Bucket lifting and material transporting trolley
By designing a bucket material transport truck with a combined structure of rollers, L-shaped frames and bucket neckbands, the problem of low transportation efficiency of building materials under traditional hand-held mode is solved, and efficient transfer and operation efficiency of material barrels are achieved.
Patent Information
- Application Number
- CN202420809017.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-18
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-04-18
AI Technical Summary
In construction projects, traditional portable transport of mixed building materials is inefficient and time-consuming, especially when the operation volume is large, the existing technology cannot effectively improve the material transportation efficiency.
A bucket material transport truck was designed, using a combined structure of rollers, L-shaped frames, bucket neckbands and drag handles. By cooperating with the bucket neckbands and the neck rings of the bucket, the lever principle is used to lift the bucket. and dragging the ship, simplifying operations and improving transportation efficiency.
It realizes efficient transportation of material barrels, reduces the time and energy of manpower transportation, improves the operating efficiency and safety of construction sites, and reduces the operating intensity.
Smart Images

Figure CN222097664U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a bucket material transport trolley, which is used for short-distance transportation of mixing type building materials. Background Art
[0002] In the field of construction engineering, when polymer anti-crack mortar, putty, real stone paint and other powdered or granular mixing building materials are mechanically mixed in barrels in the material stacking area and then transported to various construction work surfaces, the workers at this stage still use the traditional hand-carrying method to transport the mixed materials to the work surface. This method completely relies on manpower and is very time-consuming and labor-intensive. When the workload is large and the work intensity is high, the phenomenon of low material transportation efficiency is particularly prominent. The barrels used on construction sites to hold mixing building materials, commonly known as ash barrels, are generally in a cone shape with a large top and a small bottom. There is a collar on the top of the barrel. In addition, there are many building materials on the construction site. In combination with the shape characteristics of the barrels, the purpose of this plan is to use local materials to design a cart to improve the transportation efficiency of the barrels on the construction site. Utility Model Content
[0003] The utility model provides a bucket material transport trolley, which uses rollers as fulcrums, and a combined structure of an L-shaped frame, a bucket neck hoop and a towing handle as a lever, and the bucket is lifted and towed through the cooperation of the bucket neck hoop and the material bucket. The material bucket transfer process is simple to operate, saves time and effort, and improves the efficiency of the material bucket transfer. The trolley has a simple structure and can be processed and formed using materials on site on the construction land, thereby improving the construction land operation efficiency and reducing the operation intensity.
[0004] In order to achieve the above purpose, the technical solution adopted by the utility model is:
[0005] The bucket material transport trolley is characterized by comprising an L-shaped frame with rollers at the bottom, a bucket neck hoop which can cooperate with the neck ring of the material bucket and is in a semicircular shape, and a T-shaped dragging handle fixed on the L-shaped frame, the bucket hoop is fixed on the top of the L-shaped frame, and the dragging handle is vertically fixed to the bucket neck hoop and extends upward from the top of the L-shaped frame.
[0006] Preferably, the L-shaped frame includes a rectangular vertical steel pipe frame and transverse steel pipes vertically fixed at both ends of the top of the vertical steel pipe frame, the roller is installed at the bottom of the vertical steel pipe frame, and the bucket neck hoop is fixed between the two transverse steel pipes.
[0007] Preferably, the bucket neck hoop is parallel to the transverse steel pipe and opens outwards, and the bucket neck hoop is welded between the two transverse steel pipes and is respectively welded to the towing handle and the vertical steel pipe frame.
[0008] Preferably, the bottom of the vertical steel pipe frame is welded to the free end of the transverse steel pipe through an obliquely arranged diagonal bracing steel pipe.
[0009] Preferably, the towing handle is welded to the top and bottom of the vertical steel tube frame respectively and is arranged along the center line of the vertical steel tube frame. The bucket neck hoop is composed of two sections of arc-shaped steel tubes, one end of the arc-shaped steel tube is welded to the transverse steel tube, and the other end is welded to the towing handle and the center of the top of the vertical steel tube frame.
[0010] Preferably, a retractable front support rod parallel to the vertical steel pipe frame is welded to the front end of the transverse steel pipe, and the length of the front support rod when not extended is less than the height of the vertical steel pipe frame. The transverse steel pipe is supported to a horizontal position as the front support rod is extended into place.
[0011] The beneficial effects of the utility model are:
[0012] The rollers in the utility model are installed at the bottom of the L-shaped frame, and the bucket neck hoop is fixed at the top of the L-shaped frame. When in use, the rollers touch the ground, and the mop handle is held to set the L-shaped frame vertically. The trolley is in an upright state, and the material bucket is placed in front of the bucket neck hoop. Then the trolley is tilted forward slightly and the roller is pushed forward to make the material bucket enter the bucket neck hoop. The bucket neck hoop and the bottom of the barrel neck ring are abutted. Then the trolley is tilted backward to make the bucket neck material lift the bucket, and the towing handle is pulled to drag the bucket to the working surface. After reaching the working surface, the trolley is tilted forward to make the barrel land steadily, and then the trolley is dragged backward to separate the trolley from the barrel to complete the transfer. The roller is used as a fulcrum, and the combined structure of the L-shaped frame, the barrel lifting neck hoop and the towing handle is used as a lever. The barrel is lifted and dragged through the cooperation of the barrel lifting neck hoop and the barrel. The barrel transfer process is simple to operate, saving time and effort, and improving the efficiency of barrel transfer. The trolley has a simple structure and can be processed and formed on the construction land, thereby improving the efficiency of construction land operations and reducing work intensity. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a schematic diagram of the bucket material transport trolley in the first embodiment.
[0014] Figure 2 A schematic diagram showing the placement of a bucket in front of the bucket collar.
[0015] Figure 3 This is a schematic diagram of the state of the trolley towing the barrel.
[0016] Figure 4 It is a schematic diagram of the bucket material transport trolley when the front support rod in the second embodiment is not extended.
[0017] Figure 5 Schematic diagram of the bucket-carrying material transport trolley when the front support rod is extended to the full extent in the second embodiment
[0018] Figure 6 A cross-sectional view of the front strut. DETAILED DESCRIPTION
[0019] Combine the following Figures 1 to 6The embodiments of the utility model are described in detail. Embodiment 1:
[0020] The bucket material transport trolley is characterized by: comprising an L-shaped frame 2 with rollers 1 at the bottom, a bucket neck hoop 3 which can cooperate with the neck ring 101 of the material bucket 100 and is in a semicircular shape, and a T-shaped dragging handle 4 fixed on the L-shaped frame 2, the bucket hoop 3 is fixed on the top of the L-shaped frame 1, and the dragging handle 4 is vertically fixed to the bucket neck hoop 3 and extends upward from the top of the L-shaped frame 2.
[0021] In the above-mentioned bucket material transport trolley, the roller 1 is installed at the bottom of the L-shaped frame 2, and the bucket neck hoop 3 is fixed on the top of the L-shaped frame 2. When in use, the roller 1 touches the ground, and the mop handle 4 is held to set the L-shaped frame 2 vertically. The trolley is in an upright position, and the bucket 100 is placed in front of the bucket neck hoop 3. Then the trolley is tilted forward slightly and the roller 1 is pushed forward to make the bucket 100 enter the bucket neck hoop 2. The bucket neck hoop 2 and the bottom of the bucket collar 101 are abutted. Then the trolley is tilted backward to make the bucket neck hoop 3 lift the bucket 100, and the towing handle 4 is pulled to lift the bucket 1 00 is dragged to the working surface. After reaching the working surface, the trolley is tilted forward to make the material barrel 100 land stably, and then the trolley is dragged backward to separate the trolley from the material barrel to complete the transfer. The roller 1 is used as a fulcrum, and the combined structure of the L-shaped frame 2, the bucket lifting neck hoop 3 and the towing handle 4 is used as a lever. The bucket 100 is lifted and dragged through the cooperation of the bucket lifting neck hoop 3 and the material barrel. The material barrel transfer process is simple to operate, saves time and effort, and improves the efficiency of the material barrel transfer. The trolley has a simple structure and can be processed and formed on the construction land, thereby improving the construction land operation efficiency and reducing the operation intensity.
[0022] The L-shaped frame 2 includes a rectangular vertical steel pipe frame 21 and transverse steel pipes 22 respectively fixed vertically at both ends of the top of the vertical steel pipe frame 21, the roller 1 is installed at the bottom of the vertical steel pipe frame 21, and the bucket neck hoop 3 is fixed between the two transverse steel pipes 22. The vertical steel pipe frame 21 and the transverse steel pipe 22 are fixedly connected to form an L-shaped frame, and the transverse steel pipe 22 reinforces the bucket neck hoop 3, and bears the weight of the bucket together with the bucket neck hoop 3, thereby improving the reliability of the bucket.
[0023] The bucket neck hoop 3 is parallel to the horizontal steel pipe 22 and opens outward, and the bucket neck hoop 3 is welded between the two horizontal steel pipes 22 and is respectively welded to the towing handle 4 and the vertical steel pipe frame 21. The bucket neck hoop 3, the towing handle 4 and the L-shaped frame 2 are welded and fixed into a combined structure, which has higher structural strength and is strong and durable.
[0024] The bottom of the vertical steel pipe frame 21 is welded to the free end of the horizontal steel pipe 22 through an inclined bracing steel pipe 23. The oblique bracing steel pipe 23 can prevent the bucket neck hoop 3 from tilting downward, further improve the structural strength, and ensure the structural stability of the trolley.
[0025] The towing handle 4 is welded to the top and bottom of the vertical steel pipe frame 21 respectively and arranged along the center line of the vertical steel pipe frame 21. The bucket neck hoop 3 is composed of two sections of arc-shaped steel pipes 31. One end of the arc-shaped steel pipe 31 is welded to the horizontal steel pipe 22, and the other end is welded to the towing handle 4 and the center of the top of the vertical steel pipe frame 21. The bucket neck hoop 3 is semicircular and composed of two sections of arc-shaped steel pipes 31. The arc-shaped steel pipe 31 is welded to the towing handle 4 and the vertical steel pipe frame 21. The arc-shaped steel pipe 31 is shorter in length, higher in strength and less prone to deformation, which further improves the structural strength, ensures the structural stability of the trolley, and makes the trolley strong and durable. Embodiment 2:
[0026] The difference from the first embodiment is that the front end of the transverse steel tube 22 is welded with a retractable front support rod 5 parallel to the vertical steel tube frame 21. The length of the front support rod 5 when not extended is less than the height of the vertical steel tube frame 21. The transverse steel tube 22 is supported to a horizontal position as the front support rod 5 is extended to the right position. Figure 4 and 5 As shown, since the length of the front support rod 5 when not extended is less than the height of the vertical steel pipe frame 21, the bottom end of the front support rod 5 is still some distance away from the ground when not extended, which will not affect the trolley to lift the bucket and drag it. When the trolley is transporting materials, the front support rod 5 is in an unextended state and does not affect the use; when the front support rod 5 is extended to the right position, the transverse steel pipe 22 is supported to the horizontal position, and the trolley is in a standing state. When the trolley is placed independently, the front support rod 5 can be extended to the right position so that it can stand; the front support rod 5 can select a spring pin telescopic rod structure commonly used in the prior art, such as Figure 6 As shown, the front support rod 5 includes an outer sleeve 51 and an inner sleeve 52 extending from the bottom into the outer sleeve 51, a torsion spring 53 is fixed in the inner sleeve 52, a spring pin 54 is fixed at one end of the torsion spring 53, and an extension hole corresponding to the spring pin 54 is respectively provided at the upper and lower ends of the outer sleeve 51, and the spring pin 54 retracts when pressed, and extends with the rebound of the torsion spring 53 when aligned with the extension hole. When the spring pin 54 extends from the extension hole at the upper end of the outer sleeve 51, the front support rod 5 is in an unextended state, and the spring pin 54 is pressed inwardly and then the inner sleeve 54 is pulled down. When the spring pin 54 extends from the extension hole at the lower end of the outer sleeve 51, the front support rod 5 is in an extended state. The telescopic operation of the front support rod 5 is convenient, and the trolley can be in a standing state when not transporting materials, which is convenient for storage and management, and avoids the trolley from tipping over. The inner sleeve 52 and the outer sleeve 51 can be made of a steel pipe with a square cross section to prevent the inner sleeve 52 from rotating in the outer sleeve 51.
[0027] The above is a complete description of the technical solutions of the embodiments of the utility model in combination with the accompanying drawings. It should be noted that the described embodiments are only part of the embodiments of the utility model. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.
Claims
1. Bucket material transport cart, Features: The utility model comprises an L-shaped frame with rollers at the bottom, a semicircular bucket lifting neck hoop which can cooperate with the neck ring of the material barrel, and a T-shaped dragging handle which is fixed on the L-shaped frame. The bucket lifting hoop is fixed on the top of the L-shaped frame, and the dragging handle is vertically fixed to the bucket lifting neck hoop and extends upward from the top of the L-shaped frame.
2. The bucket material transporting trolley according to claim 1, Features: The L-shaped frame comprises a rectangular vertical steel pipe frame and transverse steel pipes respectively fixed vertically at the two ends of the top of the vertical steel pipe frame, the roller is installed at the bottom of the vertical steel pipe frame, and the bucket neck hoop is fixed between the two transverse steel pipes.
3. The bucket material transporting trolley according to claim 2, Features: The bucket lifting neck hoop is parallel to the transverse steel pipe and opens outwards. The bucket lifting neck hoop is welded between the two transverse steel pipes and is respectively welded to the towing handle and the vertical steel pipe frame.
4. The bucket material transporting trolley according to claim 2, Features: The bottom of the vertical steel pipe frame is welded to the free end of the horizontal steel pipe through an inclined bracing steel pipe.
5. The bucket material transporting trolley according to claim 3, Features: The towing handle is welded to the top and bottom of the vertical steel pipe frame respectively and is arranged along the center line of the vertical steel pipe frame. The bucket neck hoop is composed of two sections of arc-shaped steel pipes, one end of the arc-shaped steel pipe is welded to the horizontal steel pipe, and the other end is welded to the towing handle and the center of the top of the vertical steel pipe frame.
6. The bucket material transporting trolley according to claim 2, Features: The front end of the transverse steel pipe is welded with a retractable front support rod parallel to the vertical steel pipe frame. The length of the front support rod when not extended is less than the height of the vertical steel pipe frame. The transverse steel pipe is supported to a horizontal position as the front support rod is extended into place.