Portable artificial city rain and sewage diversion pipe construction device

Through the design of the portable artificial urban rainwater and sewage diversion pipe construction device, the construction positioning frame, guide rail rod, sliding arm, locking rod and bidirectional threaded screw are used to solve the problems of inaccurate positioning and offset of the pipeline, and the pipeline is realized Stable fixed and low resistance water current transmission.

CN222101090UActive Publication Date: 2024-12-03CHINA UNITED ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420864277.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-24
Publication Date
2024-12-03
Estimated Expiration
2034-04-24

AI Technical Summary

Technical Problem

During the construction of urban rainwater and sewage diversion pipes, the pipeline is prone to problems such as inability to center and position deviation, resulting in unstable landfill and affecting water flow resistance and construction efficiency.

Method used

A portable artificial urban rainwater and sewage pipe construction device is designed, including construction positioning frame, guide rail rod, sliding arm, locking rod, bidirectional threaded screw and clamp. These components are used to achieve accurate positioning and stable fixation of the pipe to avoid deviation. .

Benefits of technology

It effectively avoids deviation during pipeline laying, ensures the stability of the pipeline and the small resistance to water flow transmission, and improves the construction efficiency and service life of the pipeline.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222101090U_ABST
    Figure CN222101090U_ABST
Patent Text Reader

Abstract

The utility model provides a portable artificial city rain sewage diversion pipe construction device which is reasonable in structural design, convenient to operate and capable of avoiding the deviation phenomenon in the pipeline laying process. The device comprises a construction positioning frame, a guide rail rod, a sliding arm, a locking rod, a bidirectional threaded screw rod and a clamping plate, the guide rail rod is fixedly arranged on the construction positioning frame; the sliding arm is slidably arranged on the guide rail rod; the locking rod is fixedly arranged on the sliding arm; the two-way threaded lead screw is rotationally installed on the construction positioning frame, the lead screw nuts are installed on a left-hand thread and a right-hand thread of the two-way threaded lead screw, and the two sets of sliding arms are installed on the lead screw nut with the left-hand thread and the lead screw nut with the right-hand thread respectively; a rotating handle is fixedly connected to the two-way threaded screw rod; the clamping plate is fixedly arranged at the bottom of the construction positioning frame.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a portable artificial urban rainwater and sewage diversion pipe construction device. Background Art

[0002] Urban rainwater and sewage diversion projects require pipeline laying. Usually, multiple groups of pipes are connected to a rainwater and sewage discharge hub, that is, multiple groups of pipes branch the rainwater and sewage into wells for collection, and finally enter the sewage treatment network through the main pipeline.

[0003] During the construction of urban rainwater and sewage diversion pipes, it is necessary to dig out ditches for placing the pipes. The traditional operation is to place the pipes directly in the ditches. Due to the lack of positioning, the pipes are prone to being unable to be centered during subsequent construction operations. In order to ensure the stability of the buried pipes, the position of the pipes needs to be adjusted. This construction method is inconvenient to operate, and the pipes are prone to positional deviation during the subsequent landfill process, resulting in large internal water flow resistance after the pipes are laid. Utility Model Content

[0004] The purpose of the utility model is to overcome the above-mentioned deficiencies in the prior art and to provide a portable artificial urban rainwater and sewage diversion pipe construction device with reasonable structural design and convenient operation, so as to avoid deviation during the pipeline laying process.

[0005] The technical solution adopted by the utility model to solve the above-mentioned problems is: a portable artificial urban rainwater and sewage diversion pipe construction device, characterized in that: it includes a construction positioning frame, a guide rod, a sliding arm, a locking rod, a bidirectional threaded screw and a clamping plate; the guide rod is fixedly arranged on the construction positioning frame; the sliding arm is slidably arranged on the guide rod; the locking rod is fixedly arranged on the sliding arm; the bidirectional threaded screw is rotatably installed on the construction positioning frame, and screw nuts are installed on the left-handed thread and the right-handed thread of the bidirectional threaded screw, and the sliding arm is divided into two sets, which are respectively installed on the screw nut of the left-handed thread and the screw nut of the right-handed thread; a rotating handle is fixedly connected to the bidirectional threaded screw; and the clamping plate is fixedly arranged at the bottom of the construction positioning frame.

[0006] The construction positioning frame of the utility model comprises an upper fixing frame, a lower fixing frame and a connecting block, and the upper fixing frame and the lower fixing frame are fixed together by the connecting block.

[0007] The connecting blocks described in the utility model are divided into two groups, which are arranged on the left and right sides.

[0008] The two ends of the guide rail rod of the utility model are fixedly connected to two groups of connection blocks.

[0009] The bidirectional threaded screw rod of the utility model is rotatably connected to two groups of connecting blocks.

[0010] The clamping plate of the utility model is fixedly provided with a rubber pad.

[0011] The clamping plate described in the utility model is V-shaped.

[0012] Compared with the prior art, the utility model has the following advantages and effects: the pipeline can be clamped in the center to avoid deviation during the pipeline laying process, thereby ensuring that the pipeline is subjected to stable force, so that the pipeline has small resistance and good stability when transmitting rainwater and sewage later. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a structural schematic diagram of one perspective of an embodiment of the utility model.

[0014] Figure 2 It is a structural schematic diagram of another perspective of an embodiment of the utility model.

[0015] Figure 3 It is a schematic diagram of the local structure of an embodiment of the utility model.

[0016] Figure 4 It is a schematic structural diagram of the sliding arm of an embodiment of the utility model. DETAILED DESCRIPTION

[0017] The present invention will be further described in detail below with reference to the accompanying drawings and through examples. The following examples are provided to explain the present invention, but the present invention is not limited to the following examples.

[0018] The embodiment of the utility model comprises a construction positioning frame 1, a guide rail rod 2, a sliding arm 3, a locking rod 301, a bidirectional threaded screw rod 4 and a clamping plate 5.

[0019] The construction positioning frame 1 comprises an upper fixing frame 101, a lower fixing frame 102 and a connecting block 103. The upper fixing frame 101 and the lower fixing frame 102 are fixed together by the connecting block 103. The overall structure of the construction positioning frame 1 is compact, the processing and manufacturing cost is low, and it is easy to assemble. The connecting block 103 is divided into two groups, which are arranged on the left and right.

[0020] The guide rail rod 2 is fixedly arranged on the construction positioning frame 1. More specifically, both ends of the guide rail rod 2 are fixedly connected to two sets of connecting blocks 103. The connecting blocks 103 are provided to support the guide rail rod 2, so that the support of the guide rail rod 2 to the sliding arm 3 is stable.

[0021] The sliding arm 3 is slidably arranged on the guide rail rod 2. The locking rod 301 is fixedly arranged on the sliding arm 3, and the locking rod 301 is used to be inserted into both sides of the pipeline construction ditch, thereby realizing the positioning of the construction positioning frame 1.

[0022] The bidirectional threaded screw rod 4 is rotatably mounted on the construction positioning frame 1. More specifically, the bidirectional threaded screw rod 4 is rotatably connected to two sets of connecting blocks 103. The connecting blocks 103 are provided to support the bidirectional threaded screw rod 4. The bidirectional threaded screw rod 4 is provided with a left-handed thread and a right-handed thread. The left-handed thread and the right-handed thread are both provided with a screw nut 6. The sliding arm 3 is provided with two sets, which are respectively provided on the screw nuts 6 of the left-handed thread and the right-handed thread.

[0023] A rotating handle 401 is fixedly connected to the bidirectional threaded screw rod 4 , and the rotating handle 401 is provided to facilitate the rotation of the bidirectional threaded screw rod 4 .

[0024] The clamping plate 5 is fixedly arranged at the bottom of the construction positioning frame 1, and is used to clamp and position the pipe. A rubber pad 501 is fixedly arranged on the clamping plate 5, and the rubber pad 501 enables the clamping plate 5 to have a good clamping and positioning effect on the rainwater and sewage pipe. The clamping plate 5 is V-shaped and suitable for different pipe diameters.

[0025] The utility model is convenient for realizing preliminary positioning of the urban rainwater and sewage diversion pipe inside the ditch when in use, so as to facilitate the laying and construction of long-distance pipelines. After the pipeline is placed inside the ditch, multiple groups of the construction device are used to clamp the position so that the pipeline is located in the middle of the ditch. During operation, the pipeline is placed in the middle of the ditch, and the construction positioning frame 1 is first placed inside the ditch, and the clamping plate 5 is used to clamp the pipeline. After clamping, the handle 401 is rotated to rotate the bidirectional threaded screw 4, and the bidirectional threaded screw 4 is used to drive the sliding arm 3 and the locking rod 301 to move outward, and the locking rod 301 is finally inserted into both sides of the ditch, so as to realize the fixing of the position of the construction positioning frame 1, and ensure that the construction positioning frame 1 and the clamping plate 5 clamp and position the pipeline in the middle of the ditch, which is convenient for subsequent construction.

[0026] In addition, it should be noted that the shapes and names of the parts and components of the specific embodiments described in this specification may be different, and the above content described in this specification is only an example of the structure of the utility model. All equivalent changes or simple changes made based on the structure, features and principles described in the patent concept of the utility model are included in the protection scope of the utility model patent. Technicians in the technical field of the utility model can make various modifications or supplements to the specific embodiments described or replace them in a similar manner, as long as they do not deviate from the structure of the utility model or exceed the scope defined by the claims, they should all fall within the protection scope of the utility model.

Claims

1. A portable artificial urban rainwater and sewage diversion pipe construction device, characterized in that: It includes a construction positioning frame, a guide rod, a sliding arm, a locking rod, a bidirectional threaded screw and a clamp; the guide rod is fixedly arranged on the construction positioning frame; the sliding arm is slidably arranged on the guide rod; the locking rod is fixedly arranged on the sliding arm; the bidirectional threaded screw is rotatably installed on the construction positioning frame, and screw nuts are installed on the left-handed thread and the right-handed thread of the bidirectional threaded screw. The sliding arm has two sets, which are respectively installed on the screw nut of the left-handed thread and the screw nut of the right-handed thread; a rotating handle is fixedly connected to the bidirectional threaded screw; the clamp is fixedly arranged at the bottom of the construction positioning frame.

2. The portable artificial urban rainwater and sewage diversion pipe construction device according to claim 1 is characterized by: The construction positioning frame comprises an upper fixing frame, a lower fixing frame and a connecting block, and the upper fixing frame and the lower fixing frame are fixed together by the connecting block.

3. The portable artificial urban rainwater and sewage diversion pipe construction device according to claim 2 is characterized in that: The connecting blocks are divided into two groups, which are arranged on the left and right sides.

4. The portable artificial urban rainwater and sewage diversion pipe construction device according to claim 3 is characterized by: The two ends of the guide rail rod are fixedly connected to two groups of connecting blocks.

5. The portable artificial urban rainwater and sewage diversion pipe construction device according to claim 3 is characterized by: The bidirectional threaded screw rod is rotatably connected to the two groups of connecting blocks.

6. The portable artificial urban rainwater and sewage diversion pipe construction device according to claim 1 is characterized by: A rubber pad is fixedly arranged on the clamping plate.

7. The portable artificial urban rainwater and sewage diversion pipe construction device according to claim 1 is characterized by: The clamping plate is V-shaped.