Transverse beam rest stand system in hoisting of gantry crane
By using the gantry crane lifting medium beam shelving system in the construction of steel pipe concrete arch bridge, the precise lifting and displacement of medium beams is achieved using the boom and movable van system, the problem of the large impact and high cost of traditional construction methods on the waterway is solved. , improve construction efficiency and lifting accuracy.
Patent Information
- Application Number
- CN202420752132.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-12
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-04-12
AI Technical Summary
In the construction of steel pipe concrete arch bridges in Dajiang River, which have high navigation requirements, traditional floating hanging staircase construction has caused great impact on the waterway, high cost, and insufficient construction efficiency and lifting accuracy.
The gantry crane is used to hoist the middle beam shelving system, including the gantry crane structure, shelving hanger and movable van system. The precise lifting and displacement of the middle beam is achieved through the hoisting rod, and the gantry crane support system and control system are used for precise control.
It improves construction efficiency, saves construction period, and effectively ensures the lifting accuracy of the middle beams, simplifies position adjustment operations.
Smart Images

Figure CN222099411U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of bridge engineering, and in particular comprises a crossbeam shelving frame system for a gantry crane hoisting system. Background Art
[0002] For the construction of steel tube concrete tied arch bridges on large rivers with high navigation requirements, the traditional floating hanging method has problems such as great impact on the waterway and high cost during the installation of the prefabricated middle cross beam of the steel tube concrete tied arch bridge. In order to improve the construction efficiency, save the construction period and ensure the hoisting accuracy of the middle cross beam, it is urgent to propose an effective measure to solve the above problems. Utility Model Content
[0003] The utility model aims to overcome the deficiencies in the prior art and provide a crossbeam shelf system for a gantry crane hoisting system.
[0004] The crossbeam shelf system for gantry crane hoisting includes: a gantry crane structure and a shelf hanger;
[0005] Gantry crane support systems are provided on both sides of the gantry crane structure, and a gantry crane travel system is provided at the bottom of the gantry crane support system; a gantry crane crossbeam is installed between the gantry crane support systems, and a movable gantry crane overhead crane system is installed on the gantry crane crossbeam, and the movable gantry crane overhead crane system is used to lower the middle crossbeam;
[0006] A mounting hanger is installed above the installation position of the middle cross beam between the gantry crane support systems, and the middle cross beam is hung under the mounting hanger during installation.
[0007] Preferably, a gantry crane supporting pedestal is supported below the gantry crane structure, a gantry crane traveling system is installed at the bottom of the gantry crane structure, a gantry crane supporting system is installed on the gantry crane traveling system, and a movable gantry crane overhead crane system moves along the gantry crane beam.
[0008] Preferably, a gantry crane control system is arranged on the lower side of the gantry crane beam, and the gantry crane control system is used to control the lifting of the middle beam. The gantry crane control system is arranged in contact with the gantry crane support system on one side. A reinforcement structure is provided on the outer side of the gantry crane support system, and the gantry crane beam extends to the upper end of the reinforcement structure.
[0009] Preferably, a shelf hanger is installed on the upper side of the installation position of the middle cross beam, and both sides of the shelf hanger are respectively connected to the gantry crane support system on both sides of the gantry crane structure, and a hanging rod is arranged under the shelf hanger. The middle cross beam hoisted to the installation position is hung under the shelf hanger by the hanging rod, and a protective railing is arranged on the shelf hanger.
[0010] The beneficial effects of the utility model are:
[0011] 1) The utility model provides a movable gantry crane overhead travelling vehicle system for hoisting the middle cross beam through the gantry crane cross beam, and realizes the hoisting of the middle cross beam through the middle cross beam shelf system. The position adjustment operation is simple, which effectively improves the construction efficiency and saves the construction period.
[0012] 2) The utility model arranges a hanging bracket above the design position of the middle cross beam, arranges a hanging rod under the hanging bracket, and uses the hanging rod to hang the middle cross beam to shift the middle cross beam, thereby effectively ensuring the hoisting accuracy of the middle cross beam. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a schematic diagram of the crossbeam structure during gantry crane hoisting.
[0014] In the figure: 1-gantry crane supporting platform, 2-gantry crane traveling system, 3-movable gantry crane overhead travelling system, 4-gantry crane supporting system, 5-gantry crane control system, 6-gantry crane cross beam, 7-middle cross beam, 8-suspension hanger, 9-hanging rod, 10-guardrail. DETAILED DESCRIPTION
[0015] The utility model is further described below in conjunction with the embodiments. The description of the following embodiments is only used to help understand the utility model. It should be pointed out that for ordinary people in this technical field, the utility model can also be modified in some ways without departing from the principle of the utility model, and these improvements and modifications also fall within the scope of protection of the claims of the utility model.
[0016] As an example, Figure 1 As shown, this gantry crane hoisting middle beam shelf system includes: a gantry crane structure and a shelf hanger 8 structure.
[0017] A gantry crane traveling system 2 is installed on the gantry crane supporting platform 1, a gantry crane supporting system 4 is installed on the gantry crane traveling system 2, a gantry crane crossbeam 6 is installed between the gantry crane supporting systems 4, a movable gantry crane overhead travelling system 3 is installed on the gantry crane crossbeam 6, and a middle crossbeam 7 is suspended under the movable gantry crane overhead travelling system 3.
[0018] A gantry crane control system 5 is arranged at the lower side of the gantry crane beam 6, and the hoisting of the middle cross beam 7 is realized through the gantry crane control system 5. The gantry crane control system 5 is arranged in close contact with a gantry crane support system 4 on one side, and a reinforcement structure is arranged on the outer side of the gantry crane support system 4, and the gantry crane beam 6 extends to the upper end of the reinforcement structure.
[0019] A shelf hanger 8 is installed on the upper side of the installation position of the middle cross beam 7. Both sides of the shelf hanger 8 are respectively connected to the gantry crane support system 4. A suspension rod 9 is arranged under the shelf hanger 8. The middle cross beam 7 is hoisted to the installation position through the movable gantry crane overhead crane system 3. The middle cross beam 7 is hoisted by the suspension rod 9 for precise displacement of the middle cross beam 7. A protective railing 10 is arranged on the shelf hanger 8 to ensure construction safety.
Claims
1. A gantry crane hoisting middle beam shelf system, characterized in that: include: Gantry crane structure and shelving bracket; Gantry crane support systems are provided on both sides of the gantry crane structure, and a gantry crane travel system is provided at the bottom of the gantry crane support system; a gantry crane crossbeam is installed between the gantry crane support systems, and a movable gantry crane overhead crane system is installed on the gantry crane crossbeam, and the movable gantry crane overhead crane system is used to lower the middle crossbeam; A mounting hanger is installed above the installation position of the middle cross beam between the gantry crane support systems, and the middle cross beam is hung under the mounting hanger during installation.
2. The gantry crane hoisting middle beam shelf system according to claim 1 is characterized in that: The gantry crane structure is supported by a gantry crane supporting pedestal below, a gantry crane traveling system is installed at the bottom of the gantry crane structure, a gantry crane supporting system is installed on the gantry crane traveling system, and a movable gantry crane overhead crane system moves along the gantry crane beam.
3. The gantry crane hoisting middle beam shelf system according to claim 1 is characterized in that: A gantry crane control system is arranged on the lower side of the gantry crane beam. The gantry crane control system is used to control the hoisting of the middle beam. The gantry crane control system is arranged in contact with the gantry crane support system on one side. A reinforcement structure is arranged on the outside of the gantry crane support system, and the gantry crane beam extends to the upper end of the reinforcement structure.
4. The gantry crane hoisting middle beam shelf system according to claim 1 is characterized in that: A shelf hanger is installed on the upper side of the installation position of the middle cross beam. Both sides of the shelf hanger are respectively connected to the gantry crane support systems on both sides of the gantry crane structure. A hanging rod is arranged under the shelf hanger. The middle cross beam hoisted to the installation position is hung under the shelf hanger through the hanging rod. A guardrail is arranged on the shelf hanger.