Short steel shaft and concrete shaft combined reverse opening well shaft

By adopting a combined structure of short steel wellbore and concrete wellbore in reverse well construction, the safety risks and sealing effects of welding operations in narrow spaces are solved, and a larger working space and higher sealing effect are achieved, reducing construction risks .

CN222102031UActive Publication Date: 2024-12-03CHINA CONSTR SIXTH ENG BUREAU CIVILENG +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420597540.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-26
Publication Date
2024-12-03
Estimated Expiration
2034-03-26

AI Technical Summary

Technical Problem

During the reverse well construction process, workers need to perform welding and thermal cutting operations in a narrow space, which poses safety risks and poor air circulation, which affects construction efficiency and sealing effect.

Method used

A combination of short steel wellbore and concrete wellbore reverse opening wellbore structure is adopted. By installing a steel wellbore in the steel casing and filling it with waterproof mortar and concrete, a three-way structure is formed. Workers can weld and Sealed operation, the steel wellbore height is 50cm-60cm, which is easy to adjust and install manually.

Benefits of technology

It greatly improves the work space and construction safety of workers, enhances the sealing effect, reduces construction risks, simplifies the construction process, and reduces dependence on crane equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222102031U_ABST
    Figure CN222102031U_ABST
Patent Text Reader

Abstract

The utility model discloses a short steel shaft and concrete shaft combined type reverse opening well shaft which comprises a steel casing driven underground, the bottom of the steel casing is in close contact with the outer wall of an underground jacking pipe at a set position, steel shafts are arranged in the steel casing at intervals, the bottoms of the steel shafts are connected with steel plates wrapped outside pipe joints of the jacking pipe in a full welding mode, and the steel pipes are connected with the concrete shafts in a full welding mode. The area, located in the steel shaft, of the jacking pipe joint is communicated with the steel shaft to form a three-way structure, a gap between the steel shaft and the steel casing is filled with quick-drying waterproof mortar, a reinforcing mesh is hung on the inner wall of the steel shaft, and an epoxy mortar lining is sprayed on the inner wall of the steel shaft. The bottom of the concrete prefabricated shaft is supported on the inner side of the top wall of the steel shaft and the top wall of the epoxy mortar lining, plain concrete is filled between the concrete prefabricated shaft and the steel casing, and the height of the steel shaft ranges from 50 cm to 60 cm. When the structure is used for constructing the steel shaft, the space in the steel casing is used as the working space, and the working space is maximum.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a city municipal pipe jacking construction structure, in particular to a short steel shaft and a concrete shaft combined type reverse well shaft. Background Art

[0002] When constructing new large-diameter drainage pipes on the road, the jacking construction technology has the least impact on the surrounding environment and the highest efficiency. Among them, the inspection wells are divided into reverse wells and open wells. The reverse wells require drilling from the ground to the constructed jacking pipe after the jacking construction is completed, breaking the constructed jacking pipe section to form a connection. The jacking pipe section usually adopts a reinforced concrete structure, which is covered with a layer of steel plate with a thickness of 1 to 2 cm. Usually, when constructing reverse wells, it is necessary to first lay a casing, then excavate the earth inside the casing, and then lower the steel well shaft. Workers need to weld the steel well shaft and the steel plate covering the pipe section in the well shaft several meters high, and then manually cut the steel plate and concrete structure at the connection between the well shaft and the pipe section to form a tee. In this process, workers need to perform welding and hot cutting operations in a narrow space. Air circulation is difficult, and the working space is severely limited, posing a safety risk. Summary of the invention

[0003] The purpose of the utility model is to overcome the shortcomings of the existing technology and provide a combined reverse wellbore of a short steel wellbore and a concrete wellbore. By adopting this structure, workers can obtain a larger working space, improve the sealing effect of the bottom of the steel casing, greatly improve the operating environment of the workers, and reduce the safety risks of construction.

[0004] In order to solve the technical problems existing in the existing construction, the utility model adopts the following technical solutions:

[0005] The utility model discloses a combined reverse wellbore of a short steel wellbore and a concrete wellbore, comprising a steel casing driven into the ground, wherein the bottom of the steel casing is arranged in close contact with the outer wall of an underground top pipe at a set position, the steel wellbore is arranged in intervals in the steel casing, the bottom of the steel wellbore is fully welded to the outer steel plate of the top pipe section, the area of ​​the top pipe section located in the steel wellbore is connected to the steel wellbore to form a three-way structure, the gap between the steel wellbore and the steel casing is filled with quick-drying waterproof mortar, a steel mesh is hung on the inner wall of the steel wellbore and an epoxy mortar lining is sprayed, the bottom of the prefabricated concrete wellbore is supported on the inner side of the top wall of the steel wellbore and on the top wall of the epoxy mortar lining, plain concrete is filled between the prefabricated concrete wellbore and the steel casing, and the height of the steel wellbore is 50cm-60cm.

[0006] Beneficial effects of the utility model:

[0007] (1) The utility model can achieve step-by-step construction through the combined characteristics of the device itself. When constructing a steel shaft, the space inside the steel casing is used as the working space, and the working space is maximized.

[0008] (2) When constructing a steel shaft, workers of the utility model use the space inside the steel casing as their working space when welding and connecting the steel shaft and the outer steel plate of the top pipe section, thus maximizing the working space.

[0009] (3) When sealing the gap between the steel shaft and the steel casing, the utility model allows workers to fill the gap on the working surface and manually vibrate it to make it dense, rather than pouring it directly from the ground. This results in a denser filling effect. During construction, the space inside the casing after the concrete prefabricated shaft 1 is installed is used as the working space, and the working space is maximized.

[0010] (4) The steel shaft involved in the utility model is only 50cm-60cm high and light in weight. Workers can manually adjust the shaft position to make the steel shaft and the outer steel plate of the top pipe section fit more perfectly. No crane assistance is required, which is more convenient. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 The utility model discloses a short steel shaft and a concrete shaft combined type reverse opening shaft. DETAILED DESCRIPTION

[0012] The utility model is further described in detail below with reference to the accompanying drawings and specific embodiments.

[0013] like Figure 1 As shown, a short steel shaft and concrete shaft combined reverse opening shaft of the utility model comprises a steel casing driven into the ground, the bottom of the steel casing is closely contacted with the outer wall of the underground top pipe at a set position, the steel shaft 4 is arranged in intervals in the steel casing, the bottom of the steel shaft 4 is fully welded with the outer steel plate of the top pipe section, the area of ​​the top pipe section located in the steel shaft is connected with the steel shaft to form a three-way structure, the gap between the steel shaft 4 and the steel casing 6 is filled with quick-drying waterproof mortar 5, a steel mesh is hung on the inner wall of the steel shaft 4 and an epoxy mortar lining 3 is sprayed, the bottom of the concrete prefabricated shaft 1 is supported on the inner side of the top wall of the steel shaft 4 and the top wall of the epoxy mortar lining 3, and plain concrete 2 is filled between the concrete prefabricated shaft 1 and the steel casing 6. The height of the steel shaft is 50cm-60cm.

[0014] The construction process of this structure is as follows:

[0015] Step 1: After the underground pipe jacking construction is completed, a steel casing 6 is driven underground at the designed position until the bottom of the steel casing 6 contacts the outer wall of the pipe section of the underground pipe jacking;

[0016] Step 2: excavate the soil inside the steel casing until the outer steel plate of the top pipe section is completely exposed, and then manually clean the working surface inside the steel casing;

[0017] Step 3: Hang the steel shaft 4 with a height H of 50cm-60cm to the bottom of the steel casing and manually adjust the position of the steel shaft 4 to the set position, and then fully weld the bottom of the steel shaft 4 to the outer steel plate of the top pipe section; 7 in the figure is the weld;

[0018] Step 4: After welding is completed, fill the gap between the steel shaft 4 and the steel casing 6 with quick-drying waterproof mortar 5 and vibrate it to make it dense. After the quick-drying waterproof mortar solidifies, hang a steel mesh on the inner wall of the steel shaft 4 and spray the epoxy mortar lining 3;

[0019] Step 5: Use artificial thermal cutting to cut off the outer steel plate of the top pipe section located in the area of ​​the steel shaft 4, then break the concrete of the top pipe section in the area and cut off the steel bars of the top pipe section, so that the steel shaft and the top pipe section form a three-way structure;

[0020] Step 6: Hang the prefabricated concrete shaft 1 and install it on the upper part of the steel shaft 4. The bottom of the prefabricated concrete shaft 1 is supported on the inner side of the top wall of the steel shaft 4 and the top wall of the epoxy mortar lining 3;

[0021] Step 7: Fill the space between the prefabricated concrete shaft 1 and the steel casing 6 with plain concrete 2 and vibrate to compact it.

[0022] After the construction of the concrete prefabricated shaft of the utility model is completed, the well seat construction and the well cover installation construction can be carried out according to the existing method.

[0023] The above-mentioned specific implementations are merely illustrative rather than restrictive. Under the guidance of the present invention, ordinary technicians in this field can make many modifications without departing from the purpose of the present invention and the scope of protection of the claims, all of which are protected by the present invention.

Claims

1. A short steel shaft and concrete shaft combined reverse well shaft, characterized in that: It includes a steel casing driven into the ground, the bottom of the steel casing is arranged in close contact with the outer wall of the underground top pipe at a set position, the steel shaft is arranged in the steel casing at intervals, the bottom of the steel shaft is fully welded to the steel plate outside the top pipe section, the area of ​​the top pipe section located in the steel shaft is connected with the steel shaft to form a three-way structure, the gap between the steel shaft and the steel casing is filled with quick-drying waterproof mortar, a steel mesh is hung on the inner wall of the steel shaft and an epoxy mortar lining is sprayed, the bottom of the concrete prefabricated shaft is supported on the inner side of the steel shaft top wall and the top wall of the epoxy mortar lining, plain concrete is filled between the concrete prefabricated shaft and the steel casing, and the height of the steel shaft is 50cm-60cm.