Test platform for energy storage battery cooling-water machine
By integrating the performance test platform and the filling test platform on the chiller test platform, the flow rate, temperature and pressure of the chiller are monitored by using the PLC control unit and transmitter to achieve the test of the chiller under different water temperatures and working conditions, and solve the problem of the chiller. The problem of deviation in the test results in the prior art is to ensure the design requirements for cooling performance of the chiller.
Patent Information
- Application Number
- CN202323517605.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-22
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2033-12-22
AI Technical Summary
The existing chiller test platform is difficult to simulate various working conditions and environmental conditions in actual use, resulting in deviations from the actual use.
Design a test platform including a performance test platform and a charging test platform, use a PLC control unit to control the heat load and operating condition of the chiller, and monitor the chiller through automated refrigerant, combining heating pipelines and transmitters. The flow rate, temperature and pressure of the water chiller can be tested under different water temperature and operating conditions.
It can accurately simulate the operating state of the chiller under different water temperatures and the heat dissipation performance of the chiller under different working conditions, ensure that the cooling performance of the chiller meets the design requirements, and provide reliable equipment guarantee.
Smart Images

Figure CN222105087U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a test platform, in particular to a test platform for an energy storage battery chiller, and belongs to the technical field of energy storage battery cooling. Background Art
[0002] At present, the cooling technology of energy storage batteries has gradually changed from air cooling to water cooling. The target value T0 of the water supply temperature of the battery cooling water is generally between 17℃ and 21℃. Water cooling has better control over the battery temperature, smaller temperature difference between battery packs, and longer battery life. At present, the measure to cool the cooling water of water-cooled batteries is to configure a chiller. A chiller is a water cooling device that can provide cooling water with constant temperature, constant flow, and constant pressure. The chiller performance test mainly tests the key performance indicators of the chiller, such as cooling capacity, cooling efficiency, and cooling speed, to ensure that it meets the design requirements and usage needs. At present, the main difficulty of the chiller test lies in the limitations of laboratory condition simulation. It is difficult to fully simulate various working conditions and environmental conditions in actual use. Therefore, the test results may deviate from the actual usage. Summary of the invention
[0003] The purpose of the utility model is to provide a test platform for energy storage battery chillers which can simulate the operating state of the chiller under different water temperatures and can also detect the heat dissipation performance of the chiller under different working conditions to ensure the subsequent cooling performance of the chiller.
[0004] In order to achieve the above-mentioned purpose, the technical solution of the utility model is: a test platform for an energy storage battery chiller, the innovation of which is: comprising a performance test platform for controlling the heat load and monitoring the working condition of the chiller, a filling test platform for automatically filling the refrigerant before the chiller is operated, and a PLC control unit, wherein the performance test platform and the filling test platform are respectively electrically connected to the corresponding connection terminals of the PLC control unit,
[0005] The performance test platform includes an inlet pipe section connected to the water inlet of the chiller, an outlet pipe section connected to the water outlet of the chiller, and a heating pipe section for adjusting the test water inlet temperature of the chiller. The inlet pipe section is connected to the heating pipe section and the outlet pipe section.
[0006] The pipeline of the inlet pipeline section is provided with a water flow transmitter FIT1 for monitoring the water flow of the chiller, a temperature transmitter TT1 for monitoring the water inlet temperature of the chiller test, and a pressure transmitter PT1 for monitoring the water inlet pressure of the chiller test.
[0007] The outlet pipeline section is provided with a water flow transmitter FIT2 for monitoring the water flow of the chiller, a temperature transmitter TT2 for monitoring the test water outlet temperature of the chiller, and a pressure transmitter PT2 for monitoring the test water outlet pressure of the chiller.
[0008] The heating pipe section is provided with a heater for adjusting the inlet water temperature of the chiller test.
[0009] The water flow transmitters FIT1, FIT2, temperature transmitters TT1, TT2, pressure transmitters PT1, PT2, and the heater are electrically connected to the corresponding connection terminals of the PLC control unit, respectively.
[0010] The charging test platform includes a refrigerant bottle placed on a base, and an electronic scale for weighing the refrigerant output from the refrigerant bottle. The outlet of the refrigerant bottle is provided with two-way pipes for connecting with the high-pressure side of the chiller, one of which is provided with an electric valve V201 and a pressure transmitter PT21, and the other is provided with a manual valve V202 and a pressure transmitter PT22.
[0011] The electronic scale, the electric valve V201, and the pressure transmitters PT21 and PT22 are electrically connected to the corresponding connection terminals of the PLC control unit respectively.
[0012] In the above technical solution, a metal hose and a valve V11 are provided at the end of the water inlet pipe section, and a metal hose and a valve V12 are provided at the end of the outlet pipe section, which are used for testing and replacing chillers of different models.
[0013] In the above technical scheme, the performance test platform also includes a detection component for thermal performance analysis of the chiller, and the detection component includes temperature transmitters TT11 and TT12 for monitoring the temperatures at the inlet and outlet of the chiller, and temperature transmitters TT13 and TT14 for monitoring the suction temperature and outlet temperature of the chiller. The temperature transmitters TT11, TT12, TT13, and TT14 are respectively electrically connected to the corresponding connection terminals of the PLC control unit.
[0014] In the above technical solution, the PLC control unit includes a touch-sensitive display screen for displaying platform parameters and adjusting equipment operating constants, a PLC controller for overall system logic control, and an instrument power supply for providing working power to each sensor and PLC controller. The touch-sensitive display screen is electrically connected to the PLC controller.
[0015] In the above technical solution, the PLC controller also has a relay for safely isolating and converting the input and output signals of the PLC.
[0016] The positive effect of the utility model is that after adopting the test platform for energy storage battery chiller of the utility model, since the utility model includes a performance test platform for controlling the heat load of chilled water and monitoring the working condition, a filling test platform for automatically filling the refrigerant before the chiller is operated, and a PLC control unit, the performance test platform and the filling test platform are respectively electrically connected to the corresponding connection terminals of the PLC control unit,
[0017] The performance test platform includes an inlet pipe section connected to the water inlet of the chiller, an outlet pipe section connected to the water outlet of the chiller, and a heating pipe section for adjusting the test water inlet temperature of the chiller. The inlet pipe section is connected to the heating pipe section and the outlet pipe section.
[0018] The pipeline of the inlet pipeline section is provided with a water flow transmitter FIT1 for monitoring the water flow of the chiller, a temperature transmitter TT1 for monitoring the water inlet temperature of the chiller test, and a pressure transmitter PT1 for monitoring the water inlet pressure of the chiller test.
[0019] The outlet pipeline section is provided with a water flow transmitter FIT2 for monitoring the water flow of the chiller, a temperature transmitter TT2 for monitoring the test water outlet temperature of the chiller, and a pressure transmitter PT2 for monitoring the test water outlet pressure of the chiller.
[0020] The heating pipe section is provided with a heater for adjusting the inlet water temperature of the chiller test.
[0021] The water flow transmitters FIT1, FIT2, temperature transmitters TT1, TT2, pressure transmitters PT1, PT2, and the heater are electrically connected to the corresponding connection terminals of the PLC control unit respectively.
[0022] The charging test platform includes a refrigerant bottle placed on a base, and an electronic scale for weighing the refrigerant output from the refrigerant bottle. The outlet of the refrigerant bottle is provided with two-way pipes for connecting with the high-pressure side of the chiller, one of which is provided with an electric valve V201 and a pressure transmitter PT21, and the other is provided with a manual valve V202 and a pressure transmitter PT22.
[0023] The electronic scale, the electric valve V201, and the pressure transmitters PT21 and PT22 are electrically connected to the corresponding connection terminals of the PLC control unit respectively;
[0024] The utility model is a test platform for energy storage battery chillers. The performance test platform can be used to meet the test data analysis of the chiller at different flow rates and different temperatures. The running state of the chiller at different water temperatures can be tested and simulated. At the same time, the filling test platform can be used to realize the heat dissipation performance analysis of the chiller under different working conditions. The utility model provides a reliable equipment guarantee for the research of energy storage battery chiller cooling, energy storage battery thermal performance testing, etc. It solves the problem that the performance of the chiller cannot be accurately tested in the prior art, so that it can simulate the running state of the chiller at different water temperatures. At the same time, it can also detect the heat dissipation performance of the chiller under different working conditions to ensure that the subsequent cooling performance of the chiller meets the design requirements. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a structural schematic diagram of a specific implementation method of the utility model. DETAILED DESCRIPTION
[0026] The present invention is further described below in conjunction with the accompanying drawings and given embodiments, but is not limited thereto.
[0027] like Figure 1 As shown, a test platform for an energy storage battery chiller includes a performance test platform 1 disposed on a bearing base and used for controlling the heat load and monitoring the working condition of the chiller, a charging test platform 2 for automatically charging the refrigerant before the chiller is operated, and a PLC control unit 3. The performance test platform 1 and the charging test platform 2 are electrically connected to corresponding connection terminals of the PLC control unit 3, respectively.
[0028] The performance test platform 1 includes an inlet pipe section 11 connected to the water inlet of the chiller, an outlet pipe section 12 connected to the water outlet of the chiller, and a heating pipe section 13 for adjusting the test water inlet temperature of the chiller. The inlet pipe section 11 is connected to the heating pipe section 13 and the outlet pipe section 12.
[0029] The inlet pipeline section 11 is provided with a water flow transmitter FIT1 for monitoring the water flow of the chiller, a temperature transmitter TT1 for monitoring the water inlet temperature of the chiller test, and a pressure transmitter PT1 for monitoring the water inlet pressure of the chiller test.
[0030] The outlet pipeline section 12 is provided with a water flow transmitter FIT2 for monitoring the water flow of the chiller, a temperature transmitter TT2 for monitoring the test water outlet temperature of the chiller, and a pressure transmitter PT2 for monitoring the test water outlet pressure of the chiller.
[0031] The heating pipe section 13 is provided with a heater 131 for adjusting the test water inlet temperature of the chiller.
[0032] The water flow transmitters FIT1, FIT2, temperature transmitters TT1, TT2, pressure transmitters PT1, PT2, and heater 131 are electrically connected to corresponding connection terminals of the PLC control unit 3, respectively.
[0033] The charging test platform 2 includes a refrigerant bottle 22 placed on a base, and an electronic scale 21 for weighing the refrigerant output from the refrigerant bottle 22. The outlet of the refrigerant bottle 22 is provided with two-way pipes for connecting with the high-pressure side of the chiller, one of which is provided with an electric valve V201 and a pressure transmitter PT21, and the other is provided with a manual valve V202 and a pressure transmitter PT22.
[0034] The electronic scale 21 , the electric valve V201 , and the pressure transmitters PT21 , PT22 are electrically connected to corresponding connection terminals of the PLC control unit 3 , respectively.
[0035] Furthermore, in order to perform performance tests on chillers of different specifications and types suitable for the utility model, a metal hose and a valve V11 are provided at the end of the water inlet pipe section 11, and a metal hose and a valve V12 are provided at the end of the outlet pipe section 12, for testing and replacing chillers of different models.
[0036] Further, such as Figure 1 As shown, in order to expand the functions of the chiller performance test platform, the performance test platform 1 also includes a detection component for thermal performance analysis of the chiller, the detection component includes temperature transmitters TT11 and TT12 for monitoring the temperatures at the inlet and outlet of the chiller, and temperature transmitters TT13 and TT14 for monitoring the suction temperature and outlet temperature of the chiller, the temperature transmitters TT11, TT12, TT13, and TT14 are electrically connected to the corresponding connection terminals of the PLC control unit 3, respectively.
[0037] like Figure 1 As shown, in order to collect different signals and process and control them, the PLC control unit 3 includes a touch screen 31 for displaying platform parameters and adjusting equipment operation constants, and has a recording function, which can record platform data and further perform data analysis. The PLC controller 32 used for overall system logic control forms intelligent decision-making and control, receives chiller performance test platform, chiller filling test platform signals, and is used for providing working power to each sensor and PLC controller. The instrument power supply 33, the touch screen 31 is electrically connected to the PLC controller 32.
[0038] Furthermore, in order to ensure the stability and accuracy of the input and output signals of the PLC controller and to prevent interference and the issuance of erroneous instructions, the PLC controller 32 also has relays for safely isolating and converting the input and output signals of the PLC.
[0039] The working process of this utility model is:
[0040] ① Performance test of chiller: The main functions of the performance test platform 1 are to control the heat load of the chiller and monitor the working condition of the chiller.
[0041] The heater 131 is connected to the PLC controller 32, and the heating power can be set on the touch screen display 31. The PLC controller 32 controls the heater 131 and automatically adjusts the heater power. The core of the heater 131 has a built-in overheating chip. When the core temperature of the heater 131 is too high, the heater circuit is automatically disconnected to ensure the safety of the platform.
[0042] The PLC control unit 3 collects electrical signals from the water flow transmitters FIT1 and FIT2 to monitor and record the inlet and outlet water flows of the chiller 4.
[0043] The PLC control unit 3 collects the signals of the temperature transmitters TT1 and TT2 to monitor and record the inlet and outlet water temperatures of the chiller 4 test.
[0044] The PLC control unit 3 collects signals from the pressure transmitters PT1 and PT2 to monitor and record the inlet and outlet water pressures of the chiller 4 during the test.
[0045] The performance experiment platform is equipped with external temperature transmitters TT11 and TT12, which are installed at the air inlet and outlet of the test chiller 4 to monitor the inlet temperature and outlet temperature of the chiller. External thermometers TT13 and TT14 are installed at the air intake and outlet of the test chiller 4 to monitor the air intake temperature and air outlet temperature of the chiller. The signals of transmitters TT11, TT12, TT13 and TT14 are connected to the PLC control unit 3 to analyze the thermal performance of the chiller.
[0046] ②Automatic charging of refrigerant before chiller operation:
[0047] The main function of the charging test platform 2 is to automatically charge the refrigerant before the chiller is put into operation.
[0048] The base of the charging test platform is equipped with an electronic scale 21, which can weigh the refrigerant and transmit the data to the PLC control unit 3. A refrigerant bottle 22 is placed on the base, and a two-way pipeline is configured at the refrigerant outlet. An electric valve V201 is set on one side, and the charging weight is set by the PLC control unit 3. According to the comparison between the charging weight target value and the actual value weighed by the electronic scale, the PID control adjusts the switch of the electric valve to automatically charge the corresponding weight of refrigerant. A manual valve V202 is set at the refrigerant outlet of the other side, and the corresponding weight of refrigerant can be manually charged.
[0049] The two-way pipeline configured at the refrigerant outlet is provided with a pressure transmitter PT21 on one side and a pressure transmitter PT22 on the other side. The transmitter PT21 and PT22 signals are connected to the PLC control unit 3. When the chiller is filled with refrigerant, the high-pressure side pressure of the chiller 4 is detected. When the pressure of PT21 and 22 is too high, the PLC controller will issue an over-pressure alarm and close the electric valve V201 to stop the refrigerant filling.
[0050] It can be seen that the utility model is used for the test platform of the energy storage battery chiller. The performance test platform can be used to meet the test data analysis of the chiller at different flow rates and different temperatures. The running state of the chiller at different water temperatures can be tested and simulated. At the same time, the filling test platform can be used to realize the heat dissipation performance analysis of the chiller under different working conditions. The utility model energy storage battery chiller test platform provides reliable equipment guarantee for the research of energy storage battery chiller cooling, energy storage battery thermal performance test, etc. It solves the problem that the performance of the chiller cannot be accurately tested in the prior art, so that it can simulate the running state of the chiller at different water temperatures. At the same time, it can also detect the heat dissipation performance of the chiller under different working conditions to ensure that the subsequent cooling performance of the chiller meets the design requirements.
[0051] Based on the above ideal embodiments of the utility model, the relevant staff can make various changes and modifications without deviating from the technical concept of the utility model through the above description. The technical scope of the utility model is not limited to the content of the specification, and its technical scope must be determined according to the scope of the claims.
Claims
1. A test platform for energy storage battery chiller, characterized by: The invention comprises a performance test platform (1) disposed on a supporting base and used for controlling the heat load and monitoring the working condition of a chiller, a charging test platform (2) used for automatically charging the refrigerant before the chiller is operated, and a PLC control unit (3), wherein the performance test platform (1) and the charging test platform (2) are respectively electrically connected to corresponding connection terminals of the PLC control unit (3). The performance test platform (1) comprises an inlet pipe section (11) connected to a water inlet of a chiller, an outlet pipe section (12) connected to a water outlet of the chiller, and a heating pipe section (13) for adjusting the test water inlet temperature of the chiller, wherein the inlet pipe section (11) is connected to the heating pipe section (13) and the outlet pipe section (12). The inlet pipeline section (11) is provided with a water flow transmitter FIT1 for monitoring the water flow of the chiller inlet, a temperature transmitter TT1 for monitoring the water temperature of the chiller test inlet, and a pressure transmitter PT1 for monitoring the water pressure of the chiller test inlet. The outlet pipeline section (12) is provided with a water flow transmitter FIT2 for monitoring the water flow rate of the chiller outlet, a temperature transmitter TT2 for monitoring the test water outlet temperature of the chiller, and a pressure transmitter PT2 for monitoring the test water outlet pressure of the chiller. The heating pipe section (13) is provided with a heater (131) for adjusting the test water inlet temperature of the chiller. The water flow transmitters FIT1, FIT2, the temperature transmitters TT1, TT2, the pressure transmitters PT1, PT2, and the heater (131) are electrically connected to corresponding connection terminals of the PLC control unit (3), respectively. The charging test platform (2) comprises a refrigerant bottle (22) placed on a base, and an electronic scale (21) for weighing the refrigerant output from the refrigerant bottle (22). The outlet of the refrigerant bottle (22) is provided with two-way pipes for connecting to the high-pressure side of the chiller, one of which is provided with an electric valve V201 and a pressure transmitter PT21, and the other is provided with a manual valve V202 and a pressure transmitter PT22. The electronic scale (21), the electric valve V201, and the pressure transmitters PT21 and PT22 are electrically connected to corresponding connection terminals of the PLC control unit (3), respectively.
2. The test platform for energy storage battery chiller according to claim 1, characterized in that: The end of the inlet pipe section (11) is provided with a metal hose and a valve V11, and the end of the outlet pipe section (12) is provided with a metal hose and a valve V12, which are used for testing and replacing chillers of different models.
3. The test platform for energy storage battery chiller according to claim 1, characterized in that: The performance test platform (1) also includes a detection component for analyzing the thermal performance of the chiller, the detection component including temperature transmitters TT11 and TT12 for monitoring the temperatures at the inlet and outlet of the chiller, and temperature transmitters TT13 and TT14 for monitoring the suction temperature and outlet temperature of the chiller, the temperature transmitters TT11, TT12, TT13, and TT14 being electrically connected to corresponding connection terminals of the PLC control unit (3), respectively.
4. The test platform for energy storage battery chiller according to claim 1, characterized in that: The PLC control unit (3) comprises a touch-sensitive display screen (31) for displaying platform parameters and adjusting equipment operation constants, a PLC controller (32) for overall system logic control, and an instrument power supply (33) for providing working power to each sensor and the PLC controller. The touch-sensitive display screen (31) is electrically connected to the PLC controller (32).
5. The test platform for energy storage battery chiller according to claim 4, characterized in that: The PLC controller (32) also has a relay for safely isolating and converting the input and output signals of the PLC.
