Temporary construction track of gantry crane

By using reinforced concrete foundations and pressed steel bars instead of traditional lanes and fasteners in prefabricated gantry crane tracks, the problem of rail flatness and straightness control during construction is solved, and construction efficiency and economic benefits are improved.

CN222099385UActive Publication Date: 2024-12-03THE FIFTH ENGEERING OF CHINA RAILWAY 5TH BUREAU GROUP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420175715.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-24
Publication Date
2024-12-03
Estimated Expiration
2034-01-24

AI Technical Summary

Technical Problem

The construction process of the existing prefabricated gantry crane track is complicated, and it is difficult to control the flatness and straightness of the rail, resulting in low construction efficiency and poor economic benefits.

Method used

The buckle steel bars on both sides of the rail are combined with the reinforced concrete foundation. The rails are tightened by the piers and buckle steel bars embedded in the reinforced concrete foundation, replacing traditional nails and fasteners, simplifying the construction process and reducing subsequent adjustment needs.

Benefits of technology

The stability and flatness of the rail are controlled, the construction process is simplified, the construction efficiency and economic benefits are improved, and the costs and process complexity are reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222099385U_ABST
    Figure CN222099385U_ABST
Patent Text Reader

Abstract

The utility model discloses a gantry crane temporarily-built track which comprises a steel rail, buckling and pressing steel bars are arranged on the two sides of the steel rail and comprise the first buckling and pressing steel bar and the second buckling and pressing steel bar, a reinforced concrete foundation is arranged at the bottom of the steel rail, a plurality of pier columns are arranged in the reinforced concrete foundation, and the steel rail is placed on the tops of the pier columns. One ends of the first buckling steel bar and the second buckling steel bar are embedded into the reinforced concrete foundation and connected with a reinforcement cage in the reinforced concrete foundation, the other ends of the first buckling steel bar and the second buckling steel bar buckle the bottom of the steel rail to press the steel rail on the pier column, and the bottom of the steel rail is embedded into the reinforced concrete foundation. The gantry crane temporary construction track has the advantages of being simple, convenient and rapid to construct, high in construction efficiency, fast in project progress and high in economic benefit.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of foundation construction of a temporary construction prefabrication site running track, in particular to a temporary construction track for a gantry crane. Background Art

[0002] With the rapid development of railway, highway and other projects, prefabricated structures have great advantages and economic benefits for engineering construction. For example, the construction of temporary small and medium-sized prefabrication sites can speed up the progress of engineering structures and bring significant economic benefits.

[0003] The tracks of the existing prefabrication yard gantry cranes are stabilized by sleepers combined with spikes and fasteners. During construction, sleepers are pre-embedded, fasteners are installed on the sleepers through spikes, and then the rails and sleepers are connected through the fasteners. It is necessary to perform precision control when pre-embedded sleepers, and then adjust the fasteners one by one to ensure the flatness and straightness of the rails. The construction process is complicated, the subsequent adjustment workload is large, and it is difficult to control the flatness and straightness of the rails, which seriously affects the construction progress, resulting in low construction efficiency and poor economic benefits. Utility Model Content

[0004] The technical problem to be solved by the utility model is to overcome the deficiencies in the prior art and provide a temporary track for a gantry crane which is easy to install and does not require subsequent adjustment.

[0005] In order to solve the above technical problems, the utility model adopts the following technical solutions:

[0006] A temporary track for a gantry crane comprises a steel rail, with buckled steel bars arranged on both sides of the steel rail, the buckled steel bars comprising a first buckled steel bar and a second buckled steel bar, a reinforced concrete foundation is arranged at the bottom of the steel rail, a plurality of piers are arranged in the reinforced concrete foundation, the steel rail is placed on the top of each pier, one end of the first buckled steel bar and the second buckled steel bar are embedded in the reinforced concrete foundation and connected to a steel cage in the reinforced concrete foundation, the other ends of the first buckled steel bar and the second buckled steel bar buckle the bottom of the steel rail to press the rail against the pier, and the bottom of the rail is embedded in the reinforced concrete foundation.

[0007] As a further improvement of the above technical solution:

[0008] The first buckled steel bars and the second buckled steel bars are alternately arranged along the extension direction of the rail.

[0009] The first pressing steel bar is a U-shaped steel bar, the opening of which is arranged transversely, one end of the U-shaped steel bar is embedded in the reinforced concrete foundation, and the other end of the U-shaped steel bar presses the bottom of the rail, and the second pressing steel bar is a Z-shaped steel bar, one end of the Z-shaped steel bar is embedded in the reinforced concrete foundation, and the other end of the Z-shaped steel bar presses the bottom of the rail.

[0010] A rubber pad is provided between the first buckled steel bar and the steel rail, and the rubber pad is provided between the second buckled steel bar and the steel rail.

[0011] A plurality of the piers are arranged at intervals along the extension direction of the rails. The piers are PVC piers. The outside of the PVC piers is a PVC pipe, and the inside of the PVC pipe is poured with concrete.

[0012] The reinforced concrete foundation comprises a bottom foundation and an upper foundation, the pier is arranged in the upper foundation, and one end of the first buckled steel bar and the second buckled steel bar embedded in the reinforced concrete foundation is welded to the steel cage in the upper foundation.

[0013] Compared with the prior art, the utility model has the advantages that: the temporary track of the gantry crane of the utility model presses the rail on the pier by setting the first buckling steel bar and the second buckling steel bar, and then pours concrete to embed the bottom of the rail into the reinforced concrete foundation, improves the traditional process method of combining sleepers with spikes and fasteners according to the force design, uses the first buckling steel bar and the second buckling steel bar to be embedded in the reinforced concrete foundation to buckle the bottom edge of the rail, and replaces the traditional spikes and fasteners, which can not only counter the lateral slippage of the rail, but also strengthen the vertical bearing of the rail, has multiple functions such as bearing and stability, can meet the actual safe use conditions, and does not need to use spikes and fasteners, which greatly saves costs. During construction, the precision control of the pre-embedded sleepers in the early stage is omitted, and the fasteners do not need to be adjusted one by one later, and the adjustment amount is small. At the same time, it is easier to control the key process data such as elevation and center line during the construction process, and it is easy to control the flatness and straightness of the rail, which saves the process, so that the construction is simple and fast, the construction efficiency is high, the project progress is fast, and the economic benefit is high. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 This is a schematic diagram of the plan structure of the temporary track of the gantry crane.

[0015] Legend:

[0016] 1. Rails; 2. Reinforced concrete foundation; 21. Bottom foundation; 22. Upper foundation; 3. First buckle steel bar; 4. Second buckle steel bar; 5. Rubber pad; 6. Pier; 7. 7-shaped steel bar; 8. Cotton thread. DETAILED DESCRIPTION

[0017] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0018] like Figure 1As shown, the temporary track of the gantry crane in this embodiment includes a rail 1, and buckled steel bars are arranged on both sides of the rail 1. The buckled steel bars include a first buckled steel bar 3 and a second buckled steel bar 4. A reinforced concrete foundation 2 is provided at the bottom of the rail 1. A plurality of piers 6 are provided in the reinforced concrete foundation 2. The rail 1 is placed on the top of each pier 6. One end of the first buckled steel bar 3 and the second buckled steel bar 4 are embedded in the reinforced concrete foundation 2 and connected to the steel cage in the reinforced concrete foundation 2. The other ends of the first buckled steel bar 3 and the second buckled steel bar 4 buckle the bottom of the rail 1 to press the rail 1 against the pier 6, and the bottom of the rail 1 is embedded in the reinforced concrete foundation 2. The temporary track of the gantry crane of the present invention is provided with a first buckling steel bar 3 and a second buckling steel bar 4 to press the rail 1 onto the pier 6, and then pour concrete to embed the bottom of the rail 1 into the reinforced concrete foundation 2. The conventional process method of combining sleepers with spikes and fasteners is improved according to the force design. The first buckling steel bar 3 and the second buckling steel bar 4 are embedded in the reinforced concrete foundation 2 to buckle the bottom edge of the rail 1 to replace the conventional spikes and fasteners. The track can not only resist the lateral slippage of the rail 1, but also strengthen the vertical bearing of the rail 1. The track has multiple functions such as bearing and stability, can meet the actual safe use conditions, and does not need to use spikes and fasteners, which greatly saves costs. During construction, the accuracy control of the pre-embedded sleepers in the early stage is omitted, and the fasteners do not need to be adjusted one by one later. The adjustment amount is small. At the same time, it is easier to control the key process data such as elevation and center line during the construction process, and it is easy to control the flatness and straightness of the rail 1, which saves the process, makes the construction simple and fast, has high construction efficiency, fast project progress and high economic benefits.

[0019] In this embodiment, the first buckled steel bars 3 and the second buckled steel bars 4 are arranged alternately along the extension direction of the rail 1. There are multiple first buckled steel bars 3 and second buckled steel bars 4. The multiple first buckled steel bars 3 and the multiple second buckled steel bars 4 on one side of the rail 1 are arranged alternately along the extension direction of the rail 1, and the multiple first buckled steel bars 3 and the multiple second buckled steel bars 4 on the other side of the rail 1 are also arranged alternately along the extension direction of the rail 1. Two first buckled steel bars 3 or two second buckled steel bars 4 are arranged one by one on the opposite sides of the same cross section of the rail 1. The first buckled steel bars 3 and the second buckled steel bars 4 on the same side of the opposite sides of the rail 1 are arranged alternately, which can not only counteract the lateral slippage of the rail 1, but also strengthen the vertical bearing of the rail 1, and has multiple functions such as bearing and stability.

[0020] In this embodiment, the first pressing steel bar 3 is a U-shaped steel bar, the opening of the U-shaped steel bar is arranged horizontally, one end of the U-shaped steel bar is embedded in the reinforced concrete foundation 2, and the other end of the U-shaped steel bar presses the bottom of the rail 1, and the second pressing steel bar 4 is a Z-shaped steel bar, one end of the Z-shaped steel bar is embedded in the reinforced concrete foundation 2, and the other end of the Z-shaped steel bar presses the bottom of the rail 1. The first pressing steel bar 3 is set as a U-shaped steel bar arranged horizontally, which can limit the displacement of the rail 1 in the up and down directions, and the second pressing steel bar 4 is set as a Z-shaped steel bar, which can also limit the lateral displacement of the rail 1. The U-shaped steel bars and the Z-shaped steel bars are arranged alternately, which can jointly limit the displacement of the rail in multiple directions, and ensure the stability and reliability of the steel bar pressing the rail 1.

[0021] In this embodiment, a rubber pad 5 is provided between the first buckled steel bar 3 and the rail 1, and a rubber pad 5 is provided between the second buckled steel bar 4 and the rail 1. The rubber pad 5 is provided between the first buckled steel bar 3, the second buckled steel bar 4 and the rail 1 to play a role in shock absorption and buffering. In this embodiment, the rubber pad 5 is embedded in the reinforced concrete foundation 2.

[0022] In this embodiment, a plurality of piers 6 are arranged at intervals along the extension direction of the rail 1. The piers 6 are PVC piers. The outside of the PVC piers is a PVC pipe, and the inside of the PVC pipe is poured with concrete. After pouring, a PVC pier with a diameter of 200 mm is made every 6 meters. The spacing depends on the length of the rail 1. In this embodiment, the rail 1 is 12 meters. In other embodiments, the PVC piers can be appropriately increased or rails 1 of different lengths can be selected. The required pier height to the top elevation is measured on the concrete surface with a level. When cutting the PVC pipe, it is cut according to the required pier height. Concrete with the same or higher strength as the design is poured into the PVC pipe, and the concrete is tamped and smoothed, and then the elevation is re-measured to form a PVC pier. The pier is used to support the rail 1, which is convenient for adjusting the elevation of the track 1 during the construction process. In the later stage, there is no need to adjust the buckled steel bars one by one. It can be done by adjusting a small number of PVC piers, which reduces the later elevation adjustment, improves the installation accuracy, and accelerates the construction process. In this construction step, the flatness and straightness of the rail 1 are also guaranteed.

[0023] In this embodiment, the reinforced concrete foundation 2 includes a bottom foundation 21 and an upper foundation 22, the pier 6 is arranged in the upper foundation 22, and one end of the first buckled steel bar 3 and the second buckled steel bar 4 embedded in the reinforced concrete foundation 2 is welded and connected to the steel cage in the upper foundation 22. After the bottom foundation 21 is cast, the PVC pier is poured on the concrete surface of the bottom foundation 21, and then the rail 1 is placed on the PVC pier, and one end of the first buckled steel bar 3 and the second buckled steel bar 4 is welded to the steel cage in the upper foundation 22, so that the first buckled steel bar 3 and the second buckled steel bar 4 buckle the rail 1, and then the upper foundation 22 is cast, and the reinforced concrete foundation 2 is set to a combined structure of the bottom foundation 21 and the upper foundation 22, and the bottom foundation 21 is used as a cushion layer to facilitate the measurement of the elevation, and the first buckled steel bar 3, the second buckled steel bar 4 and the steel cage are connected by welding, and the connection is stable and reliable, no additional parts are required, and the operation is simple and quick. The bottom foundation 21 is also provided with a steel cage.

[0024] The construction method of the temporary track of the gantry crane of this embodiment is applied to the temporary track of the gantry crane mentioned above, and comprises the following steps:

[0025] Step 1: Measure and stake out the foundation excavation line;

[0026] Step 2: Use excavation equipment to dig the foundation trench;

[0027] Step 3: Use compaction equipment to level and compact the foundation trench;

[0028] Step 4: Lay gravel or concrete cushion in the foundation trench;

[0029] Step 5: Tie up the steel cage;

[0030] Step 6: pouring the bottom foundation 21;

[0031] Step 7: roughening and curing the surface of the bottom foundation 21;

[0032] Step 8: Place multiple PVC pipes at intervals on the surface of the bottom foundation 21, and pour concrete in the PVC pipes to form PVC piers;

[0033] Step 9: Place the rail 1 flat on the PVC pier, and weld the first buckled steel bar 3 and the second buckled steel bar 4 to the steel cage at the bottom of the rail 1, so that the first buckled steel bar 3 and the second buckled steel bar 4 are tightly attached to both sides of the bottom of the rail 1;

[0034] Step 10: Set up templates on both sides of the rail 1 and cast them to form an upper foundation 22;

[0035] Step 11: demolding and maintenance.

[0036] In this embodiment, in step eight: after the first pouring of concrete, the center line of the rail 1 is released with a total station, and a PVC pier with a diameter of 200 to 350 mm is set every 4000 mm to 8000 mm according to the length of the rail 1. The height of the PVC pier required to reach the top elevation is measured with a level on the concrete surface of the formed PVC pier, and the PVC pipe is cut according to the measured height. Concrete with the same or higher strength as the design is poured into the PVC pipe, and the PVC pipe is tamped and smoothed, and then the elevation is re-measured to make the elevation accurate to ±3mm. Concrete is poured in the PVC pipe to form a PVC pier to support the rail 1. The PVC pipe is used as a template for forming the pier, which is directly purchased and cut. After forming, it does not need to be removed and can be embedded in the concrete foundation. The concrete of the poured pier is consistent with the design strength or one level higher, which can ensure that the strength of the PVC pier meets the design requirements. After the rail 1 is buckled on the PVC pier by buckling the steel bar in this step, no adjustment is required in the later stage.

[0037] In this embodiment, in step nine: the hoisted rail 1 is placed flat on the PVC pier, so that the middle position of the head and tail of the rail 1 is placed on the PVC pier, and the elevation is finally measured, and the elevation is adjusted to reach the final design elevation ±3mm, and then the center point is placed on the surface of the rail 1 by using a total station, and a 7-shaped bend steel bar 7 is welded on one side of the center point, and the center point on the rail 1 is moved to the 7-shaped bend steel bar 7, and the center point is connected and straightened with cotton thread 8, and the rail 1 is pried so that the center line of the rail 1 is rigid. It is best to overlap with the cotton thread 8, and the overlap error is controlled within ±3mm. The first buckling steel bar 3 and the second buckling steel bar 4 on one side of the rail 1 are welded to the steel cage, and a rubber pad 5 is added to the part where the buckling steel bar contacts the rail 1, and the other side of the rail 1 is pressed tightly. The first buckling steel bar 3 and the second buckling steel bar 4 on the other side of the rail 1 are welded to the steel cage, and a rubber pad 5 is added to the part where the buckling steel bar contacts the rail 1, so that the buckling steel bars on both sides are tightly buckled to the bottom of the rail 1 so that the rail 1 cannot be displaced. The size and spacing of the buckling steel bars are determined by the tonnage and design of the gantry crane. By setting the 7-shaped bend steel bar 7 and using the 7-shaped bend steel bar 7 to straighten and tighten the center line point connection, it is convenient to ensure that the center line of the rail 1 is in the correct position during the construction process, so that the center line of the rail 1 overlaps with the cotton thread 8.

[0038] In this embodiment, in step nine: a thin steel sheet is set on the PVC pier or concrete on the top of the PVC pier is scraped out to adjust the elevation to reach the final design elevation of ±3 mm, and the first buckling steel bars 3 and the second buckling steel bars 4 on the same side of the rail 1 are alternately arranged to buckle the rail 1. Adjusting the elevation by a thin steel sheet or scraping out concrete is simple to operate and convenient to adjust the elevation.

[0039] In this embodiment, in step one, a gantry crane is used for continuous construction, and a total station is used to lay out the entire foundation excavation line. The foundation design edge line is widened by 150 to 250 mm on each side as the excavation control bottom line, and is marked with white lime.

[0040] In step two, consider whether to slope according to the existing site and excavation depth, and use the backward excavator to excavate the trench. When the excavator reserves 200 to 300 mm thickness, it will be removed manually. After the foundation pit is excavated to the design elevation, the foundation bearing capacity is checked by probing to see if it meets the design bearing capacity. After passing the self-inspection, report to the supervisor for acceptance of the foundation pit. For local replacement of parts that do not meet the design requirements, ensure that the bearing capacity meets the design requirements. The combination of manual and mechanical construction can reduce mechanical damage to the bottom of the foundation pit.

[0041] In step three: manually clean the bottom, remove large rocks and other debris at the bottom of the ditch, level the base shape, and use compaction equipment to compact the loose soil at the bottom to make the topsoil dense.

[0042] In step four: measure the design elevation, set up stakes on the ground, hang lines as the standard for the thickness of the cushion layer, lay the gravel or concrete cushion layer, and tamp or vibrate it to make it dense.

[0043] In step five: the steel bars are processed in a steel bar factory and transported to the site for binding and forming. The surface of the steel bars should be clean and free of oil and rust. The bending hooks, welding, binding and steel bar protective layer should be constructed according to the design drawings.

[0044] In step six: after the steel cage inspection meets the requirements, the concrete is transported to the site by concrete tanker according to the designed concrete grade, and the concrete is poured according to the construction specifications to ensure the concrete construction performance. If the direct unloading height is too large, chute pouring should be adopted to prevent concrete segregation. During the concrete vibration process, the moving distance should not exceed 1.5 times the vibration radius, and the "three no-dependence" principle should be followed, with fast insertion and slow tamping, until the surface is covered with slurry, there are no bubbles, and the concrete stops sinking.

[0045] In step seven: after the initial setting of the concrete, the surfaces that need to be combined are manually chiseled and picked to remove the floating slurry or loose parts on the surface to expose the stones, and then rinsed clean to increase the bite force of the secondary pouring. After the final setting of the concrete, the surface is covered with a film and watered for maintenance. The number of waterings should be enough to keep the concrete moist to avoid rapid loss of moisture due to sunlight, strengthen the curing and moisture retention of the concrete, ensure the rapid increase of the initial strength of the concrete, and prevent the formation of surface shrinkage cracks. The water used for concrete maintenance should be the same as the water used for mixing.

[0046] In step ten: clamp the prepared wooden formwork on both sides of the rail 1, use the tensioning bars to hold the formwork to make it stable and prevent it from running. When pouring, strictly vibrate to make the concrete dense. When finishing, pay attention to leaving a small slope from the center of the rail 1 to both sides to prevent rainwater from gathering and corroding the steel bars and rail 1.

[0047] In step 11: After removing the formwork, the concrete should be cured by watering or covering it to keep it moist. The time should not be less than 7 days so that the concrete strength can reach the design requirements.

[0048] When using this construction method, the reinforced concrete foundation 2 of the track is poured twice, and a steel cage is provided in the bottom foundation 21. When the bottom foundation 21 is poured, PVC pipes are placed at the two ends and three positions in the middle of a rail 1, and concrete is poured in the PVC pipes to form PVC piers. The elevation from the bottom surface of each PVC pier to the designed elevation of the rail 1 is accurately measured, the rail 1 is hoisted and placed on the PVC pier to be straightened and leveled, and then the processed first buckling steel bars 3 and the second buckling steel bars 4 are welded to the steel cage in the upper foundation 22 to buckle the rail 1, and a cut rubber pad 5 is added between the buckling steel bars and the rail 1. After the elevation and the center line are verified to be correct, the mold is closed and concrete is poured for a second time to form the upper foundation 22. This construction method makes it easier to control key process data such as elevation and center line during construction, and it is easier to control the flatness and straightness of the rail 1, which can save processes, speed up the progress of the project, and is quick and convenient.

[0049] The above is only a preferred embodiment of the present invention, and the protection scope of the present invention is not limited to the above embodiments. For those skilled in the art, improvements and changes obtained without departing from the technical concept of the present invention should also be regarded as the protection scope of the present invention.

Claims

1. A temporary track for a gantry crane, comprising a steel rail (1), wherein buckled steel bars are arranged on both sides of the steel rail (1). Features: The clamping steel bars include a first clamping steel bar (3) and a second clamping steel bar (4); a reinforced concrete foundation (2) is provided at the bottom of the steel rail (1); a plurality of piers (6) are provided in the reinforced concrete foundation (2); the steel rail (1) is placed on the top of each pier (6); one end of the first clamping steel bar (3) and the second clamping steel bar (4) are embedded in the reinforced concrete foundation (2) and connected to the steel cage in the reinforced concrete foundation (2); the other ends of the first clamping steel bar (3) and the second clamping steel bar (4) clamp the bottom of the steel rail (1) to press the steel rail (1) against the pier (6); and the bottom of the steel rail (1) is embedded in the reinforced concrete foundation (2).

2. The temporary construction track of the gantry crane according to claim 1, Features: The first buckling steel bars (3) and the second buckling steel bars (4) are arranged alternately along the extension direction of the steel rail (1).

3. The temporary construction track of the gantry crane according to claim 1, Features: The first pressing steel bar (3) is a U-shaped steel bar, the opening of which is arranged transversely, one end of the U-shaped steel bar is embedded in the reinforced concrete foundation (2), and the other end of the U-shaped steel bar presses the bottom of the rail (1), and the second pressing steel bar (4) is a Z-shaped steel bar, one end of the Z-shaped steel bar is embedded in the reinforced concrete foundation (2), and the other end of the Z-shaped steel bar presses the bottom of the rail (1).

4. The temporary construction track of the gantry crane according to claim 1, Features: A rubber pad (5) is provided between the first buckled steel bar (3) and the steel rail (1), and the rubber pad (5) is provided between the second buckled steel bar (4) and the steel rail (1).

5. The temporary construction track of the gantry crane according to claim 1, Features: A plurality of the piers (6) are arranged at intervals along the extension direction of the steel rail (1); the piers (6) are PVC piers, the outside of the PVC piers is a PVC pipe, and the inside of the PVC pipe is poured with concrete.

6. The temporary construction track of the gantry crane according to claim 5, Features: The reinforced concrete foundation (2) comprises a bottom foundation (21) and an upper foundation (22); the pier column (6) is arranged in the upper foundation (22); one end of the first buckled steel bar (3) and the second buckled steel bar (4) embedded in the reinforced concrete foundation (2) is welded to the steel cage in the upper foundation (22).