Water taking head structure of offshore shield tunnel
By using steel cylinders and water stop curtains in the water intake head structure of the marine shield tunnel, combined with the lining and reinforced rib structure, the dry maintenance function is realized, solving the problems of long construction cycles and high costs in the existing technology, and improving the Structural strength and construction efficiency.
Patent Information
- Application Number
- CN202420575885.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-22
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-03-22
AI Technical Summary
The existing technology cannot provide a convenient dry maintenance environment at offshore nuclear power plant sites, resulting in long construction cycles, complex processes and high project costs, making it difficult to meet the safety requirements of nuclear power plants for water intake projects.
Design a sea shield tunnel water intake head structure, adopting a steel cylinder as the outer structure, combining the bottom water stop curtain and composite foundation, and setting up a water intake gate and tunnel gate internally to realize the dry maintenance function, and through reinforced concrete lining and Strengthen the rib structure and improve strength and simplify the construction process.
The dry maintenance conditions of the entire shield tunnel line are achieved, the construction cycle and cost are shortened, the environmental impact is reduced, and convenient construction conditions and structural strength are provided, solving the problem that the existing technology cannot provide dry maintenance.
Smart Images

Figure CN222100770U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of water intake head structures of power plants, in particular to a water intake head structure of an offshore shield tunnel. Background Art
[0002] At present, the newly built sites of domestic nuclear power plants are gradually changing from traditional coastal sites to offshore sites far from the coast. The traditional open channel water intake structure scheme is difficult to apply to offshore sites. For offshore nuclear power plant sites, shield tunnels have gradually become a mainstream water intake scheme. This type of scheme generally involves building a fixed water intake head structure at the water intake end of the tunnel, or installing the water intake head structure in the form of a caisson. However, due to the high safety requirements of nuclear power plants for water intake projects, water intake tunnels require regular dry maintenance. The current scheme makes it impossible to provide a dry maintenance environment only through the existing water intake head structure, so additional gate wells need to be set up to meet the requirements, with a long construction period, complex processes, and high engineering costs. Therefore, it is urgent to develop a water intake head structure with dry maintenance function, safe and reliable structure, low construction difficulty, and short construction period. Utility Model Content
[0003] The technical problem to be solved by the utility model is to provide an offshore shield tunnel water intake head structure with lower construction difficulty, shorter construction period, lower engineering cost and capable of achieving dry maintenance conditions for the entire shield water intake tunnel in response to the defects of the prior art.
[0004] In order to solve the above technical problems, the utility model adopts the following technical solutions: an offshore shield tunnel water intake head structure, including a water intake head main structure, the water intake head main structure includes a water intake well, characterized in that: it also includes a steel cylinder, the steel cylinder is inserted into the seabed; the water intake head main structure is arranged inside the steel cylinder, and the outer wall of the water intake head main structure is formed by the steel cylinder; a water intake port and a tunnel interface are opened on the cylinder wall of the steel cylinder, the water intake port is connected to the water intake well, the water intake port is higher than the seabed surface but lower than the sea level; the tunnel interface is lower than the seabed surface, the tunnel is connected to the water intake head main structure through the tunnel interface, and the water intake well is connected to the tunnel; a water intake gate is arranged between the water intake well and the water intake, and the water inflow into the water intake head main structure through the water intake is closed by closing the water intake gate; a tunnel gate is arranged between the water intake well and the tunnel, and the water inflow of the tunnel is closed by closing the tunnel gate.
[0005] Furthermore, a number of water intakes are provided on the wall of the steel cylinder, and the inner side of each water intake is connected to the water intake well through a water inlet channel. The water inlet channel is a conical mouth structure that gradually narrows from the outside to the inside, and a filter grille is provided on the outside of the water intake; a water intake gate is provided at a position of each water inlet channel near the water intake well, and a water intake gate slot is provided at a position corresponding to the water intake gate in the main structure of the water intake head. Each water intake gate is installed in the corresponding water intake gate slot, and the gate is closed when it is lowered and opened when it is lifted.
[0006] Furthermore, the main structure of the water intake head is provided with a maintenance room, and stairs or ladders are provided in the maintenance room; an inspection passage is provided between the maintenance room and the tunnel, and the tunnel and the maintenance room are interconnected through the inspection passage, so that maintenance personnel can enter and exit the tunnel through the inspection passage.
[0007] Furthermore, a lining formed of reinforced concrete is cast along the inner wall of the steel cylinder, and a hole reinforcement structure is designed for the lining at the position corresponding to the water intake and the tunnel interface so as to be used for opening the water intake and the tunnel interface.
[0008] Furthermore, a tunnel gate is arranged at the entrance of the tunnel and between the inspection passage and the water intake well, and the inspection passage is located inside the steel cylinder; a tunnel gate groove is arranged in the main structure of the water intake head at a position corresponding to the tunnel gate, and the tunnel gate is installed in the tunnel gate groove.
[0009] Furthermore, a crown beam made of reinforced concrete is cast along the inner side of the upper part of the steel cylinder, and the crown beam is butted against the top end of the lining; a number of ring beams made of reinforced concrete are cast along the inner side of the steel cylinder, and each ring beam forms an embedded structure with the lining; a number of reinforcing ribs are arranged inside the main structure of the water intake head, and the reinforcing ribs have a transverse structure and annular structure, and adjacent water intakes are separated by the reinforcing ribs; a thickened inner wall is arranged along the edge of the water intake on the inner side of the steel cylinder to strengthen the structural strength of the window position.
[0010] Furthermore, an equipment room and an inspection port are provided in the main structure of the water intake head, and the equipment room and the inspection port are located above the water intake well; a partition wall is provided at the lower part of the main structure of the water intake head, and the water intake well is surrounded by the partition wall and a number of independent compartments are separated, and each independent compartment is filled with backfill sand.
[0011] Furthermore, a rotary jet pile end is driven at the connection between the tunnel and the outer side of the steel cylinder to form a reinforced water-stopping structure for the connection, and a ring beam is arranged on the inner side of the steel cylinder around the tunnel interface.
[0012] Furthermore, a reinforced concrete bottom plate is cast at the bottom of the steel cylinder to form a waterproof structure for the bottom of the steel cylinder, and the main structure of the water intake head is connected to the bottom plate; a high-pressure rotary jet pile foundation and a water-stop curtain of high-pressure rotary jet piles are set to reinforce the soil at the bottom of the steel cylinder.
[0013] Furthermore, a bottom protection block stone layer composed of blocks and composite geotextile mats is laid on the seabed surface outside the steel cylinder.
[0014] The utility model has the following beneficial effects: first, a large-diameter steel cylinder is used as the outer structure of the water intake head structure, combined with a bottom water-stop curtain and a composite foundation, which can provide dry construction conditions at sea, and does not require the construction of a construction cofferdam, which can shorten the construction period and reduce the impact of construction on the environment;
[0015] Second, the external steel cylinder is integrated with the internal structure of the water intake head structure to make full use of the internal space. As a permanent structure, the steel cylinder has two uses and does not need to be removed after the construction is completed, which can shorten the construction process, reduce construction costs, shorten the construction period, and strengthen the structural strength of the water intake head structure;
[0016] Third, the water intake gate and tunnel gate are arranged inside the water intake head structure, which solves the problem that the existing tunnel water intake head structure cannot provide dry maintenance function, and can realize dry maintenance of the tunnel and the water intake head structure itself;
[0017] Fourth, it can be used as a working shaft for the tunnel during the construction period, providing convenience for tunnel construction and conditions for offshore recovery of the shield machine. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a schematic diagram of the longitudinal section of the utility model (including the tunnel);
[0019] Figure 2 for Figure 1 AA section view;
[0020] Figure 3 for Figure 2 BB cross-sectional view.
[0021] In the figure, 1 is a steel cylinder, 11 is an inner lining, 12 is a crown beam, 13 is a ring beam, 14 is a water intake, 15 is a thickened inner wall, 20 is a water intake well, 21 is a reinforcing rib, 22 is a water inlet channel, 23 is a partition wall, 24 is an equipment room, 25 is a maintenance room, 26 is a water intake gate slot, 27 is a tunnel gate slot, 28 is backfill sand, 31 is a water intake gate, 32 is a tunnel gate, 4 is a tunnel, 41 is a maintenance channel, 5 is a jet grouting pile end, 6 is a bottom plate, 7 is a high-pressure jet grouting pile foundation, 8 is a water-stop curtain, 9 is a bottom protection stone layer, and 10 is a seabed surface. DETAILED DESCRIPTION
[0022] The present invention will be further described below by means of specific embodiments in conjunction with the accompanying drawings:
[0023] In this embodiment, refer to Figure 1-Figure 3The offshore shield tunnel water intake head structure includes a steel cylinder 1 and a water intake head main structure. The water intake head main structure includes a water intake well 20 (a vertical shaft). The water intake head main structure is arranged inside the steel cylinder 1. The steel cylinder 1 is inserted into the seabed to form the outer wall of the water intake head main structure. It should be noted that the steel cylinder 1 can also adopt other shapes of cylindrical objects according to actual conditions, such as steel square cylinders, steel elliptical cylinders, and even irregularly shaped steel cylinders, etc., and the effect is equivalent. A water intake 14 and a tunnel interface (not marked) are provided on the wall of the steel cylinder 1. The water intake 14 is slightly higher than the seabed surface 10 but lower than the sea level, and the tunnel interface is lower than the seabed surface 10. The tunnel 4 is connected to the main structure of the water intake head through the tunnel interface; the water intake 14 is connected to the water intake well 20, and the water intake well 20 is connected to the tunnel 4; a water intake gate 31 is provided between the water intake well 20 and the water intake 14, and the water inflow into the main structure of the water intake head through the water intake 14 can be closed by closing the water intake gate 31, thereby realizing dry maintenance operations inside the tunnel 4 and the water intake head structure; a tunnel gate 32 is provided between the water intake well 20 and the tunnel 4, and the water inflow of the tunnel 4 can be closed by closing the tunnel gate 32, thereby realizing dry maintenance operations of the tunnel 4 more quickly and separately.
[0024] Several water intakes 14 are provided on the wall of the steel cylinder 1, for example, 6, and the specific number can be determined according to actual needs. The inner side of each water intake 14 is connected to the water intake well 20 through a water inlet channel 22. The water inlet channel 22 is a conical mouth structure that gradually narrows from the outside to the inside, and the flow cross section gradually decreases, which can make the water flow more uniform and avoid biological entrainment caused by sudden changes in flow rate. A filter grid is provided on the outside of the water intake 14 to prevent large suspended matter from being sucked into the water intake 14. The grid is made of galvanized steel or stainless steel; a water intake gate 31 is provided at a position near the water intake well 20 of each water inlet channel 22, and a water intake gate slot 26 is provided at a position corresponding to the water intake gate 31 in the main structure of the water intake head. Each water intake gate 31 is installed in the corresponding water intake gate slot 26. The water intake gate 31 is closed when it is lowered and opened when it is raised. The water flow enters from the water intake 14, flows into the water intake well 20 through the water intake channel 22 and the water intake gate 31, and then passes through the tunnel gate 32 and the tunnel interface to flow into the tunnel 4.
[0025] The main structure of the water intake head is provided with a maintenance room 25, in which a staircase (ladder and other facilities that enable people to go up and down) is provided; an inspection passage 41 is provided between the maintenance room 25 and the tunnel 4, and the tunnel 4 and the maintenance room 25 are interconnected through the inspection passage 41, so that maintenance personnel and equipment can enter and exit the tunnel 4 through the inspection passage 41.
[0026] The tunnel gate 32 is arranged at the entrance of the tunnel 4 and between the inspection passage 41 and the water intake well 20. The inspection passage 41 is located inside the steel cylinder 1. If it is a double tunnel 4 structure, the inspection room 25 can be arranged between the two tunnels 4, and the inspection passages 41 are arranged on both sides of the inspection room 25 to connect the two tunnels 4. A tunnel gate groove 27 is arranged at the position corresponding to the tunnel gate 32 in the main structure of the water intake head. The tunnel gate 32 is installed in the tunnel gate groove 27. The tunnel gate 32 is closed when it is lowered and opened when it is raised.
[0027] During normal operation, the water intake gate 31 and the tunnel gate 32 are normally open. When the water intake head structure and the tunnel 4 need to be inspected, the gates can be closed and the inside of the water intake head structure can be drained to achieve dry inspection conditions inside the tunnel 4 and the water intake head structure.
[0028] An inner lining 11 formed of reinforced concrete is cast along the inner wall of the steel cylinder 1. The inner lining 11 is designed with a hole reinforcement structure at a position corresponding to the water intake 14 and the tunnel interface to facilitate the opening of the water intake 14 and the tunnel interface.
[0029] A crown beam 12 made of reinforced concrete is arranged on the inner side of the upper part of the steel cylinder 1, and the crown beam 12 is butted with the top of the inner lining 11; a plurality of ring beams 13 made of reinforced concrete are arranged along the inner side of the steel cylinder 1, for example, five, and each ring beam 13 forms an embedded structure with the inner lining 11. The crown beam 12 and the ring beam 13 are used to meet the overall structural strength and rigidity requirements when the steel cylinder 1 is used as a dry construction cofferdam during the construction period. A plurality of reinforcing ribs 21 are arranged inside the main structure of the water intake head, and the reinforcing ribs 21 have a transverse structure and an annular structure, and the adjacent water intakes 14 are separated by the reinforcing ribs 21; a thickened inner wall 15 is arranged along the edge of the water intake 14 on the inner side of the steel cylinder 1 to strengthen the structural strength of the window position.
[0030] An equipment room 24 is provided in the main structure of the water intake head. The equipment room 24 is located above the water intake well 20 and provides space for drainage equipment, lifting equipment, power supply equipment, etc. A partition wall 23 is provided at the lower part of the main structure of the water intake head. The partition wall 23 encloses the water intake well 20 and separates a number of independent compartments, each of which is filled with backfill sand 28. A large inspection port ( Figure 1 On the left side of the equipment room shown, not marked), during dry maintenance, the water well 20 can be used as an entry channel for large maintenance equipment, providing conditions for large-scale robot automated cleaning of the water intake tunnel.
[0031] A jet grouting pile end 5 is driven at the connection between the tunnel 4 and the outer side of the steel cylinder 1 to form a reinforced water-stopping structure for the connection, and a ring beam (not shown) is arranged on the inner side of the steel cylinder 1 around the tunnel interface.
[0032] A reinforced concrete bottom plate 6 is cast at the bottom of the steel cylinder 1 to form a waterproof structure at the bottom of the steel cylinder 1, and the main structure of the water intake head is connected to the bottom plate 6; a high-pressure rotary jet pile foundation 7 and a high-pressure rotary jet pile water-stop curtain 8 are set to reinforce the soil at the bottom of the steel cylinder 1 to prevent pipe gushing and water seepage at the bottom of the foundation pit. Depending on the specific geology, reinforcement and water-stopping solutions such as mixing piles and cast-in-place piles can also be used.
[0033] A bottom protection block layer 9 composed of blocks and composite geotextile mats is laid on the seabed surface 10 outside the steel cylinder 1 to prevent the seabed surface outside the water intake head structure from being scourged by waves and tidal currents.
[0034] A berthing structure may also be provided on the outer side of the steel cylinder 1 to provide for the berthing needs of small vessels.
[0035] The construction method of the offshore shield tunnel water intake head structure is carried out according to the following steps:
[0036] Step S1, after floating the steel cylinder 1 to the designated location, use a vibration hammer to hoist, position, and vibrate the steel cylinder 1 to a designated elevation;
[0037] Step S2, setting up a piling platform on the top of the steel cylinder 1, and performing high-pressure jet grouting pile foundation 7 reinforcement on the soil inside the steel cylinder 1 and construction of a jet grouting pile water-stop curtain 8 at the bottom of the foundation pit;
[0038] Step S3, cast in-situ reinforced concrete cap beam 12 on the top of the steel cylinder 1, and drain the foundation pit after the cap beam 12 reaches the designed strength;
[0039] Step S4, excavating the foundation pit inside the steel cylinder 1, while using the inner method to construct the ring beam 13 and the cross brace inside the steel cylinder 1, and the main construction of the dry construction foundation pit is completed;
[0040] Step S5, constructing a shield machine receiving port ring beam, after the ring beam reaches the design strength, cutting a steel cylinder 1 in the foundation pit to form a shield machine receiving port;
[0041] Step S6, the shield tunnel 4 is penetrated, the foundation pit inside the steel cylinder 1 is used as a receiving well for the shield machine, the shield machine is recovered, and a convenient passage is provided for the construction of the secondary lining structure inside the tunnel 4;
[0042] Step S7, after the construction of the tunnel 4 is completed, the construction of the reinforced concrete water intake head main structure inside the steel cylinder 1 and the water intake 14 reinforcement ring beam is carried out, and the construction of the water intake head main structure is completed;
[0043] Step S8, installing the water intake gate 31 and the tunnel gate 32, and installing the filter grid, cover plate and other auxiliary facilities at the water intake 14;
[0044] Step S9, laying the outer bottom protection structure of the steel cylinder 1, cutting the outer wall of the steel cylinder underwater to form the water intake 14, and the construction is completed.
[0045] The present invention has been described in detail above. The above description is only a preferred embodiment of the present invention and should not limit the scope of implementation of the present application. All equivalent changes and modifications made within the scope of the present application should still fall within the scope of the present invention.
Claims
1. An offshore shield tunnel water intake head structure, comprising a water intake head main structure, the water intake head main structure comprising a water intake well, characterized in that: It also includes a steel cylinder, which is inserted into the seabed; the water intake head main structure is arranged inside the steel cylinder, and the outer wall of the water intake head main structure is formed by the steel cylinder; a water intake port and a tunnel interface are opened on the cylinder wall of the steel cylinder, the water intake port is connected with the water intake well, and the water intake port is higher than the seabed surface but lower than the sea level; the tunnel interface is lower than the seabed surface, the tunnel is connected to the water intake head main structure through the tunnel interface, and the water intake well is connected with the tunnel; a water intake gate is arranged between the water intake well and the water intake, and the water inflow into the water intake head main structure through the water intake is closed by closing the water intake gate; a tunnel gate is arranged between the water intake well and the tunnel, and the water inflow into the tunnel is closed by closing the tunnel gate.
2. The offshore shield tunnel water intake head structure according to claim 1, characterized in that: A number of water intakes are provided on the wall of the steel cylinder, and the inner side of each water intake is connected to the water intake well through a water inlet channel. The water inlet channel is a conical mouth structure that gradually narrows from the outside to the inside, and a filter grid is provided on the outer side of the water intake; a water intake gate is provided at a position of each water inlet channel near the water intake well, and a water intake gate slot is provided at a position corresponding to the water intake gate in the main structure of the water intake head, and each water intake gate is installed in the corresponding water intake gate slot.
3. The offshore shield tunnel water intake head structure according to claim 1, characterized in that: A lining formed of reinforced concrete is cast along the inner wall of the steel cylinder, and a hole reinforcement structure is designed at the position of the lining corresponding to the water intake and the tunnel interface.
4. The offshore shield tunnel water intake head structure according to claim 1, characterized in that: The main structure of the water intake head is provided with an inspection room, and stairs or ladders are provided in the inspection room; an inspection passage is provided between the inspection room and the tunnel, and the tunnel and the inspection room are interconnected through the inspection passage.
5. The offshore shield tunnel water intake head structure according to claim 2, characterized in that: The tunnel gate is arranged at the entrance of the tunnel and between the inspection passage and the water intake well, and the inspection passage is located inside the steel cylinder; a tunnel gate groove is arranged at the position corresponding to the tunnel gate in the main structure of the water intake head, and the tunnel gate is installed in the tunnel gate groove.
6. The offshore shield tunnel water intake head structure according to claim 4, characterized in that: A crown beam made of reinforced concrete is cast along the inner side of the upper part of the steel cylinder, and the crown beam is butted against the top end of the inner lining; a number of ring beams made of reinforced concrete are cast along the inner side of the steel cylinder, and each ring beam forms an embedded structure with the inner lining; a number of reinforcing ribs are arranged inside the main structure of the water intake head, and the reinforcing ribs have a transverse structure and annular structure, and adjacent water intakes are separated by the reinforcing ribs; a thickened inner wall is arranged along the edge of the water intake on the inner side of the steel cylinder to strengthen the structural strength of the window position.
7. The offshore shield tunnel water intake head structure according to claim 1, characterized in that: An equipment room and an inspection port are provided in the main structure of the water intake head, and the equipment room and the inspection port are located above the water intake well; a partition wall is provided at the lower part of the main structure of the water intake head, and the water intake well is surrounded by the partition wall and a number of independent compartments are separated, and each independent compartment is filled with backfill sand.
8. The offshore shield tunnel water intake head structure according to claim 1, characterized in that: A rotary jet pile end is driven at the connection between the tunnel and the outer side of the steel cylinder to form a reinforced water-stopping structure for the connection, and a ring beam is arranged on the inner side of the steel cylinder around the tunnel interface.
9. The offshore shield tunnel water intake head structure according to claim 1, characterized in that: A reinforced concrete bottom plate is cast at the bottom of the steel cylinder to form a waterproof structure for the bottom of the steel cylinder, and the main structure of the water intake head is connected to the bottom plate; a high-pressure rotary jet pile foundation and a water-stop curtain of high-pressure rotary jet piles are set to reinforce the soil at the bottom of the steel cylinder.
10. The offshore shield tunnel water intake head structure according to claim 1, characterized in that: A bottom protection block stone layer composed of blocks and composite geotextile mats is laid on the seabed surface outside the steel cylinder.