lower electrode 11 , the third positioning pin 13 - 1 is used to be embedded in the positioning hole 19 - 1 of the harness bracket 19 to achieve positioning of the harness bracket 19 .
[0071] The movable end of the fourth cylinder 15 is connected to the fourth connecting part 15-1, the fourth connecting part 15-1 is connected to one end of the third connecting rod 16, the other end of the third connecting rod 16 is connected to the third clamping block 16-2, and the middle part of the third connecting rod 16 is connected to the fourth fixed seat 14, for example, the middle part of the third connecting rod 16 is axially connected to the fourth fixed seat 14.
[0072] The third clamping block 16-2 corresponds to the third positioning pin 13-1, and the third clamping block 16-2 and the third fixing member 12 jointly clamp the wiring harness bracket 19. When the fourth cylinder 15 drives the third connecting rod 16 to perform a lever movement, the third connecting rod 16 drives the third clamping block 16-2 to perform an arc movement, and the third clamping block 16-2 is lowered to press the wiring harness bracket 19 against the top of the third fixing member 12, or the third clamping block 16-2 is lifted, so that the wiring harness bracket 19 can be removed from the top of the third fixing member 12.
[0073] A third groove 16-2 is provided at the bottom of the third clamping block 16-2, and the third groove 16-2 corresponds to the third positioning pin 13-1. When the third clamping block 16-2 and the top of the third fixing member 12 clamp the wiring harness bracket 19, the third positioning pin 13-1 is embedded in the third groove 16-2 to ensure the clamping force of the third clamping block 16-2 and the top of the third fixing member 12 on the wiring harness bracket 19, or in other words, the third groove 16-2 is used to avoid the third positioning pin 13-1.
[0074] A third bar hole 16-3 is provided at one end of the third connecting rod 16, and the fourth connecting part 15-1 is connected to the fourth connecting shaft 16-4. The fourth connecting shaft 16-4 is slidably connected to the third bar hole 16-3, so that the movable end of the fourth cylinder 15 can lift or drop one end of the third connecting rod 16, thereby providing power for the third connecting rod 16 to perform lever movement.
[0075] The top of the third fixing member 12 is a slope 12-2 to match the shape of the wire harness bracket 19. When the side where the positioning hole 19-1 of the wire harness bracket 19 is located is clamped by the third clamping block 16-2 and the top of the third fixing member 12, the other side of the wire harness bracket 19 (i.e., the side used for welding with the distribution pipe body 17) can be stably placed on the top of the third lower electrode 11 to ensure the quality of subsequent projection welding.
[0076] A third limiting protrusion 12-3 for positioning both sides of the wiring harness bracket 19 is provided on the top of the third fixing member 12. The third limiting protrusions 12-3 are connected to pre-position the side where the positioning hole 19-1 of the wiring harness bracket 19 is located. That is to say, as long as the side where the positioning hole 19-1 of the wiring harness bracket 19 is located is placed between the two third limiting protrusions 12-3, it can be ensured that the positioning hole 19-1 of the wiring harness bracket 19 is aligned with the third positioning through hole 12-1 on the top of the third fixing member 12, so that the third positioning pin 13-1 is embedded in the positioning hole 19-1 of the wiring harness bracket 19, thereby realizing the positioning function of the third positioning pin 13-1 on the wiring harness bracket 19.
[0077] A second upper electrode 1-2 and a third upper electrode 1-3 are provided at the bottom of the upper top plate 1. The second upper electrode 1-2 corresponds to the second lower electrode 8 to realize projection welding between the distribution pipe body 17 and the oil inlet pipe 18. The third upper electrode 1-3 corresponds to the third lower electrode 11 to realize projection welding between the distribution pipe body 17 and the wiring harness bracket 19. The upper top plate 1 moves up and down along the guide column 3 with the upper electrode, driving the second upper electrode 1-2 and the third upper electrode 1-3 to press the distribution pipe body 17.
[0078] An upper limit column 1-1 is provided at the bottom of the upper top plate 1, and a lower limit column 2-1 is provided at the top of the lower bottom plate 2. The upper limit column 1-1 and the lower limit column 2-1 are positioned correspondingly. When the second upper electrode 1-2 and the third upper electrode 1-3 press the distribution tube body 17, the upper limit column 1-1 and the lower limit column 2-1 are abutted against each other to avoid crushing the corresponding upper electrode, lower electrode and / or the distribution tube body 17.
[0079] The first positioning member 4, the first auxiliary positioning member 5, the second positioning member 7, the second lower electrode 8, the second limiting member 10, the third lower electrode 11, the third fixing member 12, the fourth fixing seat 14 and the fourth cylinder 15 are connected to the lower base plate 2; the first cylinder 6 is fixed to the lower base plate 2 by the first connecting member 6-2, and the second cylinder 9 is fixed to the lower base plate 2 by the second connecting member 9-1.
[0080] In this embodiment 1, there are two first positioning members 4, which are distributed at both ends of the distribution pipe body 17, and two groups of first cylinders 6 and first auxiliary positioning members 5 are located on both sides of the fifth positioning bracket 20. One group of second positioning members 7, second lower electrode 8 and second cylinder 9 correspond to the position on the distribution pipe body 17 for welding the oil inlet pipe 18; three groups of third lower electrodes 11, third fixing members 12, fourth fixing seats 14 and fourth cylinders 15 correspond to three positions on the distribution pipe body 17 for welding the harness bracket 19. This design is to meet the need to convexly weld one oil inlet pipe 18 and three harness brackets 19 on one distribution pipe body 17.
[0081] The specific use steps are as follows: first, the oil inlet pipe 18 and the three harness brackets 19 are respectively installed on the corresponding second clamping assembly and the third clamping assembly, and then the distribution pipe body 17 is pressed on the second lower electrode 8 and the oil inlet pipe 18, the three third lower electrodes 11 and the harness bracket, so that the welding position for the oil inlet pipe 18 and the welding position for the harness bracket 19 on the distribution pipe body 17 can correspond to the corresponding oil inlet pipe 18 and the harness bracket 19, and then the second upper electrode 1-2 and the three third upper electrodes 1-3 are driven downward by the top plate 1 and pressed on the distribution pipe body 17, and finally the corresponding upper and lower electrodes are energized to conduct electricity and melt the small convex points on the harness bracket 19 and the oil inlet seat, so as to finally realize the one-time welding of the oil inlet pipe 18, the harness bracket 19 and the distribution pipe body 17, complete the assembly, and reduce the error caused by multiple assemblies. The projection welding fixture in this embodiment 1 is reasonably designed, accurately positioned, easy to operate, and improves production efficiency at the same time. It also greatly improves production efficiency and reduces production costs.
[0082] The above description is only a preferred embodiment of the present invention, and does not limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made by using the contents of the specification and drawings of the present invention, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A projection welding fixture for projection welding of a fuel distribution pipe, the fuel distribution pipe comprising a distribution pipe body (17), an oil inlet pipe (18) connected to the distribution pipe body (17) and a harness bracket (19), characterized in that: The projection welding fixture comprises a first clamping assembly for clamping a distribution pipe body (17), a second clamping assembly for clamping an oil inlet pipe (18), and a third clamping assembly for clamping a wiring harness bracket (19). After the first clamping assembly clamps the distribution pipe body (17), the second clamping assembly clamps the oil inlet pipe (18), and the third clamping assembly clamps the wiring harness bracket (19), the oil inlet pipe (18) corresponds to the oil inlet hole of the distribution pipe body (17), and the wiring harness bracket (19) corresponds to the installation position of the wire speed bracket on the distribution pipe body (17).
2. A projection welding fixture for projection welding of a fuel distribution pipe according to claim 1, characterized in that: The first clamping assembly comprises a first positioning member (4), a first cylinder (6) and a first auxiliary positioning member (5) for clamping the two ends of the distribution pipe body (17); the movable end of the first cylinder (6) is connected to a first push block (6-1); the first push block (6-1) cooperates with the first auxiliary positioning member (5) to clamp the side of the distribution pipe body (17) under the drive of the first cylinder (6).
3. A projection welding fixture for projection welding of a fuel distribution pipe according to claim 2, characterized in that: An L-shaped positioning plate (5-1) for longitudinally positioning the distribution pipe body (17) is provided on the side of the first auxiliary positioning member (5) facing the distribution pipe body (17).
4. A projection welding fixture for projection welding of a fuel distribution pipe according to claim 3, characterized in that: The second clamping assembly comprises a second positioning member (7), a second lower electrode (8) and a second cylinder (9), wherein the movable end of the second cylinder (9) is connected to a second push rod (9-2); The second positioning member (7) is provided with a second concave positioning portion A (7-1) for positioning one end (18-1) of the oil inlet pipe; The second lower electrode (8) is provided with a second inner concave positioning portion B (8-1) for positioning the other end (18-2) of the oil inlet pipe. The second push rod (9-2), driven by the second cylinder (9), cooperates with the second inner concave positioning portion B (8-1) to clamp the other end (18-2) of the oil inlet pipe.
5. A projection welding fixture for projection welding of a fuel distribution pipe according to claim 4, characterized in that: The second clamping assembly comprises a second limiting member (10), and a second limiting rod (10-1) is provided on the second push rod (9-2). When the second push rod (9-2) cooperates with the second concave positioning portion B (8-1) to clamp the other end (18-2) of the oil inlet pipe, the second limiting rod (10-1) abuts against the second limiting member (10).
6. A projection welding fixture for projection welding of a fuel distribution pipe according to claim 2, 3, 4 or 5, characterized in that: The third clamping assembly comprises a third lower electrode (11), a third fixing member (12) for fixing a third cylinder (13), a fourth fixing seat (14) and a fourth cylinder (15); a third positioning through hole (12-1) is provided on the top of the third fixing member (12); a third positioning pin (13-1) is connected to the movable end of the third cylinder (13); and the third positioning pin (13-1) is telescopically movable in the third positioning through hole (12-1); The movable end of the fourth cylinder (15) is connected to the fourth connecting part (15-1), the fourth connecting part (15-1) is connected to one end of the third connecting rod (16), the other end of the third connecting rod (16) is connected to the third clamping block (16-1), and the middle part of the third connecting rod (16) is connected to the fourth fixing seat (14); The third clamping block (16-1) corresponds to the third positioning pin (13-1), and the third clamping block (16-1) and the third fixing member (12) jointly clamp the wiring harness bracket (19).
7. A projection welding fixture for projection welding of a fuel distribution pipe according to claim 6, characterized in that: A third groove (16-2) is provided at the bottom of the third clamping block (16-1), and the third groove (16-2) corresponds to the third positioning pin (13-1); And / or a third strip-shaped hole (16-3) is provided at one end of the third connecting rod (16), the fourth connecting portion (15-1) is connected to a fourth connecting shaft (16-4), and the fourth connecting shaft (16-4) is slidably connected to the third strip-shaped hole (16-3); and / or the middle portion of the third connecting rod (16) is axially connected to the fourth fixing seat (14); and / or the top of the third fixing member (12) is an inclined surface (12-2); And / or a third limiting protrusion (12-3) for positioning the two sides of the wiring harness bracket (19) is provided on the top of the third fixing member (12).
8. A projection welding fixture for projection welding of a fuel distribution pipe according to claim 7, characterized in that: The projection welding fixture also includes a fifth positioning bracket (20), and a fifth inner concave positioning portion (20-1) for positioning the injector seat (17-1) on the distribution pipe body (17) is provided on the top of the fifth positioning bracket (20).
9. A projection welding fixture for projection welding of a fuel distribution pipe according to claim 8, characterized in that: The projection welding fixture further comprises an upper top plate (1) and a lower bottom plate (2), wherein a guide column (3) is provided between the upper top plate (1) and the lower bottom plate (2); A second upper electrode (1-2) and a third upper electrode (1-3) are provided at the bottom of the upper top plate (1), the second upper electrode (1-2) corresponds to the second lower electrode (8), and the third upper electrode (1-3) corresponds to the third lower electrode (11); The upper top plate (1) moves up and down along the guide pillar (3) with the upper electrode; And / or an upper limit column (1-1) is provided at the bottom of the upper top plate (1), and a lower limit column (2-1) is provided at the top of the lower bottom plate (2), and the upper limit column (1-1) and the lower limit column (2-1) are located in corresponding positions; A first positioning member (4), a first auxiliary positioning member (5), a second positioning member (7), a second lower electrode (8), a second limiting member (10), a third lower electrode (11), a third fixing member (12), a fourth fixing seat (14) and a fourth cylinder (15) are connected to the lower base plate (2); The first cylinder (6) is fixed on the lower base plate (2) via a first connecting member (6-2), and the second cylinder (9) is fixed on the lower base plate (2) via a second connecting member (9-1).
10. A projection welding fixture for projection welding of a fuel distribution pipe according to claim 9, characterized in that: There are two first positioning members (4), which are distributed at both ends of the distribution pipe body (17); Two groups of first cylinders (6) and first auxiliary positioning members (5) are located on both sides of the fifth positioning bracket (20); A set of second positioning members (7), a second lower electrode (8) and a second cylinder (9), corresponding to positions on the distribution pipe body (17) for welding the oil inlet pipe (18); The three groups of third lower electrodes (11), third fixing members (12), fourth fixing seats (14) and fourth cylinders (15) respectively correspond to three positions on the distribution pipe body (17) for welding the wiring harness bracket (19).