Assembly trolley suitable for welding procedure of pressure steel pipe of pumped storage power station

By designing a group-to-trolley device suitable for steel pipe welding, the problem of difficult steel pipe docking adjustment and precision control in the existing technology is solved, and the high accuracy and flexibility of steel pipe welding is achieved, and it is suitable for the welding needs of steel pipes of different diameters.

CN222114114UActive Publication Date: 2024-12-06中国水电四局(兰州)机械装备有限公司 +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420794754.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-17
Publication Date
2024-12-06
Estimated Expiration
2034-04-17

AI Technical Summary

Technical Problem

Existing steel pipe welders are difficult to deal with steel pipe docking of non-fixed sizes, and it is difficult to adjust the docking and control the accuracy, resulting in limited construction site equipment and difficult construction.

Method used

A set-up trolley device including a left frame, a right frame, a connecting rod, a tube joint fixed round screw, a curved touch plate, an adjustment screw, a universal wheel and a positioning structure is designed, and the threaded connection and a spring positioning system are used. , realize flexible butt and precise circle adjustment of steel pipes.

Benefits of technology

It improves the accuracy and flexibility of steel pipe welding, can be suitable for steel pipes of different diameters, simplifies the installation and adjustment of universal wheels, and enhances the practicality and stability of the device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222114114U_ABST
    Figure CN222114114U_ABST
Patent Text Reader

Abstract

The assembly trolley suitable for the welding procedure of the pressure steel pipes of the pumped storage power station comprises a left trolley frame, one side of the left trolley frame is fixedly connected with a trolley frame connecting rod, the other end of the trolley frame connecting rod is fixedly connected with a right trolley frame, the inner side of the left trolley frame is provided with a connecting sleeve, and the connecting sleeve is fixedly connected with the right trolley frame. A pipe joint circle fixing screw rod penetrates through the inner side of the connecting sleeve, an arc-shaped touch plate is fixedly installed at the bottom of the pipe joint circle fixing screw rod, and an adjusting screw rod is arranged on the inner side of the trolley right frame. Through the combined use of the left trolley frame, the right trolley frame, the trolley frame connecting rod, the pipe joint circle fixing screw rod and other structures, the steel pipe welding assembly trolley device can reduce steel pipe welding deformation, can be used for external assembly welding of steel pipes and internal circle adjusting, guarantees accurate installation of the steel pipes, and improves the welding quality of the steel pipes. The steel pipe welding and assembling trolley device can improve the roundness adjusting and assembling precision of the steel pipe.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of an assembly trolley suitable for a welding process of pressure steel pipes in a pumped storage power station, in particular to an assembly trolley suitable for a welding process of pressure steel pipes in a pumped storage power station. Background Art

[0002] Steel pipes can be seen everywhere in life, such as industrial pipes with various functions and residential drainage system pipes. With the continuous improvement of steelmaking technology, the hardness and toughness of thin-walled steel pipes are getting higher and higher. Therefore, they are often used in water conservancy projects. In the processing of steel pipes, it is often necessary to butt-weld the ends of two steel pipes to extend the effective length of the steel pipes. However, in actual use, it is often necessary to cut the ends of the steel pipes at a certain angle so that the two steel pipes can be butt-welded. Therefore, a steel pipe butt-jointing device is needed for butt-joining.

[0003] At present, steel pipe welding machines are mostly suitable for coaxial butt welding of steel pipes of fixed sizes. In addition, the butt adjustment of two steel pipes is troublesome, the precision control of steel pipe butt welding is difficult, the application scenarios are limited, and the equipment for welding, rounding and assembling pressure steel pipes at construction sites is limited, making construction difficult. Utility Model Content

[0004] In order to overcome the shortcomings of the prior art, the utility model provides an assembly trolley suitable for the welding process of pressure steel pipes in pumped storage power stations, which can solve the problems that current steel pipe welding machines are mostly suitable for coaxial butt welding of steel pipes of fixed sizes, the butt adjustment of two steel pipes is relatively troublesome, the precision control of steel pipe butt connection is relatively difficult, and the application scenarios are limited. It aims to solve the technical problems of limited equipment for welding, rounding and assembly of pressure steel pipes at construction sites and difficult construction.

[0005] To solve the above technical problems, the utility model provides the following technical solutions: a pair of trolleys suitable for the welding process of pressure steel pipes in a pumped storage power station, comprising a trolley left frame, one side of the trolley left frame is fixedly connected to a trolley frame connecting rod, and the other end of the trolley frame connecting rod is fixedly connected to a trolley right frame, a connecting sleeve is installed on the inner side of the trolley left frame, and a pipe segment rounding screw is penetrated through the inner side of the connecting sleeve, an arc-shaped touch plate is fixedly installed on the bottom of the pipe segment rounding screw, an adjusting screw is arranged on the inner side of the trolley right frame, a threaded plug rod is penetrated through the inner side of the trolley frame connecting rod, and a universal wheel is fixedly connected to the bottom of the threaded plug rod, a threaded sleeve is sleeved on the outer side of the top end of the threaded plug rod, a positioning hole is opened on the surface of the threaded plug rod, and a connecting structure is opened on the inner side of the trolley frame connecting rod.

[0006] As a preferred technical solution of the utility model, the connecting structure includes a slot, a retraction groove and a guide groove. The slot is opened in the middle of the top end of the trolley frame connecting rod, and one side of the slot is connected to the retraction groove, and a guide groove is opened on one side of the top end of the trolley frame connecting rod.

[0007] As a preferred technical solution of the utility model, a positioning rod is distributed inside the retraction groove, and a strong spring is fixedly connected to the inside of one end of the positioning rod, and a guide block is installed on the top end of the positioning rod.

[0008] As a preferred technical solution of the utility model, the trolley right frame and the trolley left frame are symmetrically distributed along the vertical center line of the trolley frame connecting rod.

[0009] As a preferred technical solution of the utility model, the connecting sleeves are equidistantly distributed along the center point of the left frame of the trolley, and the pipe segment circular fixing screw and the connecting sleeve are threadedly connected via a thread groove.

[0010] As a preferred technical solution of the utility model, the positioning rod is slidably connected to the trolley frame connecting rod through the strong spring, and the positioning rod is symmetrically distributed along the vertical center line of the trolley frame connecting rod.

[0011] Compared with the prior art, the utility model can achieve the following beneficial effects:

[0012] 1. The combined use of the left trolley frame, the right trolley frame, the trolley frame connecting rods and the pipe segment rounding screws can reduce the deformation of steel pipe welding. The steel pipe welding trolley device can be used for external trolley welding of steel pipes and internal rounding to ensure accurate installation of steel pipes. The steel pipe welding trolley device can improve the rounding and assembling accuracy of steel pipes.

[0013] 2. By using the positioning rod, the strong spring and the guide block in combination, the subsequent disassembly and installation of the universal wheel can be facilitated. At the same time, the position of the universal wheel can be adjusted to facilitate better contact with steel pipes of different diameters, thereby improving the practicality and flexibility of the entire device. The position of the universal wheel can be adjusted according to the actual diameter of the steel pipe. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 This is a schematic diagram of the structure of the assembly trolley suitable for the welding process of the pressure steel pipe of the pumped storage power station according to the utility model;

[0015] Figure 2 This is a side structural schematic diagram of the left frame of the assembly trolley applicable to the welding process of the pressure steel pipe of the pumped storage power station according to the utility model;

[0016] Figure 3 This is a schematic diagram of the structure of the connecting rod of the trolley frame of the utility model, which is suitable for the welding process of the pressure steel pipe of the pumped storage power station;

[0017] Figure 4 This is a schematic diagram of the cross-sectional structure of the trolley frame connecting rod of the utility model, which is suitable for the welding process of the pressure steel pipe of the pumped storage power station;

[0018] Figure 5 It is a side view structural diagram of the threaded rod of the assembly trolley applicable to the welding process of the pressure steel pipe of the pumped storage power station according to the utility model;

[0019] Among them: 1. Trolley left frame; 2. Trolley frame connecting rod; 3. Trolley right frame; 4. Connecting sleeve; 5. Pipe segment circle fixing screw; 6. Arc touch plate; 7. Adjusting screw; 8. Threaded plug rod; 9. Universal wheel; 10. Threaded sleeve; 11. Positioning hole; 12. Slot; 13. Retraction groove; 14. Guide groove; 15. Positioning rod; 16. Powerful spring; 17. Guide block. DETAILED DESCRIPTION

[0020] In order to make the technical means, creative features, objectives and effects of the present invention easy to understand, the present invention is further described below in conjunction with specific embodiments, but the following embodiments are only preferred embodiments of the present invention, not all. Based on the embodiments in the implementation mode, other embodiments obtained by those skilled in the art without creative work are all within the protection scope of the present invention.

[0021] Example

[0022] Please refer to Figure 1 As shown, the utility model provides a pair of trolleys suitable for the welding process of pressure steel pipes in pumped storage power stations, including a trolley left frame 1, one side of the trolley left frame 1 is fixedly connected to a trolley frame connecting rod 2, and the other end of the trolley frame connecting rod 2 is fixedly connected to a trolley right frame 3, a connecting sleeve 4 is installed on the inner side of the trolley left frame 1, and a pipe segment rounding screw 5 is penetrated through the inner side of the connecting sleeve 4, and an arc-shaped touch plate 6 is fixedly installed on the bottom of the pipe segment rounding screw 5, an adjusting screw 7 is arranged on the inner side of the trolley right frame 3, a threaded plug rod 8 is penetrated through the inner side of the trolley frame connecting rod 2, and a universal wheel 9 is fixedly connected to the bottom of the threaded plug rod 8, a threaded sleeve 10 is sleeved on the outer side of the top end of the threaded plug rod 8, a positioning hole 11 is opened on the surface of the threaded plug rod 8, and a connecting structure is opened on the inner side of the trolley frame connecting rod 2;

[0023] When in use, firstly, the trolley frames on both sides are respectively mounted on the two ends of the steel pipe, and then they can be adjusted. After the entire trolley is connected to the steel pipe, subsequent welding processing can be conveniently performed.

[0024] As a further implementation of this embodiment, Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 5 As shown, one side of the trolley left frame 1 is fixedly connected to the trolley frame connecting rod 2, and the other end of the trolley frame connecting rod 2 is fixedly connected to the trolley right frame 3. The trolley left frame 1 is a fixed bracket for the initial installation of the steel pipe section, which plays the role of connecting, positioning and fixing the next steel pipe section. After the pressure steel pipe is butt-jointed, the trolley right frame 3 is mainly used for support, adjusting the circle of the installed pipe section, butting the welding seam, and positioning welding to prevent the steel pipe from being misplaced during the welding process, thereby improving the welding speed and quality. The trolley right frame 3 and the trolley left frame 1 is symmetrically distributed along the vertical center line of the trolley frame connecting rod 2, a connecting sleeve 4 is installed on the inner side of the trolley left frame 1, and a pipe segment fixing screw 5 is penetrated on the inner side of the connecting sleeve 4, the connecting sleeve 4 is equidistantly distributed along the center point of the trolley left frame 1, and the pipe segment fixing screw 5 and the connecting sleeve 4 are threadedly connected through a thread groove, and an arc touch plate 6 is fixedly installed on the bottom of the pipe segment fixing screw 5, an adjusting screw 7 is arranged on the inner side of the trolley right frame 3, and a screw is penetrated on the inner side of the trolley frame connecting rod 2 A threaded rod 8 is provided, and a universal wheel 9 is fixedly connected to the bottom of the threaded rod 8. A threaded sleeve 10 is sleeved on the outer side of the top of the threaded rod 8. A positioning hole 11 is provided on the surface of the threaded rod 8. A slot 12 is provided in the middle of the top of the trolley frame connecting rod 2, and one side of the slot 12 is connected with a retraction groove 13. A guide groove 14 is provided on one side of the top of the trolley frame connecting rod 2. The slot 12, the retraction groove 13 and the guide groove 14 form a connecting structure, and the connecting structure is arranged on the inner side of the trolley frame connecting rod 2. A positioning rod 15 is distributed on the inner side of the retraction groove 13, and a strong spring 16 is fixedly connected to the inner side of one end of the positioning rod 15. The positioning rod 15 is slidably connected to the trolley frame connecting rod 2 through the strong spring 16, and the positioning rod 15 is symmetrically distributed along the vertical center line of the trolley frame connecting rod 2. A guide block 17 is installed on the top of the positioning rod 15. The setting of the guide block 17 is used to assist the positioning rod 15 in lateral movement to improve its stability during lateral movement.

[0025] The trolley frame connecting rod 2 is mainly used for connecting and fixing the trolley left frame 1 and the trolley right frame 3, ensuring the stability of the trolley device during rounding and assembly welding. In addition, a Φ22 through hole is provided on the trolley frame connecting rod 2, and an M20 stud seat is welded to facilitate the installation of the universal wheel 9, so as to realize the left and right, front and back movement of the trolley, reduce the disassembly movement, and improve the installation efficiency;

[0026] A rubber pad is provided under the arc touch plate 6, and the pipe segment rounding screw 5 and the adjusting screw 7 are coated with a rubber layer. The adjusting screw 7 is mainly used to fix the roundness of the steel pipe after it is installed and adjusted in place, for misalignment, roundness and offset.

[0027] When welding the hydraulic and hydroelectric pressure steel pipes on site, the left frame 1 of the trolley is sleeved on the outside of one end of the first steel pipe, and then a wrench is used to twist the pipe segment fixing screw 5. Since the pipe segment fixing screw 5 and the connecting sleeve 4 are threadedly connected through the thread groove, the pipe segment fixing screw 5 can move longitudinally when it rotates, and then the pipe segment fixing screw 5 drives the arc touch plate 6 to move accordingly, and then the plurality of arc touch plates 6 distributed equidistantly can be combined to press and limit one end of the first steel pipe, and then the second steel pipe to be welded is inserted into the inside of the right frame 3 of the trolley, and the adjusting screw 7 is rotated to drive the arc touch plate 6 fixedly connected at its bottom to contact one end of the second steel pipe, so as to realize the positioning of the second steel pipe, and then the ends of the second steel pipe and the first steel pipe are butt-jointed, and the adjusting screw 7 arranged on the inner side of the right frame 3 of the trolley adjusts the second steel pipe, so that the second steel pipe and the first steel pipe remain concentric, thereby welding the second steel pipe and the first steel pipe. After the welding is completed, the inner side of the left frame 1 of the trolley is released The tube segment circle fixing screw 5 locks the first steel pipe, and then releases the inner adjusting screw 7 of the trolley right frame 3 to lock the second steel pipe, pulls the trolley right frame 3 to move, and the trolley right frame 3 drives the trolley frame connecting rod 2 to move horizontally, and the rear trolley frame connecting rod 2 drives the trolley left frame 1 to move on the second steel pipe and the first steel pipe, so as to move the trolley left frame 1 to the end of the second steel pipe, so as to dock the next section of the steel pipe, and when it is necessary to realize the positioning of the universal wheel 9, first fix the top of the universal wheel 9 The connected threaded rod 8 is input into the inner side of the slot 12, and then the lateral force applied to the guide block 17 is released. Then the reverse force generated by the deformation of the strong spring 16 can push the positioning rod 15 in the reverse direction, so that one end of the positioning rod 15 moves from the inner side of the retraction groove 13 to the inner side of the positioning hole 11, thereby realizing the positioning of the threaded rod 8, and then the threaded sleeve 10 is provided to further tighten the threaded rod 8, so as to ensure the stability of the universal wheel 9.

[0028] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only preferred examples of the utility model and are not used to limit the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection of the utility model is defined by the attached claims and their equivalents.

Claims

1. A trolley assembly suitable for a pumped storage power station pressure steel pipe welding process, comprising a trolley left frame (1), Features: A trolley frame connecting rod (2) is fixedly connected to one side of the trolley left frame (1), and the other end of the trolley frame connecting rod (2) is fixedly connected to the trolley right frame (3); a connecting sleeve (4) is installed on the inner side of the trolley left frame (1), and a pipe segment rounding screw (5) is passed through the inner side of the connecting sleeve (4); an arc-shaped touch plate (6) is fixedly installed on the bottom of the pipe segment rounding screw (5); an adjusting screw (7) is arranged on the inner side of the trolley right frame (3); a threaded plug rod (8) is passed through the inner side of the trolley frame connecting rod (2), and a universal wheel (9) is fixedly connected to the bottom of the threaded plug rod (8); a threaded sleeve (10) is sleeved on the outer side of the top end of the threaded plug rod (8), a positioning hole (11) is provided on the surface of the threaded plug rod (8), and a connecting structure is provided on the inner side of the trolley frame connecting rod (2).

2. According to claim 1, a pairing trolley suitable for the welding process of pressure steel pipes in pumped storage power stations, Features: The connecting structure comprises a slot (12), a retraction slot (13) and a guide slot (14); the slot (12) is arranged at the middle of the top end of the trolley frame connecting rod (2); one side of the slot (12) is connected to the retraction slot (13); and one side of the top end of the trolley frame connecting rod (2) is provided with a guide slot (14).

3. According to claim 2, a trolley suitable for welding process of pressure steel pipes in pumped storage power stations, Features: A positioning rod (15) is distributed inside the retraction groove (13), and a strong spring (16) is fixedly connected to the inside of one end of the positioning rod (15), and a guide block (17) is installed at the top end of the positioning rod (15).

4. The assembly trolley suitable for the welding process of pressure steel pipes in pumped storage power stations according to claim 1, Features: The trolley right frame (3) and the trolley left frame (1) are symmetrically distributed along the vertical center line of the trolley frame connecting rod (2).

5. The assembly trolley suitable for the welding process of pressure steel pipes in pumped storage power stations according to claim 1, Features: The connecting sleeves (4) are equidistantly distributed along the center point of the trolley left frame (1), and the pipe segment circular fixing screw (5) and the connecting sleeve (4) are threadedly connected via a thread groove.

6. The assembly trolley suitable for the welding process of pressure steel pipes in pumped storage power stations according to claim 3, Features: The positioning rod (15) is slidably connected to the trolley frame connecting rod (2) via the strong spring (16), and the positioning rod (15) is symmetrically distributed along the vertical center line of the trolley frame connecting rod (2).