Wellbore concrete pipeline conveying loose joint pipe
By designing a stable and flexible conical cylinder, hook and hanging chain structure, the problem of poor stability of the existing live hook hook structure is solved, and stable and convenient operation is achieved during the underground pouring process, which improves the reliability of concrete pouring Sex and efficiency.
Patent Information
- Application Number
- CN202420447969.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-08
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2034-03-08
AI Technical Summary
The hook-hook structure of existing wellbore concrete pipeline conveying live pipes has poor stability and is easy to fall off during the underground pouring process, affecting the stability and operation convenience of the concrete pouring channel.
A live pipe structure including a conical cylinder, hook and hanging chain is designed. The hook is made of steel bars and welded and fixed. The hanging chain is composed of multiple hanging rings. The hook and hanging chain are distributed at 90 degrees in a circumference and are used. Damping mounting and tensile dampers for enhanced stability and flexibility.
It improves the stability and operation convenience of the live pipe, ensures that the hooking is not easy to fall off during the underground pouring process, and can flexibly grasp the concrete pouring distance and location, improving construction efficiency and safety.
Smart Images

Figure CN222122476U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of mine shaft construction, in particular to a shaft concrete pipeline conveying flexible pipe. Background Art
[0002] During the construction of the shaft, in the same section, the digging and masonry operations are usually carried out alternately in the order of digging and masonry, so that the rock wall can be supported in time after digging to prevent the weathering of the exposed shaft wall and ensure the safety of the operation. Due to the limited space in the shaft, the concrete mixing station is generally arranged at the wellhead. There are two ways to transport concrete in the shaft: ash pipe transportation and bucket transportation. The advantages of the concrete delivery pipe are: concrete can be poured continuously; the construction speed is fast and the efficiency is high; the process is simple, the operation is easy, safe and reliable; the labor intensity of the personnel is reduced; the disadvantages are: the pipe is easy to wear; improper operation will cause concrete segregation, so the flexible pipe plays a decisive role in the quality of pouring.
[0003] The existing structure of the flexible pipe is generally used for multiple connections, which can be long or short. For example, the patent publication number CN208122852 U discloses a partition construction device in a tunnel ventilation shaft, which is composed of a hanging plate and a ash chuting system. The ash chuting pipe of the ash chuting system is a multi-section flexible pipe. The main body of the flexible pipe is a pipe body, which is a cone pipe. The lower end of the upper flexible pipe is inserted into the lower flexible pipe. A rotating collar is provided on the outer wall of the lower end of the cone pipe, and a hook is provided through the rotating collar. A hanging ring is provided on the outer wall of the upper end of the cone pipe. The upper flexible pipe and the next flexible pipe are hung by the hook and the hanging ring. It adopts a hooking structure of a hook and a rotating collar, and has the following defects during use:
[0004] First, the hook is hooked from top to bottom from the outside to the upper rotating sleeve of the lower joint pipe, and its stability is poor. Secondly, during pouring, it is necessary to follow the requirements of the underground pouring working surface. The upper and lower joint pipes often need to transition at an inclined angle, and there is mutual movement between them. At this time, the hook on the inclined side is prone to fall off, thereby affecting the overall pouring channel, causing inconvenience to the on-site personnel, and being unable to flexibly control the concrete pouring distance and position. Therefore, its structure needs to be further optimized. Utility Model Content
[0005] The purpose of the utility model is to overcome the defects and shortcomings of the prior art, provide a shaft concrete pipeline conveying flexible pipe, and solve various problems existing in the prior art.
[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0007] A shaft concrete pipeline conveying flexible pipe comprises a plurality of flexible pipe monomers which are sleeve-connected, and each flexible pipe monomer has exactly the same structure. The flexible pipe monomer comprises a conical cylinder, the upper end of which is a large end, and two symmetrical hooks are arranged on the outer wall of the large end. The lower end of the conical cylinder is provided with two symmetrical hanging chains, and a distance is left from the bottom end of the hanging chain to the small end of the conical cylinder. The distance ensures the sleeve-connection transition of the upper and lower flexible pipe monomers. When connected, the hook of the upper end of the lower flexible pipe monomer is hung on the hanging chain of the upper flexible pipe monomer, and the upper and lower adjacent hooks and hanging chains are staggered 90 degrees in a circle.
[0008] The hook is made by bending a steel bar.
[0009] The hook is fixed on the outer wall of the flexible pipe by welding.
[0010] The hook damper is installed on one side of the conical cylinder, a guide block is welded on one side of the hook, a guide seat is welded on the outer wall of the conical cylinder, a guide groove is provided in the guide seat for matching with the guide block, the upper end of the guide groove is closed, a tensile damper is installed on the lower end surface of the guide groove, the pull rod end of the tensile damper is connected to the guide block, and an end cover is installed on the bottom end surface of the guide groove.
[0011] The cross section of the guide groove is a T-shaped structure.
[0012] The lifting chain is composed of multiple lifting rings and hinges.
[0013] The lifting chain is composed of three lifting ring hinges.
[0014] The lifting ring is made of steel bars, the lifting ring at the upper end is flattened by a flattening process, fixed to the outer wall of the flexible pipe by welding, and the lower part is connected to the lower lifting ring.
[0015] The lifting ring at the upper end is a U-shaped structure, and the U-shaped end portion is provided with a boss extending to both sides, the thickness of the boss is greater than the thickness of the lifting ring, and the inner end surface of the boss is welded and fixed to the side wall of the conical cylinder.
[0016] Compared with the prior art, the beneficial effects of the utility model are:
[0017] The utility model has reasonable structural design, and its stability is relatively good through the structural design of the hook matched with the hook and the lifting chain. The upper end of the hanging is welded on the movable pipe to ensure the strength of the hook, and the lifting chain can ensure the movable range of the suspension. When the requirements of the underground pouring working surface require that the upper and lower movable pipes often need to transition at an inclined angle, the lifting rings of the lifting chain have good flexibility, which can ensure the relative stability of the hook, and it is not easy to fall off, and it can move freely within the spatial angle, so as to flexibly control the concrete pouring distance and position, which brings convenience to the on-site pouring personnel. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a structural schematic diagram of the utility model.
[0019] Figure 2 A schematic diagram of the structure of the hook.
[0020] Figure 3 It is a schematic diagram of the structure of the upper lifting ring of the lifting chain.
[0021] Figure 4 This is a structural diagram of the hook damping installation.
[0022] Figure 5 for Figure 4 A cross-sectional view of the structure of the hook in the figure, which cooperates with the guide seat and guide block.
[0023] Figure 6 for Figure 4 Schematic diagram of the structure of the middle guide seat and guide block.
[0024] Reference numerals:
[0025] 1. Conical cylinder; 2. Hook; 3. Lifting chain; 4. Guide block; 5. Guide seat; 6. Guide groove; 7. Tensile damper; 8. End cover; 9. Lifting ring; 10. Boss. DETAILED DESCRIPTION
[0026] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0027] Embodiment 1:
[0028] See attached Figure 1-3A shaft concrete pipeline conveying flexible pipe comprises a plurality of flexible pipe monomers connected by sleeve connection, and each flexible pipe monomer has exactly the same structure, the flexible pipe monomer comprises a conical cylinder 1, the upper end of the conical cylinder 1 is a large end, and two symmetrical hooks 2 are arranged on the outer wall of the large end, and two symmetrical hanging chains 3 are arranged on the lower end of the conical cylinder 1, and a distance is left from the bottom end of the hanging chain 3 to the small end of the conical cylinder 1, and the distance ensures the sleeve connection transition of the upper and lower flexible pipe monomers. When connected, the hook 2 at the upper end of the lower flexible pipe monomer is hung on the hanging chain 3 of the upper flexible pipe monomer, and the upper and lower adjacent hooks 2 and hanging chains 3 are staggered 90 degrees in a circle. The structural design of the hook with the help of the hook and the lifting chain has relatively good stability; the upper end of the hook is welded to the flexible pipe to ensure the strength of the hook, and the lifting chain can ensure the range of motion of the suspension. When the requirements of the underground pouring working surface require that the upper and lower flexible pipes often need to transition at an inclined angle, the lifting rings of the lifting chain have good flexibility, which can ensure the relative stability of the hook, and it is not easy to fall off, and it can move freely within the spatial angle, so as to flexibly control the concrete pouring distance and position, which brings convenience to the on-site pouring personnel.
[0029] In the structure, the hook 2 is made of round steel bars. The vertical section of the hook 2 is fixed to the outer wall of the flexible pipe by welding, and the length of the welding part is about 75mm. The hook part adopts a circular chamfer with a radius of R10, and the length of the hook is 40mm.
[0030] The lifting chain 3 is composed of multiple lifting rings and ring hinges. The arc chamfer radius of the end of the lifting ring is R10, and the overall length of the lifting ring is 60mm. The lifting chain 3 is composed of three lifting rings and ring hinges, and the length of the entire chain is about 160mm. The lifting ring is made of steel bars. The lifting ring 9 at the upper end is flattened by a flattening process, fixed to the outer wall of the flexible pipe by welding, and the lower part is connected to the lower lifting ring.
[0031] Embodiment 2:
[0032] See attached Figure 4-6 A shaft concrete pipeline conveying flexible pipe comprises a plurality of flexible pipe monomers connected by sleeve connection, and each flexible pipe monomer has exactly the same structure, the flexible pipe monomer comprises a conical cylinder 1, the upper end of the conical cylinder 1 is a large end, and two symmetrical hooks 2 are arranged on the outer wall of the large end, and two symmetrical hanging chains 3 are arranged at the lower end of the conical cylinder 1, and a length distance is left from the bottom end of the hanging chain 3 to the small end of the conical cylinder 1, and the length distance ensures the sleeve connection transition of the upper and lower flexible pipe monomers. When connected, the hook 2 at the upper end of the lower flexible pipe monomer is hung on the hanging chain 3 of the upper flexible pipe monomer, and the upper and lower adjacent hooks 2 and hanging chains 3 are staggered 90 degrees in a circle.
[0033] Further, the hook 2 is damped and installed on one side of the conical cylinder 1. A guide block 4 is welded on one side of the hook 2. A guide seat 5 is welded on the outer wall of the conical cylinder 1. A guide groove 6 is provided in the guide seat 5 to cooperate with the guide block 4. The upper end of the guide groove 6 is closed. A tension damper 7 is installed on the lower end face of the guide groove 6. Limit blocks are provided between the two sides of the tension damper and the guide groove. The pull rod end of the tension damper 7 is connected to the guide block 4. An end cover 8 is installed on the bottom end face of the guide groove 6. The cross section of the guide groove 6 is a T-shaped structure. Through the structure of the guide seat 5 and the guide block 4, it can be ensured that the hook 2 increases the damping tension in the vertical direction. On the one hand, it enhances the strength of the hook and ensures the stability of the hook. On the other hand, when the upper and lower flexible pipes need to transition at an inclined angle, the hook on one side is in a tensioned state, and the hook on the other side is subjected to less tension. There is relative sliding between the guide block and the guide seat, and the damper retracts to provide a reset force. At the same time, the damping force may ensure that the hook is relatively stable and not easy to fall off.
[0034] Furthermore, the lifting chain 3 is composed of a plurality of lifting ring hinges. The lifting chain 3 is composed of three lifting ring hinges. The lifting ring is made of steel bars, and the lifting ring 9 at the upper end is flattened by a flattening process. The lifting ring 9 at the upper end is a U-shaped structure, and the end portion of the U-shaped structure is provided with a boss 10 extending to both sides, the thickness of the boss 10 is greater than the thickness of the lifting ring, and the inner end surface of the boss 10 is welded and fixed to the side wall of the conical cylinder 1.
[0035] Although this specification is described according to implementation modes, not every implementation mode includes only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment can also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
[0036] Therefore, the above description is only a preferred embodiment of the present application and is not intended to limit the scope of implementation of the present application; that is, all equivalent changes made according to the scope of the claims of the present application are within the protection scope of the claims of the present application.
Claims
1. A shaft concrete pipeline conveying flexible pipe, comprising a plurality of flexible pipe units connected by sleeves, each flexible pipe unit having a completely identical structure, characterized in that: The flexible pipe unit comprises a conical cylinder (1), the upper end of the conical cylinder (1) being a large end, and two symmetrical hooks (2) are arranged on the outer wall of the large end, and the lower end of the conical cylinder (1) is provided with two symmetrical hanging chains (3), and a distance is left between the bottom end of the hanging chain (3) and the small end of the conical cylinder (1), and the distance ensures the transition of the upper and lower flexible pipe units. When connected, the hook (2) at the upper end of the lower flexible pipe unit is hung on the hanging chain (3) of the upper flexible pipe unit, and the upper and lower adjacent hooks (2) and hanging chains (3) are staggered 90 degrees in a circle.
2. The shaft concrete pipeline conveying flexible pipe according to claim 1 is characterized in that: The hook (2) is made by bending a steel bar.
3. The shaft concrete pipeline conveying flexible pipe according to claim 2 is characterized in that: The hook (2) is fixed to the outer wall of the flexible pipe by welding.
4. The shaft concrete pipeline conveying flexible pipe according to claim 1 is characterized in that: The hook (2) is dampedly mounted on one side of the conical cylinder (1); a guide block (4) is welded to one side of the hook (2); a guide seat (5) is welded to the outer wall of the conical cylinder (1); a guide groove (6) is provided in the guide seat (5) for guiding and cooperating with the guide block (4); the upper end of the guide groove (6) is closed; a tension damper (7) is installed on the lower end surface of the guide groove (6); the pull rod end of the tension damper (7) is connected to the guide block (4); and an end cover (8) is installed on the bottom end surface of the guide groove (6).
5. The shaft concrete pipeline conveying flexible pipe according to claim 4 is characterized in that: The cross section of the guide groove (6) is a T-shaped structure.
6. The shaft concrete pipeline conveying flexible pipe according to claim 1, characterized in that: The lifting chain (3) is composed of multiple lifting rings and hinges.
7. The shaft concrete pipeline conveying flexible pipe according to claim 6 is characterized in that: The lifting chain (3) is composed of three lifting ring hinges.
8. The shaft concrete pipeline conveying flexible pipe according to claim 7 is characterized in that: The lifting ring is made of steel bars, the lifting ring (9) at the upper end is flattened by a flattening process, fixed to the outer wall of the flexible pipe by welding, and the lower part is connected to the lower lifting ring.
9. The shaft concrete pipeline conveying flexible pipe according to claim 8, characterized in that: The lifting ring (9) at the upper end is a U-shaped structure, and the U-shaped end portion is provided with a boss (10) extending to both sides, the thickness of the boss (10) is greater than the thickness of the lifting ring, and the inner end surface of the boss (10) is welded and fixed to the side wall of the conical cylinder (1).