Structure for enhancing ductility of track beam concrete at supporting point position of jacking equipment

By adopting a reinforced structure with a combination system of supporting frame, iron parts and walker on the track beam, the problem of cracks in the old city renovation is solved, the stiffness and service life of the track beam are improved, and the safety of the building is ensured.

CN222121045UActive Publication Date: 2024-12-06SHANGHAI MINSI CONSTR ENG TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420779639.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-15
Publication Date
2024-12-06
Estimated Expiration
2034-04-15

AI Technical Summary

Technical Problem

During the renovation of the old city, the concrete beams are prone to cracks after the track is laid, resulting in safety hazards of the translation building. A concrete ductile structure of the track beams at the fulcrum of the hoisting equipment is needed to reduce cracks and improve safety.

Method used

The supporting frame, iron parts and walker combination system is adopted, and the reinforcement structure of the chord, oblique rod and vertical rod is reinforced to form a solid whole connection with the track beam. The supporting frame is strengthened by using equal angle steel materials to ensure that the support frame is not subject to repeated stress cycles. Cracks appeared.

Benefits of technology

It effectively extends the service life of track beams, improves the stiffness of track beams, reduces the safety risks caused by stress-strain, and ensures the safety of the translated building.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222121045U_ABST
    Figure CN222121045U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of track beam reinforcement, in particular to a structure for enhancing the ductility of track beam concrete at the fulcrum position of jacking equipment, which comprises a support frame provided with a first iron piece and a second iron piece. The first iron piece and the second iron piece can be installed on the supporting frame and form a stable whole with the upper track beam through the supporting frame. The first walking device is fixedly arranged on the first iron piece, the first walking device and the supporting frame can be installed through the first iron piece, the first walking device and the track beam form a whole, and stable reciprocating walking is achieved; and the second walking device is fixedly arranged on the second iron piece, the second walking device can be installed through the second iron piece, the second walking device and the track beam form a whole and conduct reciprocating jacking and falling, and the second walking device and the first walking device are combined to form a set of system to push the building to walk forwards in a reciprocating mode. According to the structure for enhancing the ductility of the track beam concrete at the supporting point position of the jacking equipment, cracks do not occur after walking equipment is subjected to repeated stress circulation (3000 times), the service life of the concrete beam is effectively prolonged, and practicability is high.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of track beam reinforcement, in particular to a track beam concrete ductility structure at a fulcrum position of a reinforced jacking device. Background Art

[0002] Old city renovation refers to the partial or overall and step-by-step renovation and renewal of the entire material living environment of the old city in order to fundamentally improve its labor, living services and rest conditions. It not only reflects the development process of the city, the urban space planning organization, and the improvement process of buildings and social welfare facilities; it also represents the material achievements and reflects the current state of buildings and welfare facilities. Old city renovation is an uninterrupted process, which depends on the direction and speed of urban development. With the development of the urban economy, in order to meet the needs of the approved current round of detailed urban planning, the expansion and rerouting of old urban infrastructure that does not conform to the planned development, the demolition and reconstruction of industrial and mining, enterprises, commerce, housing, cultural relics and historical buildings, and the expansion and construction of green spaces and public cultural, educational and entertainment venues are implemented. Old city renovation is an important part of the new round of detailed urban development planning, and it is also an important way to intensively use urban land and continuously improve the efficiency of land use. It is also a necessary measure to make the urban structure layout more reasonable and improve the different functions of the city.

[0003] During the reconstruction of old cities, cultural relics buildings, historical buildings or buildings with major historical changes are required to be demolished or demolished and their value cannot be restored. They need to be moved to another device and concrete beams are used for track laying. However, the concrete beams of existing tracks are prone to cracks after laying, which poses a serious safety hazard to the translated buildings. In order to reduce the cracks in the tracks and ensure the safety of the translated buildings, a concrete ductile structure of the track beam at the fulcrum position of the jacking equipment is required. Utility Model Content

[0004] The utility model provides a track beam concrete ductility structure for reinforcing the fulcrum position of jacking equipment, which aims to solve the problem that cracks are easy to appear in the concrete beam after the driving track is laid.

[0005] The embodiment of the utility model is implemented as follows: a concrete ductility structure of an upper track beam at a fulcrum position of an enhanced lifting device comprises: a support frame, on which a first iron piece and a second iron piece are arranged, the first iron piece and the second iron piece can be installed on the support frame and form a stable whole with the upper track beam through the support frame; a first walker, which is fixedly arranged on the first iron piece, the first walker can be installed with the support frame through the first iron piece and form a whole with the track beam and can stably reciprocate; a second walker, which is fixedly arranged on the second iron piece, the second walker can be installed through the second iron piece and form a whole with the track beam and can lift and lower reciprocally, and the second walker and the first walker are combined into a system to push the building forward back and forth.

[0006] Preferably, the support frame includes: a chord rod, which is arranged in the same direction as the walking direction of the first walker and the second walker, and there are multiple chord rods, and diagonal rods are fixedly arranged on the multiple chord rods, and there are multiple diagonal rods; a vertical rod, which is fixedly connected to adjacent chord rods, and there are multiple vertical rods for further reinforcing the chord rods.

[0007] Preferably, the chord rod is an L80*80*6 equilateral angle steel, the diagonal rod is an L50*50*6 equilateral angle steel, and the vertical rod is an L50*50*6 equilateral angle steel.

[0008] The utility model provides an enhanced concrete ductile structure of the track beam at the fulcrum position of the jacking equipment, which can prevent cracks from occurring after repeated stress cycles (3000 times) of the walking equipment, effectively extending the service life of the track beam on the translational building, greatly improving the rigidity of the track beam, and controlling the state of safety risk of the translational object caused by the repeated stress-strain cycles of the track beam and the excessive deformation of the concrete beam, and has strong practicality. BRIEF DESCRIPTION OF THE DRAWINGS

[0009] Figure 1 Schematic diagram of the concrete structure of the track beam at the fulcrum position of the jacking equipment to enhance ductility.

[0010] In the accompanying drawings: 1-support frame, 2-first iron piece, 3-second iron piece, 4-first walker, 5-second walker, 11-chord rod, 12-diagonal rod, 13-vertical rod. DETAILED DESCRIPTION

[0011] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model, and do not limit the utility model.

[0012] The specific implementation of the present utility model is described in detail below in conjunction with specific embodiments.

[0013] See also Figure 1The embodiment of the utility model provides a concrete ductility structure of the track beam at the fulcrum position of the enhanced jacking equipment, and the concrete ductility structure of the track beam at the fulcrum position of the enhanced jacking equipment includes: a support frame 1, and the support frame 1 is provided with a first iron piece 2 and a second iron piece 3, and the first iron piece 2 and the second iron piece 3 can be installed on the support frame 1 and form a stable whole with the upper track beam through the support frame 1; a first walker 4, which is fixedly arranged on the first iron piece 2, and the first walker 4 can be installed with the support frame 1 through the first iron piece 2 and form a whole with the track beam and walk stably back and forth; a second walker 5, which is fixedly arranged on the second iron piece 3, and the second walker 5 can be installed through the second iron piece 3 and form a whole with the track beam and lift and lower reciprocately, and the second walker 5 and the first walker 4 are combined into a system to push the building forward back and forth.

[0014] like Figure 1 As shown, as a preferred embodiment of the utility model, the support frame 1 includes: a chord 11, which is arranged in the same direction as the walking direction of the first walker 4 and the second walker 5, and a plurality of chords 11 are provided, and a plurality of diagonal bars 12 are fixedly provided on the plurality of chords 11, and a plurality of diagonal bars 12 are provided; a vertical bar 13, which is fixedly connected to the adjacent chord bars 11, and a plurality of vertical bars 13 are provided for further reinforcing the chord bars 11.

[0015] like Figure 1 As shown, as a preferred embodiment of the utility model, the chord rod 11 is an L80*80*6 equilateral angle steel, the diagonal rod 12 is an L50*50*6 equilateral angle steel, and the vertical rod 13 is an L50*50*6 equilateral angle steel.

[0016] Through the connection between the chord 11 and the diagonal rod 12 and the connection between the chord 11 and the vertical rod 13, under the action of repeated walking (i.e. repeated stress cycles) of the first walker 4 and the first iron piece 2 and the second walker 5 and the second iron piece 3 for three thousand times, no cracks appeared in the concrete beam. Without setting the position of the chord 11, the diagonal rod 12 and the vertical rod 13, micro cracks began to appear after the first walker 4 and the first iron piece 2 and the second walker 5 and the second iron piece 3 had walked for about five hundred times in a cycle. As the number of cycles increased, the number of cracks increased, and the width of the cracks would further expand near the equipment position.

[0017] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A concrete ductility structure for enhancing the track beam at the fulcrum position of a jacking device, comprising a support frame, It is characterized in that The support frame is provided with a first iron piece and a second iron piece, and the first iron piece and the second iron piece can be installed on the support frame and form a stable whole with the upper track beam through the support frame; A first walker, which is fixedly arranged on the first iron piece, can be installed with the support frame through the first iron piece and form an integral body with the track beam and can stably reciprocate; The second walker is fixedly arranged on the second iron piece. The second walker can be installed through the second iron piece and form a whole with the track beam and can be lifted and lowered reciprocatingly. The second walker and the first walker are combined into a system to push the building forward back and forth.

2. The reinforced concrete ductile structure of the track beam at the fulcrum position of the jacking equipment according to claim 1, It is characterized in that The support frame comprises: A chord rod is arranged in the same direction as the walking direction of the first walking device and the second walking device, and a plurality of chord rods are arranged, and a plurality of diagonal rods are fixedly arranged on the plurality of chord rods, and a plurality of diagonal rods are arranged; A vertical rod is fixedly connected to an adjacent chord rod, and a plurality of vertical rods are provided to further reinforce the chord rod.

3. The concrete ductility structure of the track beam at the fulcrum position of the enhanced jacking equipment according to claim 2, It is characterized in that The chord rod is an L80*80*6 equilateral angle steel, the diagonal rod is an L50*50*6 equilateral angle steel, and the vertical rod is an L50*50*6 equilateral angle steel.