Combination template system for laminated slab structure
By designing a combined template system, using multiple sets of buckle vertical poles, square steel and double channel steel components, the problems of insufficient bending performance and slurry leakage in traditional laminated plate construction are solved, and the safety and quality of laminated plate structure are improved. , reducing costs and material losses.
Patent Information
- Application Number
- CN202420393393.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-29
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-02-28
AI Technical Summary
In the construction of traditional laminated plates, the lack of a rod at the bottom of the beam leads to insufficient bending performance and the safety performance cannot be guaranteed. Moreover, the laying of wooden formwork at the bottom of the plates on both sides of the beam cannot effectively block the slurry leakage problem during cast-in-place structure beam slabs, which is difficult to meet the quality acceptance. Require.
A combined formwork system was designed, including a formwork support system under the plate, a formwork reinforcement system on the beam and a formwork support system under the beam. It adopts multiple sets of buckles, adjustable top support, square steel main and secondary linings, and double grooves. The steel shelved cross beams, beam side wooden formwork and steel pipe main corrugated components are sealed with special grouting materials to ensure balanced load transfer and sealing.
It improves the safety and molding quality of the laminated plate structure, avoids slurry leakage, reduces material losses and engineering costs, and improves construction efficiency and safety.
Smart Images

Figure CN222101450U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of building construction, and in particular relates to a combined template system for a composite plate structure. Background Art
[0002] With the development of industrial and civil construction, the construction industry has higher and higher requirements for prefabrication and assembly rates, and there are more and more composite slab construction projects. The conventional composite slab construction process is as follows:
[0003] Erection of beam bottom and slab bottom support system (no vertical pole is installed at beam bottom and one vertical pole is added) → Laying of wooden formwork at beam bottom and beam sides (about 500mm wooden formwork is laid at the bottom of slab on both sides of beam) → Hoisting of precast concrete slab → Construction of reinforcement for cast-in-place structural beam and slab → Reinforcement of beam side formwork → Casting of cast-in-place structural beam and slab.
[0004] Regarding the above-mentioned related technologies, they have the following defects:
[0005] (1) There is no vertical pole at the bottom of the beam. The main steel pipe at the bottom of the beam is connected with the vertical pole on the side of the beam. The cross-sectional size of the beam is slightly larger, and the bending resistance of the steel pipe is insufficient. An additional vertical pole is added at the bottom of the beam. Eccentric stress is very common and safety performance cannot be guaranteed.
[0006] (2) The additional wooden formwork laid on the bottom of the slabs on both sides of the beam cannot effectively prevent the occurrence of slurry leakage during the pouring of the cast-in-place structure beams and slabs, and it is difficult to meet the quality acceptance requirements of the composite slabs.
[0007] Therefore, in order to solve the above technical problems, the utility model designs a novel combined formwork system for composite plate structures. Utility Model Content
[0008] In view of the deficiencies in the prior art, the utility model provides a combined formwork system for composite slab structures, which effectively solves the problems existing in the traditional formwork system, such as low safety and inability to effectively prevent leakage during the pouring of cast-in-place structure beams and slabs.
[0009] The utility model achieves the above technical objectives through the following technical means.
[0010] A combined formwork system for a composite slab structure, the composite slab structure comprises a precast concrete slab, an upper cast-in-place concrete slab, and a side cast-in-place concrete beam. The combined formwork system comprises a slab under-slab formwork support system arranged at the bottom of the precast concrete slab, a beam side formwork reinforcement system arranged at both sides of the side cast-in-place concrete beam construction area, and a beam under-beam formwork support system arranged at the bottom of the side cast-in-place concrete beam construction area; the joints between the beam side formwork reinforcement system and the precast concrete slab are sealed with special grouting materials.
[0011] Furthermore, the under-slab formwork support system includes a plurality of sets of disc-locked uprights arranged on both sides of the side cast-in-place concrete beam construction area, an adjustable top support A is installed on the top of the disc-locked upright, a square steel main rib A is installed in the adjustable top support A, a square steel secondary rib A is installed above the square steel main rib A, and the square steel main rib A and the square steel secondary rib A are perpendicular to each other, and the precast concrete slab is hoisted and placed above the square steel secondary rib A.
[0012] Furthermore, the beam lower formwork support system includes a double-channel steel shelving beam, which is installed on a connecting plate of a disc-locked upright, and two adjustable top supports B are installed between the gaps between the two channel steels of the double-channel steel shelving beam, and the spacing between the adjustable top supports B is the same as the width of the side cast-in-place concrete beam; a square steel main rib B is installed in the adjustable top support B, and a square steel secondary rib B is installed above the square steel main rib B, the square steel main rib B and the square steel secondary rib B are perpendicular to each other, and a beam bottom wooden formwork is laid above the square steel secondary rib B, and above the beam bottom wooden formwork is the side cast-in-place concrete beam 13 construction area.
[0013] Furthermore, the beam side formwork reinforcement system includes beam side wooden formworks arranged on both sides of the side cast-in-place concrete beam construction area, the top of the beam side wooden formwork is butt-jointed with the precast concrete slab and sealed by a special grouting material, and the bottom is butt-jointed with the beam bottom wooden formwork; the outer side of the beam side wooden formwork is sequentially provided with longitudinally arranged wooden square secondary ribs and vertically arranged steel pipe main ribs, and the tension screws pass through the steel pipe main ribs on both sides and the beam side wooden formwork and are tightened.
[0014] Furthermore, during the construction of the composite slab structure, after the precast concrete slab is hoisted, the upper cast-in-place concrete slab and the side cast-in-place concrete beam are constructed, and the upper cast-in-place concrete slab and the side cast-in-place concrete beam are cast and formed at one time.
[0015] The utility model has the following beneficial effects:
[0016] 1. Double-channel steel beams are set under the beams to balance the force of the structural system, and fully utilize the shear strength of the buckle connection plate, saving buckle poles under the beams;
[0017] 2. The sealing of grouting material between the composite slab and the ordinary formwork solves the problem of grout leakage that cannot be avoided when the side formwork of the traditional composite slab beam extends to both sides for a distance, improves the quality of concrete molding, saves formwork, and reduces engineering costs;
[0018] 3. The use of primary and secondary steel back ribs replaces wood with steel, which greatly reduces material turnover loss. The steel back ribs are all fixed in length, which makes installation and disassembly fast and the construction efficiency high;
[0019] 4. The combination of the support and reinforcement system under the beam, under the slab and on the side of the beam ensures the reliable transfer of loads during the hoisting and pouring process of the composite slab structure, with strong overall stability and high safety. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 This is a schematic diagram of the combined formwork system for the composite plate structure described in the present invention.
[0021] In the figure: 1- composite plate structure; 11-; 12-; 13-; 2- support system of formwork under the plate; 21- square steel secondary rib A; 22- square steel main rib A; 23- adjustable top support A; 3- beam side formwork reinforcement system; 31- beam side wooden formwork; 32- wooden square secondary rib; 33- steel pipe main rib; 34- tension screw; 4- support system of formwork under the beam; 41- beam bottom wooden formwork; 42- square steel secondary rib B; 43- square steel main rib B; 44- adjustable top support B; 45- double channel steel shelving beam; 5- special grouting material; DETAILED DESCRIPTION
[0022] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments, but the protection scope of the present invention is not limited thereto.
[0023] In the description of the present invention, it should be understood that the terms "upper", "lower", "left", "right", "horizontal", "vertical", etc. indicating the orientation or position relationship are based on the orientation or position relationship shown in the accompanying drawings, and are only for the convenience of describing the present invention, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, because they cannot be understood as limitations on the present invention; the terms "installation", "connection", "fixed", etc. should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection, it can be a direct connection, it can be an indirect connection through an intermediate medium, or it can be the internal connection of two elements; for ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to the specific circumstances.
[0024] like Figure 1 As shown, the combined formwork system for the composite slab structure described in the utility model includes a composite slab structure 1, a slab under-slab formwork support system 2, a beam side formwork reinforcement system 3, a beam under-beam formwork support system 4, and a grouting and sealing structure at the formwork joints.
[0025] like Figure 1 As shown, the composite slab structure 1 includes a precast concrete slab 11, an upper cast-in-place concrete slab 12, and a side cast-in-place concrete beam 13. After the precast concrete slab 11 is hoisted, the cast-in-place concrete beam slab (including the upper cast-in-place concrete slab 12 and the side cast-in-place concrete beam 13) is constructed, and the cast-in-place concrete beam slab is cast and formed at one time.
[0026] like Figure 1As shown, the under-slab formwork support system 2 is located at the lower part of the precast concrete slab 11, and includes square steel secondary ribs A21, square steel main ribs A22, adjustable top supports A23, and buckle uprights. The under-slab formwork support system 2 is constructed from bottom to top. After the buckle uprights and adjustable top supports A23 are erected, the square steel main ribs A22 are installed in the adjustable top supports A23, and the square steel secondary ribs A21 are installed above the square steel main ribs A22. The square steel main ribs A22 and the square steel secondary ribs A21 are perpendicular to each other. The precast concrete slab 11 is hoisted and placed above the square steel secondary ribs A21. The load of the precast concrete slab 11 is transferred to the adjustable top supports A23 and the buckle uprights through the square steel secondary ribs A21 and the square steel main ribs A22.
[0027] like Figure 1 As shown, the beam bottom formwork support system 4 is located at the lower part of the cast concrete beam 13, including the beam bottom wood formwork 41, square steel secondary ribs B42, square steel main ribs B43, adjustable top supports B44, and double-channel steel shelving cross beams 45. The beam bottom formwork support system 4 is constructed from bottom to top, and the two ends of the double-channel steel shelving cross beam 45 are respectively installed on the connecting plates at the corresponding positions of the two plate buckle uprights, and two adjustable top supports B44 are installed in the gap between the two channel steels of the double-channel steel shelving cross beam 45, and the spacing between the adjustable top supports B44 is the same as the width of the beam (side cast-in-place concrete beam 13); the square steel main ribs B43 are installed in the adjustable top supports B44, and the square steel secondary ribs B42 are installed above the square steel main ribs B43. The square steel main ribs B43 and the square steel secondary ribs B42 are perpendicular to each other, and the beam bottom wood formwork 41 is laid above the square steel secondary ribs B42, and the side cast-in-place concrete beam 13 is above the beam bottom wood formwork 41. The load of the side cast-in-place concrete beam 13 is transmitted to the double-channel steel shelving beam 45 through the beam bottom wooden formwork 41, square steel secondary rib B42, square steel main rib B43, and adjustable top support B44. The two ends of the double-channel steel shelving beam 45 are placed laterally on the connecting plate of the disc buckle upright (the opening direction of the channel steel faces outward), and finally the vertical force is transmitted to the disc buckle upright through the connecting plate.
[0028] like Figure 1 As shown, the beam side formwork reinforcement system 3 is located at the lateral part of the side cast-in-place concrete beam 13, including the beam side wood formwork 31, wood square secondary ribs 32, steel pipe main ribs 33, and tension screws 34. The beam side formwork reinforcement system 3 is constructed from the inside to the outside. The beam side wood formwork 31 is arranged on both sides of the construction area of the side cast-in-place concrete beam 13, the top is connected to the precast concrete slab 11, and the bottom is connected to the beam bottom wood formwork 41; the outer side of the beam side wood formwork 31 is sequentially provided with longitudinally arranged wood square secondary ribs 32 and vertically arranged steel pipe main ribs 33, and the tension screws 34 pass through the steel pipe main ribs 33 on both sides and the beam side wood formwork 31 and are tightened, thereby constraining the entire beam side formwork reinforcement system 3. The beam side load of the side cast-in-place concrete beam 13 is transmitted to the tension screws 34 through the beam side wood formwork 31, wood square secondary ribs 32, and steel pipe main ribs 33.
[0029] The beam side wood formwork 31 and the precast concrete slab 11 of the composite slab structure 1 are made of different materials, and the joints between the two materials are sealed with a special grouting material 5 to ensure the integrity and sealing of the entire formwork reinforcement system.
[0030] In actual applications, during the construction of the composite slab structure 1, the workers only need to assemble the under-slab formwork support system 2, the beam side formwork reinforcement system 3, and the under-beam formwork support system 4, and then hoist the precast concrete slab 11 and cast the cast-in-place beam-slab structure. In addition to the three major formwork systems of the slab bottom, beam bottom, and beam side, it is also necessary to grout and seal the formwork joints, so as to provide good support, reinforcement, and sealing for the composite slab formwork system, which is beneficial to improve the stability, integrity, and sealing of the entire composite slab formwork system, so as to meet the safety and quality requirements during the casting of the composite slab structure.
[0031] The embodiments are preferred implementations of the present invention, but the present invention is not limited to the above-mentioned implementations. Any obvious improvements, substitutions or modifications that can be made by those skilled in the art without departing from the essential content of the present invention belong to the protection scope of the present invention.
Claims
1. A combined formwork system for a composite plate structure, characterized in that: The composite slab structure (1) comprises a precast concrete slab (11), an upper cast-in-place concrete slab (12), and a side cast-in-place concrete beam (13); the combined formwork system comprises a slab under-slab formwork support system (2) arranged at the bottom of the precast concrete slab (11), a beam side formwork reinforcement system (3) arranged at both sides of a construction area of the side cast-in-place concrete beam (13), and a beam under-slab formwork support system (4) arranged at the bottom of the construction area of the side cast-in-place concrete beam (13); the joint between the beam side formwork reinforcement system (3) and the precast concrete slab (11) is sealed with a special grouting material (5).
2. The combined formwork system for composite plate structure according to claim 1, characterized in that: The under-slab formwork support system (2) comprises a plurality of sets of buckle uprights arranged on both sides of the construction area of the side cast-in-place concrete beam (13), an adjustable top support A (23) being installed on the top of the buckle uprights, a square steel main rib A (22) being installed in the adjustable top support A (23), a square steel secondary rib A (21) being installed above the square steel main rib A (22), and the square steel main rib A (22) and the square steel secondary rib A (21) being perpendicular to each other, and the precast concrete slab (11) being hoisted and placed above the square steel secondary rib A (21).
3. The combined formwork system for composite plate structure according to claim 2, characterized in that: The beam bottom formwork support system (4) comprises a double-channel steel shelving crossbeam (45), the double-channel steel shelving crossbeam (45) being mounted on a connecting plate of a plate buckle upright, two adjustable top supports B (44) being mounted between two channel steels of the double-channel steel shelving crossbeam (45), the spacing between the adjustable top supports B (44) being the same as the width of the side cast-in-place concrete beam (13); a square steel main rib B (43) being mounted inside the adjustable top supports B (44), a square steel secondary rib B (42) being mounted above the square steel main rib B (43), the square steel main rib B (43) and the square steel secondary rib B (42) being perpendicular to each other, a beam bottom wood formwork (41) being laid above the square steel secondary rib B (42), and a construction area of the side cast-in-place concrete beam 13 being located above the beam bottom wood formwork (41).
4. The combined formwork system for composite plate structure according to claim 3, characterized in that: The beam side formwork reinforcement system (3) comprises beam side wood formworks (31) arranged on both sides of the construction area of the side cast-in-place concrete beam (13), the top of the beam side wood formworks (31) being butted against the precast concrete slab (11) and sealed by a special grouting material (5), and the bottom being butted against the beam bottom wood formwork (41); The outer side of the beam side wood formwork (31) is provided with longitudinally arranged wood square secondary ribs (32) and vertically arranged steel pipe main ribs (33) in sequence, and the tension screws (34) pass through the steel pipe main ribs (33) on both sides and the beam side wood formwork (31) and are fastened.
5. The combined formwork system for composite plate structure according to claim 1, characterized in that: During the construction of the composite slab structure (1), after the precast concrete slab (11) is hoisted, the upper cast-in-place concrete slab (12) and the side cast-in-place concrete beams (13) are constructed, and the upper cast-in-place concrete slab (12) and the side cast-in-place concrete beams (13) are cast and formed at one time.