Gutter inlet template

By designing the U-shaped lintel and reinforcement components of the rainwater outlet formwork, the multi-poured rainwater outlet is achieved at one-time casting and efficient construction, solving the problems of long construction cycle, poor quality and maintenance difficulties in the existing technology, and improving the rainwater outlet Integrity and construction efficiency.

CN222101100UActive Publication Date: 2024-12-03JINAN URBAN CONSTRUCTION GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420788923.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-17
Publication Date
2024-12-03
Estimated Expiration
2034-04-17

AI Technical Summary

Technical Problem

The existing rainwater port construction methods have long cycles, high labor intensity, difficult construction quality, and difficult maintenance. In particular, the heavy rainwater port has poor integrity and is easy to damage, which affects the water collection capacity.

Method used

A rainwater outlet formwork was designed, including U-shaped lintel formwork, side formwork and corner formwork. The side formwork has a gap in the lintel position. The lintel formwork does not need to be fixed, and reinforcement components and internal support components are provided to Improve the integrity and stability of the formwork and allow one-time casting to form.

Benefits of technology

It improves the construction quality and efficiency of rainwater outlets, enhances the integrity of the formwork, prevents deformation, simplifies the mold removal process, and reduces construction difficulty and maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222101100U_ABST
    Figure CN222101100U_ABST
Patent Text Reader

Abstract

The utility model belongs to the field of municipal engineering, and particularly relates to a gutter inlet template which adopts a novel gutter inlet template, a U-shaped lintel template is placed at a notch of the gutter inlet template, and a gutter inlet can be formed through one-time pouring. All structures of the gutter inlet can be integrally formed, and the construction quality and efficiency of the gutter inlet are improved; according to the gutter inlet formwork, the integrity of the formwork is improved through the inner supporting assemblies and the reinforcing assemblies in the gutter inlet formwork, and formwork deformation is effectively prevented.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the field of municipal engineering, in particular to a rainwater inlet template. Background Art

[0002] The rainwater inlet is a facility in the urban drainage system, which is used to collect and discharge rainwater. At present, the construction methods of rainwater inlets are usually divided into two methods: brickwork and cast-in-place. The construction of brickwork rainwater inlets has problems such as long construction period, high labor intensity, difficult to ensure construction quality, and difficult maintenance; the construction of cast-in-place rainwater inlets is divided into two methods: integral casting and step-by-step casting. The integral casting is suitable for single-grid rainwater inlets. When double-grid rainwater inlets or multi-grid rainwater inlets are located between adjacent rainwater inlets, it will cause various problems such as difficulty in demolding, difficulty in placing reinforcement steel bars, and difficulty in casting. Therefore, multi-grid rainwater inlets are currently cast in steps. The first step is to cast to the bottom of the ring beam, and the second step is to cast the ring beam and lintel, and install the well grate. The step-by-step cast rainwater inlets have poor structural integrity, and the rainwater inlets are easily damaged by vehicles for a long time, which greatly affects the water collection capacity of the rainwater inlets, causing water accumulation at the rainwater inlets to form puddles, which not only affects the safety of vehicles but also reduces the appearance of the city. Summary of the invention

[0003] The problem to be solved by the present invention is to overcome the shortcomings of the background technology and provide a rainwater inlet template.

[0004] A rainwater inlet template, comprising a U-shaped lintel template, side templates on both sides and corner templates assembled together, the side template has a notch at the position of the rainwater inlet lintel, the lintel template is placed at the notch position of the side templates on both sides, and the upper surface of the lintel template is flush with the upper surface of the side template; the connecting surfaces of the side template and the corner template are both inclined surfaces; and also includes a plurality of reinforcement components, the reinforcement components include a long-axis horizontal beam and a short-axis horizontal beam, wherein the long-axis horizontal beam is fixed on the inner side of the side template, and the two ends of the long-axis horizontal beam are respectively fixed to the corner templates at both ends The short-axis horizontal beam is fixed on the corner formwork, and the two ends of the short-axis horizontal beam are vertically connected to the long-axis horizontal beam; diagonal support blocks are fixed outward at both ends of the long-axis horizontal beam, and the inclination angle of the diagonal support block is consistent with the inclined surface, and the diagonal support block abuts against the inner side of the corner formwork along the inclined surface; an internal support assembly is provided between the long-axis horizontal beams, and the internal support assembly includes a vertical fixed shaft, the fixed shaft is fixed to the long-axis horizontal beam on either side, one end of a horizontal rotating shaft is rotatably connected to the fixed shaft, and the other end of the rotating shaft is an oblique cut, and when the rotating shaft is rotated to be perpendicular to the long-axis horizontal beam, it abuts against the long-axis horizontal beam on the other side.

[0005] Preferably, the long-axis horizontal beam and the short-axis horizontal beam are both channel steels.

[0006] The lintel template of the rainwater outlet template of the present invention is not fixed together with the side template, but is directly placed on the notch of the side template, so that all structures of the rainwater outlet can be formed as a whole, and the rainwater outlet can be cast in one time, which greatly improves the construction quality and efficiency of the rainwater outlet; the internal support components and reinforcement components in the rainwater outlet template of the present invention improve the integrity of the template and effectively prevent the template from deformation. BRIEF DESCRIPTION OF THE DRAWINGS

[0007] Figure 1 This is a schematic diagram of the structure before concrete pouring in this embodiment;

[0008] Figure 2 This is a structural schematic diagram of the rainwater inlet foundation pit excavation in this embodiment;

[0009] Figure 3 It is a structural schematic diagram of the side formwork assembly of this embodiment;

[0010] Figure 4 This is a schematic diagram of the structure of the corner template assembly of this embodiment;

[0011] Figure 5 This is a schematic diagram of the structure of the rainwater inlet template assembled in this embodiment;

[0012] Figure 6 This is a schematic diagram of the rainwater inlet template structure after hoisting in this embodiment;

[0013] Figure 7 This is a schematic diagram of the structure after the well screen frame is inserted into this embodiment;

[0014] Figure 8 This is a schematic diagram of the structure after construction of this embodiment;

[0015] Fig. 9 This is a schematic diagram of the structure of the reinforcement component and the inner support component of this embodiment;

[0016] Fig.10 This is a schematic diagram of the rotation structure of the inner support assembly of this embodiment;

[0017] Fig.11 This is a schematic diagram of the structure in which the inner support assembly of this embodiment is screwed into the long axis horizontal beam;

[0018] Fig.12 This is a schematic diagram of the structure before the lintel template is placed in this embodiment.

[0019] In the figure, 1 is the rainwater inlet foundation pit, 2 is the concrete cushion layer, 3 is the side formwork, 4 is the corner formwork, 5 is the notch, 6 is the lintel formwork, 7 is the ring beam reinforcement, 8 is the asphalt middle surface layer, 9 is the well grate frame, 10 is the rainwater grate, 11 is the inclined surface, 12 is the long axis horizontal beam, 13 is the short axis horizontal beam, 14 is the diagonal support block, 15 is the fixed axis, 16 is the rotating axis, 17 is the oblique cut, and 18 is the square wood. DETAILED DESCRIPTION

[0020] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments.

[0021] The traditional multi-grid gully template includes a side template 3, corner templates 4 at four corners, and a lintel template 6. The lintel template 6 between adjacent gullies is either integrated with the entire gully template, or the lintel template 6 is fixedly connected to the side template 3 of the gully template by bolts. It is difficult or impossible to remove the template later, so the gully can only be constructed in the form of multiple pouring. The present invention improves the existing gully template, and the improvements are described in detail as follows:

[0022] The lintel template 6 of the rainwater inlet template of the present invention is U-shaped, and the side form template 3 has a notch 5 at the position of the rainwater inlet lintel. The U-shaped lintel template 6 is placed at the notch 5 position of the side form templates 3 on both sides. Different from the existing lintel template 6, the lintel template 6 of the present invention is only placed on the notch 5 of the side form templates 3 on both sides, and does not require any connecting parts to connect. The front and rear sides of the lintel template 6 are respectively on the same vertical plane with the outer side surfaces of the side form templates 3 on both sides, and the upper surface of the lintel template 6 is flush with the upper surface of the side form template 3. The rainwater inlet template designed in this way can be cast in one time, and the concrete is cast in one time until it is flush with the asphalt middle surface layer 8 of the road. The concrete can be directly poured into the U-shaped mouth of the lintel template 6. After the side form template 3 and the corner form 4 are removed in the later stage, the lintel template 6 can be directly removed downwards, which solves the problem that the mold cannot be removed during the overall casting.

[0023] In order to facilitate the demolding of the corner formwork 4 and the side formwork 3, the connection surfaces of the corner formwork 4 and the side formwork 3 used in the present invention are all corresponding inclined surfaces 11, that is, the connection surfaces of the corner formwork 4 and the side formwork 3 are not perpendicular to the side formwork 3, but are at an obtuse angle with the side formwork 3, generally between 120°-140°. The inclined surface 11 is designed because when demolding, the corner formwork 4 and the side formwork 3 can be quickly demolded by staggering inward along the inclined surface 11, which saves effort and time. At present, the corner formwork 4 and the side formwork 3 connected by the inclined surface 11 already exist, and no more details are given here.

[0024] At present, the internal support components and reinforcement components inside the corner formwork 4 and the side formwork 3 are relatively complex and need to be connected piece by piece, which not only complicates the reinforcement process but also has poor integrity. The internal support component and the reinforcement component of the present invention are integrated, and the reinforcement component includes a long-axis horizontal beam 12 and a short-axis horizontal beam 13, which surround the inside of the rainwater outlet formwork for a week to support and reinforce the inside of the rainwater outlet formwork. The left and right ends of the long-axis horizontal beam 12 abut against the inner side of the corner formwork 4, and the left and right ends are fixed to the corner formwork 4 by bolts. The long-axis horizontal beam 12 is fixed to the side formwork 3 along the length direction of the side formwork 3 by bolts. The long-axis horizontal beams 12 on both sides are symmetrically arranged, and the short-axis horizontal beams 13 are connected between the long-axis horizontal beams 12. The short-axis horizontal beams 13 are fixed to the corner formwork 4 by bolts. The two ends of the short-axis horizontal beam 13 are respectively fixed to the long-axis horizontal beams 12 on both sides. The short-axis horizontal beams 13 on both sides are also symmetrically distributed. The two long-axis horizontal beams 12 and the two short-axis horizontal beams 13 form a rectangular reinforcement frame as a whole, as shown in the attached figure. Fig. 9 As shown, several such reinforcement frames are fixed from bottom to top inside the rainwater inlet template, and the upper surface of the uppermost reinforcement frame is located below the notch 5. Preferably, diagonal bracing blocks 14 are also fixed outwardly at both ends of the long axis horizontal beam 12, and the inclination angle of the diagonal bracing blocks 14 is consistent with the inclined surface 11 connected to the corner template 4, and the diagonal bracing blocks 14 abut against the inner side of the corner template 4 along the inclined surface 11. Preferably, the long axis horizontal beam 12 and the short axis horizontal beam 13 are made of channel steel.

[0025] The present invention also innovatively sets an inner support assembly on the reinforcement assembly, and the inner support assembly includes a fixed shaft 15, which is a vertical short shaft. The fixed shaft 15 is fixed on the long axis horizontal beam 12, and one end of a horizontal rotating shaft 16 is rotatably connected to the fixed shaft 15, and the rotating shaft 16 can rotate around the fixed shaft 15. In this embodiment, a circular hole is provided on the rotating shaft 16 that passes through the circular hole to realize the rotation connection between the rotating shaft 16 and the fixed shaft 15. The other end of the rotating shaft 16 is an oblique cut 17, as shown in the attached Fig.10 As shown, when the rotating shaft 16 rotates to be perpendicular to the long axis horizontal beam 12, it can press against the long axis horizontal beam 12 on the other side, that is, when the rotating shaft 16 rotates to be perpendicular to the long axis horizontal beam 12, it abuts against the long axis horizontal beam 12 on the other side. The setting of the oblique cut 17 can ensure that the rotating shaft 16 can rotate to a state perpendicular to the long axis horizontal beam 12. The present invention can set a plurality of such inner support components between the long axis horizontal beams 12 on both sides. In this embodiment, two inner support components are set on each reinforcement component, as shown in the attached figure. Fig. 9 As shown, the inner support assembly of the present invention not only improves the integrity of the gully template but also effectively prevents the gully template from deformation.

[0026] The invention discloses a method for integrally forming a multi-grating rainwater outlet, which is completed based on the above-mentioned rainwater outlet template and comprises the following steps:

[0027] Step 1: Excavation of rainwater inlet foundation pit 1

[0028] As attached Figure 2 As shown, the road stormwater inlet is generally constructed after the construction of the road asphalt middle surface layer 8 is completed. First, the four endpoints of the stormwater inlet are extracted from the stormwater inlet design drawing, and the construction line is hung to cut the asphalt middle surface layer 8, and the position of the stormwater inlet is marked. Then, the earth excavation of the stormwater inlet foundation pit 1 and the earth excavation of the upper ring beam are carried out. The excavation of the stormwater inlet foundation pit 1 is a conventional step in the construction of existing stormwater wells, which will not be elaborated here.

[0029] Step 2: Pour concrete cushion layer 2 into the rainwater inlet foundation pit 1

[0030] A concrete cushion layer 2 is poured at the bottom of the excavated rainwater inlet foundation pit 1. Generally, the thickness of the concrete cushion layer 2 is about 10 cm.

[0031] Step 3: Install the rainwater inlet template

[0032] First, assemble the side formwork 3 on one side. After the side formwork 3 are assembled together, fix the long axis horizontal beam 12 at the lower part of the side formwork 3. The long axis horizontal beam 12 is fixed to the side formwork 3 by bolts, as shown in the attached figure. Figure 3 As shown; then install the corner templates 4 on both sides of the side template 3, the corner template 4 is fixed together with the side template 3 and the long axis horizontal beam 12, and the diagonal support block 14 is tightly against the inner side of the corner template 4; install the upper long axis horizontal beam 12, the upper long axis horizontal beam 12 is fixed together with the corner template 4 and the side template 3, as shown in the attached Figure 4 As shown; then assemble the side formwork 3, corner formwork 4 and long axis horizontal beam 12 on the other side in the same way, and connect the corner formworks 4 on both sides together; then fix the short axis horizontal beam 13 between the long axis horizontal beams 12 on both sides, and fix the short axis horizontal beam 13 with the corner formworks 4 on both sides together; finally, rotate the rotating shaft 16 on one side of the long axis horizontal beam 12, so that the rotating shaft 16 rotates to be perpendicular to the long axis horizontal beam 12 and tightly supports the other side of the long axis horizontal beam 12. At this point, the installation of the rainwater inlet template is completed, as shown in the attached figure Figure 5 shown.

[0033] Step 4: Install the rainwater outlet formwork and tie the ring beam reinforcement 7

[0034] Lift the rainwater inlet template installed in step 3 into the rainwater inlet foundation pit 1 and place it on the concrete cushion layer 2. Figure 6As shown, the notch 5 of the side formwork 3 is aligned with the designed lintel position, and then the lintel formwork 6 is placed at the notch 5, with the opening of the lintel formwork 6 facing upward, and the lintel formwork 6 is overlapped on the notch 5 of the side formwork 3. Then the ring beam reinforcement 7 is tied. After the ring beam reinforcement 7 is tied, in order to further ensure the stability of the rainwater inlet formwork, square wood 18 can be temporarily used on the upper part of the rainwater inlet formwork to support the outside of the rainwater inlet formwork from all sides to prevent its displacement, as shown in the attached figure. Figure 1 and 12 As shown, when the pouring is almost to the position of the square wood 18, the square wood 18 can be removed.

[0035] Step 5: Concrete pouring

[0036] Concrete is poured into the stormwater inlet foundation pit 1, and the pouring height is flush with the road asphalt middle surface layer 8.

[0037] Step 6: Install the well grate frame 9

[0038] When the poured concrete is initially set, the well grate frame 9 is inserted downward into the concrete to allow the well grate frame 9 to solidify with the concrete. Figure 7 shown.

[0039] Step 7: Remove the rainwater inlet template

[0040] After the concrete is completely solidified, the rainwater inlet formwork is removed. When removing the formwork, the rotating shaft 16 is rotated to make the internal support assembly lose its internal support function, and then the long-axis horizontal beam 12 and the short-axis horizontal beam 13 are removed with an electric wrench, and the bolts connecting the formworks are removed. The side formwork 3 or the corner formwork 4 is pried toward the inside of the rainwater inlet along the inclined surface 11 connecting the side formwork 3 and the corner formwork 4 to separate the side formwork 3 and the corner formwork 4, and each side formwork 3 and the corner formwork 4 is gradually removed, and finally the lintel formwork 6 is pressed down or knocked to remove the lintel formwork 6.

[0041] Step 8: Install the rain grate 10

[0042] The rainwater grate 10 is installed on the well grate frame 9. The installation process is the same as the existing process and will not be repeated here. At this point, the rainwater inlet construction is completed. Figure 8 shown.

[0043] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit them. Those skilled in the art should understand that they can still modify the technical solutions described in the above embodiments, or replace some of the technical features therein with equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A rainwater inlet template, comprising a U-shaped lintel template, side templates on both sides and corner templates assembled together, the side template has a gap at the position of the rainwater inlet lintel, characterized in that: The lintel template is placed at the notch positions of the side templates on both sides, and the upper surface of the lintel template is flush with the upper surface of the side template; the connecting surfaces of the side template and the corner template are both inclined surfaces; it also includes a number of reinforcement components, the reinforcement components include a long-axis horizontal beam and a short-axis horizontal beam, wherein the long-axis horizontal beam is fixed on the inner side surface of the side template, and the two ends of the long-axis horizontal beam are respectively fixed to the corner templates at both ends, and the short-axis horizontal beam is fixed on the corner template, and the two ends of the short-axis horizontal beam are vertically connected to the long-axis horizontal beam; diagonal support blocks are fixed outward at both ends of the long-axis horizontal beam, and the inclination angle of the diagonal support blocks is consistent with the inclined surface, and the diagonal support blocks abut the inner side surface of the corner template along the inclined surface; an internal support component is arranged between the long-axis horizontal beams, and the internal support component includes a vertical fixed shaft, the fixed shaft is fixed on the long-axis horizontal beam on either side, and one end of a horizontal rotating shaft is rotatably connected to the fixed shaft, and the other end of the rotating shaft is an oblique cut, and when the rotating shaft is rotated to be perpendicular to the long-axis horizontal beam, it abuts the long-axis horizontal beam on the other side.

2. The rainwater inlet template according to claim 1 is characterized in that: The long-axis horizontal beam and the short-axis horizontal beam are both channel steels.