Preparation device for concrete bridge surface coating paint
By using a rotating electric machine to drive the mixing mechanism and discharge mechanism of multiple stirring paddles in the preparation device for coating the concrete bridge surface, the problems of insufficient mixing of paint and inconvenient discharge are solved, and the quality and production efficiency of paint are improved.
Patent Information
- Application Number
- CN202420509226.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-15
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2034-03-15
Smart Images

Figure CN222111513U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of coating preparation devices, and specifically to a coating preparation device for concrete bridge surface coating. Background Art
[0002] The protective coating and the combined effect of multiple measures realize the full life cycle of concrete components, extend the service time of concrete components, reduce the maintenance costs and labor costs of highway concrete components, and significantly reduce the costs required for the project. The protective coating and the combined effect of multiple measures significantly reduce the number of maintenance times for highway concrete components and minimize the impact of damage to concrete components on the main structure. It has extremely broad market application value, and the preparation device is generally used in the production process of coatings.
[0003] Chinese patent CN217829628U discloses a device for preparing an antioxidant nano coating, including a machine base, a reactor fixedly installed on the top of the machine base, a stirring structure rotatably connected inside the reactor, and an inner wall cleaning structure movably installed inside the reactor; the inner wall cleaning structure includes a slide groove, a slider, a scraper ring, a fixed ring and a threaded rod, and the stirring structure includes a motor, a rotating rod and a stirring rod. The utility model can clean the nano coating raw materials adhered to the inner wall of the preparation device, but during stirring and mixing, only a single stirring rod is working, resulting in insufficient mixing of the coating raw materials, resulting in poor overall quality of the produced coating, and inconvenient for discharging and collecting the coating, so it is not useful. Therefore, a device for preparing concrete bridge surface coating is proposed to solve the above-mentioned problems. Utility Model Content
[0004] In response to the shortcomings of the prior art, the present application provides a device for preparing concrete bridge surface coatings, which solves the problem that only a single stirring rod is working during stirring and mixing, resulting in insufficient mixing of the coating raw materials, poor overall quality of the produced coating, inconvenience in discharging and collecting the coating, and unutilized use.
[0005] To achieve the above-mentioned purpose, the present application provides the following technical solutions: a preparation device for coating a concrete bridge surface, comprising a preparation box and a coating tank, wherein a mixing mechanism is provided inside the preparation box;
[0006] The mixing mechanism includes a rotating motor fixedly installed on the front side of a preparation box, the output shaft of the rotating motor is fixedly connected to a first mixing roller having one end passing through and extending to the outside, the top of the first mixing roller is fixedly connected to a driving pulley, two second mixing rollers having one end passing through and extending to the outside are rotatably connected to the inside of the preparation box, the top of the second mixing roller is fixedly connected to a driven pulley, the outer surfaces of the driving pulley and the driven pulley are both provided with transmission belts, the driving pulley is driven by the transmission belt and the driven pulley, the outer surfaces of the first mixing roller and the second mixing roller are both fixedly connected to a plurality of stirring paddles, and a discharging mechanism is provided on the outside of the preparation box.
[0007] By adopting the above-mentioned technical solution, when in use, the rotating motor can drive the first mixing roller and the two second mixing rollers to rotate synchronously through the action of the driving pulley, the transmission belt and the driven pulley, and then the paint raw materials and water inside the preparation box are fully stirred and mixed through multiple stirring paddles, thereby improving the quality of the paint.
[0008] Furthermore, the discharging mechanism includes a discharging pipe fixedly installed on the left side of the preparation box, a solenoid valve is fixedly installed on the outer surface of the discharging pipe, a docking pipe is fixedly installed on the top of the paint tank, and the top of the discharging pipe and the docking pipe are fixedly connected with a magnet ring.
[0009] The beneficial effect of adopting the above further scheme is: by setting up a discharging mechanism, when the paint preparation is completed, the staff only needs to place the paint can under the discharging pipe. At this time, under the action of the magnet ring, the discharging pipe can be adsorbed and fixed to the docking pipe, so as to dock the pipes. When the docking is completed, open the solenoid valve, and part of the paint can be directly introduced into the paint tank for storage, which is convenient for the staff to take at any time.
[0010] Furthermore, an observation window for observing the amount of paint is provided on the outer surface of the paint tank, and a scale is provided on the outer surface of the observation window.
[0011] The beneficial effect of adopting the above further solution is that by providing an observation window, it is convenient for the staff to observe and confirm the amount of paint inside the paint tank, thereby avoiding overflow as much as possible.
[0012] Furthermore, a guide rail is fixedly installed on the top of the preparation box, and a sliding cover is slidably connected to the inner side of the guide rail.
[0013] The beneficial effect of adopting the above further solution is that by providing the guide rail and the sliding cover, when in use, the staff only needs to pull open the sliding cover to inject water and coating raw materials into the preparation box.
[0014] Furthermore, a handle is fixedly connected to the top of the sliding cover, and an anti-slip sleeve is sleeved on the outer surface of the handle.
[0015] The beneficial effect of adopting the above further solution is that by providing a handle, it is convenient for the staff to pull and push back the sliding cover, and at the same time, the anti-slip sleeve can also play an effect of avoiding slipping as much as possible.
[0016] Furthermore, the first mixing roller and the second mixing roller are both provided with sealing gaskets for preventing leakage, and the front side of the sealing gasket is bonded and fixed to the back side of the preparation box.
[0017] The beneficial effect of adopting the above further solution is that by providing a sealing gasket, the sealing performance of the preparation box can be improved, thereby avoiding paint leakage as much as possible.
[0018] Furthermore, a traveling frame is fixedly installed at the bottom of the preparation box, and universal wheels are fixedly connected around the bottom of the traveling frame.
[0019] The beneficial effect of adopting the above further solution is that by providing a traveling frame and universal wheels, the preparation box can be moved to a designated location for use.
[0020] Furthermore, the preparation box is a stainless steel box, and a handrail is fixedly connected to the right side of the preparation box.
[0021] The beneficial effect of adopting the above further solution is that the preparation box made of stainless steel has strong corrosion resistance and a long service life.
[0022] Compared with the prior art, the present application provides a device for preparing coatings for concrete bridge surfaces, which has the following beneficial effects:
[0023] 1. The preparation device for concrete bridge surface coating is provided with a mixing mechanism. When in use, the rotating motor can drive the first mixing roller and the two second mixing rollers to rotate synchronously through the action of the driving pulley, the transmission belt and the driven pulley, and then the coating raw materials and water in the preparation box are fully stirred and mixed through multiple stirring paddles, thereby improving the quality of the coating.
[0024] 2. The preparation device for concrete bridge surface coating paint is provided with a discharging mechanism. When the paint preparation is completed, the staff only needs to place the paint can under the discharging pipe. At this time, under the action of the magnet ring, the discharging pipe can be adsorbed and fixed to the docking pipe, so as to dock the pipes. When the docking is completed, open the solenoid valve to directly introduce part of the paint into the paint tank for storage, which is convenient for the staff to take at any time. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 This is the internal schematic diagram of this application;
[0026] Figure 2 A schematic diagram of the top view of the box structure prepared for this application;
[0027] Figure 3 A schematic diagram of the side view structure of the box prepared for this application.
[0028] In the figure: 1. preparation box; 2. rotating motor; 3. first mixing roller; 4. driving pulley; 5. second mixing roller; 6. driven pulley; 7. transmission belt; 8. stirring paddle; 9. discharge pipe; 10. solenoid valve; 11. paint tank; 12. docking pipe; 13. magnet ring; 14. observation window; 15. guide rail; 16. sliding cover; 17. handle; 18. sealing gasket; 19. walking frame; 20. universal wheel; 21. handrail. DETAILED DESCRIPTION
[0029] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0030] See also Figure 1-3 In this embodiment, a preparation device for concrete bridge surface coating includes a preparation box 1 and a coating tank 11, and a mixing mechanism is provided inside the preparation box 1;
[0031] The mixing mechanism includes a rotating motor 2 fixedly mounted on the front of the preparation box 1, the output shaft of the rotating motor 2 is fixedly connected to a first mixing roller 3 having one end passing through and extending to the outside, a driving pulley 4 is fixedly connected to the top of the first mixing roller 3, two second mixing rollers 5 having one end passing through and extending to the outside are rotatably connected to the inside of the preparation box 1, the top of the second mixing roller 5 is fixedly connected to a driven pulley 6, a transmission belt 7 is provided on the outer surfaces of the driving pulley 4 and the driven pulley 6, the driving pulley 4 is driven by the driving belt 7 and the driven pulley 6, a plurality of stirring paddles 8 are fixedly connected to the outer surfaces of the first mixing roller 3 and the second mixing roller 5, a discharging mechanism is provided on the outside of the preparation box 1, by setting the mixing mechanism, when in use, the rotating motor 2 can drive the first mixing roller 3 and the two second mixing rollers 5 to rotate synchronously through the driving pulley 4, the transmission belt 7 and the driven pulley 6, and then the coating raw materials and water in the preparation box 1 are fully stirred and mixed through the plurality of stirring paddles 8, thereby improving the coating quality.
[0032] Among them, the discharging mechanism includes a discharging pipe 9 fixedly installed on the left side of the preparation box 1, a solenoid valve 10 is fixedly installed on the outer surface of the discharging pipe 9, a docking pipe 12 is fixedly installed on the top of the paint tank 11, and the tops of the discharging pipe 9 and the docking pipe 12 are fixedly connected with a magnet ring 13. By setting the discharging mechanism, when the paint is prepared, the staff only needs to place the paint tank 11 under the discharging pipe 9. At this time, under the action of the magnet ring 13, the discharging pipe 9 can be adsorbed and fixed with the docking pipe 12, so as to dock the pipeline. When the docking is completed, open the solenoid valve 10, and part of the paint can be directly introduced into the paint tank 11 for storage, which is convenient for the staff to use at any time. It is worth mentioning that the discharging pipe 9 is a rubber tube with certain toughness and bending performance. During the docking process, the discharging pipe 9 can be slightly bent to be magnetically docked with its bottom end and the top of the paint tank 11.
[0033] At the same time, the outer surface of the paint tank 11 is provided with an observation window 14 for observing the amount of paint, and the outer surface of the observation window 14 is provided with a scale. By providing the observation window 14, it is convenient for the staff to observe and confirm the amount of paint inside the paint tank 11, so as to avoid overflowing as much as possible.
[0034] It should be noted that a guide rail 15 is fixedly installed on the top of the preparation box 1, and a sliding cover 16 is slidably connected to the inner side of the guide rail 15. By setting the guide rail 15 and the sliding cover 16, when in use, the staff only needs to pull open the sliding cover 16 to inject water and paint raw materials into the preparation box 1. A handle 17 is fixedly connected to the top of the sliding cover 16, and an anti-slip cover is sleeved on the outer surface of the handle 17. By setting the handle 17, it is convenient for the staff to pull and push back the sliding cover 16. At the same time, the anti-slip cover can also play an effect of minimizing slipping.
[0035] It should be understood that the first mixing roller 3 and the second mixing roller 5 are both provided with sealing gaskets 18 on the outside for preventing leakage, and the front side of the sealing gasket 18 is bonded and fixed to the back side of the preparation box 1. By providing the sealing gasket 18, the sealing performance of the preparation box 1 can be improved, thereby avoiding paint leakage as much as possible.
[0036] In addition, a traveling frame 19 is fixedly installed at the bottom of the preparation box 1, and universal wheels 20 are fixedly connected around the bottom of the traveling frame 19. By setting the traveling frame 19 and the universal wheels 20, the preparation box 1 can be moved to a designated location for use. The preparation box 1 is a stainless steel box body, and a handrail 21 is fixedly connected to the right side of the preparation box 1. The preparation box 1 made of stainless steel has strong corrosion resistance and a long service life.
[0037] The implementation principle of a preparation device for concrete bridge surface coating in the embodiment of the present application is as follows:
[0038] When using the preparation device for coating the surface of concrete bridges, the staff first needs to open the sliding cover 16, and then inject water and coating raw materials into the interior of the preparation box 1. After the injection is completed, push back the sliding cover 16, and then start the rotating motor 2, wherein the rotating motor 2 can drive the first mixing roller 3 and the two second mixing rollers 5 to rotate synchronously through the action of the belt transmission between the active pulley 4, the transmission belt 7 and the driven pulley 6, and then the coating raw materials and water in the preparation box 1 are fully stirred and mixed through the multiple stirring paddles 8. In addition, when the coating is prepared, the staff first needs to turn off the rotating motor 2, and then place the coating tank 11 under the discharge pipe 9. At this time, under the action of the magnet ring 13, the discharge pipe 9 can be adsorbed and fixed with the docking pipe 12, so as to dock the pipes. When the docking is completed, open the solenoid valve 10, and then directly introduce part of the coating into the coating tank 11 for storage. When the coating tank 11 is full, close the solenoid valve 10, and it can be used at any time, which is more convenient.
Claims
1. A device for preparing a coating material for a concrete bridge surface, comprising a preparation box (1) and a coating tank (11), characterized in that: The preparation box (1) is provided with a mixing mechanism inside; The mixing mechanism comprises a rotating motor (2) fixedly mounted on the front of the preparation box (1); the output shaft of the rotating motor (2) is fixedly connected to a first mixing roller (3) having one end penetrating and extending to the outside; the top of the first mixing roller (3) is fixedly connected to a driving pulley (4); two second mixing rollers (5) having one end penetrating and extending to the outside are rotatably connected inside the preparation box (1); the tops of the second mixing rollers (5) are fixedly connected to a driven pulley (6); the outer surfaces of the driving pulley (4) and the driven pulley (6) are both provided with a transmission belt (7); the driving pulley (4) is driven by the transmission belt (7) and the driven pulley (6); the outer surfaces of the first mixing roller (3) and the second mixing roller (5) are both fixedly connected to a plurality of stirring paddles (8); and a discharging mechanism is provided outside the preparation box (1).
2. The device for preparing a coating material for a concrete bridge surface according to claim 1, characterized in that: The discharge mechanism comprises a discharge pipe (9) fixedly mounted on the left side of the preparation box (1), a solenoid valve (10) fixedly mounted on the outer surface of the discharge pipe (9), a butt joint pipe (12) fixedly mounted on the top of the coating tank (11), and a magnet ring (13) fixedly connected to the top of both the discharge pipe (9) and the butt joint pipe (12).
3. The device for preparing a coating material for a concrete bridge surface according to claim 1, characterized in that: An observation window (14) for observing the amount of paint is provided on the outer surface of the paint tank (11), and a scale is provided on the outer surface of the observation window (14).
4. The device for preparing a coating material for a concrete bridge surface according to claim 1, characterized in that: A guide rail (15) is fixedly mounted on the top of the preparation box (1), and a sliding cover (16) is slidably connected to the inner side of the guide rail (15).
5. A preparation device for concrete bridge surface coating according to claim 4, characterized in that: The top of the sliding cover (16) is fixedly connected to a handle (17), and the outer surface of the handle (17) is sleeved with an anti-slip sleeve.
6. The device for preparing a coating material for a concrete bridge surface according to claim 1, characterized in that: The first mixing roller (3) and the second mixing roller (5) are both provided with sealing gaskets (18) on the outside for preventing leakage, and the front side of the sealing gasket (18) is bonded and fixed to the back side of the preparation box (1).
7. The device for preparing a coating material for a concrete bridge surface according to claim 1, characterized in that: A traveling frame (19) is fixedly mounted on the bottom of the preparation box (1), and universal wheels (20) are fixedly connected around the bottom of the traveling frame (19).
8. The device for preparing a coating material for a concrete bridge surface according to claim 1, characterized in that: The preparation box (1) is a stainless steel box body, and a handrail (21) is fixedly connected to the right side of the preparation box (1).