Arch bridge temporary support butt joint positioning device
The temporary support docking and positioning device for arch bridges improves the accuracy and efficiency of column butt joints through hoops and positioning rods, addressing the challenges of alignment and cost in steel structure arch bridges.
Patent Information
- Application Number
- CN202420474373.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-12
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-03-12
AI Technical Summary
The accuracy of butt joints in steel structure arch bridges is difficult to guarantee during installation, requiring significant time and labor for corrections, thereby impacting construction period and cost.
A temporary support docking and positioning device comprising hoops and positioning rods with fixing fasteners, allowing precise alignment and adjustment of column butt joints using clamps and bolts.
Enhances the accuracy of support docking, reduces installation time, and lowers construction costs by enabling quick assembly and disassembly, while being cost-effective and easy to manufacture.
Smart Images

Figure CN222100626U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of arch bridge construction, in particular to a temporary support butt joint positioning device for an arch bridge. Background Art
[0002] In recent years, steel structure bridges have been widely used, especially steel structure arch bridges. When installing the arch ribs, temporary brackets are needed for installation. However, due to the high height of the columns, they are often pre-welded and assembled on the ground, and then the columns are fixed to the foundation through hoisting, and finally the upper and lower columns are butt-welded. However, the accuracy of the butt joint of the upper and lower columns is difficult to guarantee, and a lot of time and labor are needed to make corrections at this time, which has a great impact on the construction period and increases the construction cost. Summary of the invention
[0003] In view of the above-mentioned prior art, the utility model proposes a temporary support docking and positioning device for an arch bridge.
[0004] The utility model provides a temporary support docking and positioning device for an arch bridge, comprising two hoops and a plurality of positioning rods, wherein the two hoops are respectively sleeved on the docking ends of two columns, the plurality of positioning rods are distributed along the periphery of the docking point, and the two ends of the positioning rods are respectively in tight contact with the two hoops, and either end of the positioning rod is connected to an adjacent hoops via a fixing fastener.
[0005] Preferably, the clamp is a metal steel ring, and two first bolt holes are provided at both ends of the metal steel ring.
[0006] Preferably, the positioning rod is made of a cylindrical steel pipe.
[0007] Preferably, the fixing fastener comprises a C-shaped steel plate, both ends of the C-shaped steel plate are provided with straight steel plates, and two second bolt holes are provided on the two straight steel plates.
[0008] Preferably, the number of the positioning rods is three, and the three positioning rods form an angle of 90 degrees.
[0009] Preferably, the steel plate material of the fixing fastener is Q235.
[0010] Compared with the prior art, the beneficial effects of the utility model are:
[0011] 1. The utility model provides a temporary support docking and positioning device for an arch bridge, which adopts a clamp and a positioning rod to effectively control the accuracy of the support docking and effectively reduce the time of the support docking. The clamp can be adjusted on the column by adjusting the bolt, and can be installed and disassembled at any time, and the construction can be adjusted according to the diameter of the support.
[0012] 2. The utility model has a simple structure, low cost, and is easy to manufacture and dismantle. Multiple devices can be manufactured at the same time to carry out construction on the butt joint of brackets of multiple sections of columns. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a schematic diagram of the application of the temporary support docking and positioning device for an arch bridge in an embodiment of the utility model.
[0014] Figure 2 It is a schematic diagram of the structure of the clamp in the embodiment of the utility model.
[0015] Figure 3 It is a schematic diagram of the structure of the fixing fastener in the embodiment of the utility model.
[0016] Figure 4 It is a schematic diagram of the distribution of the positioning rods in the embodiment of the utility model.
[0017] In the figure: 1. clamp; 2. positioning rod; 3. first bolt hole; 4. C-shaped steel plate; 5. straight steel plate; 6. second bolt hole. DETAILED DESCRIPTION
[0018] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below with reference to specific illustrations.
[0019] Example: Figure 1-4 The present invention discloses a temporary support docking and positioning device for an arch bridge, comprising two hoops 1 and three positioning rods 2. The hoops 1 are metal steel rings, and two first bolt holes 3 are arranged at both ends of the metal steel rings. The two hoops 1 are respectively sleeved on the docking ends of the upper and lower columns of the support and fixed by bolts.
[0020] Furthermore, the positioning rod 2 adopts a cylindrical steel pipe, and three positioning rods 2 are distributed along the outer circumference of the joint, and the three positioning rods 2 are at an angle of 90 degrees, and the two ends of the positioning rod 2 are tightly in contact with the two clamps 1 respectively, and the lower end of the positioning rod 2 is connected to the clamp 1 located on the lower side through a fixing fastener and a bolt, and the fixing fastener includes a C-shaped steel plate 4, and straight steel plates 5 are provided at both ends of the C-shaped steel plate 4, and two second bolt holes 6 are provided on the two straight steel plates 5, and the steel plate material of the fixing fastener is Q235.
[0021] In this embodiment, the width of the clamp 1 is 10 cm and the thickness is 2 mm. The diameter of the positioning rod 2 is 10 cm and the length is 30 cm. It can be adjusted according to the on-site construction conditions to adjust the construction efficiency.
[0022] This embodiment uses a clamp 1 and a positioning rod 2 to effectively control the accuracy of the bracket docking and effectively reduce the time of bracket docking. The clamp 1 can be opened and closed on the column by adjusting the bolts, and can be installed and removed at any time, and the construction can be adjusted according to the diameter of the bracket.
[0023] The above are only implementation methods of the present utility model, and are not intended to limit the patent scope of the present utility model. Any equivalent structure made using the contents of the specification and drawings of the present utility model, directly or indirectly used in other related technical fields, are also within the patent protection scope of the present utility model.
Claims
1. A temporary support docking and positioning device for an arch bridge, characterized in that: It includes two hoops and a number of positioning rods. The two hoops are respectively sleeved on the butt ends of the two columns. The several positioning rods are distributed along the periphery of the butt joint, and the two ends of the positioning rods are respectively in tight contact with the two hoops. Any end of the positioning rod is connected to an adjacent hoops through a fixing fastener.
2. The temporary support docking and positioning device for an arch bridge as claimed in claim 1, characterized in that: The clamp is a metal steel ring, and two first bolt holes are arranged at both ends of the metal steel ring.
3. The temporary support docking and positioning device for an arch bridge according to claim 1 or 2, characterized in that: The positioning rod is made of a cylindrical steel pipe.
4. The temporary support docking and positioning device for an arch bridge according to claim 1 or 2, characterized in that: The fixing fastener comprises a C-shaped steel plate, both ends of the C-shaped steel plate are provided with straight steel plates, and two second bolt holes are provided on the two straight steel plates.
5. The temporary support docking and positioning device for an arch bridge according to claim 1 or 2, characterized in that: The number of the positioning rods is three, and the three positioning rods form an angle of 90 degrees.
6. The temporary support docking and positioning device for an arch bridge as claimed in claim 4, characterized in that: The steel plate material of the fixing fastener is Q235.