Movable arch frame structure for arch bridge dismantling
By designing a mobile arch structure, the arch bridge removal support is simplified by using temporary support arches and winches, the problems of complex construction and obstruction in the existing technology are solved, and an efficient and safe arch bridge removal process is achieved.
Patent Information
- Application Number
- CN202321545086.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-06-16
- Publication Date
- 2024-12-03
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The design of the existing arch bridge is complicated in the design of the supporting structure, which is inconvenient to construction and hinders the passage under the bridge, affecting construction efficiency and safety.
A mobile arch structure is designed, including temporary support arches, semicircular temporary arch hinge seats and transverse steel pipes. The arch frame is translated through a winch, simplifying the support system, reducing construction strength, and passing normally under the arch bridge.
The support system for demolition of arch bridges has been greatly simplified, construction efficiency and safety have been improved, and the bridge is navigational during construction is suitable for a wider range of promotion and application.
Smart Images

Figure CN222100660U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a mobile arch frame structure used for dismantling an arch bridge, belonging to the field of dismantling and reconstruction of old bridges. Background Art
[0002] In actual arch bridge construction, "brick and stone structures" or "concrete structures" built with bricks, stones, mortar or concrete as building materials are collectively referred to as "masonry structures". Masonry arch bridges are also a commonly used arch bridge construction method. When dismantling and renovating masonry arch bridges, it is necessary to first set up supports for the arch bridges, and then gradually dismantle the arch bridges. The current support setting method is complicated to operate, and the support needs to be supported by the hull under the arch bridge. Not only is the construction inconvenient, but the bottom of the arch bridge will also be blocked and impassable, and the defects are very obvious. Summary of the invention
[0003] The utility model provides a movable arch frame structure for dismantling an arch bridge, so as to solve the problems that the existing arch bridge dismantling supporting structure is unreasonable in design, not only the construction is inconvenient, but also the passage under the bridge is blocked.
[0004] In order to solve the above problems, it is proposed to adopt a mobile arch frame structure for arch bridge dismantling, including a temporary supporting arch supported under the arch bridge, the temporary supporting arches are distributed in sequence along the transverse direction of the bridge, and adjacent temporary supporting arches are fixedly connected. Temporary arch hinge seats with semicircular cross-sections are opened on the main arch seats at the bottom of both ends of the arch bridge along the transverse direction of the bridge, and the arch feet at the bottom of both ends of the temporary supporting arch are fixed on transverse steel pipes, and the transverse steel pipes at both ends are hinged in the temporary arch hinge seats at both ends of the arch bridge, so that the temporary supporting arch can be driven by a winch to translate under the arch bridge along the transverse direction of the bridge.
[0005] In the aforementioned arch frame structure, the temporary arch hinge seat is formed by fixing a semicircular seamless steel pipe hinge seat in a semicircular arch hinge groove;
[0006] In the aforementioned arch frame structure, an I-beam is laid on the upper end of the temporary supporting arch as a transverse distribution beam, a longitudinal square timber is laid between the transverse distribution beam and the arch bridge, and a 1.8 cm thick bamboo plywood is laid on the longitudinal square timber as a bottom formwork;
[0007] In the aforementioned arch frame structure, the temporary supporting arch is a steel arch frame formed by splicing together sections, and the bottom arch foot sections on both sides are spliced upward in sequence to form a temporary supporting arch.
[0008] Compared with the prior art, the utility model does not need to set up a large number of supports when dismantling the arch bridge. Only a few sets of arch frames need to be installed to achieve effective support of the bridge body, which greatly simplifies the support system and reduces the construction intensity. During construction, the temporary arch frame can be translated along the transverse direction of the bridge by a winch, and dismantling and installation are more convenient. During the construction process, the area below the arch bridge will not be affected by the construction. Navigation can be normal while paying attention to the surrounding environment and safety, and navigation will not be affected by the construction. The utility model has been successfully applied and has been verified in practice to be suitable for wider promotion and application. BRIEF DESCRIPTION OF THE DRAWINGS
[0009] Figure 1 It is a schematic diagram of the structure of the utility model in use;
[0010] Figure 2 yes Figure 1 Schematic diagram of the structure before the temporary supporting arch is constructed;
[0011] Figure 3 yes Figure 1 Sectional view along AA direction when temporary supporting arch is not constructed;
[0012] Figure 4 yes Figure 1 The AA section view during the construction of the first set of temporary supporting arches;
[0013] Figure 5 yes Figure 1 The AA section view after all the temporary support arches are in place;
[0014] Figure 6 yes Figure 1 A partial enlarged view of point B in the middle. DETAILED DESCRIPTION
[0015] In order to make the purpose, technical solutions and advantages of the utility model clearer, the utility model will be further described in detail below in conjunction with the accompanying drawings. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.
[0016] Example
[0017] Reference Figures 1 to 6 The present embodiment provides a movable arch frame structure for dismantling an arch bridge, including a temporary supporting arch 2 supported and arranged below the arch bridge 1, the temporary supporting arches 2 are distributed in sequence along the transverse direction of the bridge, and adjacent temporary supporting arches 2 are fixedly connected. The temporary supporting arch 2 is a steel arch frame formed by segmented splicing, and the bottom arch foot sections on both sides are sequentially spliced upward to form the temporary supporting arch 2. An I-beam is laid on the upper end of the temporary supporting arch 2 as a transverse distribution beam, and a longitudinal square timber is padded between the transverse distribution beam and the arch bridge, and a 1.8 cm thick bamboo plywood is laid on the longitudinal square timber as a bottom mold.
[0018] Temporary arch hinge seats 4 with semicircular cross sections are provided on the main arch seats 3 at the bottom of both ends of the arch bridge 1 along the transverse direction of the bridge. Figure 6 As shown, the temporary arch hinge seat 4 is formed by fixing a semicircular seamless steel pipe hinge seat 42 in a semicircular arch hinge groove 41, and the arch feet at the bottom of both ends of the temporary supporting arch 2 are fixed on the transverse steel pipe 5, and the transverse steel pipes 5 at both ends are hinged in the temporary arch hinge seats 4 at both ends of the arch bridge 1, so that the temporary supporting arch 2 can be driven by the winch 6 to translate along the transverse direction under the arch bridge 1.
[0019] Take the demolition of a bridge as an example:
[0020] The total length of the bridge is 92m, the span is 1×48m, the total width of the bridge is 7.5m, the width of the carriageway is 6.5m, and the bridge structure is a hollow stone arch bridge. The width of the bridge deck is composed of: net 6.5m (carriageway) + 2×0.5 (guardrail), and the bridge deck is paved with asphalt. The original bridge design load level: car-20, hanging-100. The lower structure is a gravity U-shaped abutment. The main arch ring adopts a block stone arch structure, and the arch ring is designed as a circular arch with a uniform cross-section. The net span of the main arch ring is 48m, the rise span ratio f / L is 1 / 6, the arch ring thickness is 120cm, and the total width of the arch ring is 7.0m. After reinforcement and widening in 2014. The span arrangement is 1×47.5m, and the bridge design load is: highway-Ⅱ level. The bridge head approach road level is a secondary highway, with a design speed of 40Km / h, and the current total daily traffic volume of motor vehicles on the bridge is 4322 vehicles / day. The width of the bridge deck is: 8.0m+2×1.0m (sidewalk+guardrail), and the total length of the bridge is 92.0m. The main span of the superstructure is a stone arch bridge with a clear span of 1×47.5m, a clear rise of 7.75m, and a rise-span ratio of 1 / 6.1. The transverse width of the arch ring of the main span is 7.6m, and the section height is 170cm. The belly holes on both sides are clear 2.5m masonry arches, the arch ring thickness is 40cm, the clear rise is 1.25m, and the rise-span ratio is 1 / 2. The abutments of the lower structure are mortar-built stone abutments.
[0021] During the bridge demolition construction, the main arch ring arch frame of the temporary supporting arch 2 is constructed with a suspended steel arch frame. The steel arch frame material is Q345 steel, the upper and lower chords are made of 18*160mm diameter steel pipes, the web members are made of 89*5mm steel pipes, the cross braces and diagonal braces are connected with ∠70×70×5mm, and the steel arch frame is set at a spacing of 150cm per piece, a total of 7 pieces, and welded into a whole through cross braces and diagonal braces. 16 I-beams are laid on the top of the steel arch frame as transverse distribution beams with a spacing of 1m. 10×10cm longitudinal square timbers are laid on the 16 I-beams with a spacing of 30cm. 1.8cm thick bamboo plywood is laid on the longitudinal square timber as the bottom formwork. The span of the arch frame is 45.8 meters, and the upper chord height loss is 9.26 meters, which is a two-hinged arch. The arch frame chord is modeled according to the quadratic parabola, and the overall structure of the steel arch frame is a two-hinged arch. During the assembly process, hinge supports are set at the arch foot to facilitate the adjustment of the elevation during installation.
[0022] The belly arch ring bracket adopts a full-height support frame, which is erected with a socket-type disc-type steel pipe bracket. The longitudinal distance, spacing, and step distance are: 90*90*150cm respectively. The steel pipe is bent into an arch helmet on the top, and 10*10cm square wood is used on it. The arch frame is erected with a spacing of 20cm, and the square wood is fixed to the steel pipe arch helmet by wire. The main load-bearing rod of the bracket is made of a steel pipe with a diameter of 63mm, and the material is Q345B high-strength low-alloy steel. Both theoretical calculations and experiments have proved that in order to improve the bearing capacity of the vertical pole, the effect of increasing the diameter of the steel pipe is far greater than the effect of increasing the wall thickness of the steel pipe. The application of Q345B high-strength low-alloy steel material reduces the deadweight of the frame while effectively improving the bearing capacity of the vertical pole.
[0023] The specific demolition process is: construction preparation - erection of main arch ring arch frame; erection of ventral arch ring arch frame - dismantling of bridge deck system and ancillary facilities - dismantling of ventral arch ring and arch columns - dismantling of main arch ring; dismantling of abutments.
[0024] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A mobile arch frame structure for dismantling an arch bridge, characterized in that: The invention comprises a temporary supporting arch (2) supported and arranged below an arch bridge (1), wherein the temporary supporting arches (2) are sequentially distributed along the transverse direction of the bridge, and adjacent temporary supporting arches (2) are fixedly connected to each other. A temporary arch hinge seat (4) with a semicircular cross section is provided on a main arch seat (3) at the bottom of both ends of the arch bridge (1) along the transverse direction of the bridge, and the arch feet at the bottom of both ends of the temporary supporting arch (2) are fixed to transverse steel pipes (5), and the transverse steel pipes (5) at both ends are hinged in the temporary arch hinge seats (4) at both ends of the arch bridge (1), so that the temporary supporting arch (2) can be driven by a winch (6) to translate along the transverse direction of the bridge below the arch bridge (1).
2. A movable arch frame structure for dismantling an arch bridge according to claim 1, characterized in that: The temporary arch hinge seat (4) is formed by fixing a semicircular seamless steel pipe hinge seat (42) in a semicircular arch hinge groove (41).
3. The movable arch frame structure for dismantling an arch bridge according to claim 1, characterized in that: An I-beam is laid on the upper end of the temporary supporting arch (2) as a transverse distribution beam, a longitudinal square timber is laid between the transverse distribution beam and the arch bridge, and a 1.8 cm thick bamboo plywood is laid on the longitudinal square timber as a bottom formwork.
4. The movable arch frame structure for dismantling an arch bridge according to claim 1, characterized in that: The temporary supporting arch (2) is a steel arch frame formed by splicing together sections, and the bottom arch foot sections on both sides are sequentially spliced upward to form the temporary supporting arch (2).
Citation Information
Cited By
Deck type arch bridge temporary reinforcing structure and construction method thereof