High-precision rapid mold closing device for prefabricated T-beam end steel mold plate

By using high-precision fast mold clamping device with symmetrical brackets, guide angle steel and screws in bridge construction, the problem of difficult adjustment of T-beam end steel formwork under traditional hammering method is solved, and efficient and low-cost construction is achieved, suitable for women Workers operate, significantly improving construction efficiency and adaptability.

CN222096513UActive Publication Date: 2024-12-03CHINA RAILWAY CONSTR BRIDGE ENG BUREAU GRP 1ST ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323329372.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-07
Publication Date
2024-12-03
Estimated Expiration
2033-12-07

AI Technical Summary

Technical Problem

In bridge construction, it is difficult to quickly and accurately adjust the steel formwork at the end of the T-beam by traditional hammering methods, resulting in a long construction cycle, large labor volume, and serious noise pollution, affecting construction efficiency and cost.

Method used

A high-precision fast mold clamping device including symmetrical brackets, guide angle steel, screws and tie rods is designed. The screw is driven to rotate by using electric tools, and precise adjustment is achieved through positioning holes and limiting holes to reduce heavy physical labor.

Benefits of technology

It realizes high-precision and rapid adjustment of the steel formwork at the end of the T-beam, reduces construction costs and noise pollution, is suitable for ordinary female workers, and significantly improves construction efficiency and adaptability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222096513U_ABST
    Figure CN222096513U_ABST
Patent Text Reader

Abstract

The utility model discloses a high-precision rapid mold closing device for a prefabricated T-beam end steel template, which is characterized in that the mold closing device comprises two symmetrically distributed supports (1), guide angle steel (2) is uniformly connected between the two supports (1), a horizontally distributed screw rod (3) is in threaded connection with the guide angle steel (2), one end of the screw rod (3) is provided with a connecting end (4), and the other end of the screw rod (3) is provided with a bolt (5). One end of the support (1) is rotatably connected with the base (2), the other end of the support (1) is rotatably connected with a protective pad (5), a positioning part (6) is arranged on the support (1), a plurality of positioning holes (7) distributed at equal intervals are formed in the positioning part (6), the support (1) is matched with a precast beam pedestal (8), and the positioning holes (7) are matched with limiting holes formed in the side wall of the precast beam pedestal (8). Meanwhile, the mold closing device further comprises a pull rod (9) which can be connected in the positioning hole and the limiting hole in a penetrating mode at the same time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of bridge construction, in particular to a high-precision rapid mold clamping device for a prefabricated T-beam end steel template. Background Art

[0002] During the construction of highway bridges, prefabricated T-beams are widely used because they can be constructed simultaneously with the bridge substructure, have a fast construction speed, and cause less interference with road traffic. There are fewer dangerous factors for pedestrians and vehicles under the bridge during construction. At the same time, prefabricated T-beams do not require the installation and disassembly of the inner mold of the prefabricated box beam, and the construction is simple and quick.

[0003] When constructing the prefabricated T-beam of the bridge superstructure, the prefabricated T-beam with the web reinforcement tied must first be molded on the prefabricated pedestal. The end steel formwork has many holes at the bottom for the main reinforcement to pass through, and part of the load of the main reinforcement acts directly on the end steel formwork, which makes the installation of the end steel membrane difficult and the construction period long, time-consuming and labor-intensive.

[0004] The traditional construction method is to use a hammer to hit the end steel template to make it move relative to the bottom precast beam pedestal, so as to adjust the position of the end steel template on the precast beam pedestal; however, the hammering adjustment method is difficult to control the hammering force, and it is difficult to adjust the end steel template in a short time. Once the end steel template moves excessively, it needs to be pulled back by a guide chain or other mechanism. In addition, this method is relatively labor-intensive and time-consuming, which seriously affects the work efficiency of bridge construction.

[0005] In addition, a large amount of noise pollution will be generated during the hammering process, which will have an adverse impact on the surrounding residents. If construction is only carried out during the day, the production cycle of prefabricated beams will be doubled and the construction cost will be greatly increased.

[0006] Therefore, a method or device capable of solving the above problems is now needed. Summary of the invention

[0007] The utility model aims to solve the above-mentioned deficiencies in the prior art and proposes a clamping device which has a simple structure, ingenious design, reasonable layout and can quickly and conveniently realize high-precision adjustment of the T-beam end steel template.

[0008] The technical solution of the utility model is: a high-precision and rapid mold clamping device for a prefabricated T-beam end steel template, characterized in that: the mold clamping device comprises two symmetrically distributed brackets 1, a guide angle steel 2 is connected between the two brackets 1, a horizontally distributed screw rod 3 is threadedly connected to the guide angle steel 2, one end of the screw rod 3 is provided with a connecting end 4, and the other end is rotatably connected with a protective pad 5, a positioning portion 6 is provided on the bracket 1, and a plurality of positioning holes 7 distributed at equal intervals are opened on the positioning portion 6, the bracket 1 is matched with a prefabricated beam pedestal 8, and the positioning hole 7 is matched with a limiting hole opened on the side wall of the prefabricated beam pedestal 8, and the mold clamping device also includes a pull rod 9 that can be simultaneously connected to the positioning hole and the limiting hole.

[0009] Compared with the prior art, the utility model has the following advantages:

[0010] This type of high-precision rapid mold clamping device for prefabricated T-beam end steel template has a simple structure, ingenious design, and reasonable layout. Compared with the traditional hammer construction method, it has at least the following advantages:

[0011] (1) Simple structure and easy to process.

[0012] It adopts lightweight design and simple structure, only needs a small amount of templates to complete the production, and is easy to process.

[0013] (2) Electric tool construction, no repetitive heavy physical labor, and high mold clamping precision.

[0014] When the mold clamping device is in use, an electric tool can be used to drive the screw to rotate, which can save manpower and accurately control the screw.

[0015] (3) Good adaptability, no heavy physical labor, ordinary female workers can also use it, greatly saving project costs.

[0016] This high-precision and rapid mold-closing device for the prefabricated T-beam end steel formwork does not require the heavy physical labor of male workers required for traditional hammer installation. It can be operated by ordinary female workers and has good adaptability, which greatly reduces the proportion of male workers. It is especially suitable for female workers who are meticulous, not adapted to heavy physical labor and have lower costs, thus greatly reducing construction costs.

[0017] Therefore, it can be said that this rapid mold clamping device has many advantages, is particularly suitable for promotion and application in this field, and has a very broad market prospect. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is the front view of the embodiment of the utility model.

[0019] Figure 2 It is a side view of an embodiment of the utility model.

[0020] Bracket 1, guide angle steel 2, screw 3, connecting end 4, protective pad 5, positioning part 6, positioning hole 7, prefabricated beam base 8, pull rod 9, end steel template 10. DETAILED DESCRIPTION

[0021] The specific implementation of the present invention will be described below in conjunction with the accompanying drawings: Figure 1 , Figure 2 As shown, a high-precision rapid mold clamping device for a prefabricated T-beam end steel template comprises two symmetrically distributed brackets 1, a guide angle steel 2 is connected between the two brackets 1, a horizontally distributed screw rod 3 is threadedly connected to the guide angle steel 2, one end of the screw rod 3 is provided with a connecting end 4, and the other end is rotatably connected to a protective pad 5, a positioning portion 6 is provided on the bracket 1, and a plurality of positioning holes 7 distributed at equal intervals are opened on the positioning portion 6, the bracket 1 is matched with a prefabricated beam pedestal 8, and the positioning hole 7 is matched with a limiting hole opened on the side wall of the prefabricated beam pedestal 8, and the mold clamping device also comprises a pull rod 9 that can be simultaneously connected to the positioning hole and the limiting hole.

[0022] The working process of the high-precision rapid clamping device for the prefabricated T-beam end steel template of the utility model embodiment is as follows: first, the main body of the device composed of the bracket 1 and the guide angle steel 2 is buckled on the prefabricated beam pedestal 8, so that the two brackets 1 are respectively located on both sides of the prefabricated beam pedestal 8, and the relative position between the positioning part 6 and the prefabricated beam pedestal 8 is adjusted, so that a certain positioning hole 7 on the positioning part 6 coincides with the limiting hole on the side of the prefabricated beam pedestal 8, and then the pull rod 9 is penetrated into the positioning hole 7 and the limiting hole. At this time, the main body of the device is fixedly connected with the prefabricated beam pedestal 8; because the positions of the limiting holes opened on different prefabricated beam pedestals 8 may have certain deviations, there are multiple positioning holes 7 on the positioning part 6;

[0023] Then, insert the muzzle of the electric wrench into the connecting end 4 on the screw rod 3, start the electric wrench, and drive the screw rod 3 to rotate. Since the screw rod 3 and the guide angle steel 2 are threadedly connected, the screw rod 3 will move along its own axial direction when rotating, driving the protective pad 5 at the front end to push the end steel template 10 in contact with it to move. Since the electric wrench can accurately control the number of rotations of the screw rod 3 by jogging operation, the travel distance of the end steel template 10 can be accurately controlled, thereby achieving accurate and rapid adjustment;

[0024] When the end steel template 10 is adjusted into place, the mold closing operation of the prefabricated T beam is completed.

Claims

1. A high-precision rapid mold clamping device for prefabricated T-beam end steel template, characterized in that: The mold clamping device comprises two symmetrically distributed brackets (1), the two brackets (1) are connected with a guide angle steel (2), the guide angle steel (2) is threadedly connected with a horizontally distributed screw rod (3), one end of the screw rod (3) is provided with a connecting end (4), and the other end is rotatably connected with a protective pad (5), the bracket (1) is provided with a positioning part (6), and the positioning part (6) is provided with a plurality of positioning holes (7) distributed at equal intervals, the bracket (1) matches with a precast beam pedestal (8), and the positioning hole (7) matches with a limiting hole provided on the side wall of the precast beam pedestal (8), and the mold clamping device also comprises a pull rod (9) that can be simultaneously connected to the positioning hole and the limiting hole.