Shore-based engineering operation system of underwater cleaning robot
By integrating the design of the underwater cleaning robot system on the movable vehicle body, the problems of poor operation flexibility and low efficiency in the prior art are solved, and efficient and standardized underwater cleaning operations are achieved.
Patent Information
- Application Number
- CN202420891084.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-26
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-04-26
AI Technical Summary
The existing underwater cleaning robot systems have problems such as poor flexibility, limited operating range, low cleaning efficiency, low space utilization and poor cleanliness during operation.
A shore-based engineering system of underwater cleaning robot was designed, using a movable integrated design of underwater cleaning robot integrated system, including integrated base, underwater cleaning robot, control system, generator and truck crane , optimize pipelines and lines through integrated design, reduce loading, unloading, transportation and placement troubles, and improve operating efficiency.
It realizes flexible mobile operations, reduces cleaning operation time, improves on-site space utilization and cleanliness, and improves work efficiency and standardization.
Smart Images

Figure CN222097891U_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the technical field of ship cleaning, and specifically relates to a shore-based engineering operation system of an underwater cleaning robot. Background Art
[0002] In recent years, with the development of my country's shipping industry, the volume of waterborne cargo in my country has continued to rise. As ships sail in the water for a long time, algae, barnacles and other organisms in the water attach to the hull in a large area, causing serious adverse effects on ship transportation. The attached marine organisms not only damage the hull, but also increase the resistance of the ship's navigation, leading to an increase in shipping costs. Therefore, it is necessary to clean the surface of the ship regularly.
[0003] Recently, a variety of underwater cleaning robots have appeared on the market, but there is no integrated design in the robots and auxiliary integrated systems. They cannot move flexibly and have a limited operating range, which requires the rearrangement of circuits and pipelines on site, prolonging the cleaning operation time and reducing cleaning efficiency. In addition, the required operating area is large, the on-site space utilization rate is low, and the cleanliness is low. Utility Model Content
[0004] In view of the above analysis, the embodiment of the utility model aims to provide an underwater cleaning robot shore-based engineering operation system to solve one or more of the above problems existing in the prior art. The application can realize flexible mobile operation, reduce cleaning operation time, and improve on-site space utilization and cleanliness.
[0005] The purpose of the utility model is achieved in this way:
[0006] A shore-based engineering operation system for an underwater cleaning robot comprises a vehicle body, on which an underwater cleaning robot integrated system, a control system and a generator are arranged, wherein the control system is connected to the underwater cleaning robot integrated system by signal control and is used to control the operation of the underwater cleaning robot integrated system; the generator is used to generate electricity to provide electrical energy to the underwater cleaning robot integrated system; the underwater cleaning robot integrated system comprises an integrated base and an underwater cleaning robot arranged on the integrated base; the vehicle body is also provided with a vehicle-mounted crane, which is configured to lift the underwater cleaning robot into and out of water.
[0007] Furthermore, the underwater cleaning robot integrated system and the generator are arranged in the compartment of the vehicle body, and the compartment panels on both sides can be opened and closed.
[0008] Furthermore, the control system is arranged in a driving cab of the vehicle body, and the control system includes a host computer.
[0009] Furthermore, the underwater cleaning robot integrated system is arranged near the rear of the carriage, and the generator is arranged in front of the carriage, close to the front of the carriage.
[0010] Furthermore, the truck crane is arranged in the area between the front of the vehicle and the carriage, the truck crane has the functions of rotation and lifting, and the truck crane has a column and a boom.
[0011] Furthermore, a cable reel, a high-pressure pump control cabinet, a power distribution cabinet, a water storage mechanism and a high-pressure pump group are also provided on the integrated base; wherein the cable reel is configured to retract and release the integrated pipeline connected to the underwater cleaning robot; the water storage mechanism is configured to store seawater, and the water storage mechanism provides high-pressure water for cleaning to the underwater cleaning robot through the high-pressure pump group; the cable retracting and releasing operation side of the cable reel and the operation sides of the high-pressure pump control cabinet and the power distribution cabinet are arranged on the same side; the water storage mechanism, the high-pressure pump group, the high-pressure pump control cabinet and the power distribution cabinet are arranged diagonally.
[0012] Furthermore, a support beam and an upper welding frame are provided on the integrated base. The upper welding frame is a rectangular frame structure and is fixedly arranged on the top of the support beam. Four support beams and the upper welding frame constitute a lateral stress resistance mechanism. The lateral stress resistance mechanism as a whole is a rectangular frame structure.
[0013] Furthermore, a water tank welding frame is provided on the integrated base, and the lower space of the water tank welding frame is used to install the high-pressure pump group; the water storage mechanism has a water tank, the water tank is arranged on the water tank welding frame, the water inlet of the water tank is connected to the submersible pump through the water inlet pipe, and the submersible pump can pump seawater into the water tank; the water outlet of the water tank is connected to the high-pressure pump group through the water outlet pipe, and the water in the water tank is pumped out at high pressure by the high-pressure pump group, so that the underwater cleaning robot can clean the hull and bottom of the ship.
[0014] Furthermore, a first filter element and a second filter element are respectively provided at the water outlet and the water inlet of the water tank; the first filter element adopts a 50-mesh filter element, and the second filter element adopts a 30-mesh filter element.
[0015] Furthermore, a maintenance platform is provided on the integrated base, and the underwater cleaning robot is placed above the maintenance platform. There is a maintenance space at the bottom of the maintenance platform. The bottom maintenance space is used to store cables and submersible pumps during transportation; a protective cage is provided on the outside of the submersible pump.
[0016] Compared with the prior art, the shore-based engineering operation system of the underwater cleaning robot provided by the utility model can be flexibly moved for operation by arranging an underwater cleaning robot integrated system of integrated design on a movable body; and the underwater cleaning robot integrated system adopts an integrated design, optimizes pipelines and lines, and integrates the originally scattered components into an integrated base, eliminating the trouble of multiple loading and unloading and transportation, the need to place and route the components, and laying out the pipelines, reducing the cleaning operation time, achieving efficient operation, a smaller operation area, improving the utilization rate of on-site space and cleanliness, and making the on-site cleanliness and standardization better. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] In order to more clearly illustrate the embodiments of this specification or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the embodiments of this specification. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.
[0018] Figure 1 A schematic diagram of the structure of the shore-based engineering operation system of the underwater cleaning robot provided by the utility model;
[0019] Figure 2 A schematic diagram of the state of hoisting the underwater cleaning robot when the shore-based engineering operation system of the underwater cleaning robot provided by the utility model is operating;
[0020] Figure 3 This is a schematic diagram of the interior of the cab of the shore-based engineering operation system of the underwater cleaning robot provided by the utility model;
[0021] Figure 4 A schematic diagram of the structure of the underwater cleaning robot integrated system provided by the utility model from a first perspective;
[0022] Figure 5 A second perspective structural diagram of the underwater cleaning robot integrated system provided by the utility model;
[0023] Figure 6 An exploded view of the underwater cleaning robot integrated system provided by the utility model;
[0024] Figure 7 A schematic diagram of the structure of the cable reel provided by the utility model;
[0025] Figure 8 A schematic diagram of the structure of the water pipe reel of the cable reel provided by the utility model;
[0026] Fig. 9 A schematic diagram of the structure of the water storage mechanism provided by the utility model;
[0027] Fig.10 This is a schematic diagram of the internal structure of the water storage mechanism provided by the utility model.
[0028] Reference numerals:
[0029] 100-car body; 200-underwater cleaning robot integrated system; 300-cab; 301-host computer; 302-steering wheel; 400-car crane; 500-generator;
[0030] 1-Integrated base; 2-Cable reel; 2.1-Base; 2.2-Water pipe reel; 2.2.1-Spindle; 2.2.2-Inner bushing; 2.2.3-Small disc; 2.2.4-Sleeve; 2.2.5-Large disc; 2.2.6-Bearing with seat; 2.2.7-Sprocket; 2.2.8-Connecting rod; 2.2.9-Swivel joint; 2.2.10-Shaft retaining ring; 2.3-Motor assembly; 2.4-Chain drive group; 2.5-Chain guard; 2.6-Protective tube; 2.7-Brake assembly; 2.8-Guide pulley; 3- Support beam; 4-upper welding frame; 5-high-pressure pump control cabinet; 6-power distribution cabinet; 7-underwater cleaning robot; 8-high-pressure pump group; 9-water storage mechanism; 9.1-water tank; 9.2-water inlet pipe; 9.2.1-transfer end; 9.3-water tank overflow pipe; 9.4-drain pipe; 9.5-liquid level observation pipeline; 9.6-automatic water supply device; 9.7-inspection cover; 9.8-high-pressure pump overflow pipe; 9.9-water outlet pipe; 9.10-first filter element; 9.11-second filter element; 10-inspection platform; 11-submersible pump; 12-water tank welding frame. DETAILED DESCRIPTION
[0031] In order to make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the technical scheme in the embodiments of the present application will be clearly and completely described in combination with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all of the embodiments. It should be noted that, in the absence of conflict, the embodiments in the present disclosure and the features in the embodiments can be combined, separated, interchanged and / or rearranged with each other. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.
[0032] In the accompanying drawings, the size and relative size of components may be exaggerated for clarity and / or descriptive purposes. When the exemplary embodiments may be implemented differently, a specific process sequence may be performed in a different order than described. For example, two successively described processes may be performed substantially simultaneously or in an order opposite to the order described. In addition, the same reference numerals represent the same components.
[0033] The terms used here are for the purpose of describing specific embodiments, and are not intended to be restrictive. As used here, unless the context clearly indicates otherwise, the singular forms "one (kind, person)" and "said (the)" are also intended to include plural forms. In addition, when the terms "comprise" and / or "include" and their variations are used in this specification, it is explained that there are stated features, integral bodies, steps, operations, parts, assemblies and / or their groups, but it is not excluded that there are or add one or more other features, integral bodies, steps, operations, parts, assemblies and / or their groups. It should also be noted that, as used here, the terms "substantially", "approximately" and other similar terms are used as approximate terms and not as degree terms, so that they are used to explain the inherent deviations of the measured values, calculated values and / or the values provided that will be recognized by those of ordinary skill in the art.
[0034] Example 1
[0035] A specific embodiment of the utility model is as follows Figures 1 to 3 As shown, an underwater cleaning robot shore-based engineering operation system is disclosed, including a vehicle body 100, on which an underwater cleaning robot integrated system 200, a control system and a generator 500 are provided. The control system is connected to the underwater cleaning robot integrated system 200 by signal control, and is used to control the operation of the underwater cleaning robot integrated system 200; the generator 500 is used to generate electricity to provide electrical energy to the underwater cleaning robot integrated system 200 and other electrical components.
[0036] The control system is arranged in the cab 300 of the vehicle body 100, and the control system includes a host computer 301, which controls the operation of the underwater cleaning robot integrated system 200. The host computer 301 and the steering wheel 302 are arranged in parallel in the cab 300, that is, the host computer 301 is arranged in front of the co-pilot position for easy operation.
[0037] The underwater cleaning robot integrated system 200 and the generator 500 are arranged in the compartment of the vehicle body 100, and the compartment panels on both sides can be opened and closed. The underwater cleaning robot integrated system 200 is arranged near the rear of the compartment, and the generator 500 is arranged in front of the compartment, near the front of the vehicle.
[0038] The underwater cleaning robot integrated system 200 includes an integrated base 1 and an underwater cleaning robot 7 arranged on the integrated base 1. The underwater cleaning robot 7 is configured to clean the hull and bottom of the ship. After cleaning the dirt, the ship runs faster and saves more fuel. The vehicle body 100 is also provided with a vehicle crane 400. The vehicle crane 400 is arranged in the area between the front of the vehicle and the carriage. The vehicle crane 400 is configured to lift the underwater cleaning robot into and out of the water. The vehicle crane 400 has the functions of rotation and lifting. The vehicle crane 400 has a column and a boom. The column is arranged vertically. The column is rotatably arranged on the vehicle body 100 through a first rotating shaft. The column can rotate 360° around the first rotating shaft. The boom is rotatably connected to the top of the column through a second rotating shaft. The first rotating shaft is perpendicular to the second rotating shaft. The boom can rotate 360° around the second rotating shaft in the vertical direction. In addition, the lengths of the column and the boom are adjustable, that is, the column has a vertical lifting function and the boom has a telescopic function. The above-mentioned structural arrangement can lift the underwater cleaning robot 7 of the underwater cleaning robot integrated system 200 to a designated position above the sea surface, and dive below the sea surface.
[0039] When the underwater cleaning robot shore-based engineering operation system is operating, the vehicle body 100 is driven to the shore-based working position, and the underwater cleaning robot 7 of the underwater cleaning robot integrated system 200 is lifted to a designated position above the sea surface by the vehicle crane 400, and dives below the sea surface to clean the hull and bottom of the ship to be cleaned; after the cleaning is completed, the underwater cleaning robot 7 is lifted above the sea surface by the vehicle crane 400, and moved and reset to the initial placement position on the vehicle body 100.
[0040] like Figures 4 to 10As shown, the integrated ship underwater cleaning system 200 also includes a cable reel 2, a high-pressure pump control cabinet 5, a distribution cabinet 6, a water storage mechanism 9 and a high-pressure pump group 8 arranged on the integrated base 1; wherein the cable reel 2 is configured to retract and release the integrated pipeline connected to the underwater cleaning robot 7; the water storage mechanism 9 is configured to store seawater, and the water storage mechanism 9 provides high-pressure water for cleaning to the underwater cleaning robot 7 through the high-pressure pump group 8; the high-pressure pump group 8 is configured to provide high-pressure water to the underwater cleaning robot 7, and can pump the water in the water tank 9.1 to the cleaning operation end of the underwater cleaning robot 7 under high pressure; optionally, the high-pressure pump group 8 is separately provided with a control cabinet for storing the frequency converter, and the pressure of the high-pressure pump group 8 can be adjusted according to demand. The underwater cleaning robot 7 is configured to clean the hull and bottom of the ship. After cleaning the dirt, the ship runs faster and saves more fuel. The cable reel 2's cable retracting and releasing operation side, the high-pressure pump control cabinet 5 and the distribution cabinet 6's operation side are arranged on the same side. Because the cable retracting and releasing operation requires two people to work together, the operators at the high-pressure pump control cabinet 5 and the distribution cabinet 6 can assist the cable reel cable retracting and releasing personnel. When the underwater robot system is mounted on a vehicle, there is also a situation where the integrated system does not unload the vehicle for operation, so only one side of the car body needs to be opened; the water storage mechanism 9, the high-pressure pump group 8, the high-pressure pump control cabinet 5, and the distribution cabinet 6 are arranged diagonally, that is, the water storage mechanism 9 and the high-pressure pump group 8 are arranged in a corner area of the integrated base 1, and the high-pressure pump control cabinet 5 and the distribution cabinet 6 are arranged in a diagonal area of the integrated base 1. The long distance can avoid damage to electrical components caused by accidental leakage of water. The motor of the cable drum 2 and the motor of the high-pressure pump group 8 are arranged close to the power distribution cabinet 6. The cable drum 2 and the motor of the high-pressure pump group 8 are close to the power distribution cabinet 6, which is convenient for wiring.
[0041] A support beam 3 and an upper welding frame 4 are also provided on the integrated base 1. The upper welding frame 4 is a rectangular frame structure and is fixedly arranged on the top of the support beam 3. Four support beams 3 and the upper welding frame 4 are constructed to form a lateral stress resistance mechanism. The lateral stress resistance mechanism is a rectangular frame structure as a whole. When the integrated ship underwater cleaning system is hoisted, it can resist the lateral stress during hoisting and better protect the water tank and the cable drum 2 from being squeezed by the sling.
[0042] Furthermore, an oblique brace is provided on the support beam 3 , one end of the oblique brace is fixed on the support beam 3 , and the other end is fixed on the upper welding frame 4 , and the angle between the oblique brace and the support beam 3 is 45°-60°.
[0043] Furthermore, the upper welding frame 4 is welded from steel pipes, and a blocking plate is welded at the port to prevent rainwater from seeping in. After completion, it is sprayed with plastic. When the underwater cleaning robot 7 is hoisted, it can resist the lateral stress during hoisting and better protect the water tank and the cable reel 2 from being squeezed by the sling.
[0044] The integrated base 1 is also provided with a water tank welding frame 12 for installing the water storage mechanism 9. Figures 7 and 8As shown, the water storage mechanism 9 comprises a water tank 9.1, a water inlet pipe 9.2 and a water outlet pipe 9.9. The water tank 9.1 is a welded water tank having a water inlet and a water outlet. The water inlet of the water tank 9.1 is connected to a submersible pump 11 through a water inlet pipe 9.2. The submersible pump 11 can pump seawater into the water tank 9.1 for use by the high-pressure pump group 8. The water outlet of the water tank 9.1 is connected to the high-pressure pump group 8 through a water outlet pipe 9.9. The high-pressure pump group 8 is used to pump out the water in the water tank 9.1 under high pressure for the underwater cleaning robot 7 to clean the hull and bottom of the ship.
[0045] The water storage mechanism 9 also includes a water tank overflow pipe 9.3, a sewage pipe 9.4, a liquid level observation pipeline 9.5 and a high-pressure pump overflow pipe 9.8; wherein, one end of the water tank overflow pipe 9.3 is connected to the pagoda joint on the top surface of the water tank 9.1, and the other end is connected to the drain valve and the sewage pipe 9.4 at the bottom of the water tank 9.1 by a three-way pagoda joint. The water tank overflow pipe 9.3 is configured to overflow through the water tank overflow pipe 9.3 when the water level in the water tank 9.1 is too high, so as to prevent the water level from overflowing the water tank and overflowing to the integrated system; one end of the sewage pipe 9.4 is connected to the three-way pagoda joint as described above, and the other end extends to the coast. When the water level is too high, the water in the water tank overflow pipe 9.3 can be discharged When going to the sea, when it is necessary to clean the water tank 9.1, open the drain valve to discharge the silt and other debris at the bottom of the water tank; the two ends of the liquid level observation pipeline 9.5 are connected to the upper pagoda joint and the lower pagoda joint on the side of the water tank, and the upper pagoda joint and the lower pagoda joint are installed one above the other, serving as the upper and lower limits of the water tank 9.1. The liquid level observation pipeline 9.5 is a transparent tube, and the water level in the water tank can be observed from the outside, so as to more intuitively judge whether the submersible pump is blocked, etc.; one end of the high-pressure pump overflow pipe 9.8 is connected to the mechanical pressure regulating valve of the high-pressure pump group 8, and the other end is connected to the upper interface of the water tank 9.1, and is configured to flow back into the water tank 9.1 when the pressure of the high-pressure pump is too high and water overflow occurs.
[0046] Furthermore, the water storage mechanism 9 also has an automatic water supply device 9.6, which has an automatic water supply function and can control the operation of the submersible pump 11 in real time;
[0047] Furthermore, the water tank 9.1 also has a two-stage filtering function, and is provided with a first filter element 9.10 and a second filter element 9.11. Specifically, the first filter element 9.10 and the second filter element 9.11 are respectively provided at the water outlet and the water inlet of the water tank 9.1, the second filter element 9.11 provided at the water inlet of the water tank adopts a 30-mesh filter element, and the first filter element 9.10 provided at the water outlet of the water tank adopts a 50-mesh filter element, which can better filter out impurities and enable the underwater cleaning robot 7 to perform a stable cleaning operation; further, two openable and closable inspection covers 9.7 are provided on the top of the water tank 9.1, one of which is located above the first filter element 9.10, and the other is located above the second filter element 9.11.
[0048] The water storage mechanism 9, the water tank welding frame 12 and the high-pressure pump group 8 are arranged in a vertical structure layer, which can effectively utilize the space, and the water storage mechanism 9 is located above the high-pressure pump group 8, which is convenient for pipeline layout, making the entire system look more beautiful and neat. Specifically, the water tank welding frame 12 is a support frame for installing the water tank 9.1. The water tank 9.1 is arranged on the top surface of the water tank welding frame 12. The lower space of the water tank welding frame 12 is used to install the high-pressure pump group 8. Since the lower space of the support frame is surrounded by a plurality of legs, it can also protect the high-pressure pump group 8;
[0049] When installing the water storage mechanism 9, first fix the water tank 9.1 on the water tank welding frame 12, then wrap the raw tape around all the joints of the water tank 9.1, and install the water inlet pipe 9.2, the water tank overflow pipe 9.3, the sewage pipe 9.4, the high-pressure pump overflow pipe 9.8, and the liquid level observation pipeline 9.5 to the corresponding positions of the water tank 9.1 in turn. One end of the water inlet pipe 9.2 is connected to the water tank 9.1, and the other end is the adapter end 9.2.1, which is used to connect with the water outlet pipeline of the submersible pump 11; the adapter end 9.2.1 is connected to the water inlet pipe 9.2 through a quick-disassembly joint, and the pipeline adopts a quick-disassembly joint and is designed to be integrated. During engineering operations, only the water outlet pipeline of the submersible pump is connected to the water inlet pipeline of the water tank to realize the operation, which is simple and efficient. Then one end of the water outlet pipe 9.9 is connected to the water tank 9.1, and the other end is connected to the water inlet of the high-pressure pump group 8. After that, the first filter element 9.10 and the second filter element 9.11 are installed at the joint inside the water tank, and the end of the filter element is threaded for easy disassembly, and can also store impurities for easy cleaning. After that, the automatic water supply device 9.6 is installed on the inspection cover 9.7, and the positions of the two liquid level switches on the automatic water supply device are adjusted to achieve the ideal water supply effect. In this way, the water storage mechanism 9 is installed.
[0050] A maintenance platform 10 is also provided on the integrated base 1. The maintenance platform 10 is configured to place the underwater cleaning robot 7. The underwater cleaning robot 7 is placed above the maintenance platform 10. The bottom of the maintenance platform 10 has a maintenance space, and the bottom maintenance space is used to store items such as cables and submersible pumps 11 during transportation, with high space utilization. The submersible pump 11 is configured to extract seawater and inject it into the water tank 9.1 for storage for use by the high-pressure pump group 8. Furthermore, a protective cage is provided on the outside of the submersible pump 11, and the aperture of the protective cage is 5 mm to prevent the submersible pump 11 from inhaling larger impurities.
[0051] In this embodiment, the integrated base 1 has a first installation area, a second installation area and a third installation area on the plane, wherein the second installation area and the third installation area are arranged side by side on the same side of the first installation area, and the three installation areas roughly form a rectangular area on the plane where the integrated base 1 is located; the bearing cable drum 2, the support beam 3, the upper welding frame 4, the high-pressure pump group 8, the water storage mechanism 9 and the water tank welding frame 12 are installed in the first installation area; the high-pressure pump control cabinet 5 and the power distribution cabinet 6 are installed in the second installation area; the underwater cleaning robot 7, the maintenance platform 10 and the submersible pump 11 are installed in the third installation area. Through the above reasonable layout, the center of gravity of the integrated system can be roughly located in the middle of the space above the integrated base 1, avoiding the instability caused by the center of gravity offset. The structure of the underwater cleaning robot integrated system is compact, and it is convenient to arrange the site after integration. The overall length and width of the underwater cleaning robot integrated system are 3500mm*2000mm. The use of this size parameter can meet the loading of a truck with a compartment width of 2400mm.
[0052] The installation steps of the underwater cleaning robot integrated system are as follows: first install the integrated base 1, and install 8 shock-absorbing pads at the bottom thereof, then hoist the cable reel 2 to the first installation area of the integrated base 1 for installation, and then install the high-pressure pump group 8 and its pipelines on the first installation area of the integrated base 1, install the water storage mechanism 9 on the water tank welding frame 12 and connect the corresponding pipelines, and then install the welding frame 4 and its support beam 3; then install the maintenance platform 10 and the high-pressure pump control cabinet 5 and the distribution cabinet 6 in the second installation area of the integrated base 1, and finally straighten the lines and pipelines and fix them on the integrated base 1; fix the maintenance platform 10 on the third installation area of the integrated base 1, hoist the underwater cleaning robot 7 on the maintenance platform 10, and place the submersible pump 11 and items such as cables in the maintenance space below the maintenance platform 10.
[0053] The integrated base 1 is welded by channel steel and steel pipe. According to the stress conditions at different positions, suitable materials are designed for welding, and plastic spraying is performed after completion. The integrated base 1 is provided with a hoisting interface, a fork-mounted interface, and a transfer wheel installation interface, and has multiple moving modes. Furthermore, the bottom of the integrated base 1 is also provided with multiple shock-absorbing pad installation interfaces, such as 8 shock-absorbing pad installation interfaces, and a shock-absorbing pad is installed on each shock-absorbing pad installation interface, for a total of 8 shock-absorbing pads.
[0054] The cable drum 2 is configured to store cables, water pipes, and communication cables connected to the underwater cleaning robot 7, and to retract and release cables, communication cables, and water pipes according to the underwater operation distance. Specifically, the cable drum 2 includes a base 2.1, a water pipe drum 2.2, a motor assembly 2.3, a chain drive group 2.4, a chain guard 2.5, a protective tube 2.6, a brake assembly 2.7, and a guide pulley 2.8; the protective tube 2.6 is used to protect water pipes, cables, and communication cables, and the cables, water pipes, and communication cables are integrated in the protective tube 2.6 to form an integrated pipeline; the integrated pipeline is wound around the water pipe drum 2.2, and the retraction and release of the integrated pipeline are achieved by the rotation of the water pipe drum 2.2; the water pipe drum 2.2, a motor assembly 2.3, a chain drive group 2.4 and a brake assembly 2.7 are arranged on the base 2.1. The chain drive group 2.4 is connected to the output shaft end of the motor assembly 2.3 through a chain. The motor assembly 2.3 drives the water pipe disc 2.2 to rotate through the chain drive group 2.4 and the chain. The outer cover of the chain is provided with a chain protective cover 2.5. The brake assembly 2.7 is used for braking the water pipe disc 2.2; the guide pulley 2.8 is used for guiding when the integrated pipeline is released, so that the integrated pipeline can be released and retracted smoothly.
[0055] In this embodiment, the water pipe disc 2.2 includes a main shaft 2.2.1, an inner sleeve 2.2.2, a small disc 2.2.3, a sleeve 2.2.4, a large disc 2.2.5, a seat bearing 2.2.6, a sprocket 2.2.7, a connecting rod 2.2.8, a rotary joint 2.2.9, and a shaft retaining ring 2.2.10. A frame is provided on the base 2.1, and both ends of the main shaft 2.2.1 are rotatably arranged on the frame through seat bearings 2.2.6. A sprocket 2.2.7 is provided at the end of the main shaft 2.2.1, and the sprocket 2.2.7 is connected to the chain drive group 2.4 through a chain. The motor assembly 2.3 rotates through the chain drive group 2.4 and the chain drive sprocket 2.2.7, thereby driving the main shaft 2.2.1 to rotate; a water passage is coaxially provided at one end of the main shaft 2.2.1, and a water outlet connector connected to the water passage is provided on the side wall of the main shaft 2.2.1, and the water outlet connector is used to connect the water pipe to be retracted; the rotary joint 2.2.9 has a water inlet end and a water outlet end, the water inlet end of the rotary joint 2.2.9 is connected to the water pipe, and the water outlet end of the rotary joint 2.2.9 is connected to the water passage of the main shaft 2.2.1. A large disc 2.2.5 is provided at both ends of the main shaft 2.2.1, and the space between the two large discs 2.2.5 forms a winding space for the integrated pipeline, and the water outlet connector is located in the winding space. A plurality of connecting rods 2.2.8 are also provided in the winding space, and the connecting rods 2.2.8 are arranged parallel to the main shaft 2.2.1. The two ends of the connecting rods 2.2.8 are fixedly connected to the two large discs 2.2.5, and the plurality of connecting rods 2.2.8 are located on the same cylindrical surface, and the integrated pipeline is wound on the connecting rods 2.2.8 located on the same circumferential surface. At least one small disc 2.2.3 is also provided on the main shaft 2.2.1, and the diameter of the small disc 2.2.3 is smaller than the diameter of the large disc 2.2.5. A plurality of connecting rods 2.2.8 are evenly fixed on the outer circumference of the small disc 2.2.3, and the small disc 2.2.3 supports the connecting rods 2.2.8. Among them, an inner sleeve 2.2.2 is installed between the small disc 2.2.3 and the main shaft 2.2.1, and the inner sleeve 2.2.2 is fixed by a shaft retaining ring 2.2.10; a sleeve 2.2.4 is installed between the large disc 2.2.5 and the main shaft 2.2.1. During installation, install the two inner sleeves 2.2.2 and the two small discs 2.2.3 on the main shaft 2.2.1, and fix the inner sleeves with the shaft retaining ring 2.2.10, then install the key on the main shaft 2.2.1, insert the large disc 2.2.5, install the sleeve 2.2.4 on the main shaft 2.2.1, and insert it on the large disc 2.2.5, then tighten the bolts, install the 6 connecting rods 2.2.8, and fasten them to the large disc 2.2.5 with bolts, then install the seat bearing 2.2.6 on the main shaft 2.2.1, and tighten the set screws, and finally install the sprocket 2.2.7 and the rotary joint 2.2.9 on the main shaft 2.2.1.Lift the installed water pipe reel 2.2 onto the base 2.1 and fasten it with bolts. Then install the chain drive group 2.4 and the motor assembly 2.3 onto the base 2.1. The chain drive group 2.4 is connected to the output shaft end of the motor assembly 2.3 through a chain. After the chain is tightened, fasten the motor assembly 2.3. Finally, install the chain guard 2.5 and the brake assembly 2.7. The overall installation of the cable reel 2 is now complete. During operation, the guide pulley 2.8 needs to be placed against the shore.
[0056] In this embodiment, the motor of the motor assembly 2.3 has a frequency conversion function and is configured to control the motor speed through the frequency converter according to the operation requirements, thereby controlling the speed of cable reeling and releasing. Optionally, the cable drum 2 also has a manual release function. In an emergency, the brake is opened and the cable drum 2 is manually rotated to reel in and release the cable. The brake assembly 2.7 can hold the large disk of the cable drum during transportation to reduce its vibration. In an emergency, the brake assembly 2.7 can also be manually pressed to prevent the large disk from continuing to rotate.
[0057] Furthermore, floating materials and protective tubes 2.6 are used to wrap water pipes, cables, and communication cables. That is, protective tubes 2.6 are sheathed on the outside of water pipes, cables, and communication cables, and floating materials are arranged on the protective tubes 2.6, which can achieve zero buoyancy and facilitate the robot's movement and operation.
[0058] The high-pressure pump control cabinet 5 can adjust the pressure of the high-pressure pump group according to the flow rate used during operation to meet the needs of cleaning work; the power distribution cabinet 6 adopts a modular design, integrating control modules such as the robot power control switch, the water pump control power supply, the automatic water supply device switch, and the motor control switch of the cable drum 2, which can supply power to the underwater cleaning robot integrated system and has a safety protection switch and a control switch, which is safe and convenient;
[0059] When the underwater cleaning robot integrated system is in operation, first connect the submersible pump 11 to the water storage mechanism 9 through the water supply pipe, and fix the submersible pump 11 at a position 3 to 4 meters below the sea level, and use the truck crane 400 to lift the underwater cleaning robot 7 to a position 0.5m above the sea level and stop, test the status of the underwater cleaning robot 7's propeller, crawler motor and other electrical components, and after ensuring that there are no problems, pressurize the high-pressure pump group to test the high-pressure pump status. After all problems are confirmed, lift the underwater cleaning robot 7 into the sea, remove the belt, operate the frequency converter of the cable drum 2 to release the cable, and control the underwater cleaning robot 7 to operate. The overall operation is simple and fast.
[0060] Compared with the prior art, the underwater cleaning robot shore-based engineering operation system provided in this embodiment has the following beneficial effects:
[0061] 1. By setting up an integrated underwater cleaning robot integrated system on a movable body, flexible mobile operations can be achieved.
[0062] 2. The underwater cleaning robot integrated system adopts an integrated design. The cable reel, support beam, upper welding frame, high-pressure pump control cabinet, distribution cabinet, underwater cleaning robot, high-pressure pump group, water storage mechanism, maintenance platform, submersible pump, water tank welding frame, etc. are integrated together through the integrated base. After the system integration, the pipelines and lines are also optimized to make the site more beautiful and tidy, with high integration, eliminating the trouble of multiple loading and unloading and transportation, the need to place and route various components, and the laying of pipes, reducing the cleaning operation time, achieving efficient operation, and a smaller operation area. The utilization rate and cleanliness of the on-site space are improved, and the site is more clean and standardized.
[0063] The specific implementation methods described above further illustrate the purpose, technical solutions and beneficial effects of the present application in detail. It should be understood that the above description is only the specific implementation method of the present application and is not intended to limit the scope of protection of the present application. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application should be included in the scope of protection of the present application.
Claims
1. An underwater cleaning robot shore-based engineering operation system, characterized in that: The vehicle body is provided with an underwater cleaning robot integrated system, a control system and a generator. The control system is connected with the underwater cleaning robot integrated system by signal control and is used to control the operation of the underwater cleaning robot integrated system. The generator is used to generate electricity to provide electrical energy to the underwater cleaning robot integrated system. The underwater cleaning robot integrated system includes an integrated base and an underwater cleaning robot arranged on the integrated base. The vehicle body is also provided with a vehicle-mounted crane, which is configured to lift the underwater cleaning robot into and out of water.
2. The underwater cleaning robot shore-based engineering operation system according to claim 1 is characterized in that: The underwater cleaning robot integrated system and the generator are arranged in the compartment of the vehicle body, and the compartment panels on both sides can be opened and closed.
3. The underwater cleaning robot shore-based engineering operation system according to claim 1 is characterized in that: The control system is arranged in the driving room of the vehicle body, and the control system includes a host computer.
4. The underwater cleaning robot shore-based engineering operation system according to claim 1 is characterized in that: The underwater cleaning robot integrated system is arranged near the rear of the carriage, and the generator is arranged at the front of the carriage, close to the front of the carriage.
5. The underwater cleaning robot shore-based engineering operation system according to claim 4 is characterized in that: The truck crane is arranged in the area between the front of the train and the carriage. The truck crane has the functions of rotation and lifting. The truck crane has a column and a boom.
6. The underwater cleaning robot shore-based engineering operation system according to claim 1 is characterized in that: A cable reel, a high-pressure pump control cabinet, a power distribution cabinet, a water storage mechanism and a high-pressure pump group are also provided on the integrated base; wherein the cable reel is configured to retract and release the integrated pipeline connected to the underwater cleaning robot; the water storage mechanism is configured to store seawater, and the water storage mechanism provides high-pressure water for cleaning to the underwater cleaning robot through the high-pressure pump group; the cable retracting and releasing operation side of the cable reel and the operation sides of the high-pressure pump control cabinet and the power distribution cabinet are arranged on the same side; the water storage mechanism, the high-pressure pump group, the high-pressure pump control cabinet and the power distribution cabinet are arranged diagonally.
7. The underwater cleaning robot shore-based engineering operation system according to claim 6 is characterized in that: A support beam and an upper welding frame are also provided on the integrated base. The upper welding frame is a rectangular frame structure and is fixedly arranged on the top of the support beam. Four support beams and the upper welding frame constitute a lateral stress resistance mechanism. The lateral stress resistance mechanism is a rectangular frame structure as a whole.
8. The underwater cleaning robot shore-based engineering operation system according to claim 7 is characterized in that: A water tank welding frame is also provided on the integrated base, and the lower space of the water tank welding frame is used to install the high-pressure pump group; the water storage mechanism has a water tank, and the water tank is arranged on the water tank welding frame. The water inlet of the water tank is connected to the submersible pump through an inlet pipe, and the submersible pump can pump seawater into the water tank; the water outlet of the water tank is connected to the high-pressure pump group through an outlet pipe, and the water in the water tank is pumped out at high pressure by the high-pressure pump group, so that the underwater cleaning robot can clean the hull and bottom of the ship.
9. The underwater cleaning robot shore-based engineering operation system according to claim 8, characterized in that: The water outlet and the water inlet of the water tank are respectively provided with a first filter element and a second filter element; the first filter element adopts a 50-mesh filter element, and the second filter element adopts a 30-mesh filter element.
10. The underwater cleaning robot shore-based engineering operation system according to claim 9, characterized in that: An inspection platform is also provided on the integrated base. The underwater cleaning robot is placed on top of the inspection platform. There is an inspection space at the bottom of the inspection platform. The bottom inspection space is used to store cables and submersible pumps during transportation. A protective cage is provided on the outside of the submersible pump.