Prefabricated pipe pile core filling concrete leakage-proof device
By installing dense metal mesh on the bottom of the steel cage to cover the gap between the steel plate and the pipe holes, forming a metal mesh bag or bowl-like structure, the problem of concrete leaking from pouring concrete by prefabricated pipe piles is solved, and material saving and simplicity of construction are achieved.
Patent Information
- Application Number
- CN202420115432.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-17
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-01-17
AI Technical Summary
During construction, when prefabricated pipe piles pour concrete, the concrete leaks slurry due to the gap between the steel plate pallet and the pipe pile, resulting in waste of materials. The existing technical solutions are complex and costly, making it difficult to promote.
A dense metal mesh is fixed to the bottom of the steel cage. The diameter of the metal mesh is greater than the diameter of the pipe hole, covering the gap between the edge of the baffle and the inner wall of the pipe hole, and fixed by a plastic lock and pressing plate to form a metal mesh bag or bowl shaped to seal the gap.
Only metal mesh can effectively solve the problem of concrete slurry leakage, save materials, convenient implementation, and low cost.
Smart Images

Figure CN222100865U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a prefabricated pipe pile core-filled concrete anti-leakage device, belonging to the technical field of building construction. Background Art
[0002] With the vigorous promotion and application of ten new technologies in the construction industry by the state, high-strength prestressed pipe piles have been widely used in the field of construction. Pipe piles are prefabricated concrete pipe bodies with lengths ranging from several meters to tens of meters, which are buried vertically underground. When pouring concrete into the core pipe hole of the pipe pile, a steel cage composed of 6-8 steel bars arranged and welded in a ring will be inserted into the core pipe hole of the pile first. In order to save materials and ensure the quality standards, the pouring depth of the reinforced concrete of the pile core is only the upper part of the pile core pipe hole, and the lower part of the pile core pipe hole is empty. During construction, in order to reduce the poured concrete falling into the lower part of the pile core pipe hole, a steel plate tray is usually used as a head plugging plate at the bottom of the steel cage to prevent concrete leakage. In order to facilitate the lowering of the steel cage, the diameter of the steel plate disc used in the design is about 50mm smaller than the diameter of the pipe pile, so that there is a gap between the steel plate tray and the pipe pile for easy falling, but this gap will still cause leakage. In practice, a single exposed pipe pile will not cause much loss, but if a project base has hundreds or even tens of thousands of exposed pipe piles, the cumulative loss is staggering.
[0003] The present application aims to solve the above-mentioned problems.
[0004] In order to solve the above problems more specifically, we conducted relevant searches and obtained a patent document with application number 202320560904.4, which discloses a prefabricated pipe pile core concrete leakage prevention device and leakage prevention structure; the leakage prevention device includes a support plate with a circular outer edge, a conical inclined surface on the bottom of the support plate, and a plurality of fan-shaped or fan-shaped extension plates distributed in equal circles on the conical inclined surface; an upper baffle is provided along the outer arc edge of the extension plate, and a limiter is provided on the inner side of the extension plate. A limit frame is provided on the conical inclined surface, the fan-shaped extension plate is located in the limit frame, and the limit piece and the upper baffle are respectively located on the inner and outer sides of the limit frame; the leakage-proof structure includes pipe piles, pile core steel cages and crown beam steel cages, and also includes the above-mentioned pipe pile core concrete leakage-proof device, the upper part of the pile core steel cage is connected to the crown beam steel cage, and the lower part is connected to the top of the support plate, and a leak-proof gasket is placed on the upper part between the extension plates; this scheme can achieve the purpose of reducing leakage and saving concrete, and can be suitable for prefabricated pipe piles of various sizes.
[0005] Although the technical solutions disclosed in the above patent documents also solve the problem of concrete leakage, the technical solutions to solve the problem are complex, costly, and difficult to promote and apply. Utility Model Content
[0006] The technical problem to be solved by the utility model is: how to solve the problem of grout leakage when pouring concrete into the pile core in a simple way.
[0007] In view of the above problems, the technical solution proposed by the utility model is:
[0008] A prefabricated pipe pile core-filled concrete leakage prevention device comprises a circular baffle that can be fixed on the bottom of a steel cage, with a gap between the edge of the baffle and the inner wall of the pipe hole of the pipe pile; the leakage prevention device also comprises a dense metal mesh installed on the bottom end of the steel cage, the diameter of the metal mesh is larger than the diameter of the pipe hole of the pipe pile, and the metal mesh can block the gap between the edge of the baffle and the inner wall of the pipe hole.
[0009] Furthermore, the metal mesh is folded over the bottom surface of the baffle, and the periphery of the metal mesh is turned up.
[0010] Furthermore, it also includes a plastic lock buckle, which fixes the edge of the periphery of the metal mesh on the fixed ring of the steel cage, so that the metal mesh forms a metal net bag.
[0011] Furthermore, it also includes a pressing plate and screws, the pressing plate is provided with screw through holes, the baffle is provided with screw threaded holes corresponding to the screw through holes, and the metal mesh is pressed onto the bottom surface of the baffle by the pressing plate through the screws.
[0012] Furthermore, the upturned peripheral wrinkles of the metal mesh sheet form a badminton-shaped metal mesh bowl. When in use, the peripheral edge of the metal mesh bowl is tightly attached to the inner wall of the pipe hole of the pipe pile above the pressing plate.
[0013] Furthermore, the pressing plate is annular.
[0014] Beneficial effect: The problem of slurry leakage during concrete pouring in the pile core can be solved by simply using a metal mesh to hold the baffle, which saves materials and is easy to implement. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a top view schematic diagram of the metal mesh described in Example 1;
[0016] Figure 2 It is a front view schematic diagram of a metal net bag made of the metal mesh sheet in Example 1;
[0017] Figure 3 It is a schematic diagram of the steel cage in the pipe hole of the pipe pile according to the first embodiment;
[0018] Figure 4 It is a schematic diagram of the metal net bag described in Example 1 holding the bottom of the steel cage in the pipe hole of the pipe pile;
[0019] Figure 5 It is a top view schematic diagram of the metal mesh bowl described in Example 2;
[0020] Figure 6 It is a front view schematic diagram of the metal mesh bowl described in Example 2;
[0021] Figure 7 This is a schematic diagram of the disassembly of the leakage prevention device described in Example 2;
[0022] Figure 8 This is a schematic diagram of the metal mesh bowl described in Example 2 holding the bottom of the steel cage in the pipe hole of the pipe pile.
[0023] In the figure: 1, metal mesh; 101, metal net bag; 102, metal net bowl; 103, periphery; 2, baffle; 201, screw threaded hole; 3, plastic lock buckle; 4, pressure plate; 401, screw through hole; 5, screw; 6, inner wall of pipe hole; 7, gap; 8, steel cage; 801, solid ring. DETAILED DESCRIPTION
[0024] The utility model is further described below in conjunction with the accompanying drawings: Embodiment 1
[0025] like Figure 1 As shown in FIG. 4 , a prefabricated pipe pile core-filled concrete leakage prevention device includes a circular baffle 2 that can be fixed at the bottom of a steel cage 8, and a gap 7 is provided between the edge of the baffle 2 and the inner wall 6 of the pipe hole of the pipe pile. The improvement is that the leakage prevention device also includes a dense metal mesh 1 installed at the bottom of the steel cage 8, the diameter of the metal mesh 1 is larger than the diameter of the pipe hole of the pipe pile, and the metal mesh 1 can block the gap 7 between the edge of the baffle 2 and the inner wall 6 of the pipe hole. Here, the dense metal mesh 1 refers to a mesh with a very small aperture, which can prevent sand particles with a smaller particle size from passing through, and the sand particles block the concrete slurry. Another advantage of using a metal mesh is that it can be ventilated to ensure that the gas inside can pass through when the concrete mortar is poured. Here, the gap 7 between the edge of the baffle 2 and the inner wall 6 of the pipe hole of the pipe pile is only about 20 mm. Since the metal mesh 1 has a certain strength, when the metal mesh 1 blocks the gap 7, it can block the impact of the concrete poured downward. In this way, the problem of slurry leakage at the bottom of the steel cage 8 can be solved by only using the metal mesh 1.
[0026] The metal mesh 1 is placed on the bottom surface of the baffle 2, and the periphery 103 of the metal mesh 1 is turned up. Furthermore, the anti-leakage device further comprises a plastic lock 3, which fixes the edge of the periphery 103 of the metal mesh 1 on the solid ring 801 of the steel cage 8, so that the metal mesh 1 forms a metal mesh bag 101. In this way, when pouring concrete mortar, after the concrete head that falls first falls into the metal mesh bag 101, the metal mesh bag 101 expands outward to block the gap 7. Embodiment 2
[0027] like Figure 5—8, which is different from the first embodiment in that: the anti-leakage device also includes a pressing plate 4 and a screw 5, the pressing plate 4 is provided with a screw through hole 401, the baffle 2 is provided with a screw threaded hole 201 corresponding to the screw through hole 401, and the metal mesh 1 is pressed on the bottom surface of the baffle 2 by the pressing plate 4 through the screw 5. Furthermore, the upturned periphery 103 of the metal mesh 1 is wrinkled to form a badminton-shaped metal mesh bowl 102. When used, the edge of the periphery 103 of the metal mesh bowl 102 is tightly attached to the inner wall 6 of the pipe hole of the pipe pile above the pressing plate 4. In this way, when pouring concrete mortar, the concrete head that falls first falls on the metal mesh bowl 102, so that the periphery 103 of the metal mesh bowl 102 is more tightly pressed against the inner wall 6 of the pipe hole to block the gap 7.
[0028] The pressing plate 4 is annular, which can save materials.
[0029] The above embodiments are only used to more clearly describe the present invention and cannot be regarded as limiting the protection scope of the present invention. Any modifications in equivalent forms should be regarded as falling within the protection scope of the present invention.
Claims
1. A prefabricated pipe pile core-filled concrete leakage prevention device, comprising a circular baffle (2) that can be fixed to the bottom of a steel cage (8), with a gap (7) between the edge of the baffle (2) and the inner wall (6) of the pipe hole of the pipe pile, characterized in that: It also includes a dense metal mesh (1) installed at the bottom end of the steel cage (8), the diameter of the metal mesh (1) being larger than the diameter of the pipe hole of the pipe pile, and the metal mesh (1) being capable of blocking the gap (7) between the edge of the baffle (2) and the inner wall (6) of the pipe hole.
2. The prefabricated pipe pile core-filled concrete leakage prevention device according to claim 1 is characterized in that: The metal mesh (1) is folded over the bottom surface of the baffle (2), and the periphery (103) of the metal mesh (1) is turned up.
3. The prefabricated pipe pile core-filled concrete leakage prevention device according to claim 2 is characterized in that: It also includes a plastic lock buckle (3), which is used to fix the edge of the periphery (103) of the metal mesh (1) on the fixing ring (801) of the steel cage (8), so that the metal mesh (1) forms a metal net bag (101).
4. The prefabricated pipe pile core-filled concrete leakage prevention device according to claim 2 is characterized in that: It also comprises a pressing plate (4) and screws (5); the pressing plate (4) is provided with a screw through hole (401); the baffle plate (2) is provided with a screw threaded hole (201) corresponding to the screw through hole (401); the metal mesh (1) is pressed onto the bottom surface of the baffle plate (2) by the pressing plate (4) through the screws (5).
5. The prefabricated pipe pile core-filled concrete leakage prevention device according to claim 3 is characterized in that: The upturned periphery (103) of the metal mesh (1) is wrinkled to form a badminton-shaped metal mesh bowl (102). When in use, the periphery edge of the metal mesh bowl (102) is tightly attached to the inner wall (6) of the pipe hole of the pipe pile above the pressing plate (4).
6. The prefabricated pipe pile core-filled concrete leakage prevention device according to claim 4 is characterized in that: The pressing plate (4) is annular.