Prefabricated civil engineering pool
Through the design of prefabricated and assembled civil engineering pools, the construction process of civil engineering pools is simplified by using spliced cement materials prefabricated parts and fasteners, and the construction process of civil engineering pools is solved, the construction complex and time-consuming problems in the existing technology is solved, and the construction efficiency is improved and the convenience of multiple use.
Patent Information
- Application Number
- CN202420757373.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-12
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2034-04-12
AI Technical Summary
The construction process of the existing civil engineering pond is complex and time-consuming, requiring more manpower and material resources, and the construction cycle is long.
The design of prefabricated assembly civil engineering pool is adopted, including the bottom frame structure and the side plate structure. The sub-side base plate and sub-side plate structure of different sizes are connected through fasteners to form spliced cement material prefabricated parts to simplify the construction process.
It realizes simple operation, convenient construction, short construction period, simple disassembly and assembly, convenient storage and transportation, and supports multiple uses.
Smart Images

Figure CN222121089U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of civil engineering manufacturing, in particular to a prefabricated civil engineering pool. Background Art
[0002] Civil engineering pools mainly refer to swimming pools (water pools) built by civil engineering means. It usually involves the use of materials such as concrete, has a relatively complex structure, and a long construction period, usually taking more than two months. The construction of a civil engineering pool involves multiple links, including excavation, foundation treatment, concrete pouring, etc., so it requires more manpower and material resources.
[0003] The most commonly used method is to build a pond on site, which is often time-consuming and complicated. Utility Model Content
[0004] In order to overcome the above-mentioned defects of the prior art, the purpose of the utility model is to provide a prefabricated civil construction pool.
[0005] In order to achieve the purpose of this utility model, the technical solution adopted is:
[0006] A prefabricated civil construction pool, comprising:
[0007] A bottom frame structure, wherein a plurality of side bottom plate structures for fixing the side plates are arranged around the bottom frame structure;
[0008] The side bottom plate structure includes a plurality of sub-side bottom plate structures;
[0009] The sub-side bottom plate structure includes a first mounting plate in the vertical direction and a second mounting plate in the horizontal direction;
[0010] The sizes of the second mounting plates between the plurality of sub-side bottom plate structures are different;
[0011] The first mounting plate is evenly distributed with a plurality of first mounting hole structures;
[0012] A plurality of second mounting hole structures are evenly distributed on the second mounting plate;
[0013] The side panel includes a plurality of sub-side panel structures;
[0014] The two sides of the sub-side plate structure are symmetrically provided with third mounting hole structures;
[0015] A fourth mounting hole structure is provided at the bottom edge of the sub-side plate structure;
[0016] The bottom edge sizes of the plurality of sub-side plate structures are different;
[0017] The third mounting hole structure or the fourth mounting hole structure of the sub-side plate structure is correspondingly mounted at the first mounting hole structure or the second mounting hole structure of the sub-side bottom plate structure by fasteners according to size requirements.
[0018] In a preferred embodiment of the present invention, the first spacing distance between the first mounting hole structures and the second spacing distance between the second mounting hole structures are equidistant or unequal.
[0019] In a preferred embodiment of the present invention, a first bending portion is provided at the end of the first mounting plate.
[0020] In a preferred embodiment of the present invention, the third spacing distance between the third mounting hole structures or the fourth spacing distance between the fourth mounting hole structures are equidistant or unequal.
[0021] In a preferred embodiment of the present invention, the top edge of the sub-side plate structure is symmetrically provided with a second bending portion.
[0022] In a preferred embodiment of the present invention, the bottom frame structure and the side panels are prefabricated parts made of cement, and the cement material is preferably PⅢ anti-seepage cement.
[0023] In a preferred embodiment of the present invention, the fastener is a bolt.
[0024] The beneficial effects of the utility model are:
[0025] The utility model discloses a prefabricated civil construction pool which has the characteristics of simple operation, convenient construction, short construction period, easy assembly and disassembly, convenient storage and transportation, and multiple uses. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 The structure of the utility model is shown in FIG. Figure 1 .
[0027] Figure 2 The structure of the utility model is shown in FIG. Figure 2 . DETAILED DESCRIPTION
[0028] In order to make the purpose, technical solution and advantages of the utility model clearer, the utility model is further described in detail below through the accompanying drawings and embodiments. However, it should be understood that the specific embodiments described herein are only used to explain the utility model and are not used to limit the scope of the utility model. In addition, in the following structure, the description of the well-known structure and technology is omitted to avoid unnecessary confusion of the concept of the utility model.
[0029] In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "top / bottom" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description. They do not indicate or imply that the device or component referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.
[0030] like Figure 1 Or a prefabricated and assembled civil engineering pool as described in 2 includes a bottom frame structure, and a plurality of side bottom plate structures 100 for fixing side plates 200 are arranged around the bottom frame structure. The bottom frame structure can be a bottom cement board.
[0031] The side bottom plate structure 100 includes several sub-side bottom plate structures 110, and the sub-side bottom plate structure 110 includes a first mounting plate 111 in the vertical direction and a second mounting plate 112 in the horizontal direction. The second mounting plates 112 between the several sub-side bottom plate structures 110 have different sizes and can be used according to actual needs.
[0032] A plurality of first mounting hole structures 111a are evenly distributed on the first mounting plate 111, and a plurality of second mounting hole structures 112a are evenly distributed on the second mounting plate 112. A first bending portion 113 is disposed at the end of the first mounting plate 111, and support can be provided by the first bending portion 113.
[0033] The first spacing distance between the first mounting hole structures 111a and the second spacing distance between the second mounting hole structures 112a may be equidistant or unequal, and may be adjusted according to actual needs.
[0034] The mounting hole structure is Figure 1 It is represented by a circle with the hole as the axis and a vertical line.
[0035] The side panel 200 includes a plurality of sub-side panel structures 210, both sides of which are symmetrically provided with third mounting hole structures 211, and the bottom side of the sub-side panel structure 210 is provided with a fourth mounting hole structure 212, and the bottom side sizes of the plurality of sub-side panel structures 210 are different.
[0036] The third mounting hole structure 211 or the fourth mounting hole structure 212 of the sub-side plate structure 210 is mounted on the first mounting hole structure 111a or the second mounting hole structure 112a of the sub-side bottom plate structure 110 according to the size requirements by means of fasteners (not shown in the figure). The fasteners are bolts.
[0037] The third spacing distances between the third mounting hole structures 211 or the fourth spacing distances between the fourth mounting hole structures 212 are equidistant or unequal.
[0038] The mounting hole structure is Figure 2 It is represented by a circle with the hole as the axis and a vertical line.
[0039] The top edge of the sub-side plate structure 210 is symmetrically provided with a second bending portion 213, and the bottom frame structure and the side plate are prefabricated parts made of cement material, and the cement material is preferably PⅢ anti-seepage cement.
[0040] Because of the above structure, the working principle of the utility model is:
[0041] By splicing different units of the present invention, a 4.5mX5mX6m square pool can be formed. The minimum length of the pool is 0.5m, the maximum length is 12m, and the depth is 4.5m.
[0042] The prefabricated standard parts are made of anti-seepage cement. When splicing, the joints and bolt holes of the prefabricated parts are made of quick-drying anti-seepage cement and anti-corrosion paint, which can meet the general engineering commissioning. The cement strength meets the pressure of 8Kpa, and the pad foundation is made according to the size of the pool before splicing.
[0043] The utility model has the characteristics of simple operation, convenient construction, short construction period, easy assembly and disassembly, convenient storage and transportation, and multiple uses.
Claims
1. A prefabricated civil construction pool, characterized in that: include: A bottom frame structure, wherein a plurality of side bottom plate structures for fixing the side plates are arranged around the bottom frame structure; The side bottom plate structure includes a plurality of sub-side bottom plate structures; The sub-side bottom plate structure includes a first mounting plate in the vertical direction and a second mounting plate in the horizontal direction; The sizes of the second mounting plates between the plurality of sub-side bottom plate structures are different; The first mounting plate is evenly distributed with a plurality of first mounting hole structures; A plurality of second mounting hole structures are evenly distributed on the second mounting plate; The side panel includes a plurality of sub-side panel structures; The two sides of the sub-side plate structure are symmetrically provided with third mounting hole structures; A fourth mounting hole structure is provided at the bottom edge of the sub-side plate structure; The bottom edge sizes of the plurality of sub-side plate structures are different; The third mounting hole structure or the fourth mounting hole structure of the sub-side plate structure is correspondingly mounted at the first mounting hole structure or the second mounting hole structure of the sub-side bottom plate structure by fasteners according to size requirements.
2. A prefabricated civil construction pool as claimed in claim 1, characterized in that: The first spacing distance between the first mounting hole structures and the second spacing distance between the second mounting hole structures are equidistant or unequal.
3. A prefabricated civil construction pool as claimed in claim 1, characterized in that: A first bending portion is disposed at the end of the first mounting plate.
4. A prefabricated civil construction pool as claimed in claim 1, characterized in that: The third spacing distances between the third mounting hole structures or the fourth spacing distances between the fourth mounting hole structures are equidistant or unequal.
5. A prefabricated civil construction pool as claimed in claim 1, characterized in that: The top edge of the sub-side plate structure is symmetrically provided with a second bending portion.
6. A prefabricated civil construction pool as claimed in claim 1, characterized in that: The fastener is a bolt.