Emergency release valve detection device
By designing an emergency discharge valve detection device and integrating testing projects, equipment replacement and resource consumption are reduced, the problem of waste of manpower and material resources during the inspection process in the existing technology is solved, and efficient emergency discharge valve detection is achieved.
Patent Information
- Application Number
- CN202420882596.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-26
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-04-26
AI Technical Summary
The existing emergency discharge valve detection device needs to be frequently disassembled and installed, which consumes a lot of manpower and material resources. In the test process, blowers and exhaust fans must be used separately, which wastes a lot of resources.
An emergency discharge valve detection device is designed, including a pressure stabilizing tank, control cabinet, fan, test barrel and gas regulation port, integrating leakage, opening pressure, ventilation test, and sealing connection between the air inlet and outlet of the fan. The use of fans to send or pump air reduces equipment replacement and resource consumption.
The multiple tests of the emergency discharge valve are achieved without repeated disassembly and assembly, saving manpower and material resources, and the use of fan sealing reduces costs, improves detection efficiency and resource utilization.
Smart Images

Figure CN222105066U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of valve detection, in particular to an emergency relief valve detection device. Background Art
[0002] Emergency relief valves can perform emergency pressure relief and vacuum relief. In emergency situations (tank exterior exposed to fire), ordinary exhaust devices may have too little discharge to prevent the tank from being over-pressurized due to sudden situations. Emergency relief valves have the necessary pressure relief and vacuum relief devices to keep the tank within a safe operating range. The integrated vacuum valve provides additional protection to prevent the tank from collapsing due to excessive steam or vacuum.
[0003] When the existing device is in use, the leakage, opening pressure and ventilation volume of the emergency relief valve are measured above and below the ground of the pressure regulating tank respectively. The emergency relief valve needs to be disassembled and assembled constantly, which consumes a lot of manpower and material resources. At the same time, during the test, a blower and an exhaust fan need to be used to supply and exhaust air respectively, which wastes certain resources. Utility Model Content
[0004] In view of the deficiencies in the prior art, the utility model provides an emergency relief valve detection device, which solves the technical problems raised in the above background technology.
[0005] To achieve the above objectives, the utility model is implemented through the following technical solutions: an emergency relief valve detection device, comprising a pressure-stabilizing tank, a control cabinet, a fan, a test cylinder and a gas regulating port, the gas regulating port and the test cylinder are fixedly installed on the top of the pressure-stabilizing tank, a test seat is provided at the top of the test cylinder, a third valve is installed in the test cylinder, a first valve is installed in the gas regulating port, a first test pipe is connected to the test cylinder between the third valve and the test seat from the top of the pressure-stabilizing tank, a second valve and a second flowmeter are installed on the first test pipe, a second test pipe is connected to the test cylinder between the third valve and the test seat outwardly, a third flowmeter, a U-shaped press and a fourth valve are installed on the second test pipe, a pressure gauge and a thermometer are installed in the pressure-stabilizing tank, an outlet and an inlet are connected at the air inlet and the air outlet of the fan respectively, a connecting pipe is connected between the outlet and the inlet, the outlet is connected to the pressure-stabilizing tank, and a first flowmeter is installed between the connecting pipe and the pressure-stabilizing tank.
[0006] Preferably, a sixth valve is installed on the outlet between the communicating pipe and the fan, and a pipe on which a fifth valve is installed is connected to the outlet between the sixth valve and the fan.
[0007] Preferably, a seventh valve is installed on the communication pipeline between the outlet and the inlet, and an eighth valve is installed on the communication pipeline outside the inlet.
[0008] Preferably, the second flow meter, the third flow meter, the U-type press, the pressure gauge, the thermometer, the first flow meter, and the fan are all electrically connected to the control cabinet.
[0009] Preferably, the connections between the air inlet and the air outlet of the fan and the outlet and the inlet are all sealed structures.
[0010] Beneficial Effects
[0011] The utility model provides an emergency relief valve detection device, which has the following beneficial effects: when the device is in use, the leakage, opening pressure and ventilation volume of the emergency relief valve are integrated into the test tube for testing, thereby avoiding the problem of repeatedly disassembling and assembling the emergency relief valve when testing different items, saving manpower and material resources, and at the same time, the fan is sealed with the inlet and outlet, and air can be supplied through the air outlet of the fan, and air can also be exhausted through the air inlet of the fan, saving costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 This is a schematic structural diagram of an emergency relief valve detection device described in the utility model.
[0013] In the figure: 1. first valve; 2. second valve; 3. third valve; 4. fourth valve; 5. fifth valve; 6. sixth valve; 7. seventh valve; 8. eighth valve; 9. fan; 10. inlet; 11. outlet; 12. first flow meter; 13. second flow meter; 14. third flow meter; 15. U-type press; 16. test cylinder; 17. test seat; 18. pressure gauge; 19. thermometer; 20. pressure regulating tank; 21. gas regulating port; 22. control cabinet. DETAILED DESCRIPTION
[0014] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the implementation regulations described are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0015] See also Figure 1The utility model provides a technical solution for an emergency relief valve detection device: an emergency relief valve detection device, comprising a pressure stabilizing tank 20, a control cabinet 22, a fan 9, a test tube 16 and a gas regulating port 21, the gas regulating port 21 and the test tube 16 are fixedly installed on the top of the pressure stabilizing tank 20, a test seat 17 is arranged on the top of the test tube 16, a third valve 3 is installed in the test tube 16, a first valve 1 is installed in the gas regulating port 21, a first test pipe is connected to the test tube 16 between the third valve 3 and the test seat 17 from the top of the pressure stabilizing tank 20, and a first test pipe is arranged on the first test pipe A second valve 2 and a second flowmeter 13 are installed, a second test pipe is connected to the test tube 16 between the third valve 3 and the test seat 17, a third flowmeter 14, a U-shaped press 15 and a fourth valve 4 are installed on the second test pipe, a pressure gauge 18 and a thermometer 19 are installed in the pressure-stabilizing tank 20, the air inlet and air outlet of the fan 9 are respectively connected to the outlet 11 and the inlet 10, a connecting pipe is connected between the outlet 11 and the inlet 10, the outlet 11 is connected to the pressure-stabilizing tank 20, and a first flowmeter 12 is installed between the connecting pipe and the pressure-stabilizing tank 20.
[0016] Furthermore, a sixth valve 6 is installed on the outlet 11 between the connecting pipe and the fan 9 , and a pipe on which a fifth valve 5 is installed is connected to the outlet 11 between the sixth valve 6 and the fan 9 .
[0017] Furthermore, a seventh valve 7 is installed on the communication pipeline between the outlet 11 and the inlet 10 , and an eighth valve 8 is installed on the communication pipeline outside the inlet 10 .
[0018] Furthermore, the second flow meter 13 , the third flow meter 14 , the U-type press 15 , the pressure gauge 18 , the thermometer 19 , the first flow meter 12 , and the fan 9 are all electrically connected to the control cabinet 22 .
[0019] Furthermore, the connection between the air inlet and the air outlet of the fan 9 and the outlet 11 and the inlet 10 are all sealed structures.
[0020] Example:
[0021] Positive pressure test:
[0022] Fix the emergency relief valve to be tested and test the ventilation volume, open the first valve 1, the third valve 3, the sixth valve 6, and the eighth valve 8, close the second valve 2, the fourth valve 4, the fifth valve 5, and the seventh valve 7, start the fan, and after the wind pressure stabilizes, slowly close the first valve 1 and record the value of the first flow meter 12, which is the ventilation volume of the emergency relief valve.
[0023] Start stress testing:
[0024] Slowly open the first valve 1, adjust and control the flow, observe and record the instantaneous change in the pressure gauge, which is the opening pressure of the emergency relief valve.
[0025] Leakage test:
[0026] Open the second valve 2 and the fourth valve 4, close the third valve 3 and the regulating valve 4 and control the flow to ensure that the second flow meter 13U-type pressure gauge is 75% of the opening pressure of the emergency relief valve, so that the emergency relief valve is in a closed state. After the airflow stabilizes, the difference between the second flow meter 13 and the third flow meter 14 is recorded as the leakage of the emergency relief valve.
[0027] Negative pressure test:
[0028] Open the first valve 1, the third valve 3, the fifth valve 5, and the seventh valve 7, and close the second valve 2, the sixth valve 6, and the eighth valve 8. Slowly adjust the first valve 1 and control the flow rate. Observe and record the instantaneous change in the pressure gauge, which is the negative pressure opening pressure of the emergency relief valve.
[0029] It should be noted that, in this document, relational terms such as first and second, etc. are merely used to distinguish one entity or operation from another entity or operation, but do not necessarily require or imply any such actual relationship or order between these entities or operations.
Claims
1. An emergency relief valve detection device, comprising a pressure-stabilizing tank (20), a control cabinet (22), a fan (9), a test tube (16) and a gas regulating port (21), characterized in that: The gas regulating port (21) and the test cylinder (16) are fixedly mounted on the top of the pressure-stabilizing tank (20); a test seat (17) is arranged on the top of the test cylinder (16); a third valve (3) is installed in the test cylinder (16); a first valve (1) is installed in the gas regulating port (21); a first test pipe is connected from the top of the pressure-stabilizing tank (20) to the test cylinder (16) between the third valve (3) and the test seat (17); a second valve (2) and a second flow meter (13) are installed on the first test pipe; and a valve (3) and a second flow meter (13) are arranged between the third valve (3) and the test seat (17). The test cylinder (16) is externally connected to a second test pipeline, and a third flow meter (14), a U-shaped press (15) and a fourth valve (4) are installed on the second test pipeline. A pressure gauge (18) and a thermometer (19) are installed in the pressure stabilizing tank (20). The air inlet and air outlet of the fan (9) are respectively connected to an outlet (11) and an inlet (10). A connecting pipeline is connected between the outlet (11) and the inlet (10), and the outlet (11) is connected to the pressure stabilizing tank (20). A first flow meter (12) is installed at the outlet (11) between the connecting pipeline and the pressure stabilizing tank (20).
2. An emergency relief valve detection device according to claim 1, characterized in that: A sixth valve (6) is installed on the outlet (11) between the connecting pipe and the fan (9), and a pipe on which a fifth valve (5) is installed is connected to the outlet (11) between the sixth valve (6) and the fan (9).
3. The emergency relief valve detection device according to claim 1, characterized in that: The communication pipeline is provided with a seventh valve (7) between the outlet (11) and the inlet (10), and an eighth valve (8) is provided on the communication pipeline outside the inlet (10).
4. The emergency relief valve detection device according to claim 1, characterized in that: The second flow meter (13), the third flow meter (14), the U-type press (15), the pressure gauge (18), the thermometer (19), the first flow meter (12), and the fan (9) are all electrically connected to the control cabinet (22).
5. The emergency relief valve detection device according to claim 1, characterized in that: The connection between the air inlet and the air outlet of the fan (9) and the outlet (11) and the inlet (10) are all sealed structures.