Coke oven raw gas reforming furnace boiler and dry quenching boiler combined deoxygenization water supply system
By designing a joint deoxygenation water supply system for coke oven waste gas reformer boiler and dry quenching boiler, and sharing deoxygenation equipment, the problem of repeated equipment is solved, and the safe and stable supply of boiler water and the recycling of secondary steam is achieved, saving Investment and operation costs.
Patent Information
- Application Number
- CN202420602048.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-27
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-03-27
AI Technical Summary
In the prior art, the reformer boiler and the dry quenching boiler are respectively equipped with their respective deoxygenation water supply units, resulting in repeated equipment installation, increasing footprint and investment, and operation and safety and stability are difficult to ensure.
Design a joint deoxygenation water supply system for coke oven waste gas reformer boiler and dry quenching boiler. By sharing a desalination water tank, a deoxygenation water supply pump, a deoxygenation water supply pump and a boiler water supply pump, a shared water supply system for the two boilers is realized. Set up the control valve and safety interlocking functions to ensure the stable and safe operation of the system.
It reduces equipment investment and land occupation, realizes safe and stable supply of boiler water supply, saves equipment and civil engineering investment, and improves the operation and safety of the system through the merger and recycling of secondary steam.
Smart Images

Figure CN222104490U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of coking and dry coke quenching, and particularly relates to a combined deoxygenation and water supply system for a coke oven raw gas reforming furnace boiler and a dry coke quenching boiler. Background Art
[0002] In the process of directly reforming the high-temperature raw gas from the coking byproduct to produce hydrogen-rich reducing gas, the reforming furnace boiler is the main equipment for recovering the waste heat of the reformed gas from the raw gas from the high-temperature coke oven. The high-temperature reformed gas is cooled by the boiler feed water, and the temperature drops from about 1250℃ to about 180℃; at the same time, the boiler feed water is also heated from the high-pressure feed water of 104℃ to superheated steam, and then goes to the steam turbine power generation unit for power generation. In order to ensure the continuous cooling of the raw gas reformed gas produced continuously and the uninterrupted recovery of the waste heat, three reforming furnaces are set up, and correspondingly, three reforming furnace boilers are also set up.
[0003] In the CDQ production process, the CDQ boiler is the main equipment for CDQ waste heat recovery. After the circulating gas cools the red coke, the temperature rises to about 980℃ and enters the CDQ boiler, where it is cooled by boiler feed water. At the same time, the boiler feed water is also heated from 104℃ high-pressure feed water to superheated steam, which is then sent to the steam turbine generator unit for power generation. In order to achieve full CDQ, the waste heat of red coke is recovered and used. Three CDQ furnaces are set up, and correspondingly, three CDQ boilers are also set up to form a full CDQ system.
[0004] In the prior art, the reforming furnace boiler and the dry coke quenching boiler are different waste heat recovery units, and their respective deoxygenation water supply units are respectively provided, such as: Patent Publication No.: CN206478617U, discloses a dry coke quenching boiler intermediate reheat power generation system, and its steam-water circulation system is a separate dry coke quenching boiler water supply unit water supply system. Patent Publication No.: CN113955718A, discloses a high-temperature raw coal gas non-catalytic partial oxidation direct reforming process and system, which respectively provides two water supply systems, the reforming furnace boiler water supply unit and the dry coke quenching boiler water supply unit. Many equipment of the two units (such as desalted water tank, deaerator, boiler feed water pump, deoxygenation feed water pump, etc.) need to be designed and reserved according to the design specifications and actual application conditions, resulting in the duplication of some equipment and increased land occupation and investment. Summary of the invention
[0005] The purpose of the utility model is to provide a deoxygenation water supply system for a coke oven raw gas reforming furnace boiler and a dry coke quenching boiler. The system can realize the water supply of the two waste heat boilers with the same deoxygenation water supply system, ensure the safe and stable operation of the combined water supply system, and achieve the purpose of reducing equipment investment and station building settings while ensuring the safety and stability of the water supply to each boiler.
[0006] To achieve the above purpose, the utility model is implemented through the following technical solutions:
[0007] A coke oven raw gas reforming furnace boiler and dry coke quenching boiler combined deoxygenation water supply system, comprising a desalted water tank, a deoxygenation water supply pump, a deaerator, a deoxygenation water tank, a boiler water supply pump, a reforming furnace boiler unit, and a dry coke quenching boiler unit;
[0008] The water outlet of the desalted water tank is connected to the heat pipe heat exchanger of the dry coke quenching boiler unit through the deoxygenation feed water pump. The deoxygenation feed water pump pressurizes the water in the desalted water tank and sends it to the heat pipe heat exchanger of the dry coke quenching boiler unit to cool the circulating gas passing through the heat pipe heat exchanger and heat the desalted water to recover part of the heat.
[0009] The deaerator is equipped with a deaerator water tank, which is connected to the heat pipe heat exchanger of the CDQ boiler unit and receives the return water from the heat pipe heat exchanger. The deaerator is connected to the low-pressure steam of the low-pressure pipe network for deoxidation, and a regulating valve is set on the low-pressure steam pipeline entering each deaerator.
[0010] The boiler feed water pump is connected to the deaeration water tank, and is used to receive the deaeration water sent from the deaeration water tank, and pressurize and send it to the boiler feed water main pipe; the boiler feed water main pipe is divided into two routes to send the deaeration water to the reforming furnace boiler unit and the dry coke quenching boiler unit respectively;
[0011] One path of deoxygenated water is divided into two paths in the reformer boiler unit, one path enters the economizer through the regulating valve, and the other path is connected to the water spray desuperheater;
[0012] The other deoxygenated water is divided into two paths in the CDQ boiler unit, one path enters the economizer through the regulating valve, and the other path is connected to the water spray desuperheater;
[0013] A dry coke quenching boiler continuous blowdown expansion tank is provided in the dry coke quenching boiler unit, the dry coke quenching boiler continuous blowdown expansion tank is connected to the secondary steam outlet pipe, the secondary steam outlet pipe is connected to the deaerator, the dry coke quenching boiler continuous blowdown expansion tank is used to separate steam and water from the blowdown water of the dry coke quenching boiler, and the secondary steam is led out from the secondary steam outlet pipe and sent to the deaerator;
[0014] A reforming furnace boiler continuous blowdown expansion tank is provided in the reforming furnace boiler unit. The reforming furnace boiler continuous blowdown expansion tank is connected to the secondary steam outlet pipe, and the secondary steam outlet pipe is connected to the deaerator. The reforming furnace boiler continuous blowdown expansion tank is used to separate the steam and water of the blowdown water of the reforming furnace boiler, and the secondary steam is outlet through the secondary steam outlet pipe and sent to the deaerator.
[0015] There are three boiler feed pumps, which are arranged in a 2 in operation and 1 in reserve configuration.
[0016] A pressure gauge group is arranged on the boiler water supply main pipe.
[0017] An automatic circulation pump protection valve is arranged at the outlet of the boiler feed water pump.
[0018] The desalted water tank is connected with the condensate water pipeline and the desalted water pipeline. The desalted water tank receives the turbine condensate sent by the condensate water pipeline and the supplementary desalted water from the desalted water pipeline. The condensate water pipeline is provided with a regulating valve; and the desalted water pipeline is provided with an electric valve.
[0019] There are two desalted water tanks, one for operation and one for backup.
[0020] The deaerator and deaeration water tank are divided into two groups, one for working and one for standby.
[0021] A regulating valve is connected to the connecting pipe between the deoxygenated water tank and the heat pipe heat exchanger of the dry coke quenching boiler unit.
[0022] A check valve is arranged on the secondary steam outlet pipe.
[0023] Compared with the prior art, the beneficial effects of the utility model are:
[0024] 1. The utility model is provided with a combined water supply system which can supply water to the reforming furnace boiler and the dry coke quenching boiler at the same time. For the reforming furnace boiler unit and the full dry coke quenching system, the desalted water tank, deaerator, boiler feed pump and other equipment are reduced, which saves equipment land and station facilities, thereby saving equipment and civil engineering investment.
[0025] 2. Combine the secondary steam branches of the blowdown expansion tanks of various waste heat boilers and send them into the deaeration water tank of the combined deaerator to achieve combined recovery of secondary steam.
[0026] 3. Solve the operation and safety and stability problems of the joint water supply system. Regulating valves are set for the desalted water tank inlet, deoxygenated water tank inlet, deoxygenated heating steam inlet, boiler feed water and desuperheated water pipelines, and the adjustment is achieved according to the corresponding pressure and liquid level detection. At the same time, a safety interlock function is set to achieve stable and safe operation of the joint water supply system. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a structural schematic diagram of the utility model.
[0028] In the figure: 1- desalting water tank 2- deaeration water feed pump 3- desalting water tank level gauge 4- deaerator and deaeration water tank 5- boiler feed water pump 6- automatic circulation pump protection valve 7- deaerator pressure gauge 8- deaeration water tank level gauge 9- boiler feed water main pipe pressure gauge 10- reforming furnace boiler 11- reforming furnace boiler water spray desuperheater 12- reforming furnace boiler continuous sewage expansion tank 13- dry coke quenching boiler 14- dry coke quenching boiler water spray desuperheater 15- dry coke quenching boiler continuous sewage expansion tank 16- dry coke quenching heat pipe heat exchanger 17- segmented main pipe 18- boiler feed water main pipe 19- secondary steam outlet pipe 20- regulating valve one 21- regulating valve two 22- regulating valve three 23- regulating valve four DETAILED DESCRIPTION
[0029] The present invention is described in detail below in conjunction with the accompanying drawings of the specification, but it should be noted that the implementation of the present invention is not limited to the following embodiments.
[0030] See Figure 1 A combined deoxygenation water supply system for coke oven raw gas reforming furnace boiler and dry coke quenching boiler can safely and stably supply boiler feed water for the two waste heat boilers in the coking process, reduce the setting of equipment and station buildings, reduce land occupation and equipment civil engineering investment, and achieve waste heat recovery while cooling the working fluid of coke oven raw gas reforming furnace boiler and dry coke quenching boiler.
[0031] Take the reforming furnace boiler unit composed of three reforming furnace boilers 10 as the core and the dry coke quenching boiler unit composed of three dry coke quenching furnace boilers 13 as the core as an example:
[0032] The combined deoxygenation water supply system is based on the fact that the parameters of the reforming furnace boiler 10 and the dry quenching boiler 13 are both high temperature and high pressure, that is, the rated steam production temperature and pressure of the main steam are both 545±5℃ and 9.81±0.5MPa. Two desalted water tanks 1 are set in the combined deoxygenation water supply system. The desalted water enters the desalted water tank 1 through the desalted water pipeline, and the condensed water is sent to the desalted water tank 1 through the condensed water pipeline. Each desalted water tank 1 is equipped with a remote level gauge, which adjusts the opening of the condensate inlet regulating valve connected to the condensate pipeline according to the change of the liquid level to keep the liquid level at a normal water level. At the same time, the desalted water pipeline is provided with an electric valve and a liquid level interlock. When the liquid level of the desalted water tank 1 is extremely low, the valve is opened, and the desalted water is replenished in time to ensure the safe liquid level of the desalted water tank 1. The combined deoxygenation water supply system only uses two desalted water tanks 1 (one working and one standby) to complete the supply of desalted water, and the water supply safety is ensured by regulating valves and electric valves.
[0033] The deaerator is equipped with a deoxygenation water tank. The deoxygenation feed water pump 2 pressurizes the desalted water and condensed water in the desalted water tank 1 and sends it to the dry coke quenching heat pipe heat exchanger 16 to cool the circulating gas, and the heated return water is sent to the two deaerators respectively. A regulating valve 20 is set on each water pipe branch entering the deaerator. The valve position opening of the regulating valve 20 is adjusted according to the deoxygenation water tank liquid level gauge 8 set on the deoxygenation water tank. The regulating valve 20 ensures the liquid level of the deoxygenation water tank by adjusting the water inlet, and ensures the safe liquid level of the deaerator and the deoxygenation water tank 4. This method can reduce the number of deoxygenation feed water pumps 2. Only two deoxygenation feed water pumps 2 are set to meet the needs of the dry coke quenching boiler unit and the reforming furnace boiler unit. A regulating valve is connected to the connecting pipe between the deoxygenation water tank and the heat pipe heat exchanger 16 of the dry coke quenching boiler unit, which can be adjusted according to the liquid level of the deoxygenation water tank.
[0034] The heating steam for the deaerator and the deaerator water tank 4 is supplied by the low-pressure steam network, and a regulating valve 21 is arranged on the branch line entering each deaerator. The valve position opening of the regulating valve 21 is adjusted by the deaerator pressure gauge 7 on each deaerator to ensure the deoxygenation effect of each deaerator.
[0035] The deoxygenated water in the deaerator is sent to the inlet of the boiler feed water pump 5 through the segmented main pipe 17. Under the rated working conditions, two of the three boiler feed water pumps 5 are in operation and one is on standby, and their outlets are connected to the boiler feed water main pipe 18 respectively. The boiler feed water pump 5 is used to receive the deoxygenated water sent from the deoxygenated water tank and pressurize it to send it to the boiler feed water main pipe 18. The boiler feed water pump 5 is equipped with a variable frequency motor, and the operating frequency of the boiler feed water pump 5 is adjusted by the pressure of the boiler feed water main pipe 18 measured by the pressure gauge group (1 to 3 boiler feed water main pipe pressure gauges 9 can be set). If the pressure of the feed water main pipe drops to an extremely low value, the standby boiler feed water pump 5 is started to ensure the safety of the boiler water supply. An automatic circulation pump protection valve 6 is set at the outlet of each boiler feed water pump 5. The protection valve provides a main circuit check function, and at the same time, the excess feed water of the main circuit can be merged through the bypass and recycled to the deoxygenated water tank for reuse.
[0036] The boiler feed water main pipe 18 is divided into two routes to be sent to the reforming furnace boiler unit and the dry coke quenching boiler unit, and then branches into each boiler feed water pipeline. A regulating valve three 22 is set on the feed water pipeline of each reforming furnace boiler 10, and the regulating valve three 22 adjusts the flow of deoxygenated water entering the economizer of the reforming furnace boiler 10 according to the load of the reforming furnace boiler 10. A branch is drawn from the feed water pipeline of each reforming furnace boiler 10 to send deoxygenated water to the reforming furnace boiler spray water desuperheater 11 to adjust the superheater temperature of the reforming furnace boiler. Similarly, a regulating valve four 23 is set on the feed water pipeline of each dry coke quenching boiler 13, and the regulating valve four 23 adjusts the flow of deoxygenated water entering the economizer of the dry coke quenching boiler according to the load of the dry coke quenching boiler 13. A branch is drawn from the feed water pipeline of each dry coke quenching boiler 13 to send deoxygenated water to the dry coke quenching boiler spray water desuperheater 14 to adjust the superheater temperature.
[0037] The reforming furnace boiler continuous blowdown expansion tank 12 is connected to the reforming furnace boiler 10, the reforming furnace boiler continuous blowdown expansion tank 12 is connected to the secondary steam outlet pipe 19, the secondary steam outlet pipe 19 is connected to the deaerator, the reforming furnace boiler continuous blowdown expansion tank 12 is used to separate the steam and water of the blowdown water of the reforming furnace boiler 10, and the secondary steam is discharged from the secondary steam outlet pipe 19 and sent to the deaerator.
[0038] The dry quenching boiler continuous blowdown expansion tank 15 is connected to the dry quenching boiler 13, the dry quenching boiler continuous blowdown expansion tank 15 is connected to the secondary steam outlet pipe 19, the secondary steam outlet pipe 19 is connected to the deaerator, and the dry quenching boiler continuous blowdown expansion tank 15 is used to separate the steam and water of the blowdown water of the dry quenching boiler 13, and outlet the secondary steam from the secondary steam outlet pipe 19 and send it to the deaerator.
[0039] The utility model integrates the reforming furnace boiler and the dry quenching boiler water supply system, which meets the production needs while saving equipment space and station facilities, thereby saving equipment and civil engineering investment. Compared with the previous technology, it reduces the desalted water tank 1, deaerator feed water pump 2, deaerator, boiler feed water pump 5 and other equipment, and at the same time reduces the corresponding pipelines, pipe fittings, valves, equipment electricity and other configurations, reducing operation and maintenance costs. The corresponding adjustment and interlocking functions are added to ensure the safe and stable operation of the combined boiler water supply system. At the same time, the secondary steam of the blowdown expansion tank of various waste heat boilers is merged to achieve the joint recovery of secondary steam.
Claims
1. A deoxygenation water supply system for a coke oven raw gas reforming furnace boiler and a coke dry quenching boiler, characterized in that: It includes desalted water tank, deaerated feed water pump, deaerator, deaerated water tank, boiler feed water pump, reformer boiler unit, and dry coke quenching boiler unit; The water outlet of the desalted water tank is connected to the heat pipe heat exchanger of the dry coke quenching boiler unit through the deoxygenation feed water pump. The deoxygenation feed water pump pressurizes the water in the desalted water tank and sends it to the heat pipe heat exchanger of the dry coke quenching boiler unit to cool the circulating gas passing through the heat pipe heat exchanger and heat the desalted water to recover part of the heat. The deaerator is equipped with a deaerator water tank, which is connected to the heat pipe heat exchanger of the CDQ boiler unit and receives the return water from the heat pipe heat exchanger. The deaerator is connected to the low-pressure steam of the low-pressure pipe network for deoxidation, and a regulating valve is set on the low-pressure steam pipeline entering each deaerator. The boiler feed water pump is connected to the deaeration water tank, and is used to receive the deaeration water sent from the deaeration water tank, and pressurize and send it to the boiler feed water main pipe; the boiler feed water main pipe is divided into two routes to send the deaeration water to the reforming furnace boiler unit and the dry coke quenching boiler unit respectively; One path of deoxygenated water is divided into two paths in the reformer boiler unit, one path enters the economizer through the regulating valve, and the other path is connected to the water spray desuperheater; The other deoxygenated water is divided into two paths in the CDQ boiler unit, one path enters the economizer through the regulating valve, and the other path is connected to the water spray desuperheater; A dry coke quenching boiler continuous blowdown expansion tank is provided in the dry coke quenching boiler unit, the dry coke quenching boiler continuous blowdown expansion tank is connected to the secondary steam outlet pipe, the secondary steam outlet pipe is connected to the deaerator, the dry coke quenching boiler continuous blowdown expansion tank is used to separate steam and water from the blowdown water of the dry coke quenching boiler, and the secondary steam is led out from the secondary steam outlet pipe and sent to the deaerator; A reforming furnace boiler continuous blowdown expansion tank is provided in the reforming furnace boiler unit. The reforming furnace boiler continuous blowdown expansion tank is connected to the secondary steam outlet pipe, and the secondary steam outlet pipe is connected to the deaerator. The reforming furnace boiler continuous blowdown expansion tank is used to separate the steam and water of the blowdown water of the reforming furnace boiler, and the secondary steam is outlet through the secondary steam outlet pipe and sent to the deaerator.
2. The deoxygenation water supply system for a coke oven raw gas reforming furnace boiler and a coke dry quenching boiler according to claim 1 is characterized in that: There are three boiler feed pumps, which are arranged in a 2 in operation and 1 in standby mode.
3. The deoxygenation water supply system for a coke oven raw gas reforming furnace boiler and a coke dry quenching boiler according to claim 1 is characterized in that: A pressure gauge group is arranged on the boiler water supply main pipe.
4. The deoxygenation water supply system for a coke oven raw gas reforming furnace boiler and a coke dry quenching boiler according to claim 1 is characterized in that: An automatic circulation pump protection valve is arranged at the outlet of the boiler feed water pump.
5. The deoxygenation water supply system for a coke oven raw gas reforming furnace boiler and a coke dry quenching boiler according to claim 1 is characterized in that: The desalted water tank is connected with the condensate water pipeline and the desalted water pipeline. The desalted water tank receives the turbine condensate sent by the condensate water pipeline and the supplementary desalted water from the desalted water pipeline. The condensate water pipeline is provided with a regulating valve; and the desalted water pipeline is provided with an electric valve.
6. The deoxygenation water supply system for a coke oven raw gas reforming furnace boiler and a coke dry quenching boiler according to claim 1 is characterized in that: There are two desalted water tanks, one for operation and one for backup.
7. The deoxygenation water supply system for a coke oven raw gas reforming furnace boiler and a coke dry quenching boiler according to claim 1 is characterized in that: The deaerator and deaeration water tank are divided into two groups, one for working and one for standby.
8. The deoxygenation water supply system for a coke oven raw gas reforming furnace boiler and a coke dry quenching boiler according to claim 1 is characterized in that: A regulating valve is connected to the connecting pipe between the deoxygenated water tank and the heat pipe heat exchanger of the dry coke quenching boiler unit.
9. The deoxygenation water supply system for a coke oven raw gas reforming furnace boiler and a coke dry quenching boiler according to claim 1 is characterized in that: A check valve is arranged on the secondary steam outlet pipe.
Citation Information
Cited By
Coke oven raw gas reforming furnace boiler and dry quenching boiler combined deoxygenization water supply system
CN118168395A